CN217935014U - Hydraulic and hydroelectric engineering is with device of sunkening cord - Google Patents

Hydraulic and hydroelectric engineering is with device of sunkening cord Download PDF

Info

Publication number
CN217935014U
CN217935014U CN202221799573.1U CN202221799573U CN217935014U CN 217935014 U CN217935014 U CN 217935014U CN 202221799573 U CN202221799573 U CN 202221799573U CN 217935014 U CN217935014 U CN 217935014U
Authority
CN
China
Prior art keywords
bottom plate
fixedly connected
pivot
sunkening cord
water conservancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221799573.1U
Other languages
Chinese (zh)
Inventor
祝岩虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221799573.1U priority Critical patent/CN217935014U/en
Application granted granted Critical
Publication of CN217935014U publication Critical patent/CN217935014U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Hydraulic Turbines (AREA)

Abstract

The utility model relates to an engineering buries line technical field, and discloses a hydraulic and hydroelectric engineering is with device of burying line, comprising a base plate, the bottom fixedly connected with of bottom plate removes the wheel, the left top fixedly connected with push rod of bottom plate, the top fixedly connected with support of bottom plate, the inboard of support is rotated and is connected a reason line section of thick bamboo, the fixedly connected with handle is located in the centre of a circle of a reason line section of thick bamboo, the top fixedly connected with reason line piece of bottom plate, the right side of bottom plate is provided with the device of burying line, the device of burying line includes the mount of fixed connection on bottom plate right side, the inside of mount is rotated and is connected with the pivot, the one end fixedly connected with of pivot buries the line roller, the outside of pivot is rotated and is connected with the runner, the outside swing joint of pivot has the fixed block. This hydraulic and hydroelectric engineering is with device of sunkening cord adjusts the distance between the cable through the device of sunkening cord, avoids the in-process of sunkening cord to need to change the mode of sunkening cord to improve the efficiency of sunkening cord.

Description

Hydraulic and hydroelectric engineering is with device of sunkening cord
Technical Field
The utility model relates to an engineering buries line technical field, specifically is a hydraulic and hydroelectric engineering is with burying traditional thread binding putting.
Background
The hydraulic engineering is used for controlling and allocating surface water and underground water in the nature to achieve the purposes of removing harm and benefiting, the hydraulic engineering needs to build a dam, a dike and other buildings, along with continuous expansion of an urban area, the number of the hydraulic and hydroelectric engineering is increased, and the line burying work is an indispensable link in the construction process.
The existing thread burying device is mostly finished manually by a person, time and labor are wasted, and when some tools are used for thread burying, the distance between cables is fixed, so that the thread burying mode needs to be changed, the thread burying efficiency is reduced, and the thread burying device for the water conservancy and hydropower engineering is provided.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a hydraulic and hydroelectric engineering is with device of sunkening cord has possessed and has replaced manual sunkening cord, adjusts advantages such as cable interval, has solved current sunkening cord and has relied on the manual work of manpower to waste time and energy, and the problem of using tool can't change the cable interval.
(II) technical scheme
For the purpose of realizing above-mentioned engineering buried wire, the utility model provides a following technical scheme: a wire burying device for water conservancy and hydropower engineering comprises a bottom plate, wherein the bottom of the bottom plate is fixedly connected with a moving wheel, the top of the left side of the bottom plate is fixedly connected with a push rod, the top of the bottom plate is fixedly connected with a support, the inner side of the support is rotatably connected with a wire arranging cylinder, a handle is fixedly connected with the circle center of the wire arranging cylinder, the top of the bottom plate is fixedly connected with a wire arranging block, and the right side of the bottom plate is provided with the wire burying device;
the thread burying device comprises a fixing frame fixedly connected to the right side of the bottom plate, a rotating shaft is connected to the inside of the fixing frame in a rotating mode, a thread burying roller is fixedly connected to one end of the rotating shaft, a rotating wheel is connected to the outer side of the rotating shaft in a rotating mode, a fixing block is movably connected to the outer side of the rotating shaft, and a threaded bolt is connected to the inner side of the fixing block in a threaded mode.
Furthermore, the number of the wire arranging blocks is two and the wire arranging blocks are respectively positioned on the front surface of the top of the bottom plate and the back surface of the top of the bottom plate.
Furthermore, the support is located the right side of push rod, reason line piece is located the right side of support.
Furthermore, the fixed frame is composed of a transverse plate and two vertical plates, and the two vertical plates are respectively positioned on the front surface and the back surface of the transverse plate.
Furthermore, the number of the rotating shafts is two, the two rotating shafts are respectively positioned on the front face and the back face of the fixing frame, and the outer sides of the two rotating shafts at the ends away from each other are fixedly connected with the wire embedding rollers.
Furthermore, the number of the threaded bolts is two, and the threaded bolts are arranged up and down.
Furthermore, the runner is attached to a vertical plate of the fixing frame, and one side of the runner, which is far away from the vertical plate, is provided with a threaded hole corresponding to the threaded bolt.
(III) advantageous effects
Compared with the prior art, the utility model provides a hydraulic and hydroelectric engineering is with device of sunkening cord possesses following beneficial effect:
this hydraulic and hydroelectric engineering is with device of sunkening cord replaces the manual sunkening cord of manpower through the device of sunkening cord, can adjust the distance between the cable simultaneously, avoids the in-process of sunkening cord to need to change the mode of sunkening cord to improve the efficiency of sunkening cord.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a right side schematic view of the structure of the present invention.
In the figure: the device comprises a base plate 1, a moving wheel 2, a push rod 3, a support 4, a wire arranging barrel 5, a handle 6, a wire arranging block 7, a fixing frame 8, a rotating shaft 9, a wire embedding roller 10, a rotating wheel 11, a fixing block 12 and a threaded bolt 13.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: the utility model provides a hydraulic and hydroelectric engineering is with burying traditional thread binding putting, comprising a base plate 1, the bottom fixedly connected with of bottom plate 1 removes wheel 2, the left top fixedly connected with push rod 3 of bottom plate 1, the top fixedly connected with support 4 of bottom plate 1, the inboard of support 4 is rotated and is connected with a reason line section of thick bamboo 5, the centre of a circle fixedly connected with handle 6 of a reason line section of thick bamboo 5, the top fixedly connected with reason line piece 7 of bottom plate 1, the right side of bottom plate 1 is provided with buries the traditional thread binding putting, replace manual line of burying through burying the traditional thread binding putting, can adjust the distance between the cable simultaneously, avoid the mode that the in-process that buries the line need change the line, thereby improve the efficiency of burying the line.
In this embodiment, the wire burying device is a structure for laying a cable.
As shown in fig. 1, the thread burying device comprises a fixed frame 8 fixedly connected to the right side of a bottom plate 1, a rotating shaft 9 is rotatably connected inside the fixed frame 8, a thread burying roller 10 is fixedly connected to one end of the rotating shaft 9, a rotating wheel 11 is rotatably connected to the outer side of the rotating shaft 9, a fixed block 12 is movably connected to the outer side of the rotating shaft 9, and a threaded bolt 13 is connected to the inner side of the fixed block 12 in a threaded manner;
it should be noted that the fixing frame 8 is composed of a transverse plate and two vertical plates, the two vertical plates are respectively located on the front side and the back side of the transverse plate, the number of the rotating shafts 9 is two, the two rotating shafts 9 are respectively located on the front side and the back side of the fixing frame 8, the two rotating shafts 9 respectively run through the vertical plates on the front side and the back side of the fixing frame 8 and are rotatably connected with the vertical plates, the outer sides of the two rotating shafts 9 away from one end are fixedly connected with wire embedding rollers 10, the wire embedding rollers 10 are located at one ends of the rotating shafts 9 running through the vertical plates of the fixing frame 8, the number of the threaded bolts 13 is two, the threaded bolts 13 are arranged vertically, the rotating wheel 11 is attached to the vertical plates of the fixing frame 8, a shaft capable of rotating the rotating wheel 11 is installed on one side where the vertical plates are attached to the rotating wheel 11, the connecting relationship between the rotating wheel 11 and the vertical plates is a rotating connection, and one side of the rotating wheel 11 away from the vertical plates is provided with threaded holes corresponding to the threaded bolts 13.
In this embodiment, the number of the wire arrangement blocks 7 is two and is respectively located on the front side of the top of the bottom plate 1 and the back side of the top, the support 4 is located on the right side of the push rod 3, the wire arrangement block 7 is located on the right side of the support 4, wire holes matched with the cables are formed in the surface of the wire arrangement block 7, and a partition plate is arranged in the middle of the wire arrangement barrel 5 and used for distinguishing two bundles of cables.
The working principle of the above embodiment is as follows:
the cable through will reason a line section of thick bamboo 5 passes reason line piece 7, makes the cable be located the crack of roller 10 that buries, through handheld push rod 3, and then promotes bottom plate 1 to drive roller 10 that buries and lay, when the interval of needs regulation cable, through becoming flexible screw bolt 13 with fixed block 12 from runner 11 not hard up, after adjusting the interval well, insert the screw hole of runner 11 with two sets of screw bolts in front and back again.
It is to be noted that the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising a … …" does not exclude the presence of another identical element in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a hydraulic and hydroelectric engineering is with device of sunkening cord, includes bottom plate (1), its characterized in that: the wire embedding device comprises a bottom plate (1), a moving wheel (2) is fixedly connected to the bottom of the bottom plate (1), a push rod (3) is fixedly connected to the top of the left side of the bottom plate (1), a support (4) is fixedly connected to the top of the bottom plate (1), a wire arranging barrel (5) is rotatably connected to the inner side of the support (4), a handle (6) is fixedly connected to the circle center of the wire arranging barrel (5), a wire arranging block (7) is fixedly connected to the top of the bottom plate (1), and a wire embedding device is arranged on the right side of the bottom plate (1);
the utility model discloses a buried line device, including the mount (8) of fixed connection on bottom plate (1) right side, the inside of mount (8) is rotated and is connected with pivot (9), the one end fixedly connected with of pivot (9) buries line roller (10), the outside of pivot (9) is rotated and is connected with runner (11), the outside swing joint of pivot (9) has fixed block (12), the inboard threaded connection of fixed block (12) has threaded bolt (13).
2. The line burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: the number of the wire arranging blocks (7) is two and the two wire arranging blocks are respectively positioned on the front surface of the top of the bottom plate (1) and the back surface of the top.
3. The thread burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: the support (4) is located on the right side of the push rod (3), and the wire arranging block (7) is located on the right side of the support (4).
4. The thread burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: the fixing frame (8) is composed of a transverse plate and two vertical plates, and the two vertical plates are respectively positioned on the front surface and the back surface of the transverse plate.
5. The thread burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: the number of the rotating shafts (9) is two, the two rotating shafts (9) are respectively positioned on the front surface and the back surface of the fixing frame (8), and the two rotating shafts (9) are fixedly connected with the wire embedding rollers (10) at the outer sides of the ends which are away from each other.
6. The thread burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: the number of the threaded bolts (13) is two, and the threaded bolts (13) are arranged up and down.
7. The thread burying device for the water conservancy and hydropower engineering according to claim 4, characterized in that: the rotating wheel (11) is attached to a vertical plate of the fixing frame (8), and a threaded hole corresponding to the threaded bolt (13) is formed in one side, away from the vertical plate, of the rotating wheel (11).
CN202221799573.1U 2022-07-13 2022-07-13 Hydraulic and hydroelectric engineering is with device of sunkening cord Active CN217935014U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221799573.1U CN217935014U (en) 2022-07-13 2022-07-13 Hydraulic and hydroelectric engineering is with device of sunkening cord

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221799573.1U CN217935014U (en) 2022-07-13 2022-07-13 Hydraulic and hydroelectric engineering is with device of sunkening cord

Publications (1)

Publication Number Publication Date
CN217935014U true CN217935014U (en) 2022-11-29

Family

ID=84188600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221799573.1U Active CN217935014U (en) 2022-07-13 2022-07-13 Hydraulic and hydroelectric engineering is with device of sunkening cord

Country Status (1)

Country Link
CN (1) CN217935014U (en)

Similar Documents

Publication Publication Date Title
CN208628536U (en) It is a kind of for cutting the cutting machine V-type board plug device of structure-wall pipe material
CN217935014U (en) Hydraulic and hydroelectric engineering is with device of sunkening cord
CN210308354U (en) Novel horizontal pipe gallery steel mould
CN211812670U (en) Hydraulic engineering construction pipe laying pay-off
CN214783101U (en) Highway is road surface leveling device for construction
CN215947808U (en) Drainage ditch cover plate laying device for building municipal engineering
CN206318506U (en) A kind of loading machine quick-change head device
CN213573059U (en) Concrete floating device for civil engineering
CN213923830U (en) Pipe burying device for hydraulic and hydroelectric engineering
CN214460764U (en) A equipment for river course desilting
CN212104181U (en) Pipe network construction is with support fixing device that has layered structure
CN108953771B (en) Pipeline installation device for water and electricity pipeline engineering
CN114413064A (en) Underground drainage pipe laying device
CN113027052A (en) Construction method for laying polyvinyl chloride (PVC) waterproof coiled material
CN106836139B (en) Multifunctional semi-section channel unit
CN217412565U (en) Drilling equipment for steel parts for civil engineering building
CN206914809U (en) It is a kind of to beat pipe cap equipment for the automatic of plastic pipe
CN213351012U (en) Single-power cutting device for steel pipe for civil engineering construction
CN112342885B (en) Road surface hole filling equipment for municipal works
CN219411146U (en) Cover plate open side ditch sliding mode device for ditch construction
CN215561740U (en) Highway engineering film paving device
CN110867784A (en) Outdoor construction auxiliary assembly of cable for new forms of energy
CN209855684U (en) Scalable insulating single ladder of electric power construction
CN219717720U (en) Laying device for paying off cable
CN218227116U (en) Auxiliary device is used in installation of concrete structure reinforcing bar protective layer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant