CN207265620U - A kind of cable installation support of armored concrete electric power pipe trench - Google Patents

A kind of cable installation support of armored concrete electric power pipe trench Download PDF

Info

Publication number
CN207265620U
CN207265620U CN201721241103.2U CN201721241103U CN207265620U CN 207265620 U CN207265620 U CN 207265620U CN 201721241103 U CN201721241103 U CN 201721241103U CN 207265620 U CN207265620 U CN 207265620U
Authority
CN
China
Prior art keywords
cable
spill
electric power
power pipe
cable bearer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721241103.2U
Other languages
Chinese (zh)
Inventor
刘毛毛
王辉
曾广庆
段敏
杨泽民
张连录
黄海其
黄妙金
利勇
贺颖
黄红华
房明
罗嘉锐
姜鼎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Construction Co Ltd
Original Assignee
Guangzhou Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Construction Co Ltd filed Critical Guangzhou Construction Co Ltd
Priority to CN201721241103.2U priority Critical patent/CN207265620U/en
Application granted granted Critical
Publication of CN207265620U publication Critical patent/CN207265620U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of cable installation support of armored concrete electric power pipe trench, spill plank sheathing including the cystosepiment for filling the installation hole using the cable bearer formed after two pieces of steel form assembly, for stopping concrete leakage, the spill plank sheathing are connected and fixed to the periphery of the cystosepiment with the steel form;The top of the cystosepiment is equipped with the perforation that passes through of current supply cable stent, and the L-shaped angle steel along the length direction extension of the cable bearer, the L-shaped angle steel and the cable bearer banding fixed are welded with the steel form above the installation hole of the cable bearer.The utility model can improve the installation quality of armored concrete electric power pipe trench cable bearer, ensure that surface of wall is smooth, without exposed concrete phenomenon, rectify no offset in cable bearer position, so that it is guaranteed that the quality of cable installation itself and the safe passing of track traffic, the utility model has the advantages that technical feasibility, rational in infrastructure, technique is simple, easy to operate, construction safety.

Description

A kind of cable installation support of armored concrete electric power pipe trench
Technical field
It the utility model is related to the technical field of construction, and in particular to a kind of cable of armored concrete electric power pipe trench Mounting bracket.
Background technology
As Modern City Building is being mixed to depth and high development, the power pipe ditch generally use reinforcing bar of track traffic Solidifying soil is built by laying bricks or stones.The installation quality of electric power pipe trench cable bearer directly affects the current safety of track traffic, however, cable bearer Installation quality does not reach a satisfied degree all the time, wherein the cable bearer installation quality problem being primarily present is cable bearer The position of installation leaks outside there are concrete to cause surface of wall out-of-flatness, cable bearer to tilt.Therefore, how reinforced concrete is improved The installation quality of native electric power pipe trench cable bearer is that current one technical barrier for being badly in need of solution of field of engineering technology and hot spot are asked Topic.
In pouring reinforcement concrete electric power pipe trench, the mounting hole larger compared with cable bearer is reserved usually on steel form Mouthful, by the bar-mat reinforcement banding fixed between cable bearer and steel form, but in casting process cable bearer installed position Meeting visual concrete, causes maintenance demoulding back wall surface irregularity, while cable bearer position shifts, and then influences electricity Cable installation quality, the current safety for ultimately resulting in track traffic cannot get effective guarantee.
Utility model content
In view of this, the utility model aim be to provide a kind of technique be simple and convenient to operate, the reinforced concrete of construction safety The cable installation support of native electric power pipe trench, improves the installation quality of armored concrete electric power pipe trench cable bearer.
In order to solve the above-mentioned technical problem, the utility model provides a kind of cable installation of armored concrete electric power pipe trench Stent, including for filling using the cystosepiment of the installation hole of the cable bearer formed after two pieces of steel form assembly, for hindering The spill plank sheathing of concrete leakage is kept off, the spill plank sheathing is connected and fixed to the outer of the cystosepiment with the steel form Enclose;The top of the cystosepiment is equipped with the perforation that current supply cable stent passes through;Reinforcing bar between the cable bearer and the steel form Net banding fixed;The length direction along the cable bearer is welded with steel form above the installation hole of the cable bearer The L-shaped angle steel of extension, the L-shaped angle steel and the cable bearer banding fixed.
Preferably, the side of every piece of steel form is equipped with arrangement along the vertical direction and two notches of shape size unanimously.
Wherein, the shape after the shape of the cystosepiment is installed on the notch with the cable bearer is consistent.
In the preferred embodiment in the utility model, the appearance and size of the spill plank sheathing is more than the shape of the cystosepiment Size.
In the preferred embodiment in the utility model, the both sides of the spill plank sheathing are formed with symmetrically arranged rectangle hole Mouthful, screw is connected by the rectangle hole with the steel form.
In the preferred embodiment in the utility model, through hole is offered on the steel form and spill plank sheathing, passes through bolt It is each passed through the steel form and steel form is connected into fixation with spill plank sheathing with the through hole on spill plank sheathing.
Further, the sectional dimension of each notch is 8 × 14cm, and the sectional dimension of the cystosepiment is 16 × 14cm; The sectional dimension of the spill plank sheathing is 25 × 15cm.
Further, the sectional dimension of the perforation is 7 × 2cm;The top of the spill plank sheathing cuts and is useful for putting The rectangular opening of the cable bearer is put, the sectional dimension of the rectangular opening is 7 × 7cm.
The cable installation support of the armored concrete electric power pipe trench of the utility model is used for cable branch using cystosepiment filling The reserved opening of frame, stablizes cable bearer with spill plank sheathing fixed foam plate, and using L-shaped angle steel reinforced, only need to be by outer Cystosepiment, spill plank sheathing and the L-shaped angle steel in portion improve the installation quality of armored concrete electric power pipe trench cable bearer, ensure wall No offset is rectified in body surfacing, no exposed concrete phenomenon, cable bearer position, so that it is guaranteed that the cable installation quality of itself And the safe passing of track traffic.The utility model has technical feasibility, rational in infrastructure, technique is simple, easy to operate, construction peace The advantages of complete, meet the developing direction of modern project technology, thus there is larger promotion prospect.
Brief description of the drawings
, below will be to institute in embodiment or description of the prior art in order to illustrate more clearly of the technical solution of the utility model Attached drawing to be used is needed to be briefly described, it should be apparent that, drawings in the following description are only some of the utility model Embodiment, for those of ordinary skill in the art, without creative efforts, can also be attached according to these Figure obtains other attached drawings.
Fig. 1 is the steel form of the cable installation support for the armored concrete electric power pipe trench that the utility model embodiment provides Structure diagram;
Fig. 2 is the cystosepiment of the cable installation support for the armored concrete electric power pipe trench that the utility model embodiment provides Structure diagram;
Fig. 3 is the spill wooden model of the cable installation support for the armored concrete electric power pipe trench that the utility model embodiment provides The structure diagram of plate;
Fig. 4 is the structural representation of the cable installation support for the armored concrete electric power pipe trench that the utility model embodiment provides Figure.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the premise of creative work Lower all other embodiments obtained, shall fall within the protection scope of the present invention.
Embodiment:The utility model is applied to the rapid improvement project in Guangzhou Xin Guangcong roads (Huangshi East Road-street corner) [construction 14 mark], the engineering is south from Baiyun District, Guangzhou City Huangshi East Road, north to street corner, route total length 16260m, by road engineering, Science of bridge building, Tunnel Engineering, drainage system, illuminating engineering, electric power pipe trench engineering, afforestation project, traffic engineering, traffic data process and Exterior line power supply engineering etc. forms, starting point pile No.:K0+000, terminal pile No.:K16+260, wherein total length 16260m, k0+000~k3 + 575 scope road Cross Sections only add overpass without transformation.This electric power pipe trench engineering total length 12685m, pipe trench are 200*100-600*1100, -8 hole of 1 hole, buried depth 0.5m-1.2m.The installation quality of cable bearer does not reach satisfaction at present, Occurred the demoulding after concrete surface out-of-flatness, cable bearer position offset, the utility model to this cable bearer into Row reinforcement protection, it is ensured that exposed concrete will not occur in the soil casting process of Shanghai and Nanjing and cable bearer position is rectified.
Specifically, as shown in Figures 1 to 4, the cable installation support bag of the armored concrete electric power pipe trench of the utility model Include for filling using the cystosepiment 20 of the installation hole of the cable bearer 40 formed after two pieces of 10 assembly of steel form, for stopping The spill plank sheathing 30 of concrete leakage, the spill plank sheathing 30 are connected and fixed to the cystosepiment with the steel form 10 20 periphery;The top of the cystosepiment 20 is equipped with the perforation 21 that current supply cable stent 40 passes through, and the section ruler of the perforation 21 Very little is 7 × 2cm;Bar-mat reinforcement banding fixed between the cable bearer 40 and the steel form 10;The peace of the cable bearer 40 The L-shaped angle steel 50 along the length direction extension of the cable bearer, the L-shaped angle steel are welded with steel form above dress hole 50 with 40 banding fixed of cable bearer, in order not to influence the placement of cable bearer 40, the top of the spill plank sheathing 30 The rectangular opening 31 for being useful for placing the cable bearer is cut, the sectional dimension of the rectangular opening 31 is 7 × 7cm.Wherein, every block of steel The side of template 10 is equipped with arrangement along the vertical direction and two notches 11 of shape size unanimously, the sectional dimension of each notch 11 For 8 × 14cm.The shape of the cystosepiment 20 is adapted with the shape that the corresponding notch 11 of two pieces of steel forms forms, Shape after the shape of i.e. described cystosepiment 20 is installed on the notch with the cable bearer 40 is consistent, the cystosepiment 20 Sectional dimension is 16 × 14cm, and the appearance and size of the spill plank sheathing 30 in the utility model is more than the shape of the cystosepiment 20 Size, the sectional dimension of the spill plank sheathing 30 is 25 × 15cm.The utility model improves reinforcing bar by exterior multiplet The installation quality of concrete electric solenoid ditch cable bearer 40, ensures that surface of wall is smooth, unbiased is rectified in the position of cable bearer 40 Move, so that it is guaranteed that the quality of cable installation itself and the safe passing of track traffic.
Specifically, the both sides of the spill plank sheathing 30 in the utility model are formed with symmetrically arranged rectangle hole 32, spiral shell Silk is connected by the rectangle hole 32 with the steel form 10.Also, opened up on the steel form 10 and spill plank sheathing 30 There is through hole, through hole on the steel form 10 and spill plank sheathing 30 is each passed through by steel form 10 and spill wooden model by bolt The connection of plate 30 is fixed.
The installation steps of the cable bearer of the armored concrete electric power pipe trench include:
S1. the notch 11 of enough size is cut out in steel form 10, two pieces of steel forms 10 are stitched together, forms cable branch The reserved opening that frame 40 is installed, wherein the reserved opening section of every piece of steel form 10 is 8cm × 14cm, it is pre- after being stitched together Box out mouth sectional dimension is 16cm × 14cm.
S2., cable bearer 40 is installed, its bar-mat reinforcement between steel form 10 is kidnapped and is fixed.
S3. the cystosepiment 20 of the big little makings same shape of remaining space after being installed according to cable bearer 40, is filled with Into in hole, the concrete structure diagram of cystosepiment 20 is as shown in Figure 2.
S4. the periphery of cystosepiment 20, spill plank sheathing 30 are fixed on using the spill plank sheathing 30 larger compared with reserved opening Sectional dimension be 25cm × 15cm, the top of spill plank sheathing 30 cuts out rectangular opening 31 and places cable bearer 40, rectangular opening 31 sectional dimension is 7cm × 7cm.30 both sides of spill plank sheathing stay rectangle hole 32 to be connected by screw with steel form 10, should The sectional dimension at rectangle hole 32 is 4cm × 1cm.Also bolt can be used by the perforate on steel form 10 and spill plank sheathing 30 Connect to fix.
S5. one block of L-shaped angle steel 50 is welded on the steel form above reserved opening, by this L-shaped angle steel 50 and cable bearer 40 long-armed banding fixed, further ensures that no offset is rectified in the position of the cable bearer 40 after concreting.
S6. concreting:Before casting concrete, template should be irrigated fully with water, using commerical ready-mixed concrete, concrete Pour and pumped using concrete pump.Concrete transportation to scene after the slump is measured by sampling, after meeting the requirements with Concrete pump uninterrupted pumping placing concrete is used, concrete strengthens each portion while pouring is pumped with high frequency vibrating tamper Position is vibrated, and prevents leakage.Blanking should be layered when pouring, layering is vibrated, and lift height is not more than 0.5m, is shaken with immersion vibrator Levels should be overlapped no less than 50mm when smashing.Each vibrating perdurabgility a little of shaking, no longer floats until making surface that laitance be presented.
S7. concrete curing:According to the timely water seasoning of temperature situation, moisture state is kept, curing time is generally many In 7 days, the concrete curing for being impregnated with retarder was no less than 14d, and curing strength, which reaches more than 2.5MPa, can go up people's operation.
S8. form removable:After concrete strength can guarantee that its surface corner angle is not damaged because of form removal, it can tear open Remove.
As can be seen from the above-described embodiment, the cable installation support of the armored concrete electric power pipe trench of the utility model uses Reserved opening of the filling of cystosepiment 20 for cable bearer 40, with 30 fixed foam plate 20 of spill plank sheathing, and uses L-shaped angle steel 50 reinforce stable cable bearer 40, and only need to improve reinforcing bar by exterior cystosepiment 20, spill plank sheathing 30 and L-shaped angle steel 50 mix The installation quality of solidifying soil electric power pipe trench cable bearer, ensures that surface of wall is smooth, no exposed concrete phenomenon, cable bearer position Rectify without offset, so that it is guaranteed that the quality of cable installation itself and the safe passing of track traffic.The utility model has technology Feasible, rational in infrastructure, the advantages of technique is simple, easy to operate, construction safety, meet the developing direction of modern project technology, because And there is larger promotion prospect.
Above disclosed is only several preferred embodiments of the utility model, cannot limit this reality with this certainly With new interest field, therefore the equivalent variations made according to the utility model claims, still belong to the utility model and covered Scope.

Claims (8)

  1. A kind of 1. cable installation support of armored concrete electric power pipe trench, it is characterised in that:Including using two blocks of steel for filling The cystosepiment of the installation hole of the cable bearer formed after template assembly, the spill plank sheathing for stopping concrete leakage, institute State spill plank sheathing and be connected and fixed to the periphery of the cystosepiment with the steel form;
    The top of the cystosepiment is equipped with the perforation that current supply cable stent passes through;
    Bar-mat reinforcement banding fixed between the cable bearer and the steel form;
    The L along the length direction extension of the cable bearer is welded with steel form above the installation hole of the cable bearer Shape angle steel, the L-shaped angle steel and the cable bearer banding fixed.
  2. 2. the cable installation support of armored concrete electric power pipe trench according to claim 1, it is characterised in that:Every piece of punching block The side of plate is equipped with arrangement along the vertical direction and two notches of shape size unanimously.
  3. 3. the cable installation support of armored concrete electric power pipe trench according to claim 2, it is characterised in that:The foam Shape after the shape of plate is installed on the notch with the cable bearer is consistent.
  4. 4. the cable installation support of armored concrete electric power pipe trench according to claim 3, it is characterised in that:The spill The appearance and size of plank sheathing is more than the appearance and size of the cystosepiment.
  5. 5. the cable installation support of armored concrete electric power pipe trench according to claim 1, it is characterised in that:The spill The both sides of plank sheathing are connected formed with symmetrically arranged rectangle hole, screw by the rectangle hole with the steel form.
  6. 6. the cable installation support of armored concrete electric power pipe trench according to claim 1, it is characterised in that:The punching block Through hole is offered on plate and spill plank sheathing, through hole on the steel form and spill plank sheathing is each passed through by steel by bolt Template connects fixation with spill plank sheathing.
  7. 7. the cable installation support of armored concrete electric power pipe trench according to any one of claim 2 to 4, its feature exist In:The sectional dimension of each notch is 8 × 14cm, and the sectional dimension of the cystosepiment is 16 × 14cm;The spill plank sheathing Sectional dimension be 25 × 15cm.
  8. 8. the cable installation support of armored concrete electric power pipe trench according to claim 7, it is characterised in that:The perforation Sectional dimension be 7 × 2cm;The top of the spill plank sheathing cuts the rectangular opening for being useful for placing the cable bearer, should The sectional dimension of rectangular opening is 7 × 7cm.
CN201721241103.2U 2017-09-26 2017-09-26 A kind of cable installation support of armored concrete electric power pipe trench Expired - Fee Related CN207265620U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721241103.2U CN207265620U (en) 2017-09-26 2017-09-26 A kind of cable installation support of armored concrete electric power pipe trench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721241103.2U CN207265620U (en) 2017-09-26 2017-09-26 A kind of cable installation support of armored concrete electric power pipe trench

Publications (1)

Publication Number Publication Date
CN207265620U true CN207265620U (en) 2018-04-20

Family

ID=61919023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721241103.2U Expired - Fee Related CN207265620U (en) 2017-09-26 2017-09-26 A kind of cable installation support of armored concrete electric power pipe trench

Country Status (1)

Country Link
CN (1) CN207265620U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109119929A (en) * 2018-10-12 2019-01-01 中建局集团第二建筑有限公司 A kind of pipe trench high-tension cable concrete support installation fixed structure and its construction method
CN109119929B (en) * 2018-10-12 2024-05-14 中建一局集团第二建筑有限公司 Pipe ditch high-voltage cable concrete support mounting and fixing structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109119929A (en) * 2018-10-12 2019-01-01 中建局集团第二建筑有限公司 A kind of pipe trench high-tension cable concrete support installation fixed structure and its construction method
CN109119929B (en) * 2018-10-12 2024-05-14 中建一局集团第二建筑有限公司 Pipe ditch high-voltage cable concrete support mounting and fixing structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN106013228B (en) A kind of overlapping monoblock type pipe gallery prefabricated assembly structural and its construction method
CN105178357B (en) Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition
CN203755334U (en) Single-pipe tower prefabricated spiral steel pipe pile foundation
CN107542115A (en) Underground project waterproof structure and its construction method
CN201943086U (en) Underground building wall body
CN108560542A (en) A kind of waste tire cladding builds the two-directed reinforcement and its construction method of slag
CN103774687A (en) Single-pipe tower prefabricated spiral steel pipe pile foundation
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN108560536A (en) The continuous piling wall construction method of Soil-cement
CN203729322U (en) Precast concrete pipeline foundation
CN106759439A (en) For the tower crane and its construction method of foundation ditch
CN109797874A (en) A kind of high level Multi-tower post-cast strip advance water stop construction method
CN109750571A (en) A kind of road landslide emergency and permanent supporting and retaining system integral structure and construction method
CN108560586A (en) Half prefabricated assembled pipe gallery and its construction method
CN206752667U (en) A kind of basement barrier wall structure
CN206052778U (en) A kind of steel and Combined concrete piping lane
CN104652495A (en) Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate
CN108035379A (en) A kind of pipe gallery and its construction method
CN109797777A (en) Assembled is constructed from sealing underground pipe gallery and construction method
CN207265620U (en) A kind of cable installation support of armored concrete electric power pipe trench
CN111719571A (en) Construction method for foam concrete reinforcement of confined space high-fill roadbed side slope
CN207513292U (en) Cement pole and cabinet based Joint body
CN208578067U (en) Half prefabricated assembled pipe gallery
CN205637707U (en) Swimming pool
CN110344441A (en) It is a kind of to design the sponge urban road and road construction method for having pipe gallery

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180420

Termination date: 20200926

CF01 Termination of patent right due to non-payment of annual fee