CN108953771B - Pipeline installation device for water and electricity pipeline engineering - Google Patents
Pipeline installation device for water and electricity pipeline engineering Download PDFInfo
- Publication number
- CN108953771B CN108953771B CN201810945618.3A CN201810945618A CN108953771B CN 108953771 B CN108953771 B CN 108953771B CN 201810945618 A CN201810945618 A CN 201810945618A CN 108953771 B CN108953771 B CN 108953771B
- Authority
- CN
- China
- Prior art keywords
- rotary rod
- cardboard
- sides
- pipeline
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/22—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals
- F16L3/223—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals each support having one transverse base for supporting the pipes
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Sewage (AREA)
- Supports For Pipes And Cables (AREA)
Abstract
The invention discloses a pipeline installation device for hydroelectric pipeline engineering, which comprises a bottom plate, wherein supporting plates are fixed on two sides of the upper end of the bottom plate, a top plate is fixed on the top of the supporting plates, first bayonets are respectively arranged on the inner sides of the bottom plate and the top plate, a rotary rod is arranged between the supporting plates on two sides, sliding grooves are respectively arranged at the upper end and the lower end of the rotary rod, clamping blocks are slidably connected in the sliding grooves, an upper clamping plate is arranged at the upper end of the rotary rod and is slidably connected between the supporting plates on two sides, a lower clamping plate is arranged at the lower end of the rotary rod and is slidably connected between the supporting plates on two sides, clamping grooves are respectively arranged on one sides of the upper clamping plate and the lower clamping plate close to the rotary rod, a second bayonet is arranged on the other sides of the upper clamping plate and the lower clamping plate, the rotary, the time of pipeline installation is improved, and the work efficiency is improved.
Description
Technical Field
The invention relates to the technical field of pipeline installation, in particular to a pipeline installation device for hydroelectric pipeline engineering.
Background
Pipelines are widely used in the fields of houses, industry and the like as gas-liquid conveying channels. In daily life, the use of water supply pipe is very general, and the installation of pipeline indicates that to carry out centre gripping or location at installation pipeline in-process to the pipeline, and at the house decoration in-process, current pipeline is in the installation, because the quantity of pipeline is more, the workman need fix every pipeline subaerial to must arrange neatly still, such method wastes time and energy, consumes unnecessary time in a large number, and then influences the installation progress, reduces work efficiency.
Disclosure of Invention
The invention aims to solve the problems that in the prior art, the number of pipelines is large, workers need to fix each pipeline on the ground, the method wastes time and labor, consumes a large amount of unnecessary time, further influences the installation progress and reduces the working efficiency, and the pipeline installation device for the hydropower pipeline engineering is provided.
In order to achieve the purpose, the invention adopts the following technical scheme:
a pipeline installation device for water and electricity pipeline engineering comprises a bottom plate, wherein supporting plates are fixed on two sides of the upper end of the bottom plate, a top plate is fixed on the top of the supporting plate, the inner sides of the bottom plate and the top plate are both provided with a first bayonet, a rotating rod is arranged between the supporting plates on the two sides, and the upper and lower ends of the rotating rod are both provided with chutes, the chutes are internally and slidably connected with clamping blocks, springs are arranged in the chutes, one ends of the springs are fixedly connected to the bottom ends of the clamping blocks, the other ends of the springs are fixedly connected to the bottoms of the chutes, the upper end of the rotating rod is provided with an upper clamping plate, the upper clamping plate is connected between the supporting plates at the two sides in a sliding way, the lower end of the rotating rod is provided with a lower clamping plate, and the lower clamping plate is slidably connected between the supporting plates at the two sides, clamping grooves are formed in one sides, close to the rotary rod, of the upper clamping plate and the lower clamping plate, and a second bayonet is formed in the other side of the upper clamping plate and the other side of the lower clamping plate.
Preferably, the number of the first bayonets is the same as that of the second bayonets, and rubber pads are glued and fixed on the inner sides of the first bayonets and the second bayonets.
Preferably, the rotary rod passes through the bearing and rotates the connection in the backup pad, and one side backup pad is run through to the one end of rotary rod, and the one end welded fastening of rotary rod has the handle.
Preferably, the mounting plates are fixed to two sides of the bottom plate in a welding mode.
Preferably, the cross section of the clamping grooves is arc-shaped, and the number of the clamping grooves is the same as that of the clamping blocks.
Preferably, the top end of the clamping block is arc-shaped, and the clamping block is inserted into the clamping groove.
The invention has the beneficial effects that: the pipeline is inserted between the first bayonet and the second bayonet, the rotating handle is rotated to rotate the rotating rod, the rotating rod drives the clamping block to rotate while rotating, the upper clamping plate and the lower clamping plate are extruded by the clamping block to enable the first bayonet and the second bayonet to be close, so that the pipeline is fixed between the first bayonet and the second bayonet, and the surface of the rotating rod is provided with the sliding groove, the clamping block and the spring are installed in the sliding groove, when the upper clamping plate and the lower clamping plate are extruded by the clamping block, the clamping block slides downwards in the sliding groove simultaneously, the clamping block is inserted in the clamping groove to fix the rotating rod, so that the upper clamping plate and the lower clamping plate are fixed, and the pipeline is fixed, and the rubber pads are fixed on the inner sides of the first bayonet and the second bayonet and play a certain protection role on the pipeline, the pipeline can be fixed on the ground through the mounting plate, thereby facilitating the fixing arrangement of the pipeline and, the working efficiency is improved.
Drawings
FIG. 1 is a schematic front view of a piping installation device for hydroelectric piping works according to the present invention;
fig. 2 is a schematic view of an installation structure of a rotary rod, an upper clamping plate and a lower clamping plate in the pipeline installation device for the water and electricity pipeline engineering provided by the invention.
In the figure: 1 bottom plate, 2 backup pads, 3 roof, 4 lower cardboard, 5 go up cardboard, 6 rotary rods, 7 fixture blocks, 8 draw-in grooves, 9 handles, 10 first bayonet sockets, 11 rubber pads, 12 spout, 13 springs, 14 mounting panels, 15 second bayonet sockets.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-2, a pipeline installation device for hydroelectric pipeline engineering, comprising a bottom plate 1, wherein installation plates 14 are welded and fixed on two sides of the bottom plate 1, support plates 2 are welded and fixed on two sides of the upper end of the bottom plate 1, a top plate 3 is welded and fixed on the top of the support plates 2, first bayonets 10 are respectively arranged on the inner sides of the bottom plate 1 and the top plate 3, a rotary rod 6 is arranged between the support plates 2 on two sides, the rotary rod 6 is rotatably connected on the support plates 2 through bearings, one end of the rotary rod 6 penetrates through one support plate 2, a handle 9 is welded and fixed on one end of the rotary rod 6, sliding grooves 12 are respectively arranged at the upper end and the lower end of the rotary rod 6, a clamping block 7 is slidably connected in the sliding grooves 12, a spring 13 is arranged in each sliding groove 12, one end of the spring 13, and go up cardboard 5 through slider sliding connection between the backup pad 2 of both sides, the lower extreme of rotary rod 6 is equipped with down cardboard 4, and cardboard 4 passes through slider sliding connection between backup pad 2 of both sides down, go up cardboard 5 and lower cardboard 4 one side that is close to rotary rod 6 and all seted up draw-in groove 8, and go up cardboard 5 and the opposite side of lower cardboard 4 and seted up second bayonet socket 15, the quantity of first bayonet socket 10 is 8, the quantity of second bayonet socket 15 is 8, and the inboard of first bayonet socket 10 and second bayonet socket 15 all veneer is fixed with rubber pad 11, the cross section of draw-in groove 8 is arc, and the quantity of draw-in groove 8 is the same with the quantity of fixture block 7, the top of fixture block 7 is arc, be convenient for fixture block 7 to insert and establish in draw-in groove 8, and fixture block 7 inserts and.
In the embodiment, the device is fixed on the ground through the mounting plate 14, the pipeline is inserted between the first bayonet 10 and the second bayonet 15, the rotating handle 9 rotates the rotating rod 6, the rotating rod 6 rotates and simultaneously drives the fixture block 7 to rotate, the fixture block 7 extrudes the upper fixture plate 5 and the lower fixture plate 4, so that the first bayonet 10 is close to the second bayonet 15, the pipeline is fixed between the first bayonet 10 and the second bayonet 15, the chute 12 is formed in the surface of the rotating rod 6, the fixture block 7 is installed in the chute 12, a gap exists between the fixture block 7 and the inner wall of the chute 12, the spring 13 is welded at the lower end of the fixture block 7, the fixture block 7 slides downwards in the chute 12 when the fixture block 7 extrudes the upper fixture plate 5 and the lower fixture plate 4, the upper end of the fixture block 7 is arc-shaped, the cross section of the clamping groove 8 is arc-shaped, so that the fixture block, make rotary rod 6 fixed to make cardboard 5 fixed with lower cardboard 4 on the messenger, and make the pipeline fixed, owing to be fixed with rubber pad 11 in first bayonet socket 10 and the inboard of second bayonet socket 15, rubber pad 11 plays certain guard action to the pipeline, prevents the fish tail of pipeline outer wall, thereby makes things convenient for the fixed of pipeline and arranges, has improved the time of piping erection, has improved work efficiency.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.
Claims (6)
1. The utility model provides a pipeline installation device for water and electricity pipeline engineering, includes bottom plate (1), both sides of bottom plate (1) upper end are fixed with backup pad (2), and the top of backup pad (2) is fixed with roof (3), first bayonet socket (10) have all been seted up to the inboard of bottom plate (1) and roof (3), its characterized in that, be equipped with rotary rod (6) between backup pad (2) of both sides, and the upper and lower both ends of rotary rod (6) have all been seted up spout (12), sliding connection has fixture block (7) in spout (12), and is equipped with spring (13) in spout (12), and the one end fixed connection of spring (13) is in the bottom of fixture block (7), and the other end fixed connection of spring (13) is in the bottom of spout (12), the upper end of rotary rod (6) is equipped with cardboard (5), and goes up cardboard (5) sliding connection between backup pad (2, the lower extreme of rotary rod (6) is equipped with down cardboard (4), and cardboard (4) sliding connection is between both sides backup pad (2) down, go up cardboard (5) and all seted up draw-in groove (8) with lower cardboard (4) one side that is close to rotary rod (6), and the opposite side of going up cardboard (5) and cardboard (4) down has seted up second bayonet socket (15).
2. A conduit mounting device for hydroelectric pipe work according to claim 1, wherein the number of the first bayonets (10) is the same as the number of the second bayonets (15), and rubber pads (11) are glued and fixed on the inner sides of the first bayonets (10) and the second bayonets (15).
3. A pipe installation device for hydroelectric pipe engineering, according to claim 1, characterized in that the rotary rod (6) is rotatably connected to the support plate (2) through a bearing, and one end of the rotary rod (6) penetrates through one side of the support plate (2), and one end of the rotary rod (6) is welded and fixed with a handle (9).
4. A pipe installation device for hydroelectric pipe engineering according to claim 1, wherein the installation plates (14) are welded and fixed on both sides of the bottom plate (1).
5. The pipe installation device for hydroelectric pipeline engineering according to claim 1, wherein the cross section of the clamping grooves (8) is arc-shaped, and the number of the clamping grooves (8) is the same as the number of the clamping blocks (7).
6. A pipe installation device for hydroelectric pipeline engineering according to claim 1, wherein the top end of the fixture block (7) is arc-shaped, and the fixture block (7) is inserted into the slot (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810945618.3A CN108953771B (en) | 2018-08-20 | 2018-08-20 | Pipeline installation device for water and electricity pipeline engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810945618.3A CN108953771B (en) | 2018-08-20 | 2018-08-20 | Pipeline installation device for water and electricity pipeline engineering |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108953771A CN108953771A (en) | 2018-12-07 |
CN108953771B true CN108953771B (en) | 2020-06-02 |
Family
ID=64470789
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810945618.3A Active CN108953771B (en) | 2018-08-20 | 2018-08-20 | Pipeline installation device for water and electricity pipeline engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108953771B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109745864A (en) * | 2019-03-20 | 2019-05-14 | 湖南泰瑞医疗科技有限公司 | Reverse osmosis equipment and its pressure vessel for reverse osmosis fixed structure |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1290016B (en) * | 1965-09-14 | 1969-02-27 | Anger Kunststoff | Plate-shaped spacers for bundled pipes to be laid |
JP3742718B2 (en) * | 1997-02-15 | 2006-02-08 | スレド ガード テクノロジー リミテッド | Equipment for supporting tubes |
JP3313660B2 (en) * | 1999-03-11 | 2002-08-12 | 株式会社栗本鐵工所 | Tube pillow |
KR101041969B1 (en) * | 2009-03-04 | 2011-06-16 | 대경기업(주) | A piping plate |
US9863556B2 (en) * | 2013-04-25 | 2018-01-09 | Atmar Keith ROBERT, JR. | Corrosion reducing minimum contact clamp for supporting and securing tubing |
CN204872185U (en) * | 2015-06-24 | 2015-12-16 | 国网山东省电力公司济南供电公司 | Cement pole is deposited and is used fixing device |
CN205424118U (en) * | 2016-04-01 | 2016-08-03 | 信阳职业技术学院 | Adjustable high concrete duct fixing device |
CN206159658U (en) * | 2016-10-13 | 2017-05-10 | 刚大赫 | Outside protection device of petroleum pipeline |
CN207316237U (en) * | 2017-09-28 | 2018-05-04 | 西南石油大学 | A kind of height-adjustable petroleum pipeline supporting rack |
CN207729053U (en) * | 2017-12-19 | 2018-08-14 | 汤云普 | A kind of natural gas tube channel fixing device |
CN108068160A (en) * | 2017-12-28 | 2018-05-25 | 安徽安凯汽车股份有限公司 | A kind of clarinet blanking fixture |
CN208412533U (en) * | 2018-03-14 | 2019-01-22 | 余流平 | A kind of petroleum pipeline clamping device |
-
2018
- 2018-08-20 CN CN201810945618.3A patent/CN108953771B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN108953771A (en) | 2018-12-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202308184U (en) | Battery casing feeding overturning device | |
CN205764496U (en) | A kind of practical electric welding machine case of environmental protection | |
CN209869061U (en) | Ceramic tile drilling positioner for building | |
CN108953771B (en) | Pipeline installation device for water and electricity pipeline engineering | |
CN208628536U (en) | It is a kind of for cutting the cutting machine V-type board plug device of structure-wall pipe material | |
CN202377803U (en) | Multi-hole lathe fixture for machining cases | |
CN209578429U (en) | A kind of water pipe welder | |
CN218818629U (en) | Hydraulic engineering pipeline fixing device | |
CN210941850U (en) | Pipe conveying device | |
CN212104181U (en) | Pipe network construction is with support fixing device that has layered structure | |
CN203726219U (en) | Clamping mechanism for silicon bar cutting-off machine tool | |
CN210453458U (en) | Accurate location does not have support hydraulic pressure foaming platform | |
CN214489468U (en) | Fastening device for water conservancy and hydropower building construction | |
CN212273258U (en) | Pipeline fixing device for hydraulic engineering | |
CN204187129U (en) | Exempt to weld collapsible cable bearer | |
CN211690959U (en) | Water circulation utilization device of energy-saving building curtain wall | |
CN210430842U (en) | Cable fixation clamp for electrical engineering | |
CN210412771U (en) | Cutting device is used in drain pipe processing | |
CN204526155U (en) | A kind of PPR pipe thermofusion device and hot melt grafting machine thereof | |
CN208070626U (en) | A kind of no-power drum holder | |
CN218212943U (en) | Water quality detection device for hydraulic engineering | |
CN220377641U (en) | Color steel plate convenient to assemble | |
CN213541526U (en) | Fixing device for water conservancy and hydropower buried pipe | |
CN211028106U (en) | Automatic workpiece clamping mechanism of inner core drilling and turning machine tool | |
CN215291800U (en) | Hydraulic engineering is with construction guardrail that has fluorescence warning mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 239000 room 613, block C, 1999 Fung Road, Chuzhou, Anhui (Changjiang Fortune Plaza). Patentee after: Anhui Qiran Construction Technology Co., Ltd Address before: 239000 room 613, block C, 1999 Fung Road, Chuzhou, Anhui (Changjiang Fortune Plaza). Patentee before: CHUZHOU QIRAN DECORATION ENGINEERING Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |