CN217997970U - Ecological bank protection bearing structure of hydraulic and hydroelectric engineering - Google Patents

Ecological bank protection bearing structure of hydraulic and hydroelectric engineering Download PDF

Info

Publication number
CN217997970U
CN217997970U CN202222073065.1U CN202222073065U CN217997970U CN 217997970 U CN217997970 U CN 217997970U CN 202222073065 U CN202222073065 U CN 202222073065U CN 217997970 U CN217997970 U CN 217997970U
Authority
CN
China
Prior art keywords
bank protection
ecological bank
planting
ecological
bearing structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222073065.1U
Other languages
Chinese (zh)
Inventor
刘春霄
梁旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Zhoulai Construction Engineering Co ltd
Original Assignee
Anhui Zhoulai Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Zhoulai Construction Engineering Co ltd filed Critical Anhui Zhoulai Construction Engineering Co ltd
Priority to CN202222073065.1U priority Critical patent/CN217997970U/en
Application granted granted Critical
Publication of CN217997970U publication Critical patent/CN217997970U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Retaining Walls (AREA)

Abstract

The utility model relates to an ecological bank protection technical field specifically is an ecological bank protection bearing structure of hydraulic and hydroelectric engineering, including ecological bank protection, one side of ecological bank protection is provided with the drainage component, the drainage component includes spacing post, box is planted to one side fixedly connected with of spacing post. The utility model has the advantages that: when carrying out the use of ecological bank protection, at first need accomplish the construction of road bed, lean on the road bed to build the ecological bank protection of looks adaptation afterwards, pick up and plant the box and insert spacing downthehole portion with spacing post, after spacing post complete movement advances spacing post downthehole portion, place planting the earthwork and planting box inside, and plant various green planting on it, when meetting overcast and rainy weather, after the rainwater falls to planting on the earthwork, will flow through the hole of permeating water of protecting soil, collect the mass flow inslot portion at last, and then can discharge from the wash port, and can not take out planting the earthwork, the phenomenon that can effectually prevent soil erosion and water loss takes place.

Description

Ecological bank protection bearing structure of hydraulic and hydroelectric engineering
Technical Field
The utility model relates to an ecological bank protection technical field, especially an ecological bank protection bearing structure of hydraulic and hydroelectric engineering.
Background
The water conservancy and hydropower engineering mainly researches basic knowledge and skills in the aspects of water resources, hydraulic structures, hydraulics, fluid dynamics, water conservancy engineering technology and the like, and surveys, plans, designs, constructions, management and the like of the water conservancy and hydropower engineering. For example: the method comprises the steps of planning north-south water transfer engineering, building hydraulic buildings such as hydropower stations, dams and gates, designing river treatment engineering and the like, wherein in the construction of hydraulic and hydroelectric engineering, ecological revetments are often required to be built to support and protect a roadbed, and the construction is generally called as a hydraulic and hydroelectric engineering ecological revetments protection support structure.
Ecological bank protection bearing structure of present water conservancy hydroelectric engineering when using, often plants green planting on ecological bank protection, and bank protection bearing structure does not have better drainage structures in overcast and rainy day, will cause the soil and water of green below of planting to cause the loss, consequently needs the ecological bank protection bearing structure of a water conservancy hydroelectric engineering to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's shortcoming, provide a hydraulic and hydroelectric engineering ecological bank protection bearing structure, effectively solved prior art's not enough.
The purpose of the utility model is realized through the following technical scheme: the utility model provides an ecological bank protection bearing structure of hydraulic and hydroelectric engineering, includes ecological bank protection, one side of ecological bank protection is provided with the drainage component, the drainage component includes spacing post, one side fixedly connected with of spacing post plants the box, one side of planting the box is provided with the planting earthwork, one side of planting the box has been seted up and has been protected soil hole of permeating water, water drainage tank has been seted up to one side of ecological bank protection, one side of water drainage tank is provided with the collection groove, one side in collection groove is provided with the wash port.
It is optional, spacing hole has been seted up to one side of ecological bank protection, the quantity in spacing hole is a plurality of, a plurality of spacing hole linear array is in one side of ecological bank protection, the diameter size in spacing hole equals with the diameter size of spacing post, when carrying out the use of ecological bank protection, at first need accomplish the construction of road bed, lean on the road bed to build the ecological bank protection of looks adaptation afterwards, take up the planting box afterwards and insert spacing downthehole portion with spacing post, after spacing post complete movement advances spacing post downthehole portion, place planting earthwork inside the planting box to plant various green planting on it, and then can play hydraulic and hydroelectric engineering's protection and support.
Optionally, one side of ecological bank protection is provided with the mounting groove, the quantity of mounting groove is a plurality of, a plurality of mounting groove linear array is in one side of ecological bank protection, the shape and the size of mounting groove and the shape and the size looks adaptation of planting the box.
Optionally, the number of the planting earthwork is a plurality, and the plurality of the planting earthwork linear arrays are arranged on one side of the planting box.
Optionally, the quantity of soil conservation hole of permeating water is a plurality of, a plurality of soil conservation hole of permeating water symmetric distribution is in the one side of planting the box, and when meetting overcast and rainy weather, the rainwater will flow through soil conservation hole of permeating water after falling to planting earthwork, flows inside the water drainage tank afterwards, collects the mass flow inslot portion at last, and then can follow the wash port and discharge, can not take away planting earthwork moreover, can effectually prevent the phenomenon of soil erosion and water loss and take place.
Optionally, the number of water drainage tank is a plurality of water drainage tank linear array is in one side of ecological bank protection.
Optionally, the number of the drainage holes is several, and the drainage holes are linearly arrayed on one side of the ecological slope protection.
The utility model has the advantages of it is following:
this ecological bank protection bearing structure of hydraulic and hydroelectric engineering, through ecological bank protection, spacing post, plant the box, plant the earthwork, protect soil permeable hole, water drainage tank, cooperation setting between collection groove and the wash port, when carrying out the use of ecological bank protection, at first need accomplish the construction of road bed, lean on the road bed to build the ecological bank protection of looks adaptation afterwards, take up afterwards and insert spacing downthehole portion with spacing post, after spacing post complete movement advances spacing post downthehole portion, place planting the earthwork inside planting the box, and plant various green planting on it, when meetting overcast and rainy weather, the rainwater falls after planting on the earthwork, will flow out through protecting soil permeable hole, flow to water drainage tank inside afterwards, collect the collection inslot portion at last, and then can follow the wash port and discharge, and can not take away planting the earthwork, the phenomenon that can effectually prevent soil erosion from taking place.
Drawings
Fig. 1 is a schematic structural view of an assembly according to a first embodiment of the present invention;
fig. 2 is a schematic view of an ecological slope protection structure according to an embodiment of the present invention;
fig. 3 is a schematic view of a planting earthwork structure according to a first embodiment of the present invention;
fig. 4 is a schematic structural view of a planting box according to a first embodiment of the present invention;
fig. 5 is a schematic diagram of an assembly structure according to a second embodiment of the present invention.
In the figure: 1-ecological slope protection, 2-drainage components, 201-limiting columns, 202-planting boxes, 203-planting earthwork, 204-soil-preserving and water-permeable holes, 205-drainage grooves, 206-collecting grooves, 207-drainage holes, 208-reinforcing columns, 3-limiting holes and 4-mounting grooves.
Detailed Description
The present invention will be further described with reference to the accompanying drawings, but the scope of the invention is not limited to the following.
The first embodiment is as follows: as shown in fig. 1 to 4, an ecological bank protection bearing structure of hydraulic and hydroelectric engineering, including ecological bank protection 1, one side of ecological bank protection 1 is provided with drainage component 2, drainage component 2 includes spacing post 201, box 202 is planted to one side fixedly connected with of spacing post 201, one side of planting box 202 is provided with planting earthwork 203, it has seted up soil conservation hole 204 of permeating water to plant one side of box 202, water drainage tank 205 has been seted up to one side of ecological bank protection 1, one side of water drainage tank 205 is provided with current-collecting groove 206, one side of current-collecting groove 206 is provided with wash port 207.
As an optional technical solution of the utility model: spacing hole 3 has been seted up to one side of ecological bank protection 1, the quantity in spacing hole 3 is a plurality of, the 3 linear array in the one side of ecological bank protection 1 in the spacing hole of a plurality of, the diameter size in spacing hole 3 equals with the diameter size of spacing post 201, when carrying out ecological bank protection 1's use, at first need accomplish the construction of road bed, lean on the road bed to build the ecological bank protection 1 of looks adaptation afterwards, take up and plant box 202 afterwards and insert spacing 3 insides in hole with spacing post 201, until spacing post 201 complete movement advance spacing post hole 3 inside after, place planting earthwork 203 inside planting box 202, and plant various green planting on it.
As an optional technical solution of the utility model: one side of ecological bank protection 1 is provided with mounting groove 4, and the quantity of mounting groove 4 is a plurality of, and 4 linear array of a plurality of mounting groove are in one side of ecological bank protection 1, the shape and the size of mounting groove 4 and the shape and the size looks adaptation of planting box 202.
As an optional technical solution of the utility model: the number of the planting earthwork 203 is several, and several planting earthwork 203 are linearly arrayed on one side of the planting box 202.
As an optional technical solution of the utility model: the quantity of protecting soil hole 204 of permeating water is a plurality of, and a plurality of is protected soil hole 204 of permeating water symmetric distribution and is in the one side of planting box 202, when meetting rainy weather, after the rainwater falls to planting the earthwork, will permeate water the hole 204 through protecting soil and flow out, flow to inside water drainage tank 205 afterwards, collect the mass flow groove 206 inside at last, and then can follow wash port 207 and discharge.
As an optional technical solution of the utility model: the number of the drainage channels 205 is several, and several drainage channels 205 are linearly arrayed on one side of the ecological protection slope 1.
As an optional technical solution of the utility model: the number of the drainage holes 207 is several, and several drainage holes 207 are linearly arrayed on one side of the ecological slope protection 1.
The working process of the utility model is as follows: when the utility model is used by a user,
s1: when carrying out ecological bank protection 1's use, at first need accomplish the construction of road bed, lean on the road bed to build the ecological bank protection 1 of looks adaptation afterwards, take up afterwards and plant box 202 and insert spacing post 201 inside spacing hole 3, until spacing post 201 complete movement enter spacing post hole 3 inside after, place planting earthwork 203 inside planting box 202 to plant various green plants on it.
S2: when the rain falls on the planting earthwork, the rain water flows out through the soil-retaining and water-permeable holes 204, then flows into the drainage groove 205, finally collects into the collecting groove 206, and then can be discharged from the drainage holes 207.
The second embodiment: as shown in fig. 5, an ecological bank protection support structure of hydraulic and hydroelectric engineering, including ecological bank protection 1, one side of ecological bank protection 1 is provided with drainage component 2, drainage component 2 includes spacing post 201, box 202 is planted to one side fixedly connected with of spacing post 201, one side of planting box 202 is provided with planting earthwork 203, one side of planting box 202 has been seted up and has been protected native hole 204 of permeating water, drainage tank 205 has been seted up to one side of ecological bank protection 1, one side of drainage tank 205 is provided with current collection groove 206, one side of current collection groove 206 is provided with wash port 207, one side fixedly connected with reinforcement post 208 of drainage tank 205.
The working process of the utility model is as follows: when the utility model is used by a user,
when the ecological slope protection 1 is used, firstly, the roadbed needs to be built, then the ecological slope protection 1 matched with the roadbed is built by the roadbed, then the planting box 202 is taken up and the limiting column 201 is inserted into the limiting hole 3 until the limiting column 201 completely moves into the limiting column hole 3, the planting earthwork 203 is placed inside the planting box 202, various green plants are planted on the planting box, when rainy days occur, rainwater falls on the planting earthwork, flows out through the soil-preserving permeable hole 204 and flows into the drainage groove 205, and finally collects inside the flow collecting groove 206, and can be discharged from the drainage hole 207, and the planting earthwork 203 cannot be taken out, so that the phenomenon of water and soil loss can be effectively prevented, compared with the first embodiment, the second embodiment additionally arranges the reinforcing column 208 in the drainage groove 205, and the ecological slope protection 1 can be more stable.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides an ecological bank protection bearing structure of hydraulic and hydroelectric engineering which characterized in that: including ecological bank protection (1), one side of ecological bank protection (1) is provided with drainage component (2), drainage component (2) are including spacing post (201), box (202) are planted to one side fixedly connected with of spacing post (201), one side of planting box (202) is provided with plants earthwork (203), it permeates water hole (204) to have seted up the soil conservation in one side of planting box (202), water drainage tank (205) have been seted up to one side of ecological bank protection (1), one side of water drainage tank (205) is provided with current-collecting tank (206), one side of current-collecting tank (206) is provided with wash port (207).
2. The ecological slope protection bearing structure of water conservancy and hydropower engineering of claim 1, characterized in that: spacing hole (3) have been seted up to one side of ecological bank protection (1), the quantity in spacing hole (3) is a plurality of, a plurality of spacing hole (3) linear array is in one side of ecological bank protection (1), the diameter size of spacing hole (3) equals with the diameter size of spacing post (201).
3. The ecological slope protection bearing structure of water conservancy and hydropower engineering of claim 1, which is characterized in that: one side of ecological bank protection (1) is provided with mounting groove (4), the quantity of mounting groove (4) is a plurality of, a plurality of mounting groove (4) linear array is in one side of ecological bank protection (1), the shape and the size looks adaptation of size and planting box (202) of mounting groove (4).
4. The ecological slope protection bearing structure of water conservancy and hydropower engineering of claim 1, which is characterized in that: the number of the planting earthwork (203) is a plurality, and the planting earthwork (203) are linearly arrayed on one side of the planting box (202).
5. The ecological slope protection bearing structure of water conservancy and hydropower engineering of claim 1, which is characterized in that: the quantity of soil conservation water permeable holes (204) is a plurality of, and a plurality of soil conservation water permeable holes (204) are symmetrically distributed on one side of the planting box (202).
6. The ecological slope protection bearing structure of water conservancy and hydropower engineering of claim 1, characterized in that: the quantity of water drainage tank (205) is a plurality of, a plurality of water drainage tank (205) linear array is in one side of ecological bank protection (1).
7. The ecological slope protection bearing structure of water conservancy and hydropower engineering of claim 1, which is characterized in that: the number of the drainage holes (207) is a plurality, and the drainage holes (207) are linearly arrayed on one side of the ecological protection slope (1).
CN202222073065.1U 2022-08-08 2022-08-08 Ecological bank protection bearing structure of hydraulic and hydroelectric engineering Expired - Fee Related CN217997970U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222073065.1U CN217997970U (en) 2022-08-08 2022-08-08 Ecological bank protection bearing structure of hydraulic and hydroelectric engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222073065.1U CN217997970U (en) 2022-08-08 2022-08-08 Ecological bank protection bearing structure of hydraulic and hydroelectric engineering

Publications (1)

Publication Number Publication Date
CN217997970U true CN217997970U (en) 2022-12-09

Family

ID=84321489

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222073065.1U Expired - Fee Related CN217997970U (en) 2022-08-08 2022-08-08 Ecological bank protection bearing structure of hydraulic and hydroelectric engineering

Country Status (1)

Country Link
CN (1) CN217997970U (en)

Similar Documents

Publication Publication Date Title
CN100469980C (en) Water taking gallery of self flow type for underground reservoir
CN105696606A (en) Semi-arid area ecological slope protection structure and construction method thereof
CN214657138U (en) Ecological slope protection device for water and soil conservation
CN103321195A (en) Farmland ecologic interception ditch adopting slope protection technology and construction method of ditch
CN213296240U (en) Ecological slope protection mechanism for hydraulic engineering
CN111519685A (en) River channel dredging structure and dredging method thereof
CN102758417B (en) A kind of water and soil is separated the method for environmental protection and the water and soil isolating construction thereof of building up fields of harnessing the river
CN102139961A (en) Multilayer vegetation zone water quality in situ purification method for highly polluted tributary inlet
CN102926362B (en) Pollution control and emission reduction method for farmland drainage
CN202340546U (en) Circulating drainage and irrigation facility
CN217997970U (en) Ecological bank protection bearing structure of hydraulic and hydroelectric engineering
CN202936287U (en) Back-washing combined farmland non-point source pollution intercepting and purifying system
CN217905576U (en) Landscape garden circulating irrigation system
CN213709434U (en) Slope greening top of slope feed canal
CN215441745U (en) Hydraulic and hydroelectric engineering slope protection structure
CN213718893U (en) Automatic water storage and replenishing ecological tree pool for sponge city
CN112942245A (en) Ecological buffering and purifying system for gradient rainfall runoff of steep slope hard bank side belt
CN114855699A (en) Ecological slope protection structure for hydraulic engineering and construction method
CN212453359U (en) Energy-conserving roofing of green building
CN211200410U (en) Ecological bank protection of view
CN207211338U (en) A kind of PP water-storing devices for urban rainwater collection
CN217128144U (en) Ecological slope protection structure of wetland water bank
CN105862967A (en) Rainwater storage recharging module and system which are suitable for urban green land
CN220847452U (en) Ridge drainage structures for grape planting
CN221502020U (en) Slope protection retaining wall structure easy to drain

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221209