CN217897261U - Concrete anti-overflow flows baffle - Google Patents
Concrete anti-overflow flows baffle Download PDFInfo
- Publication number
- CN217897261U CN217897261U CN202221149992.0U CN202221149992U CN217897261U CN 217897261 U CN217897261 U CN 217897261U CN 202221149992 U CN202221149992 U CN 202221149992U CN 217897261 U CN217897261 U CN 217897261U
- Authority
- CN
- China
- Prior art keywords
- shielding plate
- supporting part
- pouring
- template
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model provides a concrete anti-overflow baffle, installs on pouring the template, includes shielding plate and supporting part, the one end of supporting part is installed one side of supporting part, the other end of supporting part is arranged in inserting and pours the template fixed, works as when the supporting part inserts and pours the template, the shielding plate is located one side of pouring template width direction. This application is through setting up the shielding plate and installing the supporting part on the shielding plate, before pouring, with the supporting part insert pour the template, the supporting part can the butt support the shielding plate on pouring the template, the shielding plate is located the one side of pouring module width direction this moment, when pouring, owing to there is the sheltering from of shielding plate, the concrete of pouring is difficult to spill over from pouring the template, pour take out after the completion the shielding plate can to improve the concrete placement in-process easily excessive problem among the correlation technique.
Description
Technical Field
The utility model relates to a construction technical field, concretely relates to concrete anti-overflow flows baffle.
Background
When a building construction site is built, floor boundary beams and various adjacent edge members need to be poured, and concrete is sent into an upper direction template by using a pump to be poured.
However, in the process of pouring concrete, the concrete is very easy to spill from a pouring formwork, on one hand, the concrete overflows to the outside of the formwork, so that an outer frame and a safety net are polluted, the structural appearance and quality are influenced to a certain extent, and on the other hand, if the dropped concrete falls from a high place, safety accidents are easily caused. Namely, the related art has a problem that the concrete is easy to overflow during the concrete pouring process.
SUMMERY OF THE UTILITY MODEL
Therefore, the to-be-solved technical problem of the utility model lies in improving the easy excessive problem of concrete placement in-process among the correlation technique to a concrete anti-overflow baffle is provided.
The utility model provides a concrete anti-overflow flows baffle, installs on pouring the template, includes shielding plate and supporting part, the one end of supporting part is installed one side of supporting part, the other end of supporting part is arranged in inserting the pouring template fixed, works as when the supporting part inserts in the pouring template, the shielding plate is located one side of pouring template width direction.
Furthermore, the supporting part comprises a supporting block, a connecting block is arranged at one end, close to the shielding plate, of the supporting block, a through hole is formed in the connecting block, a first threaded hole corresponding to the through hole of the connecting block is formed in one side, close to the supporting part, of the shielding plate, and a screw connected with the first threaded hole in a threaded mode is installed in the through hole of the connecting block.
Furthermore, the number of the supporting parts is at least two, and the supporting parts are arranged along the length direction of the shielding plate.
Furthermore, the thickness of the shielding plate is 1.5mm, the length of the shielding plate is 1500mm, and the width of the shielding plate is 400mm.
Furthermore, the shielding plate further comprises a holding part, and the holding part is arranged on one side, far away from the supporting part, of the shielding plate.
Furthermore, the holding part comprises a holding ring, the holding ring is provided with a splicing block, the splicing block is provided with a through hole, one end of the shielding plate close to the holding part is provided with a second threaded hole, and a screw in threaded connection with the second threaded hole is installed in the through hole of the splicing block.
Furthermore, the number of the holding parts is at least two, and the plurality of the holding parts are arranged along the length direction of the supporting part.
The utility model discloses technical scheme has following advantage:
1. according to the concrete pouring device, the shielding plate and the supporting part arranged on the shielding plate are arranged, the supporting part is inserted into the pouring template before pouring, the supporting part can be abutted against the pouring template to support the shielding plate, the shielding plate is located on one side of the width direction of the pouring module, when pouring is carried out, due to shielding of the shielding plate, poured concrete is not prone to overflowing from the pouring template, the shielding plate can be taken out after pouring is finished, and therefore the problem that the concrete is prone to overflowing in the pouring process in the related technology is solved;
2. the concrete overflow baffle further comprises a holding part, and through the arrangement of the holding part, construction personnel can conveniently take and place the concrete overflow baffle, so that the convenience of the concrete overflow baffle is improved;
3. the supporting portion, the holding portion and the shielding plate are detachably connected through the threaded connection, the supporting portion and the holding portion can be stored after being detached, and replacement or maintenance of the supporting portion and the holding portion is facilitated.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is an isometric view of a concrete overflow prevention barrier of the present application installed on a pouring form;
FIG. 2 is a rear view of a concrete overflow prevention barrier of the present application;
FIG. 3 is a side cross-sectional view of a concrete overflow prevention barrier of the present application installed on a pouring form;
description of reference numerals:
1. a shielding plate; 2. a support portion; 21. a support block; 22. connecting blocks; 3. a grip portion; 31. a grip ring; 32. and (6) splicing blocks.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Furthermore, the technical features mentioned in the different embodiments of the invention described below can be combined with each other as long as they do not conflict with each other.
Referring to fig. 1 and 2, a concrete anti-overflow baffle is installed on a casting formwork and comprises a baffle plate 1 and a supporting portion 2, wherein one end of the supporting portion 2 is installed on one side of the supporting portion 2, the other end of the supporting portion 2 is used for being inserted into the casting formwork to be fixed, and when the supporting portion 2 is inserted into the casting formwork, the baffle plate 1 is located on one side of the casting formwork in the width direction.
Specifically, the shielding plate 1 is in a rectangular parallelepiped shape, the thickness of the shielding plate 1 is 1.5mm, the length of the shielding plate 1 is 1500mm, and the width of the shielding plate 1 is 400mm. Supporting part 2 is located one side of 1 width direction of shielding plate, supporting part 2 includes supporting shoe 21, supporting shoe 21 is the cylinder size, supporting shoe 21 specifically can be that the diameter is 16 mm's plain steel muscle, supporting shoe 21's length can be 500mm, in order to install on shielding plate 1, supporting part 2 is close to shielding plate 1's one end has the connecting block 22 of rectangular size, connecting block 22 can be fixed on supporting part 2 through the welded mode, the through-hole has been seted up on connecting block 22, it is corresponding, shielding plate 1 is close to one side of supporting part 2 and sets up the first screw hole that corresponds with connecting block 22 through-hole position, install the screw with first screw hole threaded connection in the connecting block 22 through-hole, supporting part 2 installs on shielding plate 1 through threaded connection's mode promptly.
In order to increase the fixing effect, a plurality of through holes can be formed in the connecting block 22, correspondingly, a plurality of first threaded holes are formed in the shielding plate 1, and the positions of the first threaded holes correspond to the positions of the through holes of the supporting portion 2 one by one. When the supporting part 2 needs to be installed on the shielding plate 1, the supporting part 2 only needs to be placed on the shielding plate 1, so that the axis of the through hole of the connecting block 22 is aligned with the axis of the threaded hole of the shielding plate 1, and then the supporting part 2 can be installed on the shielding plate 1 by screwing the screw. The support block 21 may be attached to the shielding plate 1 by welding.
For realizing better supporting effect, supporting part 2 has two at least, and a plurality of supporting parts 2 set up along the length direction of shielding plate 1, and in this embodiment, supporting part 2 has two, and two supporting parts 2 are located shielding plate 1 length direction's both sides respectively. Through shielding plate 1 and supporting part 2, when the anti-overflow baffle is installed to needs, only need to insert supporting part 2 and pour the template, supporting part 2 can with pour the reinforcing bar butt in the template, shielding plate 1 can the butt on pouring the template to realize the spacing of anti-overflow baffle, shielding plate 1 is 30 with the contained angle of pouring the template outward flange promptly vertical direction this moment.
Referring to fig. 2 and 3, in order to facilitate the taking and placing of the overflow prevention baffle by a constructor, the concrete overflow prevention baffle of the present application further includes a holding part 3. Specifically, the portion of gripping 3 is installed in the one side that supporting part 2 was kept away from to shielding plate 1, the portion of gripping 3 is including the grip ring 31, grip ring 31 specifically is by the crooked formation of diameter 6 mm's plain steel muscle, in order to install on shielding plate 1, the both ends of grip ring 31 have the splice block 32 of cuboid type, splice block 32 specifically can be fixed on grip ring 31 through the welded mode, a plurality of through-holes have been seted up on splice block 32, shielding plate 1 has seted up the second screw hole near one side of the portion of gripping 3, install the screw with second screw hole threaded connection in the through-hole of splice block 32, the portion of gripping 3 installs in shielding plate 1 through threaded connection's mode promptly and can dismantle the connection in order to realize. The grip portion 3 may be attached to the shielding plate 1 by welding.
In order to facilitate the constructors to take and place the anti-overflow baffle, the number of the holding parts 3 is at least two, and the holding parts 3 are arranged along the length direction of the supporting part 2. In this embodiment, there are two holding portions 3, and the two holding portions 3 are respectively located at two sides of the shielding plate 1 in the longitudinal direction.
The utility model provides a theory of operation of concrete anti-overflow baffle does, constructor takes through the portion of gripping 3 and prevents overflow baffle, aim at supporting part 2 and pour the template and insert, make supporting part 2 and the reinforcing bar butt in pouring the template, the below of shielding plate 1 can the butt be on pouring the template this moment, begin to pour, because shielding plate 1's the stopping when pouring, the concrete is difficult for spilling over from pouring the template, after pouring this beam section of completion, extract through the portion of gripping 3 and prevent overflow baffle, insert next beam section and begin to pour.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications therefrom are within the scope of the invention.
Claims (7)
1. The utility model provides a concrete anti-overflow flows baffle, installs on pouring the template, its characterized in that, including shielding plate (1) and supporting part (2), the one end of supporting part (2) is installed one side of supporting part (2), the other end of supporting part (2) is arranged in inserting and pours the template and fixes, works as when supporting part (2) insert and pours the template, shielding plate (1) is located one side of pouring template width direction.
2. The concrete overflow-preventing baffle plate as recited in claim 1, wherein the supporting portion (2) comprises a supporting block (21), one end of the supporting block (21) close to the baffle plate (1) is provided with a connecting block (22), the connecting block (22) is provided with a through hole, one side of the baffle plate (1) close to the supporting portion (2) is provided with a first threaded hole corresponding to the through hole of the connecting block (22), and a screw in threaded connection with the first threaded hole is installed in the through hole of the connecting block (22).
3. A concrete overflow prevention baffle according to claim 2, characterized in that there are at least two support portions (2), and a plurality of support portions (2) are arranged along the length direction of the baffle (1).
4. A concrete overflow prevention baffle according to claim 1, characterized in that the thickness of the shielding plate (1) is 1.5mm, the length of the shielding plate (1) is 1500mm, and the width of the shielding plate (1) is 400mm.
5. A concrete overflow prevention baffle according to any one of claims 1-4, further comprising a grip portion (3), the grip portion (3) being mounted on a side of the baffle plate (1) remote from the support portion (2).
6. The concrete anti-overflow baffle plate is characterized in that the holding portion (3) comprises a holding ring (31), a splicing block (32) is arranged on the holding ring (31), a through hole is formed in the splicing block (32), a second threaded hole is formed in one end, close to the holding portion (3), of the baffle plate (1), and a screw in threaded connection with the second threaded hole is installed in the through hole of the splicing block (32).
7. The concrete overflow prevention baffle plate as claimed in claim 6, wherein the number of the holding portions (3) is at least two, and a plurality of the holding portions (3) are arranged along the length direction of the support portion (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221149992.0U CN217897261U (en) | 2022-05-13 | 2022-05-13 | Concrete anti-overflow flows baffle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221149992.0U CN217897261U (en) | 2022-05-13 | 2022-05-13 | Concrete anti-overflow flows baffle |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217897261U true CN217897261U (en) | 2022-11-25 |
Family
ID=84110276
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221149992.0U Active CN217897261U (en) | 2022-05-13 | 2022-05-13 | Concrete anti-overflow flows baffle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217897261U (en) |
-
2022
- 2022-05-13 CN CN202221149992.0U patent/CN217897261U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209780230U (en) | Construction hydraulic pressure template climbing device | |
CN211369536U (en) | Cast-in-place box girder template system | |
CN215168054U (en) | Independent supporting device for post-cast strip template | |
CN107288263A (en) | The construction method of prefabricated constructional column | |
CN113090015B (en) | Beam plate post-cast strip formwork supporting method | |
CN211524058U (en) | Small-space large-mold reinforcing device | |
CN217897261U (en) | Concrete anti-overflow flows baffle | |
CN114232988B (en) | Formwork supporting method for floor post-cast strip and formwork used by same | |
CN111456105B (en) | Construction method of post-pouring belt of underground garage bottom plate | |
CN108277927B (en) | Cast-in-place concrete anti-floating structure | |
CN208578064U (en) | Combination die for piping lane box type telescopic bottom plate and parapet | |
CN110284729A (en) | A kind of historical building wall sectional type cutting disassembling method | |
CN212613763U (en) | A timing support fixture that is used for bathroom prevention of seepage to lead wall aluminium template | |
CN214739864U (en) | Post-cast strip template supporting construction | |
CN214739890U (en) | Steel form for concrete constructional column construction | |
CN214696850U (en) | Steel form for construction of constructional column at junction of longitudinal and transverse walls of house | |
CN214658802U (en) | Building construction beam column node height low grade concrete separator | |
CN212294380U (en) | Novel cast-in-place outrigger of light structure | |
CN212053745U (en) | Formwork support frame for post-cast strip construction | |
CN114562105A (en) | Building wall plastering-free aluminum template | |
CN210910473U (en) | Prevent edge leakage and pour template | |
CN112482636A (en) | Underground assembly type station cast-in-place beam formwork-free structure and construction method thereof | |
CN206815319U (en) | A kind of construction of guide wall formwork reinforcement system | |
CN111021726A (en) | Post-cast strip and construction joint position assembled aluminum alloy template | |
JP2001140221A (en) | Repair method for overhanging floor slab, and support construction for form |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |