CN212104181U - Pipe network construction is with support fixing device that has layered structure - Google Patents

Pipe network construction is with support fixing device that has layered structure Download PDF

Info

Publication number
CN212104181U
CN212104181U CN202020447851.1U CN202020447851U CN212104181U CN 212104181 U CN212104181 U CN 212104181U CN 202020447851 U CN202020447851 U CN 202020447851U CN 212104181 U CN212104181 U CN 212104181U
Authority
CN
China
Prior art keywords
layered structure
clamping
fixing device
pipe network
network construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020447851.1U
Other languages
Chinese (zh)
Inventor
刘俊勉
杨冬红
黄振
李树辉
胡亮
周定超
吴沛泽
汤景旭
马良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen MCC guanlang Technology Development Co.,Ltd.
Original Assignee
Shenzhen Mcc Pipe Gallery Construction Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Mcc Pipe Gallery Construction Investment Co Ltd filed Critical Shenzhen Mcc Pipe Gallery Construction Investment Co Ltd
Priority to CN202020447851.1U priority Critical patent/CN212104181U/en
Application granted granted Critical
Publication of CN212104181U publication Critical patent/CN212104181U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipe network construction is with supporting fixing device who has layered structure, including wall body, regulating plate and centre gripping buckle, the wall body surface is provided with the regulating plate, and the inside expansion bolts that runs through of regulating plate, the spout has been seted up on regulating plate both sides surface, and the inside rack that is provided with of regulating plate, the rack side is connected with adjusting gear, and inside running through of adjusting gear has changeed the handle, it has the A-frame to change outer wall parcel, bolt head outer wall parcel has the nut, the centre gripping buckle is fixed in the A-frame top. This pipe network construction is with supporting fixing device who has layered structure changes the handle through rotating and can make adjusting gear reciprocate along the meshing of rack side to drive the A-frame and reciprocate, should be provided with and do benefit to the height at place of adjusting the A-frame, be favorable to making and adjust to same water flat line between the A-frame, thereby the guarantee pipeline can not appear crooked after the installation, is favorable to improving the life of pipeline.

Description

Pipe network construction is with support fixing device that has layered structure
Technical Field
The utility model relates to a pipe network construction technical field specifically is a pipe network construction is with supporting fixing device who has layered structure.
Background
The utility tunnel is exactly the utility tunnel of underground city pipeline, builds a tunnel space in the city underground promptly, collects various engineering pipelines such as electric power, communication, gas, heat supply, plumbing in an organic whole, is the important infrastructure and the lifeline of guarantee city operation, and for the inside limited space of maximize utilization piping lane, often can arrange the pipeline layering, just need have corresponding support frame to fix the pipeline this moment.
The horizontal wiring needs to be carried out on the wall before the installation to current carriage, nevertheless still can appear crooked in the actual installation between the carriage to lead to the pipeline to appear inclining, easily lead to pipeline butt joint department to appear the gap and cause the seepage, and reduce pipeline life, to above-mentioned condition, we have provided a pipe network construction with having layered structure's support fixing device.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pipe network construction is with supporting fixing device who has layered structure to propose general carriage and need carry out the level wiring before the installation in solving above-mentioned background art, nevertheless still can appear crooked in the actual installation between the support frame, thereby lead to the pipeline to appear inclining, easily lead to pipeline butt joint department to appear the gap and cause the seepage, and reduce pipeline life's problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pipe network construction is with supporting fixing device who has layered structure, includes wall body, regulating plate and centre gripping buckle, the wall body surface is provided with the regulating plate, and the inside expansion bolts that runs through of regulating plate, the spout has been seted up on regulating plate both sides surface, and the inside rack that is provided with of regulating plate, the rack side is connected with adjusting gear, and inside running through of adjusting gear has changeed the handle, it has the A-frame to change outer wall parcel, and changes the end and be provided with the bolt head, bolt head outer wall parcel has the nut, the centre gripping buckle is fixed in the A-frame top.
Preferably, the side surface of the adjusting plate is attached to the surface of the wall body, and the adjusting plate and the wall body form a fixing structure through expansion bolts.
Preferably, the adjusting gear and the adjusting plate form a meshing structure, and the racks are symmetrically distributed around the vertical center line of the adjusting plate.
Preferably, the triangular supports form a lifting structure through the adjusting gears, the racks and the adjusting plates, and the wall body forms a layered structure through the triangular supports.
Preferably, the clamping snap ring comprises a clamping ring, a clamping groove, a clamping block and a rubber pad, wherein the clamping groove is formed in one end of the clamping ring, the clamping block is arranged in the clamping groove, and the rubber pad is arranged on the inner wall of the clamping ring.
Preferably, the clamping ring forms an annular structure through the clamping groove and the clamping block, and the clamping ring forms a clamping structure through the rubber pad.
Compared with the prior art, the beneficial effects of the utility model are that: this pipe network construction is with supporting fixing device who has layered structure changes the handle through rotating and can make adjusting gear reciprocate along the meshing of rack side to drive the A-frame and reciprocate, should be provided with and do benefit to the height at place of adjusting the A-frame, be favorable to making and adjust to same water flat line between the A-frame, thereby the guarantee pipeline can not appear crooked after the installation, is favorable to improving the life of pipeline.
This pipe network construction passes through regulating plate evenly distributed in the wall body surface with the support fixing device A-frame that has layered structure, and the wall body carries out the layering planning through A-frame, is favorable to carrying out the layering classification to the pipeline when fixing to the pipeline to be favorable to making things convenient for later maintenance personnel to overhaul.
This pipe network construction is with supporting fixing device grip ring that has layered structure is flexible iron sheet, the draw-in groove has been seted up to its one end, the other end is provided with the fixture block, after the inside back of grip ring is gone into to the pipeline card, make the inside end to end connection of accomplishing the grip ring of fixture block card income draw-in groove, thereby the grip ring is inside to draw in to the pipeline centre gripping fixed this moment, this sets up convenient operation practicality and quick, work efficiency when being favorable to improving workman installation pipeline, and the grip ring inner wall is provided with the rubber pad, be favorable to improving the centre gripping dynamics to the pipeline through the rubber pad.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic view of the adjusting plate of the present invention;
fig. 3 is an enlarged schematic view of a portion a in fig. 1 according to the present invention.
In the figure: 1. a wall body; 2. an adjusting plate; 3. an expansion bolt; 4. a chute; 5. a rack; 6. an adjusting gear; 7. turning a handle; 8. a triangular bracket; 9. a bolt head; 10. a nut; 11. a clamping buckle; 1101. a clamp ring; 1102. a card slot; 1103. a clamping block; 1104. and (7) a rubber pad.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a supporting and fixing device with a layered structure for pipe network construction comprises a wall body 1, an adjusting plate 2 and a clamping buckle 11, wherein the surface of the wall body 1 is provided with the adjusting plate 2, an expansion bolt 3 penetrates through the inner part of the adjusting plate 2, the side surface of the adjusting plate 2 is attached to the surface of the wall body 1, the adjusting plate 2 forms a fixing structure with the wall body 1 through the expansion bolt 3, the adjusting plate 2 is fixed on the surface of the wall body 1 through the expansion bolt 3 after the side surface of the adjusting plate 2 is attached to the surface of the wall body 1, the arrangement is favorable for improving the connection firmness between the adjusting plate 2 and the wall body 1 and preventing falling, and the side surface of the adjusting plate 2 is attached to the surface of the wall body 1;
the adjusting plate 2 is provided with sliding grooves 4 on the surfaces of two sides, a rack 5 is arranged inside the adjusting plate 2, the side surface of the rack 5 is connected with an adjusting gear 6, a rotating handle 7 penetrates through the adjusting gear 6, the adjusting gear 6 forms a meshing structure with the adjusting plate 2 through the rack 5, the racks 5 are symmetrically distributed around the vertical central line of the adjusting plate 2, the outer wall of the rotating handle 7 is wrapped with a triangular bracket 8, the tail end of the rotating handle 7 is provided with a bolt head 9, the outer wall of the bolt head 9 is wrapped with a nut 10, the triangular bracket 8 forms a lifting structure through the adjusting gear 6, the rack 5 and the adjusting plate 2, the wall body 1 forms a layered structure through the triangular bracket 8, the adjusting gear 6 can be meshed with the side surface of the rack 5 to move up and down through rotating the rotating handle 7, so as to drive the triangular bracket 8 to, the triangular supports 8 can be adjusted to the same horizontal line, so that the pipeline is prevented from being inclined after being installed, the service life of the pipeline is prolonged, the rack 5 and the adjusting gear 6 are respectively provided with two parts which are beneficial to improving the stability of the triangular supports 8 during lifting, the triangular supports 8 are uniformly distributed on the surface of the wall body 1 through the adjusting plates 2, the wall body 1 is planned in a layered mode through the triangular supports 8, the pipeline is fixed and classified in a layered mode, and the pipeline maintenance is facilitated for later-period maintenance personnel;
the clamping snap ring 11 is fixed at the top of the triangular bracket 8, the clamping snap ring 11 comprises a clamping ring 1101, a clamping groove 1102, a clamping block 1103 and a rubber pad 1104, one end of the clamping ring 1101 is provided with the clamping groove 1102, the clamping block 1103 is arranged inside the clamping groove 1102, the inner wall of the clamping ring 1101 is provided with the rubber pad 1104, the clamping ring 1101 forms an annular structure through the clamping groove 1102 and the clamping block 1103, the clamping ring 1101 forms a clamping structure through the rubber pad 1104, the clamping ring 1101 is a flexible iron sheet, one end of the clamping ring 1101 is provided with the clamping groove 1102, the other end of the clamping ring 1101 is provided with the clamping block 1103, after a pipeline is clamped inside the clamping ring 1101, the clamping block 1103 is clamped into the clamping groove 1102 to complete the head-tail connection of the clamping ring 1101, the clamping ring 1101 is folded inside to clamp and fix the pipeline, the device is convenient, practical and rapid to operate, preventing the pipe from loosening.
The working principle is as follows: when the supporting and fixing device with the layered structure for pipe network construction is used, firstly, the side surface of the adjusting plate 2 is attached to the surface of the wall body 1, then the adjusting plate 2 is fixed on the surface of the wall body 1 through the expansion bolts 3, the arrangement is favorable for improving the connection firmness between the adjusting plate 2 and the wall body 1 and preventing falling off, then the adjusting gear 6 can be meshed to move up and down along the side surface of the rack 5 by rotating the rotating handle 7, so that the triangular support 8 is driven to move up and down, the arrangement is favorable for adjusting the height of the triangular support 8, the triangular support 8 is favorably adjusted to the same horizontal line, so that the pipeline is prevented from being inclined after being installed, the service life of the pipeline is favorably prolonged, and then the rotating handle 7 penetrates through the sliding groove 4 to expose the bolt head 9 at the tail end of the rotating handle 7 to be in threaded connection, avoid a triangular support 8 to take place the gliding, be favorable to improving the supporting effect of triangular support 8 simultaneously, go into inside back of clamping ring 1101 with the pipeline card after that, make clamping block 1103 card go into the inside end-to-end connection of accomplishing clamping ring 1101 of draw-in groove 1102, thereby clamping ring 1101 is inside draws in fixedly to the pipeline centre gripping this moment, this sets up convenient operation practicality and quick, work efficiency when being favorable to improving workman installation pipeline, last clamping ring 1101 inner wall is provided with rubber pad 1104, draw in through clamping ring 1101 and make rubber pad 1104 extrusion pipeline, be favorable to improving the centre gripping dynamics to the pipeline, prevent that the pipeline is not hard up.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a pipe network construction is with supporting fixing device who has layered structure, includes wall body (1), regulating plate (2) and centre gripping buckle (11), its characterized in that: wall body (1) surface is provided with regulating plate (2), and regulating plate (2) inside runs through there are expansion bolts (3), spout (4) have been seted up on regulating plate (2) both sides surface, and regulating plate (2) inside is provided with rack (5), rack (5) side is connected with adjusting gear (6), and adjusting gear (6) inside runs through have changeing (7), it has triangular support (8) to change (7) outer wall parcel, and changes (7) end and be provided with bolt head (9), bolt head (9) outer wall parcel has nut (10), centre gripping buckle (11) are fixed in triangular support (8) top.
2. The supporting and fixing device with a layered structure for pipe network construction according to claim 1, wherein: the side surface of the adjusting plate (2) is attached to the surface of the wall body (1), and the adjusting plate (2) forms a fixing structure with the wall body (1) through the expansion bolts (3).
3. The supporting and fixing device with a layered structure for pipe network construction according to claim 1, wherein: the adjusting gear (6) is meshed with the adjusting plate (2) through the racks (5), and the racks (5) are symmetrically distributed about the vertical center line of the adjusting plate (2).
4. The supporting and fixing device with a layered structure for pipe network construction according to claim 1, wherein: a lifting structure is formed between the triangular support (8) and the adjusting plate (2) through the adjusting gear (6), the rack (5), and the wall body (1) forms a layered structure through the triangular support (8).
5. The supporting and fixing device with a layered structure for pipe network construction according to claim 1, wherein: the clamping snap ring (11) comprises a clamping ring (1101), a clamping groove (1102), a clamping block (1103) and a rubber pad (1104), wherein the clamping groove (1102) is formed in one end of the clamping ring (1101), the clamping block (1103) is arranged inside the clamping groove (1102), and the rubber pad (1104) is arranged on the inner wall of the clamping ring (1101).
6. The supporting and fixing device with a layered structure for pipe network construction according to claim 5, wherein: the clamping ring (1101) forms an annular structure through the clamping groove (1102) and the clamping block (1103), and the clamping ring (1101) forms a clamping structure through the rubber pad (1104).
CN202020447851.1U 2020-03-31 2020-03-31 Pipe network construction is with support fixing device that has layered structure Active CN212104181U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020447851.1U CN212104181U (en) 2020-03-31 2020-03-31 Pipe network construction is with support fixing device that has layered structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020447851.1U CN212104181U (en) 2020-03-31 2020-03-31 Pipe network construction is with support fixing device that has layered structure

Publications (1)

Publication Number Publication Date
CN212104181U true CN212104181U (en) 2020-12-08

Family

ID=73636264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020447851.1U Active CN212104181U (en) 2020-03-31 2020-03-31 Pipe network construction is with support fixing device that has layered structure

Country Status (1)

Country Link
CN (1) CN212104181U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114060615A (en) * 2021-12-03 2022-02-18 河北地质大学 Underground utility tunnel bears shock-absorbing capacity reinforcing antidetonation system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114060615A (en) * 2021-12-03 2022-02-18 河北地质大学 Underground utility tunnel bears shock-absorbing capacity reinforcing antidetonation system
CN114060615B (en) * 2021-12-03 2023-09-22 河北地质大学 Underground utility tunnel bears shock-absorbing capacity reinforcing anti-seismic system

Similar Documents

Publication Publication Date Title
CN202199990U (en) Support platform for welding tubular bus-bars
CN212104181U (en) Pipe network construction is with support fixing device that has layered structure
CN203932871U (en) A kind of Novel cable fixture
CN203895838U (en) Portable paying-off tackle
CN220134824U (en) Current state underground pipeline suspension protection device
CN212070589U (en) Pipe fitting cutting device for mechanical production
CN211192592U (en) Pipe welding equipment with clamp with swing structure
CN209145308U (en) A kind of light aggregate building block clamping device
CN208556649U (en) A kind of new steel belt disconnecting device
CN204597356U (en) A kind of electrical network emergency device
CN108953771B (en) Pipeline installation device for water and electricity pipeline engineering
CN210618229U (en) Pipeline shifts uses support with protect function
CN210172916U (en) Central air conditioning fixed-position welding auxiliary device
CN210227351U (en) Construction engineering cost budget auxiliary device for technical service
CN202910794U (en) Novel generator thrust tile dismantling tool
CN206539777U (en) A kind of pipe burying device of Hydraulic and Hydro-Power Engineering
CN206422244U (en) A kind of reinforcing attachment means for the aluminum tube bus that insulate
CN210887301U (en) Utility tunnel instrument formula steel form
CN219152030U (en) Vertical overturning welding auxiliary bracket for heat collector
CN220647010U (en) Pipeline fixing and clamping device
CN206153845U (en) Assembly quality of wind -powered electricity generation gear box hollow shaft
CN216009786U (en) Water conservancy pipeline fixing device
CN213753919U (en) Traction device of bus bridge
CN214787787U (en) Utilize water supply pipe hydroelectric power generation's water pressure monitoring facilities
CN219420648U (en) Photovoltaic panel support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Room 2602, 2603, 2605, building T2, Shenye Shangcheng (South District), no.5001 Huanggang Road, Lianhua village community, Huafu street, Futian District, Shenzhen City, Guangdong Province

Patentee after: Shenzhen MCC guanlang Technology Development Co.,Ltd.

Address before: Room 2602, 2603, 2605, building T2, Shenye Shangcheng (South District), no.5001 Huanggang Road, Lianhua village community, Huafu street, Futian District, Shenzhen City, Guangdong Province

Patentee before: Shenzhen MCC pipe gallery construction investment Co., Ltd