CN217840095U - Inspection well pouring platform and device - Google Patents

Inspection well pouring platform and device Download PDF

Info

Publication number
CN217840095U
CN217840095U CN202121684555.4U CN202121684555U CN217840095U CN 217840095 U CN217840095 U CN 217840095U CN 202121684555 U CN202121684555 U CN 202121684555U CN 217840095 U CN217840095 U CN 217840095U
Authority
CN
China
Prior art keywords
platform
template
platform body
pouring
inspection well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121684555.4U
Other languages
Chinese (zh)
Inventor
黄涛
李泰鹏
宋磊
刘亮
李安
李安雄
何另程
郭鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Science and Industry Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Science and Industry Corp Ltd filed Critical China Construction Science and Industry Corp Ltd
Priority to CN202121684555.4U priority Critical patent/CN217840095U/en
Application granted granted Critical
Publication of CN217840095U publication Critical patent/CN217840095U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The application discloses inspection shaft pouring platform and device relates to construction technical field. Inspection shaft pouring platform includes: the platform body, be provided with stiffening rib on the platform body, the platform body includes the platform main part and encircles the slope that the platform main part set up, the platform body is used for the lid to establish at the top of the inlayer of inspection shaft wall of a well template, through the slope with the concrete to the regional pouring of the inlayer and the outer encirclement of inspection shaft wall of a well template is pour. The inspection well pouring platform can effectively improve the pouring speed of concrete, simplifies the operation process, and enables the inspection well to be quickly poured with high quality.

Description

Inspection well pouring platform and device
Technical Field
The application relates to the technical field of building construction, especially, relate to an inspection shaft pouring platform and device.
Background
In the correlation technique, municipal works's construction has related to a large amount of municipal pipe network constructions, and in the pipe network work progress, the inspection shaft construction is the key and indispensable process. The inspection shaft usually adopts the mode of concrete cast in situ to pour, but at cast-in-place in-process, because the wall of a well cross-section size of single inspection shaft is little, the concrete square size is not big, can't adopt the equipment of pouring of concrete directly to pour, consequently most of the cases adopt artifical the shovel of relying on to pour. When the concrete is poured in situ manually, on one hand, the pouring speed is slow, the on-site waiting time is long, and the concrete is easy to harden due to untimely pouring, so that the quality of the concrete is influenced, and even the material is wasted; on the other hand, in many cases, the depth of the inspection well is designed to be deep, and in the process of on-site pouring, due to the fact that the inspection well is deep, after the on-site formwork is erected, concrete pouring is difficult, concrete needs to be transported to the position near the inspection well and piled on the ground, then the concrete is shoveled into the erected formwork manually by a shovel, operation is difficult, construction efficiency is low, and construction quality cannot be guaranteed.
SUMMERY OF THE UTILITY MODEL
The present application is directed to solving at least one of the problems in the prior art. Therefore, the application provides an inspection well pouring platform and device, which can enable concrete to rapidly flow into an inspection well wall formwork to complete rapid pouring of an inspection well.
The inspection well pouring platform according to the embodiment of the first aspect of the application comprises:
the platform body, be provided with stiffening rib on the platform body, the platform body includes the platform main part and encircles the slope that the platform main part set up, the platform body is used for the lid to establish at the top of the inlayer of inspection shaft wall of a well template, through the slope with the concrete to the regional pouring of the inlayer and the outer encirclement of inspection shaft wall of a well template is pour.
According to inspection shaft pouring platform of this application embodiment, at least following beneficial effect has: on one hand, the platform body is provided with the stiffening ribs, so that the inspection well pouring platform is firm and reliable; on the other hand, the height of the top surface of the platform body is gradually reduced from the central area to the edge of the platform body, and the concrete can be directly poured on the inspection well pouring platform, so that the operation is simple, and when the concrete is poured on the inspection well pouring platform, the slope can quickly flow into the inspection well wall template under the influence of gravity, and the inspection well is quickly poured; therefore, the inspection well pouring platform can effectively improve the pouring speed of concrete, simplify the operation process and enable the inspection well to be poured quickly and in high quality.
According to some embodiments of the present application, the stiffening ribs include a first stiffening rib and a second stiffening rib, the first stiffening rib and the second stiffening rib intersecting each other, the second stiffening rib being at least one.
According to some embodiments of the application, the one side that the inspection shaft wall template was kept away from to the platform body is provided with rings.
According to some embodiments of the application, the lifting ring is disposed on an edge proximate to the platform body.
According to some embodiments of the application, the lifting rings are two and are symmetrically arranged with respect to the center of the platform body.
According to some embodiments of the present application, the platform body comprises a plurality of plywood panels interconnected to form the platform body.
An inspection well casting device according to an embodiment of a second aspect of the application comprises:
the inspection well pouring platform is as above;
the inspection well wall template comprises a first template and a second template, a gap is formed between the first template and the second template, a pouring area is formed in the gap, and the top of the first template is covered by the platform body.
According to this application embodiment's inspection shaft pouring device, at least, following beneficial effect has: on one hand, the platform body is provided with the stiffening ribs, so that the inspection well pouring platform is firm and reliable; on the other hand, the height of the top surface of the platform body is gradually reduced from the central area to the edge of the platform body, and the concrete can be directly poured on the inspection well pouring platform, so that the operation is simple, and when the concrete is poured on the inspection well pouring platform, the slope can quickly flow into the inspection well wall template under the influence of gravity, and the inspection well is quickly poured; therefore, the inspection well pouring device provided by the embodiment of the application can effectively improve the pouring speed of concrete, and simplify the operation process, so that the inspection well can be poured quickly and in high quality.
According to some embodiments of the application, the shape of the first template matches the shape of the manhole casting platform.
According to some embodiments of the application, the bottom side of first template is provided with first through-hole, is located beside first through-hole the bottom side of second template is provided with the second through-hole, first through-hole with the size of second through-hole is unanimous and the center is coaxial, and at least one downspout wears to locate first through-hole with the second through-hole.
Additional aspects and advantages of the present application will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the present application.
Drawings
The present application is further described with reference to the following figures and examples, in which:
fig. 1 is a side structure view of a manhole casting platform according to an embodiment of the present disclosure;
FIG. 2 is a schematic top view of an inspection well placement platform according to an embodiment of the present disclosure;
fig. 3 is a structural cross-sectional view of an inspection well casting device according to an embodiment of the present application.
Reference numerals:
the structure comprises a platform body 100, a plywood 110, a platform main body 120, a slope 130, a stiffening rib 200, a first stiffening rib 210, a second stiffening rib 220, a lifting ring 300, an inspection well wall formwork 400, a first formwork 410, a second formwork 420 and a rainwater pipe 500.
Detailed Description
Reference will now be made in detail to embodiments of the present application, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present application and are not to be construed as limiting the present application.
In the description of the present application, it is to be understood that the positional descriptions, such as the directions of up, down, front, rear, left, right, etc., referred to herein are based on the directions or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, and do not indicate or imply that the referred device or element must have a specific direction, be constructed and operated in a specific direction, and thus, should not be construed as limiting the present application.
In the description of the present application, the meaning of a plurality is one or more, the meaning of a plurality is two or more, and the above, below, exceeding, etc. are understood as excluding the present number, and the above, below, within, etc. are understood as including the present number. If there is a description of first and second for the purpose of distinguishing technical features only, this is not to be understood as indicating or implying a relative importance or implicitly indicating the number of technical features indicated or implicitly indicating the precedence of technical features indicated.
In the description of the present application, unless otherwise expressly limited, terms such as set, mounted, connected and the like should be construed broadly, and those skilled in the art can reasonably determine the specific meaning of the terms in the present application by combining the detailed contents of the technical solutions.
In the description of the present application, reference to the description of the terms "one embodiment," "some embodiments," "an illustrative embodiment," "an example," "a specific example," or "some examples," etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the present application. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
An inspection well casting platform according to an embodiment of the application is described below with reference to fig. 1-3.
It can be understood that, as shown in fig. 1 to 3, the manhole casting platform according to the embodiment of the present application includes:
platform body 100 is provided with stiffening rib 200 on the platform body 100, and platform body 100 includes platform main part 120 and the slope 130 that encircles platform main part 120 setting, and platform body 100 is used for the lid to establish at the top of the inlayer of inspection shaft wall of a well template 400, pours the concrete to the inner layer of inspection shaft wall of a well template 400 and the outer regional pouring that surrounds through slope 130.
On one hand, the platform body 100 is provided with the stiffening ribs 200, so that the inspection well pouring platform is firm and reliable, concrete can be poured conveniently, operators can stand on the platform body 100 to vibrate and collect the concrete, measures for independently erecting operator operation frames and platforms are reduced, labor and materials are saved, and the safety of the operators is ensured; on the other hand, the height of the top surface of the platform body 100 is gradually reduced from the central area of the platform body 100 to the edge, and the concrete can be directly poured on the inspection well pouring platform, so that the operation is simple, when the concrete is poured on the inspection well pouring platform, the slope 130 can quickly flow into the inspection well wall formwork 400 under the influence of gravity, and the inspection well is quickly poured; therefore, the inspection well pouring platform of the embodiment of the application can effectively improve the pouring speed of concrete, simplifies the operation process, and enables the inspection well to be poured quickly and in high quality.
It is understood that the stiffening ribs 200 include a first stiffening rib 210 and a second stiffening rib 220, as shown in fig. 2, the first stiffening rib 210 and the second stiffening rib 220 crossing each other, and at least one of the second stiffening ribs 220. Specifically, the second stiffener 220 may be two or three. Further, the first stiffener 210 and the second stiffener 220 intersect and are perpendicular to each other, so that better strength and holding can be obtained, and the platform body 100 is more stable.
It can be appreciated that the first stiffener 210 and the second stiffener 220 protrude from the edge of the platform body 100 as shown in fig. 2. Through the arrangement, the inspection well pouring platform is more convenient to place.
It can be understood that, as shown in fig. 1 and 2, the lifting ring 300 is disposed on a side of the platform body 100 away from the manhole wall template 400. Through the arrangement of the hanging ring 300, the platform body 100 can be conveniently taken and placed.
It will be appreciated that the lifting ring 300 is provided on the edge adjacent to the platform body 100, as shown in fig. 1 and 2.
It can be understood that, as shown in fig. 1 and 2, the lifting ring 300 is two and is symmetrically disposed about the center of the platform body 100. Through the symmetrical setting of rings 300, it is more stable when getting to put, reduces and rocks.
It will be appreciated that, as shown in fig. 1, the platform body 100 includes a plurality of plywood panels 110, and the plurality of plywood panels 110 are connected to one another to form the platform body 100. The plywood 110 is easy to obtain on the construction site and is simple to manufacture.
On one hand, the inspection well pouring platform is simple to manufacture, can be made of local materials, is made of site materials, is convenient and quick to assemble when used, reduces construction cost and improves construction efficiency; on the other hand, the inspection well pouring platform can be circularly used, so that the inspection well pouring platform is economical and environment-friendly.
An inspection well casting apparatus according to an embodiment of the present application is described below with reference to fig. 3.
As shown in fig. 3, the manhole casting device according to the embodiment of the present application includes:
the inspection well pouring platform is as above;
the inspection well wall formwork 400 comprises a first formwork 410 and a second formwork 420, a gap is formed between the first formwork 410 and the second formwork 420, a pouring area is formed in the gap, and an inspection well pouring platform is arranged on the top of the first formwork 410.
On one hand, the platform body 100 is provided with the stiffening ribs 200, so that the inspection well pouring platform is firm and reliable, concrete can be poured conveniently, operators can stand on the platform body 100 to vibrate and collect the concrete, measures for independently erecting operator operation frames and platforms are reduced, labor and materials are saved, and the safety of the operators is ensured; on the other hand, the height of the top surface of the platform body 100 is gradually reduced from the central area of the platform body 100 to the edge, and the concrete can be directly poured on the inspection well pouring platform, so that the operation is simple, when the concrete is poured on the inspection well pouring platform, the slope 130 can quickly flow into the gap of the inspection well wall template 400 under the influence of gravity, and the inspection well can be quickly poured; therefore, the inspection well pouring device provided by the embodiment of the application can effectively improve the pouring speed of concrete, and simplify the operation process, so that the inspection well can be poured quickly and in high quality.
It will be appreciated that the diameter of the first template 410 matches the size of the manhole casting platform, as shown in figure 3. Through the matching of size for when concrete placement, can be better be under construction, and make the concrete can be faster fall into the clearance.
It is understood that, as shown in fig. 3, the first form 410 is provided at a bottom side thereof with a first through hole, and the second form 420 located beside the first through hole is provided at a bottom side thereof with a second through hole, which are identical in size and coaxial in center, and at least one rain pipe 500 is inserted through the first and second through holes. Rainwater pipe 500 is arranged on the side face of the bottom of inspection well wall template 400 in a penetrating mode, so that the inspection well is convenient to pour and form and perform drainage construction simultaneously, and the construction period is shortened.
The embodiments of the present application have been described in detail with reference to the drawings, but the present application is not limited to the embodiments, and various changes can be made within the knowledge of those skilled in the art without departing from the spirit of the present application. Furthermore, the embodiments and features of the embodiments of the present application may be combined with each other without conflict.

Claims (9)

1. Platform is pour to inspection shaft, its characterized in that includes:
the platform body, be provided with stiffening rib on the platform body, the platform body includes the platform main part and encircles the slope that the platform main part set up, the platform body is used for the lid to establish at the top of the inlayer of inspection shaft wall of a well template, through the slope with the concrete to the regional pouring of the inlayer and the outer encirclement of inspection shaft wall of a well template is pour.
2. The manhole casting platform according to claim 1, wherein the stiffening ribs include a first stiffening rib and a second stiffening rib, the first stiffening rib and the second stiffening rib cross each other, and the second stiffening rib is at least one.
3. The inspection well pouring platform according to claim 1, wherein a lifting ring is arranged on one surface of the platform body, which is far away from the inspection well wall formwork.
4. The manhole casting platform according to claim 3, wherein the lifting ring is disposed on an edge adjacent to the platform body.
5. The manhole casting platform according to claim 4, wherein the lifting rings are two and are symmetrically arranged with respect to the center of the platform body.
6. The manhole casting platform according to claim 1, wherein the platform body comprises a plurality of plywood panels, and the plurality of plywood panels are connected to each other to form the platform body.
7. Inspection shaft pours device, its characterized in that includes:
the manhole casting platform according to any one of claims 1 to 6;
the inspection well wall template comprises a first template and a second template, a gap is formed between the first template and the second template, a pouring area is formed in the gap, and the top of the first template is covered by the platform body.
8. The manhole casting apparatus of claim 7, wherein the first form is shaped to match a shape of the manhole casting platform.
9. The manhole pouring device according to claim 8, wherein a first through hole is formed in a bottom side surface of the first template, a second through hole is formed in a bottom side surface of the second template beside the first through hole, the first through hole and the second through hole are identical in size and coaxial in center, and at least one rainwater pipe penetrates through the first through hole and the second through hole.
CN202121684555.4U 2021-07-23 2021-07-23 Inspection well pouring platform and device Active CN217840095U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121684555.4U CN217840095U (en) 2021-07-23 2021-07-23 Inspection well pouring platform and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121684555.4U CN217840095U (en) 2021-07-23 2021-07-23 Inspection well pouring platform and device

Publications (1)

Publication Number Publication Date
CN217840095U true CN217840095U (en) 2022-11-18

Family

ID=84009882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121684555.4U Active CN217840095U (en) 2021-07-23 2021-07-23 Inspection well pouring platform and device

Country Status (1)

Country Link
CN (1) CN217840095U (en)

Similar Documents

Publication Publication Date Title
CN104895092B (en) The method that a kind of interim lattice column of inner support is used as permanent structure post
CN100476142C (en) Construction method for combined V-shape steel pipe concrete pile
CN103469806A (en) Construction method for replacing brick forming die with prefabricated concrete foundation bearing platform side die
CN106245654B (en) Deposited reinforced concrete pile exempts from inter-pile soil excavation construction method
CN206495501U (en) A kind of cast-in-place concrete floor reserving hole template
CN206298900U (en) A kind of diaphram wall built-in type steel encloses purlin plug system
CN109648696A (en) Side slope precast lattice beam of reinforcing bar connection and preparation method thereof and construction method
CN217840095U (en) Inspection well pouring platform and device
CN106436721B (en) The construction method of diaphram wall built-in type steel purlin plug system
CN207004065U (en) A kind of piping shaft reserves thimble assembly
CN108149866A (en) PC stair cast-in-place node pre-cast bolt positioning devices and method
CN211037813U (en) Post-cast strip bearing structure
CN108798715A (en) A kind of tunnel type pipe gallery sectional type component assembly method
CN206736881U (en) Shallow sea region measurement control point platform
CN105569329B (en) Single surface formwork basement construction method and basement
JP3015646U (en) Concrete block for earth retaining
CN206034946U (en) Structure is handled to large -scale pressure vertical shaft concrete defect based on slipform technology
CN207812999U (en) Digital alloy steel framework plastic formwork
CN207265620U (en) A kind of cable installation support of armored concrete electric power pipe trench
CN207813015U (en) Floor slab preformed hole tool-typed formwork support construction
CN106142302A (en) The particular manufacturing craft of a kind of processing cable ditch prefabricated component and processing method thereof
CN207776228U (en) A kind of building-block structure suitable for loam wall external corner
CN102561692A (en) Method and template for pouring concrete beam or column with embedded part at top
CN204525723U (en) A kind of particular manufacturing craft of processing cable ditch prefabricated component
DK152442B (en) PROCEDURE FOR MAKING FOUNDATIONS FOR A CONSTRUCTION AND FOUNDATION BLOCK FOR USING THE PROCEDURE