CN205241099U - Interim strorage device of body of tower round pin axle - Google Patents

Interim strorage device of body of tower round pin axle Download PDF

Info

Publication number
CN205241099U
CN205241099U CN201520860562.3U CN201520860562U CN205241099U CN 205241099 U CN205241099 U CN 205241099U CN 201520860562 U CN201520860562 U CN 201520860562U CN 205241099 U CN205241099 U CN 205241099U
Authority
CN
China
Prior art keywords
bearing pin
chuck plate
fixing chuck
round pin
pin axle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520860562.3U
Other languages
Chinese (zh)
Inventor
王建军
米成宏
吴海波
李玉杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Construction Machinery Group Co Ltd XCMG
Original Assignee
Xuzhou Construction Machinery Group Co Ltd XCMG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Construction Machinery Group Co Ltd XCMG filed Critical Xuzhou Construction Machinery Group Co Ltd XCMG
Priority to CN201520860562.3U priority Critical patent/CN205241099U/en
Application granted granted Critical
Publication of CN205241099U publication Critical patent/CN205241099U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an interim strorage device of body of tower round pin axle, including fixed cardboard (1), should fixed cardboard (1) set up the end root at standard festival main chord member (2), and its both sides respectively detachable be connected to with fixed two diagonal bracings of above -mentioned main chord member (2) end root on. Can realize temporarily putting of round pin axle, save installer, improve the installation effectiveness.

Description

Tower body bearing pin temporary storage apparatus
Technical field
The utility model relates to a kind of storing unit, relates in particular to a kind of tower body bearing pin temporary storage apparatus.
Background technology
At present,, structurally generally there is not the interim deposit position of bearing pin, as shown in Figure 1 in the standard knot of existing derrick crane bearing pin type of attachment. Bearing pin generally needs supernumerary to transmit specially in installation process. Although the accurate internode of every feast-brand mark all needs to connect by bearing pin, but near connecting portion, there is not the interim deposit position of bearing pin, the personnel that bearing pin is installed in installation process need the position of extra care bearing pin, or need all the other personnel to coordinate, and install to realize smoothly.
Thereby there is in design following technical disadvantages: 1, installation effectiveness is lower. While bearing pin being installed because every joint standard knot docking is rear, all need to look for from elsewhere bearing pin, consuming time longer; 2, take installation personnel many: because bearing pin does not have the fixing position of temporarily putting, when high-altitude installation code joint, the cooperation that bearing pin personnel need other people is installed. Realize the transmission of installation process bearing pin.
Utility model content
For above-mentioned existing technical problem, the utility model provides a kind of tower body bearing pin temporary storage apparatus, and object is just to make bearing pin in installation process can have correct position to put, and makes to install more quick and easy.
For achieving the above object, the interim deposit position of tower body bearing pin of the present utility model, comprise fixing chuck plate, this fixing chuck plate is arranged on the end root of main chord of standard section, and its both sides are dismountable being connected on two diagonal web members fixing with root at the bottom of above-mentioned main chord respectively, can realize the temporarily putting of bearing pin.
Further, described fixing chuck plate is provided with the hole of depositing of assigning bearing pin. Before lifting tower-body standard section, connection bearing pin is placed in fixing chuck plate, in the time that standard knot hoisted in position is installed, installation personnel directly takes off bearing pin from fixing chuck plate, just can install, without separately bearing pin being carried out to handling.
Further, described fixing chuck plate is provided with four, is arranged on respectively the end root of four main chords of standard knot.
The utility model has designed fixing chuck plate at main chord of standard section root, has realized the function of temporarily depositing, and connection bearing pin can be placed on to nearer position, distance join place and just can conveniently install. There is following advantage: 1, install, dismantle and save manpower. In cargo handling process, do not need other people to coordinate, bearing pin can be picked and placeed at any time. 2, installation, removal efficiency are high. The bearing pin that installation needs near installation position, can be picked and placeed by installation personnel at any time at any time.
Brief description of the drawings
Fig. 1 is the connection diagram of column crane mast section in prior art;
Fig. 2 is structural representation of the present utility model;
Fig. 3 be in Fig. 2 H-H to structural representation;
In figure: 1, fixing chuck plate, 2, main chord of standard section.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
In order to make installation process more smooth, install rapider, therefore designed the structure with bearing pin temporary storage apparatus, version as shown in Figure 2, comprise fixing chuck plate 1, this fixing chuck plate 1 is arranged on the end root of main chord of standard section 2, and its both sides are dismountable being connected on two diagonal web members fixing with above-mentioned main chord 2 end root respectively, and fixing chuck plate 1 is provided with the hole of depositing of assigning bearing pin.
In above-described embodiment, in order to facilitate the installation of each main chord 2, described fixing chuck plate 1 is provided with four, is arranged on respectively the end root of four main chords 2 of standard knot.
When use, preparatory stage is installed, first two bearing pins that connect a main chord 2 are left on fixing chuck plate 1 temporarily, after docking standard knot size is suitable, take off a bearing pin and realize installation, take off subsequently another part bearing pin and install, and then complete the bearing pin connection of this main chord 2, in installation process, do not need other people cooperation.
By the application of this technology, the installation of XGTT1200 tower machine standard knot is more efficient and convenient, has improved installation effectiveness, has saved installation manpower. Meanwhile, the design of other products is had to important reference value.

Claims (3)

1. a tower body bearing pin temporary storage apparatus, it is characterized in that, comprise fixing chuck plate (1), this fixing chuck plate (1) is arranged on the end root of main chord of standard section (2), and its both sides dismountable being connected on two diagonal web members fixing with above-mentioned main chord (2) end root respectively.
2. a kind of tower body bearing pin temporary storage apparatus according to claim 1, is characterized in that, described fixing chuck plate (1) is provided with the hole of depositing of assigning bearing pin.
3. a kind of tower body bearing pin temporary storage apparatus according to claim 1 and 2, is characterized in that, described fixing chuck plate (1) is provided with four, is arranged on respectively the end root of four main chords of standard knot (2).
CN201520860562.3U 2015-11-02 2015-11-02 Interim strorage device of body of tower round pin axle Active CN205241099U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520860562.3U CN205241099U (en) 2015-11-02 2015-11-02 Interim strorage device of body of tower round pin axle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520860562.3U CN205241099U (en) 2015-11-02 2015-11-02 Interim strorage device of body of tower round pin axle

Publications (1)

Publication Number Publication Date
CN205241099U true CN205241099U (en) 2016-05-18

Family

ID=55940178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520860562.3U Active CN205241099U (en) 2015-11-02 2015-11-02 Interim strorage device of body of tower round pin axle

Country Status (1)

Country Link
CN (1) CN205241099U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106477466A (en) * 2016-11-03 2017-03-08 徐州建机工程机械有限公司 Novel pin shaft carrier structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106477466A (en) * 2016-11-03 2017-03-08 徐州建机工程机械有限公司 Novel pin shaft carrier structure

Similar Documents

Publication Publication Date Title
CN205527410U (en) Balanced heavy device of installing and removing by oneself of tower crane
CN205241099U (en) Interim strorage device of body of tower round pin axle
CN204645570U (en) One can have enough to meet the need elevator shaft protective platform
MX2021010866A (en) Vertical slip form construction system with multi-function platform, and method of constructing a building therewith.
CN103243932A (en) Structure for detaching inner climbing tower crane through roof crane and construction method thereof
CN202344163U (en) Special tool for manufacturing large or tin-wall tank body by hyperbaton
CN204434123U (en) Tower body in tower crane resistance to deformation
CN103470057B (en) A kind of high-altitude component hoisting construction method
CN102777036A (en) Air reverse mechanical joint construction method of super-long vertical reinforcement cage
CN101787795B (en) Large-size net rack suspension cable mounting platform and suspension cable construction method
CN201647823U (en) Connecting device between crown block main beam and end beam
CN204847572U (en) Support frame that cable laying used
CN205116033U (en) A reinforcing bar hoist device that is used for high mound of bridge to be under construction
CN203998724U (en) A kind of tower machine attached wall assembling and disassembling stand
CN203359782U (en) Lifting appliance
CN209443487U (en) A kind of diversion works prefabricated open caisson installation equipment
CN204714372U (en) A kind of hoisting box latch-up structure
CN208869166U (en) Precast stair suspender
CN203568661U (en) Built-in tail-sliding lifting lug
CN206569900U (en) Assembling type steel structure builds mainboard mast-up and Lift-on/Lift-off System
CN202090580U (en) Telescopic operating platform
CN206645698U (en) A kind of Portable multi-functional lifting device
CN205173734U (en) FRP (Fiber reinforced plastics) pipeline
CN205973548U (en) Marine A -frame
CN103420263A (en) Prefabricated plate hoisting tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant