CN217812266U - Automatic lifting device for climbing frame - Google Patents

Automatic lifting device for climbing frame Download PDF

Info

Publication number
CN217812266U
CN217812266U CN202221246298.0U CN202221246298U CN217812266U CN 217812266 U CN217812266 U CN 217812266U CN 202221246298 U CN202221246298 U CN 202221246298U CN 217812266 U CN217812266 U CN 217812266U
Authority
CN
China
Prior art keywords
frame
fixedly connected
installation frame
steel sheet
lifting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221246298.0U
Other languages
Chinese (zh)
Inventor
孔繁银
程祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Kaiqin New Material Technology Group Co ltd
Original Assignee
Jiangxi Kaiqin New Material Technology Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Kaiqin New Material Technology Group Co ltd filed Critical Jiangxi Kaiqin New Material Technology Group Co ltd
Priority to CN202221246298.0U priority Critical patent/CN217812266U/en
Application granted granted Critical
Publication of CN217812266U publication Critical patent/CN217812266U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a climb a self-lifting device, including the installation frame, the first steel sheet of positive fixedly connected with of installation frame, the inner chamber swing joint of installation frame has the rotary rod, the fixed surface of rotary rod is connected with the gear. The utility model discloses a set up the installation frame, first steel sheet, the rotary rod, the gear, the thorn piece, lead to the groove, the slide bar, rack and metal sheet, first steel sheet passes through bolt and building floor fixed connection, support the operation with this to the installation frame, when the rotary rod is rotatory, can drive the gear rotatory, carry out the displacement with this drive rack, it uses electric block to carry out the altitude mixture control operation as power source pulling building with climbing frame to have solved present climbing frame mostly, and need will climb the frame before carrying out the altitude mixture control and remove the fixed connection with the building, this process is comparatively loaded down with trivial details, and staff's work load has been increased, the problem of the efficiency when climbing frame promotes the operation has been reduced.

Description

Automatic lifting device for climbing frame
Technical Field
The utility model relates to a climb a technical field, specifically be a climb a automatic lifting device.
Background
The climbing frame, also called lifting frame, can be divided into several main types, such as hydraulic type, electric type, manpower hand-pulling type and the like according to the power source, is a novel scaffold system developed in recent years, is mainly applied to high-rise shear wall type buildings, and can ascend or descend along the buildings.
The frame of climbing at present mostly uses electric block to carry out the altitude mixture control operation as power source pulling building with climbing the frame, and need will climb the frame before carrying out the altitude mixture control and remove with the fixed connection of building, and this process is comparatively loaded down with trivial details, and has increased staff's work load, has reduced the efficiency of climbing when the frame promotes the operation.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a climb a self-lifting device, possess the advantage of being convenient for adjust, solved present climbing frame and mostly used electric block to carry out the altitude mixture control operation as power source pulling building with climbing frame, and need will climb the frame before carrying out the altitude mixture control and remove the fixed connection with the building, this process is comparatively loaded down with trivial details, and has increased staff's work load, has reduced the problem of climbing the efficiency when frame promotes the operation.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a climb a frame automatic lifting device, includes the installation frame, the first steel sheet of positive fixedly connected with of installation frame, the inner chamber swing joint of installation frame has the rotary rod, the fixed surface of rotary rod is connected with the gear, there is the thorn piece upper end of installation frame inner chamber through pivot swing joint, logical groove has been seted up at the top of installation frame, the inner chamber swing joint who leads to the groove has the slide bar, the positive fixedly connected with rack of slide bar, the rack meshes with the surface of gear, the back fixedly connected with metal sheet of slide bar.
Preferably, a power frame is fixedly connected to the right side of the mounting frame, and one end of the rotating rod penetrates through an inner cavity of the power frame and is fixedly connected with a driven wheel.
Preferably, the left side of the inner cavity of the power frame is fixedly connected with a speed reducing motor, an output shaft of the speed reducing motor is in transmission connection with a driving wheel, and the driven wheel is in transmission connection with the driving wheel through a belt.
Preferably, the top of the ratchet block is movably connected with a threaded rod through a rotating shaft, and the top of the threaded rod penetrates through the outer part of the mounting frame and is in threaded connection with the inner wall of the mounting frame.
Preferably, the sliding grooves are formed in the two sides of the sliding rod, the sliding blocks are fixedly connected to the two sides of the inner cavity of the through groove, and one ends of the sliding blocks extend to the inner cavity of the sliding grooves and are connected with the inner wall of the sliding grooves in a sliding mode.
Preferably, the positive upper end fixedly connected with first swash plate of installation frame, the one end that the installation frame was kept away from to first swash plate and the top fixed connection of first steel sheet.
Preferably, the bottom fixedly connected with second steel sheet of first steel sheet, the back fixedly connected with second swash plate of second steel sheet, the one end that the second steel sheet was kept away from to the second swash plate is with the bottom fixed connection of installation frame.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model discloses a set up the installation frame, first steel sheet, the rotary rod, the gear, the thorn piece, lead to the groove, the slide bar, rack and metal sheet, first steel sheet passes through bolt and building floor fixed connection, support the operation with this to the installation frame, when the rotary rod is rotatory, can drive the gear rotation, it carries out the displacement to drive the rack with this, thereby it carries out the altitude mixture control operation to drive metal sheet and outside climbing frame, after will climbing frame displacement to suitable height, the cooperation threaded rod can be with the surface engagement of thorn piece and gear, and carry out spacing operation to the gear, avoid the gear to take place the rotation, it uses electric block to carry out the altitude mixture control operation as power source pulling climbing frame for the building to have solved present climbing frame, and need remove the climbing frame with the fixed connection of building before carrying out the altitude mixture control to climbing frame, the process is comparatively loaded down with trivial details, and staff's work load has been increased, the problem of efficiency when climbing frame promotes the operation has been reduced.
Drawings
FIG. 1 is a schematic view of the present invention;
fig. 2 is an exploded schematic view of the rotary rod of the present invention;
FIG. 3 is a schematic perspective view of the driven wheel of the present invention;
fig. 4 is a schematic view of a part of an enlarged structure at a in fig. 1 according to the present invention.
In the figure: 1. a mounting frame; 2. a first steel plate; 3. rotating the rod; 4. a gear; 5. a ratchet block; 6. a through groove; 7. a slide bar; 8. a rack; 9. a metal plate; 10. a power frame; 11. a driven wheel; 12. a reduction motor; 13. a driving wheel; 14. a threaded rod; 15. a chute; 16. a slider; 17. a first sloping plate; 18. a second steel plate; 19. a second swash plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model discloses an installation frame 1, first steel sheet 2, rotary rod 3, gear 4, thorn piece 5, lead to groove 6, slide bar 7, rack 8, metal sheet 9, power frame 10, follow driving wheel 11, gear motor 12, action wheel 13, threaded rod 14, spout 15, slider 16, first swash plate 17, second steel sheet 18 and second swash plate 19 part are the parts that general standard or technical personnel in the field know, its structure and principle all are the part that this technical personnel all can learn the manual through the technique or learn through conventional experimental approach.
Referring to fig. 1-4, an automatic lifting device for climbing frame, including an installation frame 1, a first steel plate 2 fixedly connected to the front of the installation frame 1, a rotary rod 3 movably connected to the inner cavity of the installation frame 1, a gear 4 fixedly connected to the surface of the rotary rod 3, a ratchet block 5 movably connected to the upper end of the inner cavity of the installation frame 1 through a rotary shaft, a through groove 6 formed at the top of the installation frame 1, a slide rod 7 movably connected to the inner cavity of the through groove 6, a rack 8 fixedly connected to the front of the slide rod 7, the rack 8 engaging with the surface of the gear 4, a metal plate 9 fixedly connected to the back of the slide rod 7, by setting the installation frame 1, the first steel plate 2, the rotary rod 3, the gear 4, the ratchet block 5, the through groove 6, the slide rod 7, the rack 8 and the metal plate 9, the first steel plate 2 is fixedly connected to a building floor through bolts, thereby supporting the installation frame 1, when the rotary rod 3 rotates, the gear 4 can be driven to rotate, thereby driving the rack 8 to displace, thereby driving the metal plate 9 and the external climbing frame to perform height adjustment operation, when the climbing frame is displaced, the climbing frame is displaced, the lifting efficiency is reduced, and the lifting efficiency of the climbing frame is reduced.
Specifically, the right side fixed connection of installation frame 1 has power frame 10, and the one end of rotary rod 3 runs through to power frame 10's inner chamber and fixedly connected with from driving wheel 11, through setting up power frame 10 and from driving wheel 11, when rotatory from driving wheel 11, can drive rotary rod 3 and carry out rotatory operation to this drives gear 4 and rotates.
Specifically, the left side fixedly connected with gear motor 12 of power frame 10 inner chamber, the output shaft transmission of gear motor 12 is connected with action wheel 13, connects through belt transmission from driving wheel 11 and action wheel 13, through setting up gear motor 12 and action wheel 13, provides the power source for the rotation from driving wheel 11.
Specifically, the top of ratchet piece 5 has threaded rod 14 through pivot swing joint, and the top of threaded rod 14 runs through to the outside of installation frame 1 and with the inner wall threaded connection of installation frame 1, through setting up threaded rod 14, through rotatory threaded rod 14 to this promotes ratchet piece 5 and gear 4's surface engagement, and carries out spacingly to ratchet piece 5, avoids gear 4 to take place the rotation.
Concrete, spout 15 has all been seted up to the both sides of slide bar 7, leads to the equal fixedly connected with slider 16 in both sides of 6 inner chambers, and the one end of slider 16 extends to the inner chamber of spout 15, and with the inner wall sliding connection of spout 15, through setting up spout 15 and slider 16, carries on spacingly to the displacement of slide bar 7, avoids slide bar 7 to appear the off normal when the displacement.
Specifically, the first swash plate 17 of the positive upper end fixedly connected with of installation frame 1, the one end that installation frame 1 was kept away from to first swash plate 17 and the top fixed connection of first steel sheet 2 through setting up first swash plate 17, increases the stability of being connected of installation frame 1 and first steel sheet 2.
Specifically, the bottom fixedly connected with second steel sheet 18 of first steel sheet 2, the back fixedly connected with second swash plate 19 of second steel sheet 18, the one end that second steel sheet 18 was kept away from to second swash plate 19 and the bottom fixed connection of installation frame 1, through setting up second steel sheet 18 and second swash plate 19, further increase the support function of first steel sheet 2 to installation frame 1, second steel sheet 18 cooperation bolt continues threaded connection with the building floor simultaneously, cooperate first steel sheet 2 to increase the connection stability of device.
When the height of the external climbing frame needs to be adjusted, firstly, the speed reducing motor 12 is started through the external controller, an output shaft of the speed reducing motor 12 drives the driving wheel 13 to rotate, the driving wheel 13 is matched with the belt to drive the driven wheel 11 and the rotary rod 3 to rotate, the rotary rod 3 drives the gear 4 to rotate, so that the slide rod 7 is driven to move upwards along an inner cavity of the sliding groove 15, the metal plate 9 and the external climbing frame are driven to perform height adjustment operation while the slide rod 7 moves, after the height adjustment of the external climbing frame is completed, the threaded rod 14 is rotated, the bottom of the threaded rod 14 moves downwards in the inner cavity of the installation frame 1, the bottom of the ratchet block 5 is pushed to be meshed with the gear 4, the limit of the gear 4 is completed, the gear 4 is prevented from rotating, the problem that the climbing frame for the building is pulled to perform height adjustment operation by using an electric hoist as a power source before the height adjustment of the climbing frame is performed is solved, the fixed connection between the climbing frame and the building is released, the process is tedious, the workload of workers is increased, and the problem that the efficiency of the climbing frame during the lifting operation is reduced.
The standard parts used in the present application document can be purchased from the market, and can be customized according to the description of the specification and the accompanying drawings, the specific connection mode of each part adopts the conventional means of mature bolt, rivet, welding and the like in the prior art, the machines, parts and equipment adopt the conventional models in the prior art, the control mode is automatically controlled by a controller, the control circuit of the controller can be realized by simple programming of technicians in the field, the control circuit belongs to the common knowledge in the field, and the present application document is mainly used for protecting mechanical devices, so the control mode and the circuit connection are not explained in detail in the present application.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising a … …" does not exclude the presence of another identical element in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. An automatic climbing frame lifting device comprises a mounting frame (1), and is characterized in that: the utility model discloses a quick-witted installation structure, including installation frame (1), inner chamber swing joint have rotary rod (3), the fixed surface of rotary rod (3) is connected with gear (4), the upper end of installation frame (1) inner chamber has sour jujube piece (5) through pivot swing joint, logical groove (6) have been seted up at the top of installation frame (1), the inner chamber swing joint who leads to groove (6) has slide bar (7), the positive fixedly connected with rack (8) of slide bar (7), the surface engagement of rack (8) and gear (4), the back fixedly connected with metal sheet (9) of slide bar (7).
2. The automatic lifting device for climbing frame according to claim 1, characterized in that: the right side fixed connection of installation frame (1) has power frame (10), the one end of rotary rod (3) runs through to the inner chamber of power frame (10) and fixedly connected with from driving wheel (11).
3. The automatic lifting device for climbing frame according to claim 2, characterized in that: the left side fixedly connected with gear motor (12) of power frame (10) inner chamber, the output shaft transmission of gear motor (12) is connected with action wheel (13), follow driving wheel (11) and action wheel (13) and pass through belt transmission and connect.
4. The automatic lifting device for climbing frame according to claim 1, characterized in that: the top of the ratchet block (5) is movably connected with a threaded rod (14) through a rotating shaft, and the top of the threaded rod (14) penetrates through the outer part of the mounting frame (1) and is in threaded connection with the inner wall of the mounting frame (1).
5. The automatic lifting device for climbing frame according to claim 1, characterized in that: spout (15) have all been seted up to the both sides of slide bar (7), lead to the equal fixedly connected with slider (16) in both sides of groove (6) inner chamber, the one end of slider (16) extends to the inner chamber of spout (15), and with the inner wall sliding connection of spout (15).
6. The automatic lifting device for climbing frame according to claim 1, characterized in that: the positive upper end fixedly connected with first swash plate (17) of installation frame (1), the top fixed connection of the one end and first steel sheet (2) of installation frame (1) is kept away from in first swash plate (17).
7. The automatic lifting device for climbing frame according to claim 1, characterized in that: the bottom fixedly connected with second steel sheet (18) of first steel sheet (2), the back fixedly connected with second swash plate (19) of second steel sheet (18), the one end that second steel sheet (18) were kept away from in second swash plate (19) and the bottom fixed connection of installation frame (1).
CN202221246298.0U 2022-05-23 2022-05-23 Automatic lifting device for climbing frame Active CN217812266U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221246298.0U CN217812266U (en) 2022-05-23 2022-05-23 Automatic lifting device for climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221246298.0U CN217812266U (en) 2022-05-23 2022-05-23 Automatic lifting device for climbing frame

Publications (1)

Publication Number Publication Date
CN217812266U true CN217812266U (en) 2022-11-15

Family

ID=83985298

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221246298.0U Active CN217812266U (en) 2022-05-23 2022-05-23 Automatic lifting device for climbing frame

Country Status (1)

Country Link
CN (1) CN217812266U (en)

Similar Documents

Publication Publication Date Title
CN217812266U (en) Automatic lifting device for climbing frame
CN213742476U (en) Construction is with prefabricated wallboard auxiliary stay structure
CN213329907U (en) Thin plastering construction tool
CN212684350U (en) Wall drilling equipment is used in security protection engineering construction
CN212656583U (en) Wall building machine for wall body structure
CN211770012U (en) Loading attachment for construction
CN219548294U (en) Impact assembly for firm tile
CN220463791U (en) Movable feeding platform
CN218335033U (en) Cable erecting device for building electromechanical installation
CN220100569U (en) Building construction appurtenance
CN217812444U (en) Vertical mechanical connecting mechanism of assembled shear wall
CN219241246U (en) Building construction frame
CN218323813U (en) Building construction climbing frame
CN219261718U (en) House building construction platform
CN211813309U (en) Multi-functional lifting device of architectural equipment
CN218169420U (en) Metal processing stable type workstation
CN220451368U (en) Intelligence auxiliary stay frame convenient to adjust
CN221222270U (en) Property equipment facility remote monitoring platform
CN219929428U (en) Solar photovoltaic cell assembly installation equipment
CN220116171U (en) EPC assembled super high-rise building is built interlude and is under construction with lifting support
CN219218857U (en) Water retaining device of hydraulic and hydroelectric engineering with adjustable
CN211775501U (en) Plastering device for building construction
CN221160892U (en) Roll-over stand is used in production of PC prefabricated component
CN216377279U (en) Novel hoisting apparatus for constructional engineering
CN218176559U (en) Scaffold work platform and scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant