CN204872185U - Cement pole is deposited and is used fixing device - Google Patents

Cement pole is deposited and is used fixing device Download PDF

Info

Publication number
CN204872185U
CN204872185U CN201520440356.7U CN201520440356U CN204872185U CN 204872185 U CN204872185 U CN 204872185U CN 201520440356 U CN201520440356 U CN 201520440356U CN 204872185 U CN204872185 U CN 204872185U
Authority
CN
China
Prior art keywords
axle
sleeve
cement pole
ball
deposited
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520440356.7U
Other languages
Chinese (zh)
Inventor
肖茂友
王依标
王贞民
陈萌
金璐
马明慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201520440356.7U priority Critical patent/CN204872185U/en
Application granted granted Critical
Publication of CN204872185U publication Critical patent/CN204872185U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

The utility model discloses a cement pole is deposited and is used fixing device, its structure includes support body, axle and rolling device, the support body constitute by two risers and a bottom plate, be connected with the riser respectively perpendicularly in the corresponding both sides of bottom plate, it has three row at least axles to arrange about between two riser inboards, every row of axle parallel is equipped with at least two, the epaxial a plurality of rolling device that evenly is equipped with the limiting plate respectively between every adjacent rolling device, the rolling device comprises sleeve and ball, the sleeve is put with the axle sleeve, at the inside through -hole that is equipped with of sleeve, be equipped with the ball in the through -hole, ball and axle rolling friction, the sleeve outside is the arcwall face to the indent. This fixing device increases than the current mode of stacking and stacks quantity, and can guarantee that the cement pole of stacking can not sideslip or turn on one's side under the same condition of area occupied, just is convenient for get and puts, and labour saving and time saving reduces intensity of labour.

Description

A kind of cement pole is deposited and is used anchor fitting
Technical field
The utility model relates to a kind of anchor fitting, and specifically a kind of cement pole is deposited and used anchor fitting.
Background technology
Existing cement pole is stacked basic employing taper and is stacked mode, this mode exist take store area large, utilization of area efficiency is low, stack the too high upper strata cement pole that easily causes to break away, cement pole is caused to damage and injury to personnel, for addressing this problem, existing mode adopts substantially reinforces bottom both sides cement poles, pads triangle or wedge shape anchor fitting (stone, steel etc.) is reinforced below the cement pole of bottom both sides.Upper strata cement pole first can only be removed laggard line operate by access bottom cement pole, causes work capacity to strengthen.
Utility model content
The purpose of this utility model is to provide a kind of cement pole to deposit with anchor fitting, and this anchor fitting, when area occupied is identical, increases stacking quantity than existing stacking mode, and can ensure that the cement pole stacked can not break away or turn on one's side, and be convenient to pick and place, time saving and energy saving, reduce labour intensity.
The technical scheme in the invention for solving the technical problem is: a kind of cement pole is deposited with anchor fitting, its structure comprises support body, axle and tourelle, described support body is made up of two risers and a base plate, vertically riser is connected with respectively in the corresponding both sides of base plate, be arranged above and below between inside two risers at least three row's axles, often row axle is parallel is provided with at least two, described axle is evenly provided with several tourelles, between often adjacent tourelle, is respectively equipped with positioning plate; Described tourelle is made up of sleeve and ball, and described sleeve and axle sleeve are put, and is provided with a through hole in sleeve inner, is provided with ball in described through hole, ball and axle friction of rolling; Arcwall face for concaving outside described sleeve.
Further, the two ends of described axle are fixedly connected with respectively with inside the riser of support body, the ball in described sleeve and axle point cantact.
Further, described positioning plate is a circular plate body, and the through hole of positioning plate is put with axle sleeve and is fixedly connected with.
The beneficial effects of the utility model are:
1, because the support body employing of this anchor fitting arranges riser in base plate both sides, can ensure that the cement pole stacked can not due to too high and turn on one's side, the personnel that cause are avoided to injure, the axle of many rows with tourelle is had between riser, ensure that the cement pole quantity of often arranging stacking is identical, under floor area same case, add and stack cement pole quantity, make full use of space.Owing to having sufficient distance between upper row and the axle of lower row, when picking and placeing cement pole, without the need to again upper strata cement pole being removed laggard line operate, time saving and energy saving, ensure worker safety.
If 2, due to the axle between riser being provided with individual tourelle, and be the arcwall face of indent outside the sleeve of tourelle, when placing cement pole, because cement pole is cylindrical, cement pole more can be fitted with the sleeve of arcwall face, prevents from breakking away; Because sleeve is by ball and axle point cantact, stack cement pole time only need pile from one end into, time saving and energy saving.
3, owing to being provided with positioning plate between often adjacent tourelle, prevent tourelle from moving both sides while rotation, ensure that the stability of tourelle, safety labor-saving when cement pole is stacked.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the left view of the utility model using state;
Fig. 3 is the birds-eye view of Fig. 1;
Fig. 4 is the connection diagram of support body and axle in the utility model;
Fig. 5 is the connection diagram of tourelle and axle;
Fig. 6 is the left view of Fig. 5;
Fig. 7 is using state figure of the present utility model.
In figure: 1 riser, 2 base plates, 3 axles, 4 tourelles, 41 through holes, 42 balls, 43 sleeves, 5 positioning plates, 6 cement poles.
Detailed description of the invention
With reference to Figure of description, a kind of cement pole of the present utility model is deposited and be described in detail below with anchor fitting.
As shown in Fig. 1, Fig. 3, Fig. 4, a kind of cement pole of the present utility model is deposited with anchor fitting, its structure comprises support body, axle 3 and tourelle, described support body is made up of two risers 1 and a base plate 2, riser 1 is vertically connected with respectively in the corresponding both sides of base plate 2, be arranged above and below between inside two risers 1 at least three row's axles 3, often row axle is parallel is provided with at least two, also many rows many axles can be set according to the situation in different place, increase while stacking cement pole quantity, ensure the stability of cement pole, prevent landing.
As shown in Figure 5, Figure 6, described axle 3 is evenly provided with several tourelles 4, between often adjacent tourelle, is respectively equipped with positioning plate 5; Described tourelle is made up of sleeve 43 and ball 42, and described sleeve 43 is nested with axle 3, is provided with a through hole 41, is provided with ball 42 in described through hole 41 in sleeve 43 inside, ball 42 and axle 3 friction of rolling; Arcwall face for concaving outside described sleeve 43.Because cement pole 6 is cylindrical, cement pole 6 more can be fitted with the sleeve 43 of arcwall face, prevents from breakking away; Because sleeve 43 is by ball 42 and axle 3 point cantact, only need pile from one end when stacking cement pole into, time saving and energy saving.
The two ends of described axle 3 are fixedly connected with respectively with inside the riser 1 of support body, the ball 42 in described sleeve 43 and axle 3 point cantact.Distance between two rows tourelle will ensure that cement pole slides smoothly, so that the heap of cement pole enters and takes out.
Described positioning plate is a circular plate body, and the through hole of positioning plate is put with axle sleeve and is fixedly connected with.Positioning plate, prevent tourelle from moving both sides while rotation, positioning plate ensure that the stability of tourelle, safety labor-saving when cement pole is stacked.
As Fig. 2, shown in Fig. 7, during use, at least need two these anchor fittings, be placed in the two ends of cement pole respectively, when stacking cement pole, a cement pole is stacked the tourelle axle from one end of this device, cement pole one end is contacted with sleeve arcwall face, then cement pole is piled into, be connected because tourelle rolls with axle, staff only need very little power cement pole is piled into, time saving and energy saving, and the upper cement pole quantity of stacking of each row is identical, actv. adds stacks space, also can pick and place arbitrarily the cement pole of each row, without the need to again upper strata cement pole being removed laggard line operate, time saving and energy saving, ensure worker safety.
The above, just explain through diagrams principles more of the present utility model, this specification sheets is not the utility model to be confined in shown described concrete structure and Applicable scope, therefore every corresponding modify of being likely utilized and equivalent, all belong to the scope of the claims that the utility model is applied for.
Except technical characteristic described in specification sheets, all the other technical characteristics are those skilled in the art's known technology.

Claims (3)

1. a cement pole is deposited with anchor fitting, it is characterized in that, comprise support body, axle and tourelle, described support body is made up of two risers and a base plate, vertically be connected with riser respectively in the corresponding both sides of base plate, be arranged above and below between inside two risers at least three row's axles, often row axle is parallel is provided with at least two, described axle is evenly provided with several tourelles, between often adjacent tourelle, is respectively equipped with positioning plate; Described tourelle is made up of sleeve and ball, and described sleeve and axle sleeve are put, and is provided with a through hole in sleeve inner, is provided with ball in described through hole, ball and axle friction of rolling; Arcwall face for concaving outside described sleeve.
2. a kind of cement pole according to claim 1 is deposited with anchor fitting, and it is characterized in that, the two ends of described axle are fixedly connected with respectively with inside the riser of support body, the ball in described sleeve and axle point cantact.
3. a kind of cement pole according to claim 1 is deposited with anchor fitting, and it is characterized in that, described positioning plate is a circular plate body, and the through hole of positioning plate is put with axle sleeve and is fixedly connected with.
CN201520440356.7U 2015-06-24 2015-06-24 Cement pole is deposited and is used fixing device Expired - Fee Related CN204872185U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520440356.7U CN204872185U (en) 2015-06-24 2015-06-24 Cement pole is deposited and is used fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520440356.7U CN204872185U (en) 2015-06-24 2015-06-24 Cement pole is deposited and is used fixing device

Publications (1)

Publication Number Publication Date
CN204872185U true CN204872185U (en) 2015-12-16

Family

ID=54816586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520440356.7U Expired - Fee Related CN204872185U (en) 2015-06-24 2015-06-24 Cement pole is deposited and is used fixing device

Country Status (1)

Country Link
CN (1) CN204872185U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105947403A (en) * 2016-07-05 2016-09-21 太仓市金毅电子有限公司 Plastic package
CN108190180A (en) * 2017-12-19 2018-06-22 中国建筑第八工程局有限公司 The device and its application method of the storage of lattice supporting member, transport and installation
CN108216972A (en) * 2017-11-29 2018-06-29 中车齐齐哈尔车辆有限公司 Container and container loading method
CN108953771A (en) * 2018-08-20 2018-12-07 滁州市棋然装饰工程有限公司 A kind of water power pipeline engineering plumbing installation
CN114701735A (en) * 2022-04-24 2022-07-05 曹银涛 Space-saving building material stacking device for highway construction and using method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105947403A (en) * 2016-07-05 2016-09-21 太仓市金毅电子有限公司 Plastic package
CN108216972A (en) * 2017-11-29 2018-06-29 中车齐齐哈尔车辆有限公司 Container and container loading method
CN108190180A (en) * 2017-12-19 2018-06-22 中国建筑第八工程局有限公司 The device and its application method of the storage of lattice supporting member, transport and installation
CN108190180B (en) * 2017-12-19 2023-11-21 中国建筑第八工程局有限公司 Device for storage, transportation and installation of lattice support members and method of use thereof
CN108953771A (en) * 2018-08-20 2018-12-07 滁州市棋然装饰工程有限公司 A kind of water power pipeline engineering plumbing installation
CN114701735A (en) * 2022-04-24 2022-07-05 曹银涛 Space-saving building material stacking device for highway construction and using method thereof

Similar Documents

Publication Publication Date Title
CN204872185U (en) Cement pole is deposited and is used fixing device
CN203006065U (en) Plastic pipe placing rack
CN203020712U (en) Storage rack applicable for piling and transferring rolls
CN203948793U (en) Delivery pipe support and Vehicular concrete conveying pump
CN204078272U (en) Combined hanging framework
CN202558275U (en) Tray stacking system
CN106480898A (en) The telescopic base structure of mountain area small load
CN203889444U (en) Escalator truss sectional material placement rack
CN203997424U (en) Suspension type tubing stacking adapter
CN209380716U (en) A kind of head rolling machine material frame
CN203819670U (en) Containerized general transport case group
CN203064333U (en) Loading box convenient to stack
CN202489016U (en) Shallow water seedling growing plate
CN202090606U (en) Putting platform for putting steel-bar stirrup
CN202124459U (en) Cap removing plate of cap remover for vacuum test tubes
CN204463167U (en) Card hopper and automatic card dispenser
CN212224636U (en) Building construction is platform is stacked with template in scene
CN205241099U (en) Interim strorage device of body of tower round pin axle
CN215753594U (en) Three-dimensional storage frame of prefabricated component
CN206051170U (en) A kind of line concentrator of computer connection wire
CN202346119U (en) Support for cable reel
CN217350362U (en) Tool capable of stacking and hoisting stirrups
CN204197601U (en) Stirrup stores lifting frame
CN207595486U (en) A kind of shelf that can make tubulose class stack of goods
CN213324620U (en) Steel pipe storage rack

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151216

Termination date: 20200624