CN210887301U - Utility tunnel instrument formula steel form - Google Patents

Utility tunnel instrument formula steel form Download PDF

Info

Publication number
CN210887301U
CN210887301U CN201921475377.7U CN201921475377U CN210887301U CN 210887301 U CN210887301 U CN 210887301U CN 201921475377 U CN201921475377 U CN 201921475377U CN 210887301 U CN210887301 U CN 210887301U
Authority
CN
China
Prior art keywords
plate
template
cavity
wall
water pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921475377.7U
Other languages
Chinese (zh)
Inventor
倪广强
张高亮
张宗旭
李冲
廖海权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201921475377.7U priority Critical patent/CN210887301U/en
Application granted granted Critical
Publication of CN210887301U publication Critical patent/CN210887301U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a comprehensive pipe gallery tool type steel template, which comprises a clamping mechanism, a bottom plate, a supporting frame and a supporting template, four groups of supporting templates are fixedly arranged on the upper surface of the bottom plate, a top plate is horizontally arranged on the top end surface of each supporting template, the top plate is provided with pouring holes communicated with the interior of the supporting templates, the supporting templates are sequentially divided into a gas chamber, a water supply chamber and an electric fire-fighting chamber, a plurality of groups of clamping rings are arranged on the plate wall in the gas cavity in an array manner, a bearing plate for installing a water pipe and a clamping mechanism for fixing the water pipe are arranged in the water supply cavity, the utility model discloses an electric fire control cavity, including electric fire control cavity, bearing board, support frame, grip ring and bearing board, the array distribution is provided with the multiunit support frame on the inner wall of electric fire control cavity, support frame, grip ring and bearing board all are the distribution of arranging in a straight line along the length direction of supporting template, the symmetrical welding of bearing board bottom has the bracing piece of two sets of L shape structures. This utility tunnel construction template, it is rational in infrastructure, convenient to use, it is pleasing to the eye clean and tidy, but wide use.

Description

Utility tunnel instrument formula steel form
Technical Field
The utility model belongs to the technical field of the piping lane construction, concretely relates to utility tunnel instrument formula steel form.
Background
The utility model relates to a comprehensive pipe gallery (Japan called 'common ditch', Taiwan called 'common pipeline'), namely an underground city pipeline comprehensive corridor, namely, a tunnel space is built underground, various engineering pipelines such as electric power, communication, gas, heat supply, water supply and drainage and the like are integrated, a special overhaul port, a lifting port and a monitoring system are arranged, unified planning, unified design, unified construction and management are implemented, and the utility model is an important infrastructure and a 'lifeline' for guaranteeing city operation.
Utility tunnel comprises the shape by the template first, is pour by cement again and forms, and current piping lane design is complicated, and the pipeline mixes easily and puts, causes to overhaul inconvenient, needs further improvement.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a utility tunnel instrument formula steel form to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a comprehensive pipe gallery tool type steel template comprises a clamping mechanism, a bottom plate, supporting frames and supporting templates, wherein four groups of supporting templates are fixedly arranged on the upper surface of the bottom plate, a top plate is horizontally arranged on the top end face of each supporting template, pouring holes communicated with the inside of each supporting template are formed in the top plate, the supporting templates are sequentially divided into a gas cavity, a water supply cavity and an electric fire-fighting cavity, a plurality of groups of clamping rings are arranged on the plate wall inside the gas cavity in an array mode, a bearing plate for installing a water pipe and a clamping mechanism for fixing the water pipe are arranged inside the water supply cavity, a plurality of groups of supporting frames are arranged on the inner wall of the electric fire-fighting cavity in an array mode, the supporting frames, the clamping rings and the bearing plate are all distributed in a straight line along the length direction of the supporting templates, two groups of L-shaped supporting rods are symmetrically welded at the bottom of the bearing plate, and, the bearing board upper surface department protrusion placed in the middle is provided with two sets of connecting blocks, and is two sets of rotate between the connecting block and install the pulley, the water pipe slides along the pulley, two sets of fixture are still installed to the upper surface both ends of bearing board symmetry, the support frame include at least with the extension board of the fixed welded fixed plate of support template and sliding connection fixed plate.
Preferably, one end of the extension plate extends into the fixing plate, and one end, far away from the fixing plate, of the extension plate is welded with the stop block.
Preferably, the side wall of the fixed plate is provided with a limit bolt, and the limit bolt penetrates through the side wall of the fixed plate and is abutted to the extension plate.
Preferably, fixture includes fixed block and splint at least, splint are the arc structure, and the outer wall of laminating water pipe, splint keep away from the one end of the one end outer wall fixed connection slide bar of water pipe, the slide bar slides and sets up inside the adapter sleeve, the adapter sleeve is inside cavity ring structure, and the symmetrical welding has the dead lever of two sets of L shape structures on the outer wall.
Preferably, the vertical welding of upper surface of loading board has the fixed block, the fixed block is improved level and is run through the screw hole of seting up and supplying the threaded rod to pass, threaded rod one end is passed the fixed block and is rotated the terminal surface of connecting the slide bar, and dead lever and fixed block welded fastening.
Preferably, the stop block is perpendicular to the extension plate and is higher than the fixed plate and the extension plate.
The utility model discloses a technological effect and advantage: this utility tunnel construction template, through electric power fire control cavity, water supply cavity and gas cavity's setting, with the inside effective partition of piping lane, divide the worker clearly and definitely, effectively avoided appearing the chaotic condition of pipeline and taken place, and then promoted the maintenance efficiency of pipeline, through the grip ring, the setting of loading board and support frame, will be used for supplying water, the air feed, the pipeline of power supply supports, make its regular orderly arrangement of putting, the aesthetic property is high, and the operation is convenient, effectively promote workman's installation effectiveness, this utility tunnel construction template, rational in infrastructure, high durability and convenient use, and is pleasing to the eye, and is neat and widely usable.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the clamping mechanism of the present invention;
fig. 3 is a schematic view of the supporting frame of the present invention.
In the figure: 1. fixture, 2, the bracing piece, 3, the bottom plate, 4, the support frame, 5, the support template, 6, the roof, 7, electric power fire control cavity, 8, the water supply cavity, 9, the gas chamber, 10, the water pipe, 11, the grip ring, 12, pour the hole, 13, the threaded rod, 14, the fixed block, 15, the adapter sleeve, 16, the dead lever, 17, the slide bar, 18, splint, 19, the extension board, 20, the fixed plate, 21, stop the piece, 22, the spacing bolt, 23, the loading board, 24, the pulley, 25, the connecting block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a utility tunnel tool type steel template as shown in figures 1-3, which comprises a clamping mechanism 1, a bottom plate 3, supporting frames 4 and supporting templates 5, wherein four groups of supporting templates 5 are fixedly arranged on the upper surface of the bottom plate 3, a top plate 6 is horizontally arranged on the top end surface of each supporting template 5, a pouring hole 12 communicated with the inside of each supporting template 5 is arranged on each top plate 6, the supporting templates 5 are sequentially divided into a gas chamber 9, a water supply chamber 8 and an electric fire-fighting chamber 7, a plurality of groups of clamping rings 11 are arranged on the plate wall inside the gas chamber 9, a bearing plate 23 for installing a water pipe 10 and a clamping mechanism 1 for fixing the water pipe 10 are arranged inside the water supply chamber 8, a plurality of groups of supporting frames 4 are arranged on the inner wall of the electric fire-fighting chamber 7 in an array manner, and the supporting frames 4, the clamping rings 11 and the bearing plate 23 are all arranged in a straight line along the length direction of the, bearing board 23 bottom symmetric welding has bracing piece 2 of two sets of L shape structures, the one end welding that bearing board 23 was kept away from to bracing piece 2 supports on the inner wall of template 5 in the water supply cavity 8, bearing board 23 upper surface department of placing in the middle protrusion is provided with two sets of connecting blocks 25, and is two sets of rotate between the connecting blocks 25 and install pulley 24, two sets of fixture 1 are installed along pulley 24 to water pipe 10, the upper surface both ends of bearing board 23 still symmetry, support frame 4 include at least with 5 fixed welded fixed plate 20 of support template and sliding connection fixed plate 20's extension board 19, through the setting of electric power fire control cavity 7, water supply cavity 8 and gas chamber 9, with the inside effective partition of piping lane, divide the worker definitely, effectively avoided appearing the chaotic condition of pipeline and taken place.
Specifically, extension board 19 one end stretches into inside fixed plate 20, extension board 19 is kept away from fixed plate 20 and is served the welding and have blockking block 21, presss from both sides tightly cable, fire control pipe through extension board 19.
Specifically, a limit bolt 22 is mounted on a side wall of the fixing plate 20, the limit bolt 22 penetrates through the fixing plate 20 and abuts against a side wall of the extension plate 19, the limit bolt 22 is screwed, and the extension plate 19 is fixed.
Specifically, fixture 1 includes fixed block 14 and splint 18 at least, splint 18 are the arc structure, and the outer wall of laminating water pipe 10, splint 18 keeps away from the one end of the one end outer wall fixed connection slide bar 17 of water pipe 10, slide bar 17 slides and sets up inside adapter sleeve 15, adapter sleeve 15 is inside cavity ring circular structure, and the symmetrical welding has the dead lever 16 of two sets of L shape structures on the outer wall.
Specifically, the vertical welding of the upper surface of loading board 23 has fixed block 14, the level runs through and sets up the screw hole that supplies threaded rod 13 to pass on the fixed block 14, threaded rod 13 one end is passed fixed block 14 and is rotated the terminal surface of connecting slide bar 17, and dead lever 16 and fixed block 14 welded fastening, and rotatory threaded rod 13 drives slide bar 17 and slides along adapter sleeve 15 is inside, pushes splint 18 to water pipe 10.
Specifically, the stop block 21 is perpendicular to the extension plate 19 and is higher than the fixed plate 20 and the extension plate 19.
Specifically, when the comprehensive pipe gallery construction formwork is used, cement pouring is carried out, the support formwork 5 is filled and formed through a pouring hole 12, the external pouring mode is consistent with the prior art, the support formwork 5 can be used without being detached, a gas pipeline penetrates through a clamping ring 11 in a gas cavity 9 to be installed and fixed, water pipes 10 penetrate through the upper portions of a plurality of groups of bearing plates 23, the water pipes 10 slide along pulleys 24 and are convenient to move, after the water pipes slide to a required position, a threaded rod 13 is rotated to drive a sliding rod 17 to slide along the inner portion of a connecting sleeve 15, a clamping plate 18 is pushed to the water pipes 10, the water pipes 10 are abutted and fixed through two groups of clamping plates 18, the bearing plates 23 are distributed in an array mode along the length direction of a pipe gallery and are welded in a water supply cavity 8 through a supporting rod 2 at the bottom, a cable or a fire pipeline is placed in an electric fire-fighting cavity 7, make stop block 21 keep away from fixed plate 20, when enough cables in interval, fire control pipeline placed, push back extension board 19, press from both sides it tightly, screw up limit bolt 22, accomplish fixedly, and grip ring 11 all distributes along the length direction array of piping lane with support frame 4, this utility tunnel construction template, rational in infrastructure, convenient to use, it is pleasing to the eye clean and tidy, but wide use.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (6)

1. The utility model provides a utility tunnel instrument formula steel form, includes fixture (1), bottom plate (3), support frame (4) and supporting template (5), its characterized in that: the fire fighting water pipe support is characterized in that four groups of support templates (5) are fixedly arranged on the upper surface of the bottom plate (3), a top end face of each support template (5) is horizontally provided with a top plate (6), pouring holes (12) communicated with the inside of each support template (5) are formed in each top plate (6), the support templates (5) are sequentially divided into a gas cavity (9), a water supply cavity (8) and an electric fire fighting cavity (7), a plurality of groups of clamping rings (11) are arranged on the plate wall inside the gas cavity (9) in an array mode, a bearing plate (23) used for installing a water pipe (10) and clamping mechanisms (1) used for fixing the water pipe (10) are arranged inside the water supply cavity (8), a plurality of groups of support frames (4) are arranged on the inner wall of the electric fire fighting cavity (7) in an array mode, and the support frames (4), the clamping rings (11) and the bearing plate (23) are all arranged, bearing board (23) bottom symmetric welding has bracing piece (2) of two sets of L shape structures, the one end welding that bearing board (23) were kept away from in bracing piece (2) supports on the inner wall of template (5) in water supply cavity (8), bearing board (23) upper surface department of placing in the middle protrusion is provided with two sets of connecting blocks (25), and is two sets of rotate between connecting block (25) and install pulley (24), pulley (24) are followed in water pipe (10) and slide, two sets of fixture (1) are installed to the upper surface both ends of bearing board (23) still symmetry, support frame (4) include at least with extension board (19) of fixed welded fixed plate (20) of bearing template (5) and sliding connection fixed plate (20).
2. The utility tunnel tool steel form of claim 1, characterized in that: extend inside board (19) one end stretches into fixed plate (20), extend board (19) and keep away from the welding on the one end of fixed plate (20) and have blockking block (21).
3. The utility tunnel tool steel form of claim 1, characterized in that: and the side wall of the fixing plate (20) is provided with a limiting bolt (22), and the limiting bolt (22) penetrates through the side wall of the fixing plate (20) and abuts against the extension plate (19).
4. The utility tunnel tool steel form of claim 1, characterized in that: fixture (1) includes fixed block (14) and splint (18) at least, splint (18) are the arc structure, and the outer wall of laminating water pipe (10), the one end of the one end outer wall fixed connection slide bar (17) of water pipe (10) is kept away from in splint (18), slide bar (17) slide to set up inside adapter sleeve (15), adapter sleeve (15) are inside cavity ring circular structure, and the symmetrical welding has dead lever (16) of two sets of L shape structures on the outer wall.
5. The utility tunnel tool steel form of claim 1, characterized in that: the vertical welding of upper surface of loading board (23) has fixed block (14), the screw hole that offers supply threaded rod (13) to pass is run through to fixed block (14) upper level, the terminal surface of fixed block (14) rotation connection slide bar (17) is passed to threaded rod (13) one end, and dead lever (16) and fixed block (14) welded fastening.
6. The utility tunnel tool steel form of claim 2, characterized in that: the stop block (21) is perpendicular to the extension plate (19) and is higher than the fixing plate (20) and the extension plate (19).
CN201921475377.7U 2019-09-06 2019-09-06 Utility tunnel instrument formula steel form Active CN210887301U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921475377.7U CN210887301U (en) 2019-09-06 2019-09-06 Utility tunnel instrument formula steel form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921475377.7U CN210887301U (en) 2019-09-06 2019-09-06 Utility tunnel instrument formula steel form

Publications (1)

Publication Number Publication Date
CN210887301U true CN210887301U (en) 2020-06-30

Family

ID=71314156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921475377.7U Active CN210887301U (en) 2019-09-06 2019-09-06 Utility tunnel instrument formula steel form

Country Status (1)

Country Link
CN (1) CN210887301U (en)

Similar Documents

Publication Publication Date Title
CN204530719U (en) A kind of quick assembled type suspension device for Support of Foundation Pit Excavation
CN203782942U (en) Mounting system used for multi-dimensional-adjusting double-curved-surface titanium-plate curtain wall
CN210216749U (en) Assembled container room
CN210887301U (en) Utility tunnel instrument formula steel form
CN211621677U (en) Underground pipe gallery formwork construction structure
CN210517727U (en) Power fitting for erecting cable line
CN113882565B (en) Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof
CN212104181U (en) Pipe network construction is with support fixing device that has layered structure
CN210623800U (en) Pipe gallery supporting and hanging frame
CN211398796U (en) Installing support is used in fire engineering construction
CN212129234U (en) Utility tunnel
CN112113035A (en) Network cable pipeline convenient to installation
CN209909315U (en) Piping lane support is used in municipal administration pipeline installation
CN203603444U (en) Steel pipe scaffold wall connecting piece
CN107965145B (en) Horizontal convex concrete construction joint hanging die supporting device
CN215981176U (en) Pipeline fixing device on civil and industrial building scaffold
CN210326957U (en) Limiting assembly used on supporting arm
CN218958450U (en) Vertical bridge fixing device
CN215367311U (en) Pipeline foundation pit supporting structure
CN213175586U (en) Portable underground plugging device
CN220016703U (en) Hoisting structure and comprehensive distribution box thereof
CN218407348U (en) Can have enough to meet need pressure-bearing well casing operation platform
CN203792220U (en) Precast opening-butt device of pipelines
CN213572988U (en) Expansion joint template for building construction
CN220622967U (en) Combined pipeline for building water supply and drainage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant