CN220011827U - TBM aircraft nose hoist and mount anchor clamps - Google Patents

TBM aircraft nose hoist and mount anchor clamps Download PDF

Info

Publication number
CN220011827U
CN220011827U CN202321066217.3U CN202321066217U CN220011827U CN 220011827 U CN220011827 U CN 220011827U CN 202321066217 U CN202321066217 U CN 202321066217U CN 220011827 U CN220011827 U CN 220011827U
Authority
CN
China
Prior art keywords
hoisting
plates
support
hoist
mount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321066217.3U
Other languages
Chinese (zh)
Inventor
孙义
慕光明
王宝安
王文龙
张迪
王帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 6 Co Ltd
Original Assignee
Sinohydro Bureau 6 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 6 Co Ltd filed Critical Sinohydro Bureau 6 Co Ltd
Priority to CN202321066217.3U priority Critical patent/CN220011827U/en
Application granted granted Critical
Publication of CN220011827U publication Critical patent/CN220011827U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Connection Of Plates (AREA)

Abstract

The utility model discloses a TBM machine head hoisting clamp, which comprises a hoisting assembly and a supporting assembly, wherein the hoisting assembly comprises a hoisting mounting plate, hoisting connecting plates are arranged in the middle of the outer side surfaces of the hoisting mounting plate, hoisting connecting holes are formed in the outer side ends of the two hoisting connecting plates in a penetrating manner, and a first connecting section bar is arranged between the two hoisting connecting plates and on the hoisting mounting plate; the supporting component comprises a supporting installation plate, the middle position of the outer side surface of the supporting installation plate is provided with supporting connection plates, two supporting connection plates are arranged between the supporting connection plates, two connecting section bars are arranged on the supporting installation plate, the number of the two connecting section bars is two, lifting lugs are prevented from being welded on a headstock through a bolt connection lifting clamp, the influence on the machining precision of the headstock is reduced, the lifting clamp is arranged on the headstock, the headstock is not turned over during installation, and the headstock can be installed after vertical lifting.

Description

TBM aircraft nose hoist and mount anchor clamps
Technical Field
The utility model relates to the technical field of TBM mounting tools, in particular to a TBM machine head hoisting clamp.
Background
The TBM is short for full-face tunnel boring machine, the machine can realize parallel continuous operation of construction procedures such as boring, supporting, slag discharging and the like, is factory-like pipeline tunnel construction equipment integrated by systems such as machinery, electricity, liquid, light, gas and the like, has the advantages of high boring speed, environmental protection, high comprehensive benefit and the like, and is widely applied to tunnel engineering such as railways, hydropower, traffic, mines, municipal administration and the like. The headstock is characterized in that the headstock is assembled on site by utilizing a bridge crane after being transported to an assembly hole by the main bearing and the main drive and transported to a TBM installation hole, and is horizontally placed on an assembly site. When the machine head frame is shipped, the machine head frame of the TBM weighs hundreds of tons, the machining precision of the machine head frame is very high, lifting lugs are not suitable for being welded on the machine head frame, otherwise, the machining precision of the machine head frame can be influenced, and a lifting clamp is arranged on the machine head frame, namely, the machine head frame is not turned over during installation, and the machine head frame can be installed after vertical lifting.
Disclosure of Invention
The utility model aims to provide a TBM machine head hoisting clamp, which aims to solve the problems that the machine head frame of a TBM weighs hundreds of tons when the machine head frame is shipped and provided in the background technology, the machining precision of the machine head frame is very high, a lifting lug is not suitable to be welded on the machine head frame, otherwise, the machining precision of the machine head frame is influenced, and the machine head frame is provided with the hoisting clamp, namely, the machine head frame is not turned over when being installed, and can be installed after being vertically hoisted.
In order to achieve the above purpose, the present utility model provides the following technical solutions: a TBM machine head hoisting clamp comprises a hoisting component and a supporting component,
the hoisting assembly comprises hoisting mounting plates, wherein the number of the hoisting mounting plates is two, hoisting connecting plates are arranged in the middle positions of the outer side surfaces of the two hoisting mounting plates, hoisting connecting holes are formed in the outer side ends of the two hoisting connecting plates in a penetrating manner, the number of the hoisting connecting holes arranged on each hoisting connecting plate is three, the three hoisting connecting holes are sequentially arranged at the outer side ends of the hoisting connecting plates, the hoisting connecting holes arranged in the middle positions are close to the hoisting connecting holes arranged at the lower ends, and a first connecting section bar is arranged between the two hoisting connecting plates and on the hoisting mounting plates;
the support assembly comprises a support mounting plate, the support mounting plate with hoist and mount mounting plate corresponds the setting, the quantity of support mounting plate is two, two the outside surface intermediate position of support mounting plate all is equipped with the support connecting plate, two the support connecting plate is both ends and stretches out to support the outside convex structure of mounting plate, two the both ends of support connecting plate all run through and are equipped with the support connecting hole, two between the support connecting plate and be in be equipped with No. two connection sections on the support mounting plate, no. two connection sections's quantity is two.
Preferably, two hoist and mount connecting plate pass through the welding respectively with two hoist and mount mounting panel fixed connection, two on the hoist and mount mounting panel and two the support connecting plate outside runs through and is equipped with hoist and mount connecting bolt hole, two hoist and mount connecting plate and two be equipped with hoist and mount reinforcing angle between the hoist and mount mounting panel.
Preferably, the two support connecting plates are respectively fixedly connected with the two support mounting plates through welding, the two support connecting plates are provided with support connecting bolt holes in a penetrating manner on the outer sides of the two hoisting connecting plates, and a support reinforcing angle is arranged between the two support connecting plates and the two support mounting plates.
Preferably, the corners of the two hoisting mounting plates, the two hoisting connecting plates and the two supporting mounting plates are all provided with arc chamfers.
Preferably, the lengths of the two hoisting connecting plates are arranged corresponding to the lengths of the two hoisting mounting plates.
Compared with the prior art, the utility model has the beneficial effects that: the machine head frame of the TBM weighs hundreds of tons when in shipment, the machining precision of the machine head frame is very high, lifting lugs are prevented from being welded on the machine head frame through the bolt connection lifting clamp, the influence on the machining precision of the machine head frame is reduced, and the lifting clamp is arranged on the machine head frame, namely, the machine head frame is not turned over when being installed, and the machine head frame can be installed after being lifted vertically.
Drawings
FIG. 1 is an isometric view of a body structure of the present utility model;
FIG. 2 is a schematic front view of the main structure of the present utility model;
fig. 3 is a schematic top view of the main structure of the present utility model.
In the figure: 1-hoisting assembly, 101-hoisting mounting plate, 102-hoisting connecting plate, 103-hoisting connecting hole, 104-first connecting section bar, 2-supporting assembly, 201-supporting mounting plate, 202-supporting connecting plate, 203-supporting connecting hole, 204-second connecting section bar, 3-hoisting connecting bolt hole, 4-hoisting reinforcing angle, 5-supporting connecting bolt hole, 6-supporting reinforcing angle and 7-arc chamfer.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, the utility model provides a TBM machine head lifting clamp, which comprises a lifting component 1 and a supporting component 2,
the hoisting assembly 1 comprises hoisting installation plates 101, wherein the number of the hoisting installation plates 101 is two, hoisting connection plates 102 are arranged in the middle positions of the outer side surfaces of the two hoisting installation plates 101, hoisting connection holes 103 are formed in the outer side ends of the two hoisting connection plates 102 in a penetrating manner, the number of the hoisting connection holes 103 arranged on each hoisting connection plate 102 is three, the three hoisting connection holes 103 are sequentially arranged at the outer side ends of the hoisting connection plates 102, the hoisting connection holes 103 arranged in the middle positions are close to the hoisting connection holes 103 arranged at the lower ends, and a first connecting section 104 is arranged between the two hoisting connection plates 102 and on the hoisting installation plates 101;
the support assembly 2 comprises support mounting plates 201, the support mounting plates 201 and the hoisting mounting plates 101 are correspondingly arranged, the number of the support mounting plates 201 is two, support connecting plates 202 are arranged in the middle of the outer side surfaces of the support mounting plates 201, the support connecting plates 202 are arc structures with two ends extending out of the support mounting plates 201, support connecting holes 203 are formed in the two ends of the support connecting plates 202 in a penetrating mode, two connecting sections 204 are arranged between the support connecting plates 202 and on the support mounting plates 201, and the number of the second connecting sections 204 is two.
During the use, will hoist mounting panel 101 is fixed to the hoist and mount end of TBM aircraft nose through the bolt, on the hoist and mount connecting hole 103 that sets up on hoist and mount connecting plate 102 with hoist and mount the aircraft nose hoist and mount end of TBM through lifting device, set up the connection section bar 104 No. one between two hoist and mount mounting panels 101, fix the interval between two hoist and mount mounting panels 101, fix the support end of support mounting plate 201 to the TBM aircraft nose through the bolt, when whole TBM aircraft nose is needed to hoist, on the support connecting hole 203 that sets up on the support connecting plate 202 with hoist and mount hook, hoist the aircraft nose support end of TBM through lifting device, set up No. two connection section bars 204 between two support mounting plates 201, when fixing two support mounting plate 201 intervals, promote the intensity of two support connecting plates 202, when only need hoist the hoist and mount end of TBM aircraft nose, support connecting plate 202 supports on the support position, hoist and mount end of TBM aircraft nose is lifted and is adjusted.
The two hoist and mount connecting plates 102 pass through the welding respectively with two hoist and mount mounting plate 101 fixed connection, two hoist and mount mounting plate 101 is last and two hoist and mount connecting bolt hole 3 is run through in hoist and mount connecting plate 102 outside is equipped with two hoist and mount reinforcing angle 4 between hoist and mount connecting plate 102 and two hoist and mount mounting plate 101, when fixing hoist and mount mounting plate 101 to the hoist and mount end of TBM, run through hoist and mount connecting bolt hole 3 through the bolt, on fixing hoist and mount mounting plate 101 to the TBM, through setting up hoist and mount reinforcing angle 4 between hoist and mount connecting plate 102 and hoist and mount mounting plate 101, promote the joint strength between hoist and mount connecting plate 102 and the hoist and mount mounting plate 101.
The two support connecting plates 202 are fixedly connected with the two support mounting plates 201 respectively through welding, the two support connecting bolt holes 5 are formed in the two support mounting plates 201 and penetrate through the two outer sides of the support connecting plates 202, the two support reinforcing angles 6 are arranged between the two support connecting plates 202 and the two support mounting plates 201, when the support mounting plates 201 are fixed to the support ends of TBM, the support mounting plates 201 are fixed to the TBM through bolts penetrating through the support connecting bolt holes 5, and the hoisting reinforcing angles 4 are arranged between the support connecting plates 202 and the support mounting plates 201, so that the connection strength between the hoisting connecting plates 202 and the hoisting mounting plates 201 is improved.
The two hoisting mounting plates 101, the two hoisting connecting plates 102 and the two corners of the supporting mounting plate 201 are respectively provided with an arc chamfer 7, and the arc chamfers 7 are arranged on the hoisting mounting plates 101, the hoisting connecting plates 102 and the supporting mounting plate 201 to avoid damage of sharp corners to TBM equipment.
The lengths of the two hoisting connecting plates 102 and the lengths of the two hoisting mounting plates 101 are correspondingly arranged, so that the connection strength of the hoisting connecting plates 102 and the hoisting mounting plates 101 is ensured.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. TBM aircraft nose lifting clamp, its characterized in that: comprises a hoisting component (1) and a supporting component (2),
the hoisting assembly (1) comprises hoisting installation plates (101), wherein the number of the hoisting installation plates (101) is two, hoisting connection plates (102) are arranged in the middle of the outer side surfaces of the hoisting installation plates (101), hoisting connection holes (103) are formed in the outer side ends of the hoisting connection plates (102) in a penetrating mode, the number of the hoisting connection holes (103) formed in each hoisting connection plate (102) is three, the three hoisting connection holes (103) are sequentially arranged at the outer side ends of the hoisting connection plates (102), the hoisting connection holes (103) arranged in the middle are close to the hoisting connection holes (103) arranged at the lower ends, and a first connecting section bar (104) is arranged between the two hoisting connection plates (102) and on the hoisting installation plates (101);
the support assembly (2) comprises support mounting plates (201), the support mounting plates (201) are correspondingly arranged with the hoisting mounting plates (101), the number of the support mounting plates (201) is two, the two support mounting plates (201) are respectively arranged at the middle positions of the outer side surfaces of the support mounting plates (202), the two support mounting plates (202) are arc structures with two ends extending out of the support mounting plates (201), the two support mounting plates (202) are respectively provided with a support connecting hole (203) in a penetrating mode, the two support mounting plates (202) are respectively provided with a second connecting section bar (204) in a penetrating mode, and the number of the second connecting section bars (204) is two.
2. A TBM nose lifting clamp as claimed in claim 1, wherein: two hoist and mount connecting plate (102) pass through the welding respectively with two hoist and mount mounting panel (101) fixed connection, two on hoist and mount mounting panel (101) and two hoist and mount connecting plate (102) outside runs through and is equipped with hoist and mount connecting bolt hole (3), two hoist and mount connecting plate (102) and two be equipped with hoist and mount enhancement angle (4) between hoist and mount mounting panel (101).
3. A TBM nose lifting clamp as claimed in claim 1, wherein: the two support connecting plates (202) are fixedly connected with the two support mounting plates (201) respectively through welding, the two support connecting plates (201) are provided with support connecting bolt holes (5) in a penetrating mode on the outer sides of the two support connecting plates (202), and support reinforcing angles (6) are arranged between the two support connecting plates (202) and the two support mounting plates (201).
4. A TBM nose lifting clamp as claimed in claim 1, wherein: the corners of the two hoisting mounting plates (101), the two hoisting connecting plates (102) and the two supporting mounting plates (201) are respectively provided with an arc chamfer (7).
5. A TBM nose lifting clamp as claimed in claim 1, wherein: the lengths of the two hoisting connecting plates (102) are corresponding to the lengths of the two hoisting mounting plates (101).
CN202321066217.3U 2023-05-06 2023-05-06 TBM aircraft nose hoist and mount anchor clamps Active CN220011827U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321066217.3U CN220011827U (en) 2023-05-06 2023-05-06 TBM aircraft nose hoist and mount anchor clamps

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321066217.3U CN220011827U (en) 2023-05-06 2023-05-06 TBM aircraft nose hoist and mount anchor clamps

Publications (1)

Publication Number Publication Date
CN220011827U true CN220011827U (en) 2023-11-14

Family

ID=88669728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321066217.3U Active CN220011827U (en) 2023-05-06 2023-05-06 TBM aircraft nose hoist and mount anchor clamps

Country Status (1)

Country Link
CN (1) CN220011827U (en)

Similar Documents

Publication Publication Date Title
CN220011827U (en) TBM aircraft nose hoist and mount anchor clamps
CN210103281U (en) Concrete sleeper gang hoisting device
CN219239023U (en) Hoop type lifting appliance for vertical lifting of cylindrical member
CN204024088U (en) The fast-positioning device of workshop steel column sectional lifting docking
CN205222516U (en) Stand and track crossbeam connection structure between assembled maintenance
CN212334358U (en) Prefabricated staircase hoisting machine constructs
CN210597877U (en) Partially-filled combined column assembly type installation tool
CN205046848U (en) Gate -type steel sheet mould holder
CN211647379U (en) Interim device of dysmorphism component installation
CN221481107U (en) Assembled building shear wall structure
CN105019556A (en) Lap-joint structure assisting quick hoisting of high-rise steel beam, and application of lap-joint structure
CN214994725U (en) Mounting device for H-shaped steel beam connecting clamp plate
CN217398221U (en) Auxiliary tool for hoisting large flue in limited space
CN221627259U (en) Box girder splicing structure
CN217972198U (en) Lifting lug structure for offshore booster station
CN216105635U (en) Movable car bumper for steel structure rail bearing beam
CN220078407U (en) Double-column type railway-crossing light portal frame
CN221318907U (en) Hoisting balance beam of prefabricated cabin type booster station
CN220334571U (en) Bridge crane rail bearing beam fixing device
CN214422094U (en) Large-section I-steel lifting appliance
CN210122447U (en) Special lifting appliance for lifting large-scale combined template
CN217947378U (en) A H shaped steel track hoist device for arc crown arch
CN211769719U (en) Special hoisting beam for large-span sheet equipment
CN211200923U (en) Square steel column structure
CN213837059U (en) Rigid connection device for H-shaped steel beam and H-shaped steel column