CN111155438A CN202010049739.7A CN202010049739A CN111155438A CN 111155438 A CN111155438 A CN 111155438A CN 202010049739 A CN202010049739 A CN 202010049739A CN 111155438 A CN111155438 A CN 111155438A
Authority
CN
China
Prior art keywords
steel tower
box body
tower column
moving
shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010049739.7A
Other languages
Chinese (zh)
Other versions
CN111155438B (en
Inventor
文定旭
薛帆
薛志武
李阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Original Assignee
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd filed Critical CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Priority to CN202010049739.7A priority Critical patent/CN111155438B/en
Publication of CN111155438A publication Critical patent/CN111155438A/en
Application granted granted Critical
Publication of CN111155438B publication Critical patent/CN111155438B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/342—Arrangements for stacking tower sections on top of each other

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses construction equipment applied to a steel tower column and a construction process thereof, wherein the construction equipment comprises a step S1, and a truck crane is adopted to finish the installation of the front sections of the steel tower column; step S2, building construction equipment; and step S3, installing the residual segment steel tower column. The invention effectively avoids the problems of large occupied area, long construction time and high cost in the traditional construction process.

Description

Construction equipment applied to steel tower column and construction process thereof
Technical Field
The invention relates to the field of construction methods of steel tower columns such as power transmission towers, bridge main towers and the like. More particularly, the present invention relates to a construction equipment applied to a steel tower column and a construction process thereof.
Background
At present, with the acceleration of urbanization process of various countries in the world, the demand of cities for electric power is obvious, and the contradiction between the increasing cities of transmission lines and transmission towers and the reduction of occupied areas of urban land is prominent. In the traditional hoisting mode of the steel tower column of the power transmission tower, the conditions of large occupied area, long construction time and low efficiency occur when the tower is assembled by a suspension guy wire holding pole, and the construction quality and the construction progress are seriously influenced; when the truck crane is adopted for segment hoisting, the assembly height and the segment weight of the power transmission tower are limited by the maximum lifting capacity of the crane, and the method has no obvious advantages for building the power transmission tower with larger height; when the helicopter is adopted for hoisting, although the occupied area is small, the hoisting height is not limited, the construction cost is greatly increased, and the helicopter is also limited to pass in a city where high buildings stand.
Disclosure of Invention
The invention aims to overcome the defects of the prior construction technology, provides a safe and reliable steel tower column construction process and equipment, and effectively solves the problems of large occupied area, long construction time and high cost in the traditional construction process.
To achieve these objects and other advantages in accordance with the purpose of the invention, there is provided construction equipment applied to a steel tower column, including: the device comprises a frame body, a moving system and a lifting system;
the frame body is of a frame structure, and a bearing beam is connected above the frame body to provide a working space for the mobile system; the lifting system is arranged on the bearing beam and used for hoisting and moving the steel tower column segment;
the moving system comprises a slide way and a moving device; the slideway is vertically fixed on the frame body and is of a ladder-shaped structure with a plurality of cross rods arranged at intervals; the climbing device is arranged on the support anchor; the moving device comprises a first box body, a second box body, a moving support and a telescopic driving device, wherein the lower end of the moving support is fixedly anchored with the support, the upper end of the moving support is fixedly connected with the lower end of the second box body, the upper end of the second box body is fixedly connected with the bottom surface of the driving device, and the upper end of the driving device is fixedly connected with the second box body; the first box body and the second box body are identical in structure;
the first case includes: the box comprises a box body, a hanging claw, a connecting rod and a spring; the hanging grab is rotationally fixed in the box body through a shaft lever, the head part of the hanging grab protrudes out of the side surface of the box body, the head of the hanging claw is in a gradually convergent shape, the upper surface of the head of the hanging claw is composed of a horizontal plane and an inclined plane which is gradually inclined downwards, the lower surface of the head part of the hanging claw is a curved surface with arc transition, the middle part of the hanging claw is fixedly connected with one end of the connecting rod, a shell with an opening at the upper part is fixed at one side of the box body far away from the head of the hanging grab, baffles are arranged at the periphery above the shell, a spring is arranged in the shell, the bottom end of the spring is fixed with the inner bottom surface of the shell, the top end of the spring is fixedly connected with a limit plate, the baffle limits the limiting plate, the other end of the connecting rod is hinged with the limiting plate, and openings which do not limit the downward movement of the connecting rod are arranged on two opposite sides of the shell; wherein the head of the hanging claw is propped against the cross rod of the slideway to bear the slideway.
Preferably, the frame body is formed by erecting a plurality of cross beams, vertical frame bodies and trusses.
Preferably, the lifting system comprises:
the hoisting mechanism is arranged on the bearing beam;
the amplitude-variable traveling mechanism controls the hoisting mechanism to move along the direction of the bearing beam;
and the lifting appliance is connected with the lifting mechanism and is used for lifting the steel tower column segment.
The invention also provides a steel tower column construction process using the construction equipment, which comprises the following steps:
step S1, completing the installation of at least the first three sections of the steel tower column, and installing the steel tower column by adopting construction equipment from the next section;
step S2, building construction equipment;
step S21, fixedly installing supporting anchors on at least two sections of the installed steel tower column sections;
s23, mounting at least four groups of vertically arranged slideways and at least eight groups of mobile devices, bearing the weight of the corresponding slideways by supporting and anchoring the mobile supports of the corresponding mobile devices and by hanging and grabbing;
step S24, erecting a frame body along the periphery of the installed steel tower column, wherein the frame body is fixedly connected with a slide way;
step S25, connecting a carrier beam above the frame body, and installing the lifting system on the carrier beam;
step S3, installing the residual segment steel tower column;
step S31, hoisting and moving the steel tower column segment to be installed by using the hoisting system, erecting a working platform on the frame body, and welding the hoisted steel tower column segment by using the working platform;
step S32, when the height of the installed steel tower column segment is higher than the hoisting height of the lifting system, controlling the driving device of the moving device to synchronously push the slideway to move upwards and ensuring that the driving devices of all the moving devices on at least one section of the steel tower column do not push; wherein the pushing length of the driving device is set as follows: the hanging claw of the moving device without pushing moves from the current cross bar of the pushing slide way to the cross bar below the pushing slide way, so that the moving device without pushing bears the slide way, and the driving devices of the rest moving devices retract to finish the upward movement of the frame body;
step S33, removing the moving device and the supporting anchor which are positioned at the lowest part of the steel tower column segment, and installing the moving device and the supporting anchor on the newly installed steel tower column segment above;
and S34, after the frame body moves upwards to the lifting system, the lifting height of the lifting system is higher than the height of the installed steel tower column segment, repeating the steps S31-S33, and completing the lifting and installation of the rest steel tower column segment until the installation of the steel tower column is completed.
Preferably, the method further comprises the step S4 of dismantling the construction equipment applied to the steel tower column after the steel tower column is installed, and hoisting the part down by a tower crane.
Preferably, the method further comprises step S4, after the steel tower is installed, controlling the frame body to move downwards, and specifically comprises the following steps:
s41, the shell of the second box body is released from the second box body, and then the shell is fixed with the second box body after being turned for 180 degrees, so that the upper surface and the lower surface of the head of the hanging claw are changed in position, namely the curved surface of the head of the hanging claw faces upwards;
s42, controlling the driving device to retract synchronously, so that the hanging claw of the first box body pushes the slideway to move downwards;
s43, turning the shell of the second box body by 180 degrees, and enabling the horizontal surface of the corresponding head to face upwards; turning the shell of the first box body by 180 degrees, and enabling the curved surface of the head correspondingly hung and grabbed to face upwards; controlling the driving device to lift the first box body;
s44, turning the shell of the second box body by 180 degrees, and enabling the curved surface of the head correspondingly hung and grabbed to face upwards; and (4) turning the shell of the first box body by 180 degrees, namely, enabling the horizontal surface of the corresponding hanging head to face upwards, so as to reach the state after the step S41, and thus, reciprocating to realize the downward movement of the rack body.
Preferably, as the installation height of the steel tower rises, auxiliary wales are connected between the steel towers.
The invention at least comprises the following beneficial effects: the construction equipment is applied to the installation and construction of the steel tower column, the self structure of the steel tower column is used as a support, and the method that the construction equipment climbs on the steel tower column and carries out segment installation is adopted to finish the installation and construction of the tower column.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention.
Drawings
FIG. 1 is a front view of the construction equipment of the present invention applied to a steel tower;
FIG. 2 is a top view of the construction equipment of the present invention applied to a steel tower;
FIG. 3 is a side view of the construction equipment of the present invention applied to a steel tower;
FIG. 4 is a schematic diagram of a mobile device according to the present invention;
FIG. 5 is a schematic structural diagram of a hoisting mechanism and a variable amplitude travelling mechanism of the invention;
FIG. 6 is a schematic view of step S31 of the steel tower erection process in example 1 of the present invention;
FIG. 7 is a schematic view of the upper part of the steel tower mounted to the steel tower in example 1 of the present invention;
FIG. 8 is a schematic view of the present invention mounted to the top of a steel tower in example 1;
FIG. 9 is a schematic view of the frame moving down after the installation of the steel tower column in embodiment 1 of the present invention;
FIG. 10 is a schematic view showing the state where the rack body is moved down in embodiment 1 of the present invention;
fig. 11 is a detailed view of the invention.
Description of reference numerals: the device comprises a frame body 1, a beam 11, a vertical frame body 12, a truss 13, a slideway 2, a moving device 3, a first box body 31, a second box body 32, a moving support 33, a driving device 34, a box body 311, a hanging claw 312, a connecting rod 313, a spring 314, a shell 315, a baffle 316, a limiting plate 317, a horizontal plane 312a, an inclined plane 312b, a curved surface 312c, a lifting mechanism 41, a pulley block 411, a steel wire rope 412, a winch 413, a luffing mechanism 42, a track 421, a rail clamp 422, an oil cylinder 423, a lifting appliance 43, a support anchor 5, a tower column segment 6, an auxiliary cross brace 7 and a carrier beam 8.
Detailed Description
The present invention is further described in detail below with reference to examples so that those skilled in the art can practice the invention with reference to the description.
In the description of the present invention, the terms "lateral", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are only for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
As shown in fig. 1 to 3, the present invention provides a construction equipment applied to a steel tower column, including: the device comprises a frame body 1, a moving system and a lifting system;
the frame body 1 is erected along the periphery of the steel tower column to form a frame structure, and a bearing beam 8 is connected above the frame body 1 to provide a working space for a mobile system; the lifting system is arranged on the bearing beam 8 and used for hoisting and moving the steel tower column segment 6;
the moving system comprises a slideway 2 and a moving device 3; the slideway 2 is vertically fixed on the frame body 1, and the slideway 2 is of a ladder-shaped structure with a plurality of cross bars arranged at intervals; the climbing device is arranged on a supporting anchor 5, the supporting anchor 5 is fixed with an erected steel tower column, and the supporting anchor 5 is used for supporting the moving device 3; the moving device 3 comprises a first box 31, a second box 32, a moving support 33 and a telescopic driving device 34 (the driving device 34 is an oil cylinder in the embodiment), the lower end of the moving support 33 is fixed with the support anchor 5, the upper end of the moving support 33 is fixed with the lower end of the second box 32, the upper end of the second box 32 is fixed with the bottom surface of the driving device 34, and the upper end of the driving device 34 is fixed with the second box 32; the first casing 31 and the second casing 32 have the same structure.
As shown in fig. 4 and 11, the first casing 31 includes: a box body 311, a hanging claw 312, a connecting rod 313 and a spring 314; the hanging claw 312 is rotatably fixed inside the box body 311 through a shaft rod, the head of the hanging claw 312 protrudes out of the side surface of the box body 311, the head of the hanging claw 312 is in a gradually converging shape, the upper surface of the head of the hanging claw 312 is composed of a horizontal plane 312a and an inclined plane 312b which gradually inclines downwards, the lower surface of the head of the hanging claw 312 is a curved surface 312c in arc transition, the middle of the hanging claw 312 is fixedly connected with one end of the connecting rod 313, a shell 315 with an open upper part is fixed on one side of the box body 311 away from the head of the hanging claw 312, baffles 316 are arranged on the periphery above the shell 315, a spring 314 is arranged in the shell 315, the bottom end of the spring 314 is fixed with the inner bottom surface of the shell 315, the top end of the spring 314 is fixedly connected with a limiting plate, the baffles 316 limit the limiting plate 317, and the other end of the connecting rod 313 is, two opposite sides of the shell 315 are provided with openings which do not limit the downward movement of the connecting rod 313; wherein the head of the hanging grab 312 is against the cross bar of the slide 2 to carry the slide 2.
In a preferred embodiment of the construction equipment applied to the steel tower column of the present application, the frame body 1 is erected by a plurality of cross beams 11, vertical frame bodies 12 and trusses 13 to form a frame structure. The beam 11 is connected with the truss 13 to increase the structural rigidity, and the carrier beam 8 is located on the vertical frame body 12 to provide a working space for the hoisting mechanism 41.
In a preferred embodiment of the construction equipment applied to a steel tower column of the present application, as shown in fig. 1 and 5, the lifting system includes:
the hoisting mechanism 41 is arranged on the bearing beam 8 and used for hoisting the steel tower column segment 6 on the ground to a height to be installed, the hoisting mechanism 41 comprises a winch 413, a pulley block 411 and a steel wire rope 412, the hoisting tool 43 is hoisted through the winch 413 and the steel wire rope 412, and the direction of the steel wire rope 412 is adjusted through the pulley block 411;
the amplitude-variable travelling mechanism 42 controls the hoisting mechanism 41 to move along the direction of the carrier beam 8 and is used for moving the steel tower column segment 6 to a position to be installed; become width of cloth running gear 42 including setting up track 421, two sets of rail clamping device 422 and hydro-cylinder 423 on carrier beam 8, wherein the pulley slidable who is connected through wire rope 412 and hoist 43 sets up on track 421, and one side and a set of rail clamping device (preceding rail clamping device) of pulley are connected, and this set of rail clamping device passes through hydro-cylinder 423 to be connected with another set of rail clamping device (back rail clamping device), drives this pulley through rail clamping device 422 and moves on track 421, specifically is: when the front rail clamping device clamps the rail 421, the rear rail clamping device loosens the rail 421, the oil cylinder 423 pushes the rear rail clamping device to move, and after the rear rail clamping device clamps the rail 421, the front rail clamping device loosens, the oil cylinder 423 retracts, the oil cylinder 423 drives the front rail clamping device to move, and the pulley is moved by the reciprocating motion.
And the lifting appliance 43 is connected with a group of pulleys of the lifting mechanism 41 through a steel wire rope 412 and is used for lifting the steel tower column section 6.
Example 1
A steel tower column construction process utilizing the construction equipment comprises the following steps:
and step S1, completing the installation of the first three sections of the steel tower column by adopting a truck crane, and installing the steel tower column by adopting construction equipment from the next section.
Step S2, building construction equipment;
step S21, installation of the support anchor 5: the support anchors 5 are fixedly mounted on at least two segments of the installed steel tower column segments 6.
Step S23, installation of mobile system: four sets of vertically arranged slideways 2 and twelve sets of mobile devices 3 are installed, the mobile support 33 corresponding to the mobile device 3 is carried by the support anchor 5, and the weight of the corresponding slideway 2 is carried by the hanging grab 312.
And step S24, erecting a frame body 1 along the periphery of the installed steel tower column, wherein the frame body 1 is fixedly connected with the slide way 2, and the load on the slide way 2 is borne by the moving device 3 arranged on the supporting anchor 5.
And step S25, connecting the carrier beam 8 above the frame body 1, and installing the lifting system on the carrier beam 8.
Step S3, installing the residual segment steel tower column;
step S31, as shown in fig. 6, hoisting and moving the steel tower segment 6 to be installed by using the hoisting system, erecting a work platform on the frame body 1, welding and other operations on the hoisted steel tower segment 6 by using the work platform, wherein the work platform is erected on the beam 11, and the constructor uses the work platform to perform the segment welding and other operations on the steel tower.
Step S32, controlling the frame body 1 to climb upwards: when the height of the installed steel tower column segment 6 is higher than the hoisting height of the lifting system, controlling the driving device 34 of the moving device 3 to synchronously push the slideway 2 to move upwards, and ensuring that the driving devices 34 of all the moving devices 3 on at least one section of the steel tower column do not push; wherein the pushing length of the driving device 34 is set as follows: the hanging claw 312 of the moving device 3 without pushing moves relatively from the current cross bar of the pushing slide 2 to the cross bar below the current cross bar, so that the moving device 3 without pushing bears the slide 2, and the driving device 34 of the rest moving device 3 retracts to finish the upward movement of the rack body 1.
Step S33, the moving means 3 and the support anchors 5 located at the lowest position of the steel tower segment 6 are removed and installed on the newly installed steel tower segment 6.
Step S34, as shown in fig. 7 and 8, after the frame body 1 is moved up to the position where the lifting height of the lifting system is higher than the height of the steel tower column segment 6 which is installed, repeating steps S31-S33, and completing the lifting and installation of the remaining steel tower column segments 6 until the installation of the steel tower column is completed. Along with the rising of steel tower column mounting height, connect supplementary stull 7 between the steel tower column, increase overall structure's stability, can dismantle supplementary stull 7 after the steel tower column installation is accomplished.
In a preferred embodiment of the steel tower construction process using the construction equipment, the construction equipment is disassembled after the steel tower is installed in step S4, and the component is hoisted by a tower crane. The construction steps are suitable for bridge construction with a tower crane.
In the preferred embodiment of the steel tower column construction process using the construction equipment, the construction step is suitable for construction of a power transmission tower type, and after the installation is completed, the construction equipment cannot be hoisted, and only the support body 1 can be controlled to move downwards to convey the construction equipment, as shown in fig. 9-10, the construction process further comprises a step S4, after the installation of the steel tower column is completed, the support body 1 is controlled to move downwards, and the construction process specifically comprises the following steps:
s41, the shell 315 of the second box 32 is released from the second box 32, and then the shell 315 is turned 180 ° and fixed to the second box 32, so that the upper and lower surfaces of the head of the hook 312 are changed in position, that is, the curved surface 312c of the head of the hook 312 faces upward;
s42, the control drive 34 is synchronously retracted so as to move downwards against the slide 2 by means of the catch 312 of the first box 31.
S43, turning the shell 315 of the second box 32 by 180 degrees, and enabling the horizontal plane 312a of the head of the corresponding hanging claw 312 to face upwards; turning the shell 315 of the first box 31 by 180 ° so that the curved surface 312c of the head corresponding to the hook 312 faces upward; the driving device 34 is controlled to lift the first box 31 while the chute 2 is stationary.
S44, turning the shell 315 of the second box 32 by 180 degrees, and enabling the curved surface 312c of the head part corresponding to the hanging claw 312 to face upwards; the shell 315 of the first box 31 is turned by 180 ° downward, and the horizontal surface 312a corresponding to the head of the hook 312 faces upward, so as to reach the state after step S41, and thus the downward movement of the rack 1 is realized in a reciprocating manner.
The process and the equipment can be used in the construction field including but not limited to the construction of steel towers of power transmission and main towers of bridges.
While embodiments of the invention have been described above, it is not limited to the applications set forth in the description and the embodiments, which are fully applicable to various fields of endeavor for which the invention may be embodied with additional modifications as would be readily apparent to those skilled in the art, and the invention is therefore not limited to the details given herein and to the embodiments shown and described without departing from the generic concept as defined by the claims and their equivalents.

Claims (7)

1. The utility model provides a be applied to construction equipment of steel tower post which characterized in that includes: the device comprises a frame body, a moving system and a lifting system;
the frame body is of a frame structure, and a bearing beam is connected above the frame body to provide a working space for the mobile system; the lifting system is arranged on the bearing beam and used for hoisting and moving the steel tower column segment;
the moving system comprises a slide way and a moving device; the slideway is vertically fixed on the frame body and is of a ladder-shaped structure with a plurality of cross rods arranged at intervals; the climbing device is arranged on the support anchor; the moving device comprises a first box body, a second box body, a moving support and a telescopic driving device, wherein the lower end of the moving support is fixedly anchored with the support, the upper end of the moving support is fixedly connected with the lower end of the second box body, the upper end of the second box body is fixedly connected with the bottom surface of the driving device, and the upper end of the driving device is fixedly connected with the second box body; the first box body and the second box body are identical in structure;
the first case includes: the box comprises a box body, a hanging claw, a connecting rod and a spring; the hanging grab is rotationally fixed in the box body through a shaft lever, the head part of the hanging grab protrudes out of the side surface of the box body, the head of the hanging claw is in a gradually convergent shape, the upper surface of the head of the hanging claw is composed of a horizontal plane and an inclined plane which is gradually inclined downwards, the lower surface of the head part of the hanging claw is a curved surface with arc transition, the middle part of the hanging claw is fixedly connected with one end of the connecting rod, a shell with an opening at the upper part is fixed at one side of the box body far away from the head of the hanging grab, baffles are arranged at the periphery above the shell, a spring is arranged in the shell, the bottom end of the spring is fixed with the inner bottom surface of the shell, the top end of the spring is fixedly connected with a limit plate, the baffle limits the limiting plate, the other end of the connecting rod is hinged with the limiting plate, and openings which do not limit the downward movement of the connecting rod are arranged on two opposite sides of the shell; wherein the head of the hanging claw is propped against the cross rod of the slideway to bear the slideway.
2. The construction equipment applied to a steel tower column according to claim 1, wherein the frame body is erected by a plurality of cross beams, vertical frame bodies and trusses to form a frame structure.
3. Construction equipment applied to a steel tower according to claim 1 or 2, wherein said lifting system comprises:
the hoisting mechanism is arranged on the bearing beam;
the amplitude-variable traveling mechanism controls the hoisting mechanism to move along the direction of the bearing beam;
and the lifting appliance is connected with the lifting mechanism and is used for lifting the steel tower column segment.
4. A steel tower construction process using the construction equipment of claim 1, comprising the steps of:
step S1, completing the installation of at least the first three sections of the steel tower column, and installing the steel tower column by adopting construction equipment from the next section;
step S2, building construction equipment;
step S21, fixedly installing supporting anchors on at least two sections of the installed steel tower column sections;
s23, mounting at least four groups of vertically arranged slideways and at least eight groups of mobile devices, bearing the weight of the corresponding slideways by supporting and anchoring the mobile supports of the corresponding mobile devices and by hanging and grabbing;
step S24, erecting a frame body along the periphery of the installed steel tower column, wherein the frame body is fixedly connected with a slide way;
step S25, connecting a carrier beam above the frame body, and installing the lifting system on the carrier beam;
step S3, installing the residual segment steel tower column;
step S31, hoisting and moving the steel tower column segment to be installed by using the hoisting system, erecting a working platform on the frame body, and welding the hoisted steel tower column segment by using the working platform;
step S32, when the height of the installed steel tower column segment is higher than the hoisting height of the lifting system, controlling the driving device of the moving device to synchronously push the slideway to move upwards and ensuring that the driving devices of all the moving devices on at least one section of the steel tower column do not push; wherein the pushing length of the driving device is set as follows: the hanging claw of the moving device without pushing moves from the current cross bar of the pushing slide way to the cross bar below the pushing slide way, so that the moving device without pushing bears the slide way, and the driving devices of the rest moving devices retract to finish the upward movement of the frame body;
step S33, removing the moving device and the supporting anchor which are positioned at the lowest part of the steel tower column segment, and installing the moving device and the supporting anchor on the newly installed steel tower column segment above;
and S34, after the frame body moves upwards to the lifting system, the lifting height of the lifting system is higher than the height of the installed steel tower column segment, repeating the steps S31-S33, and completing the lifting and installation of the rest steel tower column segment until the installation of the steel tower column is completed.
5. The steel tower construction process using construction equipment according to claim 4, further comprising step S4, after the steel tower is installed, removing the construction equipment applied to the steel tower, and hoisting down the component by a tower crane.
6. The steel tower construction process using construction equipment according to claim 4, further comprising step S4, after the steel tower is installed, controlling the frame body to move down, specifically comprising the steps of:
s41, the shell of the second box body is released from the second box body, and then the shell is fixed with the second box body after being turned for 180 degrees, so that the upper surface and the lower surface of the head of the hanging claw are changed in position, namely the curved surface of the head of the hanging claw faces upwards;
s42, controlling the driving device to retract synchronously, so that the hanging claw of the first box body pushes the slideway to move downwards;
s43, turning the shell of the second box body by 180 degrees, and enabling the horizontal surface of the corresponding head to face upwards; turning the shell of the first box body by 180 degrees, and enabling the curved surface of the head correspondingly hung and grabbed to face upwards; controlling the driving device to lift the first box body;
s44, turning the shell of the second box body by 180 degrees, and enabling the curved surface of the head correspondingly hung and grabbed to face upwards; and (4) turning the shell of the first box body by 180 degrees, namely, enabling the horizontal surface of the corresponding hanging head to face upwards, so as to reach the state after the step S41, and thus, reciprocating to realize the downward movement of the rack body.
7. The steel tower construction process using construction equipment according to claim 4, wherein an auxiliary wale is connected between the steel towers as the installation height of the steel tower rises.
CN202010049739.7A 2020-01-16 2020-01-16 Construction equipment applied to steel tower column and construction process thereof Active CN111155438B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010049739.7A CN111155438B (en) 2020-01-16 2020-01-16 Construction equipment applied to steel tower column and construction process thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010049739.7A CN111155438B (en) 2020-01-16 2020-01-16 Construction equipment applied to steel tower column and construction process thereof

Publications (2)

Publication Number Publication Date
CN111155438A true CN111155438A (en) 2020-05-15
CN111155438B CN111155438B (en) 2024-07-26

Family

ID=70563653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010049739.7A Active CN111155438B (en) 2020-01-16 2020-01-16 Construction equipment applied to steel tower column and construction process thereof

Country Status (1)

Country Link
CN (1) CN111155438B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115478731A (en) * 2022-10-12 2022-12-16 东南大学 An intelligent trim suspension holding rod system capable of resisting strong winds and its application method
CN115559209A (en) * 2022-09-08 2023-01-03 中交路桥华南工程有限公司 Double-tower-column cable tower construction method
WO2023095002A1 (en) * 2021-11-23 2023-06-01 Gregory John Neighbours Apparatus for assembling wind turbines and method therefor
US12644239B2 (en) 2022-12-16 2026-06-02 Peri Se Formwork system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0423052D0 (en) * 2004-10-16 2004-11-17 Wood Anthony M A novel shape of cast node joint, for use in the support structures of heavily loaded mono-towers, installed offshore, and particularly those for supporting
CN101122115A (en) * 2007-08-03 2008-02-13 中铁一局集团有限公司 A construction method for tower crane displacement
CN109296191A (en) * 2018-09-26 2019-02-01 中交武汉港湾工程设计研究院有限公司 An automatic climbing platform for steel tower construction
CN212128860U (en) * 2020-01-16 2020-12-11 中交武汉港湾工程设计研究院有限公司 Construction equipment applied to steel tower column

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0423052D0 (en) * 2004-10-16 2004-11-17 Wood Anthony M A novel shape of cast node joint, for use in the support structures of heavily loaded mono-towers, installed offshore, and particularly those for supporting
CN101122115A (en) * 2007-08-03 2008-02-13 中铁一局集团有限公司 A construction method for tower crane displacement
CN109296191A (en) * 2018-09-26 2019-02-01 中交武汉港湾工程设计研究院有限公司 An automatic climbing platform for steel tower construction
CN212128860U (en) * 2020-01-16 2020-12-11 中交武汉港湾工程设计研究院有限公司 Construction equipment applied to steel tower column

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023095002A1 (en) * 2021-11-23 2023-06-01 Gregory John Neighbours Apparatus for assembling wind turbines and method therefor
CN115559209A (en) * 2022-09-08 2023-01-03 中交路桥华南工程有限公司 Double-tower-column cable tower construction method
CN115478731A (en) * 2022-10-12 2022-12-16 东南大学 An intelligent trim suspension holding rod system capable of resisting strong winds and its application method
CN115478731B (en) * 2022-10-12 2024-04-30 东南大学 An intelligent balancing suspension pole system capable of resisting strong winds and a method of using the same
US12644239B2 (en) 2022-12-16 2026-06-02 Peri Se Formwork system and method

Also Published As

Publication number Publication date
CN111155438B (en) 2024-07-26

Similar Documents

Publication Publication Date Title
CN110952550B (en) Suspended self-supporting pile driving method and pile driver
CN111155438B (en) Construction equipment applied to steel tower column and construction process thereof
CN211848975U (en) Block mounting device for ultra-wide steel box girder of cable-stayed bridge
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN101139821A (en) Method and system for erecting steel trusses by stay cable auxiliary complete cantilever
CN109024291A (en) A kind of integration Bridge Erector and its working method
CN215925692U (en) Overlength multispan assembly type integrated multifunctional bridge girder erection machine
CN112160246B (en) Method for installing composite beam
CN110397289B (en) All-dimensional beam erecting equipment standing on top of house column and having automatic walking function
CN111305063A (en) Construction method of self-adaptive gradient movable type bridge maintenance hanging basket
CN217810527U (en) Asynchronous hanging basket hoisting system with corrugated steel web self-bearing function
CN108002244B (en) Hoisting system and method for high pier column steel bar formwork
CN107476560B (en) Wind power tower construction platform and method
CN116289620A (en) Combined transport device and method for box girder reinforcement parts
KR20120131896A (en) Vertical and horizontal type Hydro-crane
CN116853963B (en) A hoisting device and hoisting method for main beam of cable-stayed bridge
CN111305433B (en) A construction structure and construction method of a roof steel structure platform inclined glass curtain wall
CN209260561U (en) A kind of integration Bridge Erector
CN111021205A (en) Concrete anti-collision guardrail formwork device and manufacturing method
CN208071235U (en) A kind of bearing and lifting system of steel truss frame integral hoisting
CN115897417A (en) A formwork construction method and device in the process of cantilever pouring continuous beams
CN212128860U (en) Construction equipment applied to steel tower column
CN206015665U (en) Movable reinforcement cage installs equipment
CN210797292U (en) A six-direction positioning and quick adjustment device for realizing prefabricated segment beams
CN112744664B (en) Self-lifting hoisting equipment, construction method and sliding locking assembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant