CN217678603U - Hanging platform for installing and constructing ramp steel bridge - Google Patents

Hanging platform for installing and constructing ramp steel bridge Download PDF

Info

Publication number
CN217678603U
CN217678603U CN202220477817.8U CN202220477817U CN217678603U CN 217678603 U CN217678603 U CN 217678603U CN 202220477817 U CN202220477817 U CN 202220477817U CN 217678603 U CN217678603 U CN 217678603U
Authority
CN
China
Prior art keywords
pedal
steel bridge
wall
hanging platform
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220477817.8U
Other languages
Chinese (zh)
Inventor
戴利平
项亮
刘凯
白富康
夏军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuhang Traffic Construction Group Co ltd
Original Assignee
Yuhang Traffic Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yuhang Traffic Construction Group Co ltd filed Critical Yuhang Traffic Construction Group Co ltd
Priority to CN202220477817.8U priority Critical patent/CN217678603U/en
Application granted granted Critical
Publication of CN217678603U publication Critical patent/CN217678603U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a bridge construction equipment field especially relates to a ramp steel bridge construction is with hanging platform. The lifting platform for installing and constructing the ramp steel bridge comprises a bottom plate, and a fixedly connected pedal is erected above the bottom plate; the pedal device comprises a moving assembly, wherein the moving assembly is arranged below a pedal and comprises a rotating motor, a rotating rod, a threaded section, a threaded sleeve, a connecting frame and a moving plate. The utility model provides a ramp steel bridge roof beam construction and installation is with hanging platform, when rotating the motor and driving the dwang and rotate, the dwang then can drive the link through two screw thread opposite direction's on the outer wall screw thread section and screw thread cover and carry out opposite direction and remove, the link that removes this moment then can drive the movable plate and outwards expand at the inner wall of pedal, through the expansion of movable plate, the area of trampling in multiplicable whole platform later stage, consequently can increase later stage staff's work area to a certain extent, reduce the number of times that this device removed in the high altitude.

Description

Hanging platform for installing and constructing ramp steel bridge
Technical Field
The utility model relates to a bridge construction equipment field especially relates to a ramp steel bridge construction is with hanging platform.
Background
The suspension platform is a working site for constructors and is formed by connecting and combining four parts of a high railing, a low railing, a basket bottom and a lifter mounting frame through bolts, and the suspension platform is most used in high-altitude operation on a plurality of large-scale building construction sites
The current platform that hangs all is the welding integral type generally, and because the outward appearance volume of whole device is great relatively, consequently can bring great difficulty relatively for the transfer of whole device in later stage, simultaneously when the crane hoists whole device and removes it to required position, because the distance is relatively far away and the device is great, certain clearance can often appear in whole platform and work area, consequently can reduce later stage staff's work area to a certain extent.
Therefore, a new hanging platform for installing and constructing ramp steel bridges is needed to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a ramp steel bridge construction is with hanging platform.
The utility model provides a ramp steel bridge roof beam construction and installation is with hanging platform includes:
the pedal is fixedly connected with the bottom plate;
the movable assembly is arranged below the pedal and comprises a rotating motor, a rotating rod, a thread section, thread sleeves, a connecting frame and a movable plate, the output end of the rotating motor is fixedly connected with the rotating rod, the thread sections with two opposite thread directions are arranged on the outer wall of the rotating rod and are sleeved with the thread sleeves in threaded connection, the thread sleeves are connected with the connecting frame in a fixed mode, and the movable plate is connected with the connecting frame in a fixed mode and is arranged on one side, back to back, of the connecting frame.
Preferably, the top side of pedal erects the bracing piece that is equipped with two symmetric distributions, two all the cover is equipped with the rotation section of thick bamboo of rotating the connection on the outer wall of bracing piece, and two all install fixed connection's first guardrail on the outer wall of rotation section of thick bamboo.
Preferably, two sliding rods in sliding connection are arranged on two sides of the inner wall of the first guardrail, one end of the outer wall of each sliding rod is fixedly connected with the outer wall of the same fixing rod, and the bottom end of each fixing rod is fixedly connected with the movable plate through a rotating frame.
Preferably, the placing grooves are formed in two side walls of the pedal, the connecting blocks fixedly connected with each other are arranged on the top side of the pedal, and the bottom side of the pedal is fixedly connected with the rotating motor and the rotating rod.
Preferably, the inner walls of the two placing grooves are in sliding connection with the outer wall of the corresponding moving plate, and the specifications of the placing grooves are the same as those of the moving plate.
Preferably, a second guardrail in sliding connection is inserted between the two fixing rods on the same side, and the outer wall of each second guardrail is connected with the corresponding fixing rod through a limit knob.
Preferably, the top side of the bottom plate is provided with a fixedly connected storage battery box, and the storage battery box is electrically connected with the rotating motor through a lead.
Compared with the prior art, the utility model provides a ramp steel bridge roof beam construction and installation is with hanging platform has following beneficial effect:
1. the utility model discloses a setting of removal subassembly, the later stage is after the crane removes this device to the required position in high altitude, but the rotation motor of staff in the direct control mobile device drives the dwang and rotates, the dwang then can drive the link through two screw thread opposite direction's on the outer wall thread section and screw thread cover and carry out opposite direction and remove this moment, the link that removes this moment then can drive the movable plate and outwards expand at the inner wall of pedal, through the expansion of movable plate, the area of trampling in multiplicable whole platform later stage, consequently, can increase later stage staff's work area to a certain extent, reduce the number of times that this device removed in the high altitude.
2. The utility model discloses because first guardrail rotates between a rotation section of thick bamboo and the step board and is connected, after accomplishing the use of this device, the staff at first can take out the second guardrail from first guardrail to the first guardrail of control step board both sides uses the junction with the step board to rotate as the node, can accomplish the folding of first guardrail and accomodate, reduces this device and takes up an area of the space, consequently can improve the portability of this device transportation to a certain extent.
Drawings
Fig. 1 is a schematic structural view of a preferred embodiment of a suspension platform for installing and constructing a ramp steel bridge according to the present invention;
FIG. 2 is a schematic view of the moving assembly shown in FIG. 1;
FIG. 3 is a schematic structural view in section of the first guard rail shown in FIG. 1;
FIG. 4 is a schematic structural view of the pedal of FIG. 1;
fig. 5 is a schematic structural view of the second guard rail shown in fig. 1.
The reference numbers in the figures: 1. a base plate; 2. treading a pedal; 2a, placing grooves; 2b, connecting blocks; 3. a moving assembly; 31. rotating the motor; 32. rotating the rod; 33. a threaded segment; 34. a threaded sleeve; 35. a connecting frame; 36. moving the plate; 4. an accumulator case; 5. a support bar; 6. a first guardrail; 6a, rotating the cylinder; 6b, a sliding rod; 6c, fixing rods; 6d, rotating a rack; 7. a second guard rail; 7a and a limit knob.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The following detailed description is provided to illustrate specific embodiments of the present invention.
Please refer to fig. 1 to 5, an embodiment of the present invention provides a ramp steel bridge installation construction is with hanging platform, ramp steel bridge installation construction includes with hanging platform: the device comprises a base plate 1 and a moving assembly 3, wherein a pedal 2 fixedly connected is erected above the base plate 1.
In the embodiment of the utility model, please refer to fig. 1 and fig. 2, the removal subassembly 3 sets up in the below of pedal 2, the removal subassembly 3 is including rotating motor 31, dwang 32, screw thread section 33, thread bush 34, link 35 and movable plate 36, the output and the dwang 32 fixed connection of rotating motor 31, two screw thread sections 33 that screw thread opposite direction have been seted up on the outer wall of dwang 32, two all the cover is equipped with threaded connection's thread bush 34 on the outer wall of screw thread section 33, two fixed connection's link 35 is all installed to the bottom side of thread bush 34, and two fixed connection's movable plate 36 is all installed to one side that link 35 carried on the back mutually, the top side of bottom plate 1 is equipped with fixed connection's accumulator box 4, just accumulator box 4 passes through the wire and rotates electric connection between the motor 31.
It should be noted that: when the lifting platform is used, after a worker controls the lifting machine to move the lifting platform to a position required by high altitude, the worker on the lifting platform can directly control the rotating motor 31 in the moving device to drive the rotating rod 32 to rotate, and at the moment, the rotating rod 32 can drive the connecting frame 35 to move in the opposite direction through the threaded section 33 and the threaded sleeve 34 with the opposite thread directions on the outer wall;
at this time, the movable connecting frame 35 drives the movable plate 36 to expand outwards on the inner wall of the pedal 2, and the later-stage pedal area of the whole platform can be increased by expanding the movable plate 36, so that the working area of later-stage workers can be increased to a certain extent, and the times of high-altitude movement of the device are reduced;
after the device is used, the worker can withdraw the movable plate 36 into the pedal 2, so that the area of the device is reduced, and the use experience of the device can be further improved by flexibly contracting the movable plate 36.
In the embodiment of the utility model, please refer to fig. 1, fig. 3 and fig. 4, pedal 2's top side frame is equipped with two symmetric distribution's bracing piece 5, two all the cover is equipped with the rotation section of thick bamboo 6a of rotating the connection on the outer wall of bracing piece 5, and two all install fixed connection's first guardrail 6, two on the outer wall of rotation section of thick bamboo 6a the both sides of the inner wall of first guardrail 6 all are equipped with sliding connection's slide bar 6b, the homonymy the one end of slide bar 6b outer wall all with the outer wall fixed connection of same dead lever 6c, and every the bottom of dead lever 6c all is through rotating turret 6d and movable plate 36 fixed connection.
It should be noted that: and because the first guardrail 6 is rotatably connected with the pedal 2 through the rotating cylinder 6a, after the device is used, a worker can firstly take out the second guardrail 7 from the first guardrail 6 and control the first guardrails 6 at the two sides of the pedal 2 to rotate by taking the connecting part with the pedal 2 as a node, so that the first guardrail 6 can be folded and stored, the occupied space of the device is reduced, and the transportation portability of the device can be improved to a certain extent;
meanwhile, as the sliding rod 6b is inserted in the first guardrail 6, when the moving plate 36 is unfolded outwards, the fixed rod 6c can drive the sliding rod 6b to move in the first guardrail 6 and unfold outwards, so that the sliding rod 6b can protect the side wall of the unfolded moving plate 36.
In the embodiment of the present invention, please refer to fig. 1, fig. 2 and fig. 4, the two side walls of the pedal 2 have been provided with a placing groove 2a, the top side of the pedal 2 is provided with a plurality of fixedly connected connecting blocks 2b, and the bottom side of the pedal 2 is fixedly connected to the rotating motor 31 and the rotating rod 32.
It should be noted that: through connecting block 2 b's setting, the later stage is when using this device, and the staff can directly hang the wire rope of crane on connecting block 2b, can hang this device through connecting block 2 b.
In the embodiment of the present invention, please refer to fig. 1, fig. 2 and fig. 4, the inner walls of the two placing grooves 2a are slidably connected to the outer wall of the corresponding moving plate 36, and the specifications of the placing grooves 2a are the same as the specifications of the moving plate 36.
It should be noted that: because the specification of the placing groove 2a is the same as that of the moving plate 36, the phenomenon that the moving plate 36 randomly shakes in the processes of moving at the later stage and treading by workers can be avoided, and the stability of the moving plate 36 can be improved.
In the embodiment of the present invention, please refer to fig. 1, fig. 3 and fig. 5, two of the fixing rods 6c on the same side are inserted with a second guardrail 7 connected in a sliding manner, and each of the outer wall of the second guardrail 7 and the corresponding fixing rod 6c is connected by a limit knob 7 a.
It should be noted that: because the second guardrail 7 is inserted and established in dead lever 6c, consequently can make the installation between second guardrail 7 and the first guardrail 6 more convenient with the dismantlement, simultaneously through limit knob 7 a's setting, insert when second guardrail 7 and establish inside first guardrail 6 to screw up limit knob 7a back, limit knob 7a can carry on spacingly to second guardrail 7, can make the installation of second guardrail 7 more stable.
The utility model provides a ramp steel bridge roof beam construction and installation is as follows with the theory of operation of hanging platform:
when the lifting platform is used, after a worker controls the lifting machine to move the lifting platform to a position required by high altitude, the worker on the lifting platform can directly control the rotating motor 31 in the moving device to drive the rotating rod 32 to rotate, and at the moment, the rotating rod 32 can drive the connecting frame 35 to move in the opposite direction through the threaded section 33 and the threaded sleeve 34 with the opposite thread directions on the outer wall;
at this time, the movable connecting frame 35 drives the movable plate 36 to expand outwards on the inner wall of the pedal 2, and the later-stage pedal area of the whole platform can be increased by expanding the movable plate 36, so that the working area of later-stage workers can be increased to a certain extent, and the times of high-altitude movement of the device are reduced;
and because first guardrail 6 rotates between a section of thick bamboo 6a and the step board 2 and is connected, after accomplishing the use of this device, the staff at first can take out second guardrail 7 from first guardrail 6 to control the first guardrail 6 of step board 2 both sides and use the junction with step board 2 as the node and rotate, can accomplish the folding of first guardrail 6 and accomodate, reduce this device and take up an area of the space, consequently can improve the portability of this device transportation to a certain extent.
The utility model discloses in circuit and control that relate to be prior art, do not carry out too much repeated description here.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a ramp steel bridge construction installation is with hanging platform which characterized in that includes:
the pedal device comprises a base plate (1), wherein a pedal (2) fixedly connected is erected above the base plate (1);
remove subassembly (3), remove subassembly (3) and set up the below at pedal (2), remove subassembly (3) including rotating motor (31), dwang (32), screw thread section (33), thread bush (34), link (35) and movable plate (36), the output and dwang (32) fixed connection of rotating motor (31), set up two screw thread section (33) opposite in direction on the outer wall of dwang (32), two all overlap on the outer wall of screw thread section (33) and be equipped with threaded connection's thread bush (34), two fixed connection's link (35), and two are all installed to the bottom side of thread bush (34), and two fixed connection's movable plate (36) are all installed to one side that links (35) back on the back of the body.
2. The hanging platform for installing and constructing the ramp steel bridge according to claim 1, wherein two symmetrically distributed support rods (5) are erected on the top side of the pedal (2), rotating cylinders (6 a) which are rotatably connected are sleeved on the outer walls of the two support rods (5), and first guardrails (6) which are fixedly connected are installed on the outer walls of the two rotating cylinders (6 a).
3. The hanging platform for installing and constructing the ramp steel bridge according to claim 2, wherein sliding rods (6 b) are slidably connected to both sides of the inner wall of the two first guardrails (6), one end of the outer wall of the sliding rod (6 b) on the same side is fixedly connected to the outer wall of the same fixed rod (6 c), and the bottom end of each fixed rod (6 c) is fixedly connected to the moving plate (36) through a rotating frame (6 d).
4. The hanging platform for the installation and construction of the ramp steel bridge according to claim 2, wherein the two side walls of the pedal (2) are provided with placing grooves (2 a), the top side of the pedal (2) is provided with a plurality of fixedly connected connecting blocks (2 b), and the bottom side of the pedal (2) is fixedly connected with the rotating motor (31) and the rotating rod (32).
5. The hanging platform for installing and constructing the ramp steel bridge according to claim 4, wherein the inner walls of the two placing grooves (2 a) are in sliding connection with the outer wall of the corresponding moving plate (36), and the specifications of the placing grooves (2 a) are the same as those of the moving plate (36).
6. The hanging platform for the installation and construction of the ramp steel bridge girder according to claim 3, wherein a second guardrail (7) is inserted between the two fixing rods (6 c) on the same side, and the outer wall of each second guardrail (7) is connected with the corresponding fixing rod (6 c) through a limit knob (7 a).
7. The hanging platform for the installation and construction of the ramp steel bridge girder according to claim 1, wherein an electricity storage box (4) is fixedly connected to the top side of the bottom plate (1), and the electricity storage box (4) is electrically connected to a rotating motor (31) through a wire.
CN202220477817.8U 2022-03-07 2022-03-07 Hanging platform for installing and constructing ramp steel bridge Active CN217678603U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220477817.8U CN217678603U (en) 2022-03-07 2022-03-07 Hanging platform for installing and constructing ramp steel bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220477817.8U CN217678603U (en) 2022-03-07 2022-03-07 Hanging platform for installing and constructing ramp steel bridge

Publications (1)

Publication Number Publication Date
CN217678603U true CN217678603U (en) 2022-10-28

Family

ID=83731808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220477817.8U Active CN217678603U (en) 2022-03-07 2022-03-07 Hanging platform for installing and constructing ramp steel bridge

Country Status (1)

Country Link
CN (1) CN217678603U (en)

Similar Documents

Publication Publication Date Title
CN113235948B (en) Spatial vertical rotation construction method for steel structure roof of large-scale venue
CN112065001A (en) Simple device for positioning and installing suspender for building construction
CN109025309B (en) A kind of concrete spreader, jacking type concrete distributing device and its application method
CN112019142A (en) Motion support of telescopic container type photovoltaic panel and use method thereof
CN217678603U (en) Hanging platform for installing and constructing ramp steel bridge
KR20120131896A (en) Vertical and horizontal type Hydro-crane
CN105442454A (en) Segmented self-traveling type cast-in-place beam hydraulic inner mould and mould erecting and demoulding method thereof
CN111155438A (en) Construction equipment applied to steel tower column and construction process thereof
CN215717129U (en) Folding frame plate for reinforced concrete construction scaffold
CN215925692U (en) Overlength multispan assembly type integrated multifunctional bridge girder erection machine
CN209193424U (en) A kind of support leg device
CN205820800U (en) The hydraulic lift without scaffold building template frame can be realized
CN214429103U (en) Subway tunnel cable erection device
CN213203821U (en) Box girder template support frame structure
CN210313183U (en) Truss tower and contain its strideing across construction protective equipment
CN103359634A (en) Tower crane annular jacking crossbeam device
CN210111479U (en) Automatic crossing frame
CN210395113U (en) Bridge erecting machine
CN220081500U (en) Small-section tunnel excavation self-moving type foldable trolley
CN217712556U (en) Foldable hydraulic pressure of vertical overhauls platform
CN214456621U (en) Telescopic folding working platform
CN212128860U (en) Construction equipment applied to steel tower column
CN215974847U (en) Lifting crossing frame for power transmission line construction
CN217378594U (en) Hanging basket for bridge diaphragm construction
CN204752102U (en) Door derrick crane pylon standard festival equipment relay formula is vertical from jacking device