CN217947378U - A hoisting device for H-shaped steel rails used for curved top arches - Google Patents

A hoisting device for H-shaped steel rails used for curved top arches Download PDF

Info

Publication number
CN217947378U
CN217947378U CN202221961502.7U CN202221961502U CN217947378U CN 217947378 U CN217947378 U CN 217947378U CN 202221961502 U CN202221961502 U CN 202221961502U CN 217947378 U CN217947378 U CN 217947378U
Authority
CN
China
Prior art keywords
steel
shaped
body structure
channel
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202221961502.7U
Other languages
Chinese (zh)
Inventor
魏义兵
胡德利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN202221961502.7U priority Critical patent/CN217947378U/en
Application granted granted Critical
Publication of CN217947378U publication Critical patent/CN217947378U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)

Abstract

The utility model discloses a H shaped steel track hoist device for arc crown arch, include: the novel chain block comprises an embedded part, connecting pieces, clamping body structures, supporting body structures, chain blocks and shackles, wherein the upper surface of the embedded part is fixedly connected with an arch beam, the lower surface of the embedded part is fixedly connected with ports of the connecting pieces, the two clamping body structures are symmetrically arranged and clamped into the connecting pieces, one ends of the two chain blocks are connected with the clamping body structures through the two shackles, the other ends of the two chain blocks are connected with the supporting body structures through the other two shackles, and an H-shaped steel track is fixed at the top of the supporting body structure. The utility model discloses a H shaped steel track hoist device for arc top arch structure is firm, and convenient operation can show the hoist and mount operating efficiency that improves narrow and small space H shaped steel track.

Description

一种用于弧形顶拱的H型钢轨道吊装装置A hoisting device for H-shaped steel rails used for curved top arches

技术领域technical field

本实用新型属于水利水电工程技术领域,具体涉及一种用于弧形顶拱的H型钢轨道吊装装置。The utility model belongs to the technical field of water conservancy and hydropower engineering, and in particular relates to an H-shaped steel rail hoisting device used for arc-shaped roof arches.

背景技术Background technique

水电站设置钢梁及轨道的情况较普遍,需要在顶拱设置悬挂式起吊设备,覆盖该区域的设备吊装及检修更换,平面顶拱多数是型钢轨道与预埋件焊接或预埋螺栓连接,圆弧形顶拱则是在预埋件与型钢之间增加轨道连接件,但由于吊装操作空间狭小,常规吊装方法不能将轨道附件直接吊装到位,需搭设安装脚手架,采用辅助措施才能吊装到位,由于起重设备轨道距离较长,脚手架需多次分段搭设,一次搭设完成需大量的脚手架管,占用较多的周转性材料及现场空间,造成耗时长、费用高、效率低、施工安全风险大的问题。It is common to install steel girders and tracks in hydropower stations. It is necessary to set up hanging hoisting equipment on the top arch to hoist, repair and replace the equipment covering this area. The arc-shaped top arch is to add rail connectors between the embedded parts and the section steel. However, due to the narrow space for hoisting operations, conventional hoisting methods cannot directly hoist the rail accessories in place. Installation scaffolds need to be erected and auxiliary measures can be used to hoist them in place. The track distance of the hoisting equipment is long, and the scaffold needs to be erected in multiple sections. A large number of scaffold tubes are required to complete one erection, which takes up more turnover materials and site space, resulting in long time-consuming, high cost, low efficiency, and high construction safety risks. The problem.

发明内容Contents of the invention

本实用新型要解决的技术问题是在进行水电站圆弧形顶拱吊装型钢轨道施工时,传统方法需要采用搭设脚手架等辅助装置才能将轨道吊装到位,其效率低下,且存在安全隐患。The technical problem to be solved by the utility model is that when carrying out the construction of the arc-shaped top arch of the hydropower station to hoist the profiled steel track, the traditional method needs to use auxiliary devices such as scaffolding to hoist the track in place, which is inefficient and has potential safety hazards.

为解决上述技术问题,本实用新型提供一种用于弧形顶拱的H型钢轨道吊装装置,包括:预埋件、连接件、卡体结构、支撑体结构、手拉葫芦、卸扣,所述预埋件的上面与拱梁固定连接,所述预埋件的下面与连接件的端口固定连接,所述连接件为三块钢板组合形成一个类似U形的框架结构,两个所述卡体结构对称布置并卡入连接件,两个所述手拉葫芦的一端通过两个卸扣与卡体结构连接,所述两个手拉葫芦的另一端通过另外两个卸扣与支撑体结构连接,所述支撑体结构顶部固定有H型钢轨道。In order to solve the above-mentioned technical problems, the utility model provides an H-shaped steel rail hoisting device for arc-shaped top arches, including: embedded parts, connecting parts, card body structure, support body structure, chain block, shackle, all The upper part of the embedded part is fixedly connected to the arch beam, and the lower part of the embedded part is fixedly connected to the port of the connecting part. The connecting part is composed of three steel plates to form a U-shaped frame structure. The body structure is symmetrically arranged and snapped into the connector. One end of the two chain hoists is connected to the card body structure through two shackles, and the other end of the two chain hoists is connected to the support body structure through the other two shackles. connection, the top of the support structure is fixed with H-shaped steel rails.

进一步地,所述卡体结构包括:钢板、耳板A、螺母、槽钢、螺栓、导向板,所述钢板的一侧下方连接有耳板A,所述钢板的另一侧上方设置有螺母,下方设置有槽钢和导向板,所述槽钢的槽口朝向耳板A,所述导向板位于槽钢的槽口背面,所述钢板上开有一个U形槽,所述槽钢和导向板分别位于U形槽的左右两侧,所述U形槽卡入连接件的侧边一端,所述耳板A与卸扣相扣,所述螺栓的一端穿过螺母,螺栓的另一端与钩住连接件的立板边缘,所述螺栓为类似J形。Further, the card body structure includes: a steel plate, an ear plate A, a nut, a channel steel, a bolt, and a guide plate, the ear plate A is connected under one side of the steel plate, and a nut is arranged above the other side of the steel plate , a channel steel and a guide plate are arranged below, the notch of the channel steel faces the ear plate A, the guide plate is located at the back of the notch of the channel steel, a U-shaped groove is opened on the steel plate, the channel steel and the The guide plates are respectively located on the left and right sides of the U-shaped groove, the U-shaped groove snaps into one end of the side of the connector, the ear plate A is interlocked with the shackle, one end of the bolt passes through the nut, and the other end of the bolt With the edge of the riser that hooks onto the connector, the bolt is similar to a J shape.

进一步地,所述支撑体结构包括:工字钢、耳板B、加固槽钢A、加固槽钢B、钢支柱、轨道压板、限位螺栓,所述加固槽钢A的凹槽和凹槽背面分别与两个工字钢的一端垂直固定连接,组成一个十字形底座,所述工字钢上方设置有钢支柱,工字钢端头上方设置有耳板B,所述钢支柱前面和后面分别与两根加固槽钢B固定连接,所述钢支柱和加固槽钢B的连接处通过限位螺栓与轨道压板固定连接,所述轨道压板一侧与H型钢轨道配合连接。Further, the support structure includes: I-beam, ear plate B, reinforced channel steel A, reinforced channel steel B, steel pillars, rail pressure plate, limit bolts, the groove and groove of the reinforced channel steel A The back is vertically and fixedly connected with one end of two I-beams to form a cross-shaped base. A steel pillar is arranged above the I-beam, and an ear plate B is arranged above the end of the I-beam. The front and back of the steel pillar They are respectively fixedly connected with two reinforced channel steel B, and the connection between the steel pillar and the reinforced channel steel B is fixedly connected with the rail pressure plate through a limit bolt, and one side of the track pressure plate is matched with the H-shaped steel track.

本实用新型的有益效果:本实用新型的一种用于弧形顶拱的H型钢轨道吊装装置通过将连接件、卡体结构、、手拉葫芦、支撑体结构依次连接,并将连接件与固定在顶拱的预埋件固定连接,使所述吊装装置无需搭设脚手架即可进行吊装工作;同时,卡体结构通过U形槽直接卡在连接件上,通过旋紧螺栓即可有效防止起吊过程中卡体结构脱槽,连接方式简单可靠;另外,支撑体与有H型钢轨道通过轨道压板固定稳固,其连接可靠,拆卸方便,确保了吊装作业安全;总之,本实用新型的一种用于弧形顶拱的H型钢轨道吊装装置结构稳固,操作方便,能显著提高狭小空间H型钢轨道的吊装作业效率。Beneficial effects of the utility model: a H-shaped steel rail hoisting device for arc-shaped top arches of the utility model connects the connecting piece, the card body structure, the chain hoist, and the supporting body structure in sequence, and connects the connecting piece with the The embedded parts fixed on the top arch are fixedly connected, so that the hoisting device can be hoisted without setting up scaffolding; at the same time, the card body structure is directly stuck on the connecting part through the U-shaped groove, and the lifting can be effectively prevented by tightening the bolts During the process, the card body structure is out of groove, and the connection method is simple and reliable; in addition, the support body and the H-shaped steel rail are fixed firmly by the rail pressure plate, the connection is reliable, the disassembly is convenient, and the hoisting operation is guaranteed to be safe; The hoisting device of the H-shaped steel track based on the arc-shaped top arch has a stable structure and is easy to operate, which can significantly improve the efficiency of the hoisting operation of the H-shaped steel track in a narrow space.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, for those of ordinary skill in the art Generally speaking, other drawings can also be obtained based on these drawings on the premise of not paying creative work.

图1是本实用新型的一种用于弧形顶拱的H型钢轨道吊装装置的主视结构示意图。Fig. 1 is a front structural schematic diagram of an H-shaped steel track hoisting device for a curved top arch of the present invention.

图2是本实用新型的一种用于弧形顶拱的H型钢轨道吊装装置的侧视结构示意图。Fig. 2 is a side view structural schematic diagram of an H-shaped steel track hoisting device for arc-shaped roof arches of the present invention.

图3是本实用新型的一种用于弧形顶拱的H型钢轨道吊装装置的卡体结构的主视结构示意图。Fig. 3 is a schematic diagram of the front view of the card body structure of the H-shaped steel rail hoisting device used for the curved top arch of the present invention.

图4是本实用新型的一种用于弧形顶拱的H型钢轨道吊装装置的卡体结构的俯视结构示意图。Fig. 4 is a top view structure schematic diagram of a card body structure of an H-shaped steel rail hoisting device for a curved top arch of the present invention.

图中:1-拱粱,2-预埋件,3-连接件,4-卡体结构,41-钢板,42-耳板A,43-螺母,44-槽钢,45-螺栓,46-导向板,47-U形槽,5-H型钢轨道,6-支撑体结构,61-工字钢,62-耳板B,63-加固槽钢A,64-加固槽钢B,65-钢支柱,65-轨道压板,67-限位螺栓,7-手拉葫芦,8-卸扣。In the figure: 1-arch beam, 2-embedded parts, 3-connecting parts, 4-card body structure, 41-steel plate, 42-ear plate A, 43-nut, 44-channel steel, 45-bolt, 46- Guide plate, 47-U-shaped groove, 5-H-shaped steel track, 6-support structure, 61-I-beam, 62-ear plate B, 63-reinforced channel steel A, 64-reinforced channel steel B, 65-steel Pillar, 65-track pressure plate, 67-limit bolt, 7-chain hoist, 8-shackle.

具体实施方式detailed description

在本实用新型的描述中,还需要说明的是,除非另有明确的规定和限定,术语 “相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, it should also be noted that, unless otherwise clearly stipulated and limited, the terms "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection, Or integrally connected; it may be mechanically connected, may be directly connected, may also be indirectly connected through an intermediary, and may be internal communication between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model according to specific situations.

如图1-2所示,一种用于弧形顶拱的H型钢轨道吊装装置,包括:预埋件2、连接件3、卡体结构4、支撑体结构6、手拉葫芦7、卸扣8,所述预埋件2的上面与拱梁1固定连接,所述预埋件2的下面与连接件3的端口固定连接,所述连接件3为三块钢板组合形成一个类似U形的框架结构,两个所述卡体结构4对称布置并卡入连接件3,两个所述手拉葫芦7的一端通过两个卸扣8与卡体结构4连接,所述两个手拉葫芦7的另一端通过另外两个卸扣8与支撑体结构6连接,所述支撑体结构6顶部固定有H型钢轨道。As shown in Figure 1-2, an H-shaped steel track hoisting device for a curved roof includes: embedded parts 2, connecting parts 3, card body structure 4, support body structure 6, chain block 7, unloading Buckle 8, the upper part of the embedded part 2 is fixedly connected with the arch beam 1, and the lower part of the embedded part 2 is fixedly connected with the port of the connecting part 3, and the connecting part 3 is composed of three steel plates to form a U-shaped frame structure, the two card body structures 4 are symmetrically arranged and snapped into the connector 3, one end of the two chain hoists 7 is connected to the card body structure 4 through two shackles 8, and the two hand chain hoists The other end of the gourd 7 is connected to the support structure 6 through two other shackles 8, and the top of the support structure 6 is fixed with an H-shaped steel track.

优选的,所述卡体结构4包括:钢板41、耳板A42、螺母43、槽钢44、螺栓45、导向板46,所述钢板41的一侧下方连接有耳板A42,所述钢板41的另一侧上方设置有螺母43,下方设置有槽钢44和导向板46,所述槽钢44的槽口朝向耳板A42,所述导向板46位于槽钢44的槽口背面,所述钢板41上开有一个U形槽47,所述槽钢44和导向板46分别位于U形槽47的左右两侧,所述U形槽47卡入连接件的3侧边一端,所述耳板A42与卸扣8相扣,所述螺栓45的一端穿过螺母43,螺栓45的另一端与钩住连接件3的立板边缘,所述螺栓45为类似J形。Preferably, the card body structure 4 includes: a steel plate 41, an ear plate A42, a nut 43, a channel steel 44, a bolt 45, and a guide plate 46, and the lower side of the steel plate 41 is connected with an ear plate A42, and the steel plate 41 A nut 43 is arranged above the other side of the upper side, and a channel steel 44 and a guide plate 46 are arranged below, the notch of the channel steel 44 faces the ear plate A42, and the guide plate 46 is located at the back of the notch of the channel steel 44. There is a U-shaped groove 47 on the steel plate 41, and the channel steel 44 and the guide plate 46 are respectively located on the left and right sides of the U-shaped groove 47, and the U-shaped groove 47 snaps into one end of the 3 sides of the connector, and the ear The plate A42 is interlocked with the shackle 8, one end of the bolt 45 passes through the nut 43, and the other end of the bolt 45 is hooked to the edge of the vertical plate of the connector 3, and the bolt 45 is similar to a J shape.

优选的,所述支撑体结构6包括:工字钢61、耳板B62、加固槽钢A63、加固槽钢B64、钢支柱65、轨道压板66、限位螺栓67,所述加固槽钢A63的凹槽和凹槽背面分别与两个工字钢61的一端垂直固定连接,组成一个十字形底座,所述工字钢61上方设置有钢支柱65,工字钢61端头上方设置有耳板B62,所述钢支柱65前面和后面分别与两根加固槽钢B64固定连接,所述钢支柱65和加固槽钢B64的连接处通过限位螺栓67与轨道压板66固定连接,所述轨道压板66一侧与H型钢轨道5配合连接。Preferably, the support body structure 6 includes: I-beam 61, lug plate B62, reinforced channel steel A63, reinforced channel steel B64, steel pillar 65, rail pressure plate 66, limit bolt 67, the reinforced channel steel A63 The groove and the back of the groove are vertically and fixedly connected to one end of two I-beams 61 respectively to form a cross-shaped base, a steel pillar 65 is arranged above the I-beam 61, and an ear plate is arranged above the end of the I-beam 61 B62, the front and rear sides of the steel pillar 65 are respectively fixedly connected with two reinforced channel steels B64, and the connection between the steel pillar 65 and the reinforced channel steel B64 is fixedly connected with the rail pressure plate 66 through a limit bolt 67, and the rail pressure plate 66 one side is connected with H-shaped steel track 5 cooperation.

使用时,将卡体结构4卡入连接件3,拧紧螺栓45,将两个卡体结构4对称布置于连接件3两侧,然后挂上手拉葫芦7,将H型钢轨道5固定在支撑体结构6上,手拉葫芦7通过卸扣8连接支撑体结构6水平起吊,使H型钢轨道5与连接件3对接安装,通过让出安装对接空间,改变起吊重心,保证手拉葫芦7的安全距离,使H型钢轨道5可一次吊装就位。When in use, snap the card body structure 4 into the connector 3, tighten the bolts 45, arrange the two card body structures 4 symmetrically on both sides of the connector 3, and then hang the chain hoist 7 to fix the H-shaped steel track 5 on the support body On the structure 6, the chain hoist 7 is hoisted horizontally by connecting the support body structure 6 through the shackle 8, so that the H-shaped steel track 5 and the connecting piece 3 are docked and installed, and the lifting center of gravity is changed by allowing the installation docking space to ensure the safety of the chain hoist 7 distance, so that the H-shaped steel track 5 can be hoisted once and put in place.

上面结合附图对本实用新型的实施方式进行了详细说明,但本实用新型并不限于上述实施方式,在本领域的技术人员所具备的知识范围内,还可以对其作处种种变化。The above embodiments of the utility model are described in detail in conjunction with the accompanying drawings, but the utility model is not limited to the above embodiments, and various changes can be made within the scope of knowledge of those skilled in the art.

Claims (3)

1. The utility model provides a H shaped steel track hoist device for arc crown arch which characterized in that includes: built-in fitting (2), connecting piece (3), card body structure (4), supporting body structure (6), chain block (7), break out (8), the higher authority and arched beam (1) fixed connection of built-in fitting (2), below of built-in fitting (2) and the port fixed connection of connecting piece (3), connecting piece (3) are the frame construction of three similar U-shaped steel sheet combination formation, two card body structure (4) symmetrical arrangement is on connecting piece (3) to connecting piece (3), two are gone into to card body structure (4) card one end of chain block (7) is broken out (8) through two and is connected with card body structure (4), the other end of two chain block (7) is broken out (8) through two other and is connected with supporting body structure (6), supporting body structure (6) top is fixed with H shaped steel track (5).
2. The H-shaped steel track hoisting device for the arc-shaped roof arch according to the claim 1 is characterized in that the clamp body structure (4) comprises: steel sheet (41), otic placode A (42), nut (43), channel-section steel (44), bolt (45), deflector (46), one side below of steel sheet (41) is connected with otic placode A (42), the opposite side top of steel sheet (41) is provided with nut (43), and the below is provided with channel-section steel (44) and deflector (46), the notch of channel-section steel (44) is towards otic placode A (42), deflector (46) are located the notch back of channel-section steel (44), it has a U-shaped groove (47) to open on steel sheet (41), channel-section steel (44) and deflector (46) are located the left and right sides of U-shaped groove (47) respectively, one side of connecting piece (3) is gone into to U-shaped groove (47), otic placode A (42) are detained with shackle (8) mutually, nut (43) is passed to the one end of bolt (45), the other end of bolt (45) and the riser edge of hooking connecting piece (3), bolt (45) are similar J-shaped.
3. H-shaped steel track hoisting device for curved roofs as claimed in claim 1, wherein the support structure (6) comprises: i-steel (61), otic placode B (62), reinforcement channel-section steel A (63), reinforcement channel-section steel B (64), steel pillar (65), track clamp plate (66), stop bolt (67), the recess of reinforcing channel-section steel A (63) and the recess back respectively with the perpendicular fixed connection of one end of two I-steel (61), constitute a cross base, I-steel (61) top is provided with steel pillar (65), and I-steel (61) end top is provided with otic placode B (62), steel pillar (65) are preceding and back respectively with two reinforcement channel-section steel B (64) fixed connection, the junction of steel pillar (65) and reinforcement channel-section steel B (64) passes through stop bolt (67) and track clamp plate (66) fixed connection, track clamp plate (66) one side is connected with H shaped steel track (5) cooperation.
CN202221961502.7U 2022-07-28 2022-07-28 A hoisting device for H-shaped steel rails used for curved top arches Withdrawn - After Issue CN217947378U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221961502.7U CN217947378U (en) 2022-07-28 2022-07-28 A hoisting device for H-shaped steel rails used for curved top arches

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221961502.7U CN217947378U (en) 2022-07-28 2022-07-28 A hoisting device for H-shaped steel rails used for curved top arches

Publications (1)

Publication Number Publication Date
CN217947378U true CN217947378U (en) 2022-12-02

Family

ID=84223802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221961502.7U Withdrawn - After Issue CN217947378U (en) 2022-07-28 2022-07-28 A hoisting device for H-shaped steel rails used for curved top arches

Country Status (1)

Country Link
CN (1) CN217947378U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115180501A (en) * 2022-07-28 2022-10-14 中国水利水电第十四工程局有限公司 A H shaped steel track hoist device for arc crown arch

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115180501A (en) * 2022-07-28 2022-10-14 中国水利水电第十四工程局有限公司 A H shaped steel track hoist device for arc crown arch
CN115180501B (en) * 2022-07-28 2026-06-05 中国水利水电第十四工程局有限公司 An H-beam rail hoisting device for arched domes

Similar Documents

Publication Publication Date Title
CN214834922U (en) Super-long-distance transportation device for roof color steel plates
CN106499201A (en) A kind of dismountable safety rope tool-type holding clamp and its using method
CN115180501A (en) A H shaped steel track hoist device for arc crown arch
CN216426505U (en) Auxiliary bracket for mounting track beam in limited space
CN217458425U (en) Lifting appliance for lifting bridge deck concrete baffle
CN209260578U (en) Longitudinal temporary connecting structure of suspension bridge concrete stiffening girder installation
CN220150712U (en) Wind-resistant roofing inspection tour pavement
CN216040754U (en) Temporary supporting device in concrete box girder bridge block dismantling hoisting box
CN216583940U (en) Hydraulic lifting device for bridge reinforced concrete combined section
CN214245405U (en) Curved cover beam steel formwork
CN213651603U (en) Simple hoisting device
CN215885996U (en) F-shaped prefabricated T-beam template hoisting device
CN214833919U (en) Suspended ceiling keel support in natatorium
CN220351519U (en) Annular rail device for assembly type curtain wall hoisting
CN218061066U (en) Metal roofing wind-resistant lock presss from both sides and prevents high composite construction that weighs down
CN218375107U (en) Portable steel construction operation platform
CN220847087U (en) Movable scaffold work platform suitable for bridge overhauls
CN221396838U (en) Novel T roof beam special lifting device
CN223765939U (en) Overhead crane with cab fall protection
CN221276345U (en) General integrated safety operation platform for tie beam and bent cap
CN220926068U (en) I-steel lifting device for railway shed frame
CN220011827U (en) TBM aircraft nose hoist and mount anchor clamps
CN221627259U (en) Box girder splicing structure
CN221479216U (en) Counterweight guide rail bracket
CN217921091U (en) Simple cantilever lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20221202

Effective date of abandoning: 20260605

AV01 Patent right actively abandoned

Granted publication date: 20221202

Effective date of abandoning: 20260605

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned