CN219175620U - A suspender rod for the construction of a transition floor ceiling - Google Patents

A suspender rod for the construction of a transition floor ceiling Download PDF

Info

Publication number
CN219175620U
CN219175620U CN202320565342.2U CN202320565342U CN219175620U CN 219175620 U CN219175620 U CN 219175620U CN 202320565342 U CN202320565342 U CN 202320565342U CN 219175620 U CN219175620 U CN 219175620U
Authority
CN
China
Prior art keywords
galvanized
threaded rod
fixed
construction
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202320565342.2U
Other languages
Chinese (zh)
Inventor
史海迪
蔡蟒
李维奇
王晨宇
李程
张辉
张振鹏
路景顺
刘晏佐
邱勇
柳岩
杜博
白梓宣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Third Construction Co Ltd of China Construction First Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202320565342.2U priority Critical patent/CN219175620U/en
Application granted granted Critical
Publication of CN219175620U publication Critical patent/CN219175620U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

一种转换层吊顶施工用吊杆,包括吊杆本体和设于吊杆本体两侧的斜撑,所述吊杆本体包括中部镀锌套管和螺纹连接在镀锌套管两端部的镀锌通丝螺纹杆,上部所述镀锌通丝螺纹杆上部与固定于梁侧的角钢固定,下部所述镀锌通丝螺纹杆下部与钢结构固定,所述斜撑包括可调斜杆和设于可调斜杆下端部的卡具,所述卡具卡固在钢结构上。本申请设计角钢转换层,来转换吊杆在吊顶内的固定点,即用型钢设置一道转换层,把吊杆按规范连接在转换层上,在此基础上再做吊顶龙骨及面板安装。

Figure 202320565342

A suspender for the construction of a transition floor ceiling, comprising a suspender body and diagonal braces arranged on both sides of the suspender body, the suspender body comprising a galvanized casing in the middle and a galvanized casing threaded at both ends of the galvanized casing. Zinc threaded rod, the upper part of the galvanized threaded rod is fixed to the angle steel fixed on the side of the beam, the lower part of the galvanized threaded rod is fixed to the steel structure, and the diagonal brace includes adjustable diagonal rods and The fixture is arranged at the lower end of the adjustable inclined rod, and the fixture is fastened on the steel structure. This application designs an angle steel conversion layer to convert the fixed point of the suspender in the ceiling, that is, set up a conversion layer with section steel, connect the suspender to the conversion layer according to the specifications, and then install the ceiling keel and panel on this basis.

Figure 202320565342

Description

一种转换层吊顶施工用吊杆A suspender rod for the construction of a transition floor ceiling

技术领域technical field

本申请涉及建筑施工领域,具体属于一种转换层吊顶施工用吊杆。The application relates to the field of building construction, in particular to a suspender used for the construction of a transition floor ceiling.

背景技术Background technique

随着目前公共建筑空间的多维变化,吊顶内设备逐渐增加,吊顶空间的跨度越来越大,高度越来越高,大跨度大空间的室内吊顶工程也越来越多,随之出现的吊顶施工的技术问题也越来越多,解决此问题的主要技术方法就是增加转换层。With the multi-dimensional changes in the current public building space, the equipment in the ceiling is gradually increasing, the span of the ceiling space is getting larger and higher, and the height of the ceiling is getting higher and higher. There are more and more indoor ceiling projects with large spans and large spaces. There are more and more technical problems in construction, and the main technical method to solve this problem is to increase the conversion layer.

吊顶以上空间可以很大,根据建筑装饰规范,使用反支撑的范围确有限,吊顶以上空间超过1.5m时,需要设置反支撑,吊顶以上空间超过2.5m时,反支撑的几种方法且施工起来比较费工。The space above the suspended ceiling can be very large. According to the building decoration code, the scope of using counter-supports is indeed limited. When the space above the suspended ceiling exceeds 1.5m, counter-supports need to be installed. When the space above the suspended ceiling exceeds 2.5m, several methods of counter-supports are available Relatively labor-intensive.

实用新型内容Utility model content

本实用新型的目的是提供一种转换层吊顶施工用吊杆,要解决现有技术反支撑施工费工的技术问题。The purpose of the utility model is to provide a suspension rod for the construction of the transition floor ceiling, which solves the technical problem of the labor-intensive construction of the counter support in the prior art.

为实现上述目的,本实用新型采用如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:

一种转换层吊顶施工用吊杆,其特征在于:包括吊杆本体和设于吊杆本体两侧的斜撑,所述吊杆本体包括中部镀锌套管和螺纹连接在镀锌套管两端部的镀锌通丝螺纹杆,上部所述镀锌通丝螺纹杆上部与固定于梁侧的角钢固定,下部所述镀锌通丝螺纹杆下部与钢结构固定,所述斜撑包括可调斜杆和设于可调斜杆下端部的卡具,所述卡具卡固在钢结构上。A suspension rod for construction of a transition floor ceiling, characterized in that it includes a suspension rod body and diagonal braces arranged on both sides of the suspension rod body, the suspension rod body includes a galvanized casing in the middle and a threaded connection between the two sides of the galvanized casing. The galvanized through-wire threaded rod at the end, the upper part of the galvanized through-wire threaded rod on the upper part is fixed to the angle steel fixed on the beam side, the lower part of the galvanized through-wire threaded rod on the lower part is fixed to the steel structure, and the diagonal brace includes The tilt-adjusting rod and the fixture arranged at the lower end of the adjustable tilt-rod, the fixture is fastened on the steel structure.

进一步优选地,上部所述镀锌通丝螺纹杆露出中部镀锌套管的长度不小于70mm,下部所述镀锌通丝螺纹杆长度不得小于100mm。Further preferably, the length of the upper galvanized through-wire threaded rod exposed to the middle galvanized casing is not less than 70mm, and the length of the lower galvanized through-wire threaded rod must not be less than 100mm.

进一步地,上部所述镀锌通丝螺纹杆和下部所述镀锌通丝螺纹杆上均设有固定件,所述固定件包括三个镀锌六角螺母和两个垫片,两个镀锌六角螺母限位于角钢上方,一个镀锌六角螺母限位于角钢下方,两个镀锌六角螺母限位于钢结构下方,一个镀锌六角螺母限位于钢结构上方。Further, the upper galvanized through-wire threaded rod and the lower galvanized through-wire threaded rod are provided with fixing parts, the fixing parts include three galvanized hex nuts and two washers, two galvanized The hex nut is limited above the angle steel, one galvanized hex nut is limited below the angle steel, two galvanized hex nuts are limited below the steel structure, and one galvanized hex nut is limited above the steel structure.

进一步地,所述角钢的竖板与所述梁侧面贴合后通过膨胀螺栓固定,上部所述镀锌通丝螺纹杆与角钢横板固定。Further, the vertical plate of the angle steel is attached to the side of the beam and fixed by expansion bolts, and the upper part of the galvanized threaded rod is fixed to the horizontal plate of the angle steel.

进一步地,所述可调斜杆与中部镀锌套管通过管箍连接或焊接固定。Further, the adjustable tilt rod and the middle galvanized casing are connected or fixed by welding.

此外,所述钢结构为工字钢,所述卡具包括U型卡件,所述U型卡件顶面与可调斜杆铰接连接,所述U型卡件上设有螺杆,所述U型卡件卡在工字钢上翼缘板上,螺杆螺纹穿过U型卡件一侧侧板,端部抵接在翼缘板板面上。In addition, the steel structure is I-shaped steel, and the clamp includes a U-shaped clamp, the top surface of the U-shaped clamp is hingedly connected with an adjustable inclined rod, and a screw is provided on the U-shaped clamp, and the The U-shaped clamp is clamped on the upper flange of the I-shaped steel, the thread of the screw passes through one side plate of the U-shaped clamp, and the end abuts against the surface of the flange.

更加优选地,所述中部镀锌套管为DN25镀锌套管,壁厚3mmMore preferably, the middle galvanized casing is a DN25 galvanized casing with a wall thickness of 3mm

与现有技术相比本实用新型具有以下特点和有益效果:Compared with the prior art, the utility model has the following characteristics and beneficial effects:

本申请设计角钢转换层,来转换吊杆在吊顶内的固定点,即用型钢设置一道转换层,把吊杆按规范连接在转换层上,在此基础上再做吊顶龙骨及面板安装。This application designs an angle steel conversion layer to convert the fixed point of the suspender in the ceiling, that is, set up a conversion layer with section steel, connect the suspender to the conversion layer according to the specifications, and then install the ceiling keel and panel on this basis.

本申请在空间较高时施工起来方便,又能满足吊顶结构要求,提高了施工时的安全性,减小施工操作难度,提高施工效率,具有较好的经济性和推广性。The application is convenient for construction when the space is relatively high, and can meet the requirements of the suspended ceiling structure, improves the safety during construction, reduces the difficulty of construction operation, improves construction efficiency, and has good economy and popularization.

附图说明Description of drawings

图1为本申请一种转换层吊顶施工用吊杆。Fig. 1 is a suspender rod for construction of a transition floor ceiling in the present application.

具体实施方式Detailed ways

为使本实用新型实现的技术手段、创新特征、达成目的与功效易于明白了解,下面对本实用新型进一步说明。In order to make the technical means, innovative features, goals and effects achieved by the utility model easy to understand, the utility model will be further described below.

在此记载的实施例为本实用新型的特定的具体实施方式,用于说明本实用新型的构思,均是解释性和示例性的,不应解释为对本实用新型实施方式及本实用新型范围的限制。除在此记载的实施例外,本领域技术人员还能够基于本申请权利要求书和说明书所公开的内容采用显而易见的其它技术方案,这些技术方案包括采用对在此记载的实施例的做出任何显而易见的替换和修改的技术方案。The embodiments described here are specific specific implementations of the present utility model, and are used to illustrate the concept of the present utility model. They are all explanatory and exemplary, and should not be construed as limitations on the implementation of the present utility model and the scope of the present utility model. limit. In addition to the embodiments described here, those skilled in the art can also adopt other obvious technical solutions based on the claims of the application and the contents disclosed in the description, and these technical solutions include adopting any obvious changes made to the embodiments described here. Replacement and modified technical solutions.

一种转换层吊顶施工用吊杆,如图1所示,包括吊杆本体1和设于吊杆本体1两侧的斜撑2,吊杆本体1包括中部镀锌套管11和螺纹连接在镀锌套管11两端部的镀锌通丝螺纹杆12,上部镀锌通丝螺纹杆12上部与固定于梁3侧的角钢6固定,下部镀锌通丝螺纹杆12下部与钢结构4固定,斜撑2包括可调斜杆21和设于可调斜杆21下端部的卡具22,卡具22卡固在钢结构4上,具体实施时,吊杆本体1长度确定后,可将上部和下部的镀锌通丝螺纹杆12与镀锌通丝螺纹杆12焊接固定,需满足T形对接及角接组合焊缝,其质量等级不得低于二级焊缝。A suspension rod for the construction of a transition floor ceiling, as shown in FIG. The galvanized threaded rod 12 at both ends of the galvanized casing 11, the upper part of the upper galvanized threaded rod 12 is fixed to the angle steel 6 fixed on the side of the beam 3, and the lower part of the galvanized threaded rod 12 is connected to the steel structure 4 Fixed, the diagonal brace 2 includes an adjustable inclined rod 21 and a clamp 22 arranged at the lower end of the adjustable inclined rod 21. The clamp 22 is clamped on the steel structure 4. During specific implementation, after the length of the boom body 1 is determined, it can be The upper and lower galvanized through-wire threaded rods 12 and galvanized through-wire threaded rods 12 are welded and fixed to meet the T-shaped butt joint and fillet joint welds, and their quality grades must not be lower than the second-grade welds.

上部的镀锌通丝螺纹杆12露出中部镀锌套管11的长度不小于70mm,下部所述镀锌通丝螺纹杆12长度不得小于100mm。The length of the upper galvanized through-wire threaded rod 12 exposed to the middle galvanized casing 11 is not less than 70mm, and the length of the lower galvanized through-wire threaded rod 12 must not be less than 100mm.

上部的镀锌通丝螺纹杆12和下部的镀锌通丝螺纹杆12上均设有固定件13,固定件13包括三个镀锌六角螺母和两个垫片,两个镀锌六角螺母限位于角钢6上方,一个镀锌六角螺母限位于角钢6下方,两个镀锌六角螺母限位于钢结构4下方,一个镀锌六角螺母限位于钢结构4上方。The galvanized through-wire threaded rod 12 of the upper part and the galvanized through-wire threaded rod 12 of the lower part are provided with a fixing part 13, and the fixing part 13 includes three galvanized hexagon nuts and two washers, and the two galvanized hexagon nuts are limited Located above the angle steel 6, one galvanized hex nut is located below the angle steel 6, two galvanized hex nuts are located below the steel structure 4, and one galvanized hex nut is located above the steel structure 4.

角钢6的竖板与梁3侧面贴合后通过膨胀螺栓5固定,上部镀锌通丝螺纹杆12与角钢6横板固定。可调斜杆21与中部镀锌套管11通过管箍连接或焊接固定,钢结构4为工字钢,卡具22包括U型卡件,U型卡件顶面与可调斜杆21铰接连接,U型卡件上设有螺杆, U型卡件卡在工字钢上翼缘板上,螺杆螺纹穿过U型卡件一侧侧板,端部抵接在翼缘板板面上,中部镀锌套管11优选为DN25镀锌套管,壁厚3mm。The vertical plate of the angle steel 6 is fixed with the side of the beam 3 and fixed by the expansion bolt 5, and the upper galvanized threaded rod 12 is fixed with the angle steel 6 horizontal plate. The adjustable inclined rod 21 and the middle galvanized casing 11 are connected or fixed by welding. The steel structure 4 is I-shaped steel. The fixture 22 includes a U-shaped clamp. The top surface of the U-shaped clamp is hinged with the adjustable inclined rod 21. Connection, the U-shaped clamp is provided with a screw, the U-shaped clamp is clamped on the upper flange of the I-beam, the thread of the screw passes through the side plate of the U-shaped clamp, and the end abuts on the flange surface , The middle galvanized casing 11 is preferably a DN25 galvanized casing with a wall thickness of 3mm.

具体实施时:吊杆包括壁厚为3mm的DN25镀锌套管,所述镀锌套管上下两端焊接两段镀锌通丝螺纹,上端的螺纹为固定端,将一个镀锌螺母及垫片固定到M16×70的镀锌通丝螺纹上,将固定好镀锌螺母的螺纹穿过固定连接件,并将垫片和镀锌螺母拧紧,用以固定吊杆,通过拧紧最外侧第三个镀锌螺母,以增加吊杆稳固性。During specific implementation: the suspender includes a DN25 galvanized casing with a wall thickness of 3 mm. Two sections of galvanized through-wire threads are welded to the upper and lower ends of the galvanized casing. The upper thread is a fixed end. A galvanized nut and a pad The sheet is fixed to the M16×70 galvanized through wire thread, the thread of the fixed galvanized nut is passed through the fixed connection piece, and the gasket and the galvanized nut are tightened to fix the boom, by tightening the outermost third A galvanized nut to increase the stability of the boom.

镀锌套管的下端的螺纹为找平端,将一个镀锌螺母及垫片固定到镀锌通丝螺纹上,将固定好螺母及垫片的螺纹穿过转换层的刚性龙骨,通过调整垫片及镀锌螺母的丝扣,调整转换层龙骨的平整度,通过拧紧最外侧第三个镀锌螺母,以增加龙骨稳固性。The thread at the lower end of the galvanized casing is the leveling end, fix a galvanized nut and washer to the galvanized through-wire thread, pass the thread with the fixed nut and washer through the rigid keel of the conversion layer, and adjust the washer and galvanized nuts to adjust the flatness of the keel of the conversion layer, and increase the stability of the keel by tightening the third galvanized nut on the outermost side.

本申请通过调节镀锌通丝螺纹杆12下部两个螺母的位置,调整转换层钢结构的平整度,最后拧紧最外侧螺母,以加强固定强度。施工难度较低,结构可靠性比较强,传力的路径比较清晰明确;使用该吊杆施工人员可减少登高作业,在地面制作完成吊杆后,登高作业只安装即可,提高了施工时的安全性,减轻了施工作业操作难度,大大的提高了工作效率;整体结构简单,现场制作方便。In this application, by adjusting the positions of the two nuts at the bottom of the galvanized threaded rod 12, the flatness of the steel structure of the transition layer is adjusted, and finally the outermost nuts are tightened to strengthen the fixing strength. The construction difficulty is relatively low, the structural reliability is relatively strong, and the path of force transmission is relatively clear; the construction personnel can reduce the climbing work by using the boom. Safety reduces the difficulty of construction operations and greatly improves work efficiency; the overall structure is simple and on-site production is convenient.

本实用新型未涉及部分均与现有技术相同或可采用现有技术加以实现。The parts not involved in the utility model are all the same as the prior art or can be realized by adopting the prior art.

以上显示和描述了本实用新型的基本原理和主要特征和本实用新型的优点,对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。The basic principles and main features of the utility model and the advantages of the utility model have been shown and described above. For those skilled in the art, it is obvious that the utility model is not limited to the details of the above-mentioned exemplary embodiments, and without departing from the utility model The present utility model can be realized in other specific forms without the spirit or essential features. Therefore, no matter from all points of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, so it is intended to fall within the scope of the claims All changes within the meaning and range of equivalents of the required elements are included in the present invention. Any reference sign in a claim should not be construed as limiting the claim concerned.

此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only includes an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.

Claims (7)

1. The utility model provides a jib is used in construction of conversion layer furred ceiling which characterized in that: including jib body (1) and locate bracing (2) of jib body (1) both sides, jib body (1) include middle part galvanized sleeve pipe (11) and threaded connection lead to threaded rod (12) at galvanized sleeve pipe (11) both ends, upper portion galvanized lead to threaded rod (12) upper portion and angle steel (6) fixed in roof beam (3) side are fixed, lower part galvanized lead to threaded rod (12) lower part and steel construction (4) are fixed, bracing (2) include adjustable diagonal (21) and locate fixture (22) of adjustable diagonal (21) lower extreme, fixture (22) block is fixed on steel construction (4).
2. The boom for conversion layer ceiling construction of claim 1, wherein: the length of the galvanized wire through threaded rod (12) at the upper part, which is exposed out of the galvanized sleeve (11) at the middle part, is not less than 70mm, and the length of the galvanized wire through threaded rod (12) at the lower part is not less than 100mm.
3. The boom for conversion layer ceiling construction of claim 1, wherein: the upper portion galvanized lead to silk threaded rod (12) and lower part all be equipped with mounting (13) on the galvanized lead to silk threaded rod (12), mounting (13) are including three galvanized hexagonal nut and two gaskets, and two galvanized hexagonal nut limits are located angle steel (6) top, and one galvanized hexagonal nut limit is located angle steel (6) below, and two galvanized hexagonal nut limits are located steel structure (4) below, and one galvanized hexagonal nut limit is located steel structure (4) top.
4. The boom for conversion layer ceiling construction of claim 1, wherein: the vertical plate of the angle steel (6) is fixed through an expansion bolt (5) after being attached to the side face of the beam (3), and the galvanized wire threaded rod (12) at the upper part is fixed with the transverse plate of the angle steel (6).
5. The boom for conversion layer ceiling construction of claim 1, wherein: the adjustable inclined rod (21) is connected with the middle galvanized sleeve (11) through a pipe hoop or welded and fixed.
6. The boom for conversion layer ceiling construction of claim 1, wherein: the steel structure (4) is I-steel, fixture (22) are including U type fastener, U type fastener top surface is articulated with adjustable diagonal bar (21) and is connected, be equipped with the screw rod on the U type fastener, U type fastener card is on I-steel top flange board, and the screw rod screw thread passes U type fastener one side curb plate, and tip butt is on flange board face.
7. The boom for construction of a conversion layer ceiling of any one of claims 1-6, wherein: the middle galvanized sleeve (11) is a DN25 galvanized sleeve, and the wall thickness is 3mm.
CN202320565342.2U 2023-03-22 2023-03-22 A suspender rod for the construction of a transition floor ceiling Expired - Fee Related CN219175620U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320565342.2U CN219175620U (en) 2023-03-22 2023-03-22 A suspender rod for the construction of a transition floor ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320565342.2U CN219175620U (en) 2023-03-22 2023-03-22 A suspender rod for the construction of a transition floor ceiling

Publications (1)

Publication Number Publication Date
CN219175620U true CN219175620U (en) 2023-06-13

Family

ID=86666556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320565342.2U Expired - Fee Related CN219175620U (en) 2023-03-22 2023-03-22 A suspender rod for the construction of a transition floor ceiling

Country Status (1)

Country Link
CN (1) CN219175620U (en)

Similar Documents

Publication Publication Date Title
CN212478241U (en) Novel steel structure spherical net rack ceiling conversion layer connecting structure
CN207542694U (en) A kind of steel structure beam assembled combines hanger
CN215594561U (en) A super large curved surface furred ceiling structure for spatial grid structure
CN215564638U (en) Steel construction net mounting structure of choosing outward
CN211256707U (en) Self-anchored construction hanging basket suspension mechanism based on existing structure
CN219912882U (en) Fixing device of I-steel lower illumination lamp
CN217949707U (en) I-steel beam hanging basket connecting system
CN117513738A (en) A high-altitude cantilevered structural steel formwork support system and construction method
CN112982802B (en) Reverse bearing structure of steel construction furred ceiling
CN216428547U (en) Tool type fixing device for suspender of lower suspended ceiling structure of spherical net rack
CN216239863U (en) Girder steel safety rope support is used in construction of big span girder steel
CN214838925U (en) Fixing structure of vertical air pipe in roof truss
CN216999251U (en) Support firm large-span pipe truss structure
CN213329442U (en) A type of suspension electrical equipment bracket with flexible DC back-to-back valve hall with conversion steel beam
CN217517823U (en) I-beam steel truss conversion layer connecting device
CN115405757A (en) Support and hanger frame for mounting light steel purline lower hanging equipment and mounting construction method
CN210029824U (en) Novel tower crane is adhered to device
CN217903960U (en) A generating line bridge gallows for I-steel roof beam
CN222976123U (en) Direction-adjustable purline mounting structure on steel structure roof
CN212028735U (en) Support connection conversion device for hoisting pipeline and equipment
CN111412330B (en) Hoisting piece and hanging bracket at pipeline connecting position
CN215976851U (en) Simple to operate's continuous beam construction bracket
CN224106867U (en) Cantilever floor pouring supporting device
CN217828678U (en) Fixing device for fire-fighting deluge branch pipe of overpass layer of high and large space building
CN221257902U (en) Bearing I-shaped steel girder bottom pipeline support frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230613