CN217378594U CN202221042715.XU CN202221042715U CN217378594U CN 217378594 U CN217378594 U CN 217378594U CN 202221042715 U CN202221042715 U CN 202221042715U CN 217378594 U CN217378594 U CN 217378594U
Authority
CN
China
Prior art keywords
plate
hanging
hanging basket
rod
basket body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221042715.XU
Other languages
Chinese (zh)
Inventor
何振东
王亮
潘彬涛
郝海鹏
王文科
胡海宾
杨康宁
董士伟
李昂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Engineering Group Co Ltd
Third Engineering Branch of China Railway First Engineering Group Co Ltd
Original Assignee
China Railway First Engineering Group Co Ltd
Third Engineering Branch of China Railway First Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Engineering Group Co Ltd, Third Engineering Branch of China Railway First Engineering Group Co Ltd filed Critical China Railway First Engineering Group Co Ltd
Priority to CN202221042715.XU priority Critical patent/CN217378594U/en
Application granted granted Critical
Publication of CN217378594U publication Critical patent/CN217378594U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a hanging flower basket is used in bridge diaphragm construction, including portable support frame, foldable hanging flower basket body and lift driver. The utility model has the advantages of simple structure, reasonable in design, construct through setting up the cross slab of hanging flower basket between to two adjacent bridge segments, before the cross slab construction, folding hanging flower basket body is folded the volume that makes folding hanging flower basket body minimum, be convenient for pass the folding hanging flower basket body after folding narrow and small space between two adjacent bridge segments and transfer to between two adjacent bridge segments, after putting in place at folding hanging flower basket body, expand folding hanging flower basket body, make the volume of folding hanging flower basket body the biggest, the folding hanging flower basket body of staff after expanding of being convenient for is originally internal to be under construction the cross slab, the problem that can't set up the operation platform when having solved current cross slab construction, staff's the construction degree of difficulty has effectively been reduced, and the security is good, and then guarantee the construction quality of bridge.

Description

Hanging basket for bridge diaphragm construction
Technical Field
The utility model belongs to the technical field of the bridge diaphragm construction, concretely relates to hanging flower basket is used in bridge diaphragm construction.
Background
In recent years, with the vigorous development of road and bridge construction industry in China, the construction of precast beam bridges is more and more common, and the construction conditions of bridges are more and more complex. The hanging basket is a construction machine for high-altitude operation in construction engineering, the use of the hanging basket for construction has gradually become a trend, and the hanging basket is widely used for construction of large-scale tanks, bridges and bridge diaphragms, engineering operation of dams and the like. At present, in the construction of the bridge diaphragm plate, because the construction position of the bridge diaphragm plate is special, and the space is narrow and small, the difficulty of the construction operation of the bridge diaphragm plate is very high, and meanwhile, because the construction of the bridge diaphragm plate is in a suspended state, an operation platform cannot be set up. The construction method has the advantages that no special tool used for construction is provided, the working safety coefficient of workers is low, potential safety construction hazards exist, the construction difficulty of workers is high, the construction quality of the bridge diaphragm plate is easily influenced, the construction quality of the bridge diaphragm plate directly influences the quality of the bridge, and the construction quality of the bridge cannot be guaranteed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that lie in to above-mentioned prior art in not enough, provide a hanging flower basket is used in bridge diaphragm construction, its simple structure, reasonable in design realize the construction of bridge diaphragm, can't set up the problem of operation platform when having solved the construction of current diaphragm, have effectively reduced staff's the construction degree of difficulty, the security is good, and then guarantees the construction quality of bridge.
In order to solve the technical problem, the utility model discloses a technical scheme is: the utility model provides a hanging flower basket is used in bridge diaphragm construction which characterized in that: including setting up the hanging flower basket between two adjacent bridge segments, its characterized in that: the hanging basket comprises a movable support frame, a foldable hanging basket body and a lifting driver which is arranged on the movable support frame and is used for driving the foldable hanging basket body to move up and down;
the foldable hanging basket body comprises a limiting part arranged between two adjacent bridge sections, a middle hanging frame arranged on the limiting part, two lateral hanging frames symmetrically arranged on the front side and the rear side of the middle hanging frame, and a folder used for folding and unfolding the lateral hanging frames.
Foretell hanging flower basket is used in bridge diaphragm construction, its characterized in that: the movable support frame comprises a box-shaped frame and a plurality of travelling wheels which are arranged at the bottom of the box-shaped frame and used for driving the box-shaped frame to move on the bridge section.
Foretell hanging flower basket is used in bridge diaphragm construction, its characterized in that: the limiting part comprises two first limiting rods which are arranged in parallel, a connecting plate and two connecting rods, wherein the connecting plate and the connecting rods are used for connecting the two first limiting rods, the two first limiting rods are located between every two adjacent bridge sections, the connecting plate is located in the middle of the first limiting rods, the number of the connecting rods is two, and the two connecting rods are symmetrically arranged on the front side and the rear side of the connecting plate.
Foretell hanging flower basket is used in bridge diaphragm construction, its characterized in that: the middle hanging frame comprises a middle bottom plate and two connecting parts symmetrically arranged on the left side and the right side of the middle bottom plate, and the two connecting parts correspond to the two first limiting rods one by one;
each connecting part comprises two vertical rods and a horizontal rod arranged between the two vertical rods, the bottoms of the two vertical rods are fixedly connected with the top of the middle bottom plate, the tops of the two vertical rods are fixedly connected with the bottom of the first limiting rod, and a middle protective net piece is arranged between the two vertical rods.
Foretell hanging flower basket is used in bridge diaphragm construction, its characterized in that: the two side hanging frames are identical in structure, each side hanging frame comprises a side bottom plate, a first side protection plate, a second side protection plate and a third side protection plate, the first side protection plate, the second side protection plate and the third side protection plate are vertically arranged with the side bottom plate, the first side protection plate, the second side protection plate and the third side protection plate are sequentially hinged, the first side protection plate and the second side protection plate are arranged in parallel, one end of the side bottom plate in the width direction is hinged to one end of the middle bottom plate, and the bottom of the second side protection plate is hinged to the other end of the side bottom plate in the width direction.
Foretell hanging flower basket is used in bridge diaphragm construction, its characterized in that: the number of the folders is two, and the two folders correspond to the two side hanging frames one by one;
each folder comprises two mounting rods, a second limiting rod, a limiting stopper and a traction mechanism, wherein the second limiting rod is sleeved on each mounting rod and is in running fit with the mounting rod, the limiting stopper is arranged on the vertical rod and is used for limiting the first side protection plate and the third side protection plate, and the traction mechanism is arranged on the connecting plate;
the two installation rods are symmetrically arranged at the left end and the right end of the side bottom plate, the installation rods are arranged in parallel with the side bottom plate, one end of the second limiting rod is in running fit with the installation rods, the other end of the second limiting rod is in sliding fit with the vertical rod, and a sliding groove matched with the second limiting rod is formed in the vertical rod along the length direction of the vertical rod.
Foretell hanging flower basket is used in bridge diaphragm construction, its characterized in that: the number of the limiting devices is two, and the two limiting devices correspond to the vertical rods of the two connecting components one by one;
each stopper comprises two limiting screws, the two limiting screws correspond to the two vertical rods of each connecting component one to one, the limiting screws are in threaded connection with the vertical rods, and threaded holes for mounting the limiting screws are formed in the vertical rods.
Foretell hanging flower basket is used in bridge diaphragm construction, its characterized in that: the traction mechanism comprises a traction motor arranged on the connecting plate, a reel arranged on an output shaft of the traction motor in a sleeved mode, and a traction rope wound on the reel, wherein one end of the traction rope is fixedly connected with the reel, and the other end of the traction rope is fixedly connected with the top of the second side protection plate.
Foretell hanging flower basket is used in bridge diaphragm construction, its characterized in that: the lifting driver comprises two lifting driving mechanisms, and the two lifting driving mechanisms correspond to the two connecting rods one by one;
every lifting drive mechanism all includes the mounting panel that sets up at the box frame top, all sets up hoist engine and the fixed pulley on the mounting panel to and connect the wire rope between hoist engine and connecting rod, the fixed pulley is located the inboard of hoist engine, wire rope's one end and the middle part fixed connection of connecting rod, wire rope's the other end passes through the fixed pulley winding on the reel of hoist engine.
The utility model has simple structure and reasonable design, the cross baffle between two adjacent bridge sections is constructed by arranging the hanging basket, the hanging basket comprises a movable support frame, a folding hanging basket body and a lifting driver, before the construction of the cross baffle, the folding hanging basket body is folded to ensure that the volume of the folding hanging basket body is minimum, the folded folding hanging basket body is convenient to pass through the narrow space between two adjacent bridge sections and is placed between two adjacent bridge sections, after the folding hanging basket body is placed in place, the folding hanging basket body is unfolded to ensure that the volume of the folding hanging basket body is maximum, the construction of the cross baffle in the unfolded folding hanging basket body is convenient for workers, the problem that an operation platform can not be set up when the existing cross baffle is constructed is solved, the construction difficulty of the workers is effectively reduced, the safety is good, and the construction quality of the cross baffle is convenient to ensure, thereby ensuring the construction quality of the bridge.
The technical solution of the present invention is further described in detail by the accompanying drawings and embodiments.
Drawings
Fig. 1 is a schematic structural view of the foldable hanging basket body of the present invention when unfolded.
Fig. 2 is a schematic structural view of the foldable hanging basket body of the present invention when folded.
Fig. 3 is a top view of fig. 1.
Fig. 4 is a partially enlarged view of a portion a in fig. 3.
Fig. 5 is a schematic view of the connection relationship between the second limiting rod and the sliding chute of the present invention.
Fig. 6 is a schematic structural view of the folding hanging basket body of the present invention.
Fig. 7 is a partially enlarged view of fig. 6 at B.
Description of reference numerals:
1-a bridge section; 2-box frame; 3-a travelling wheel;
4-a first stop lever; 5, connecting a plate; 6-connecting rod;
7-middle bottom plate; 8-vertical rod; 9-horizontal bar;
10-middle protective mesh sheet; 11-side floor panels; 12-a first side guard plate;
13-second side guard plate; 14-mounting a rod; 15-a second stop lever;
15-1-sleeve section; 15-2-connecting rod section; 15-3-sliding rod section;
16-a chute; 17-a traction motor; 18-a reel;
19-a hauling cable; 20-a limit screw; 21-mounting a plate;
22-a winch; 23-a fixed pulley; 24-a steel wire rope;
25-third side guard plate; 26-diaphragm plate; 27-vertical plate;
28-a pedal; 29-a rectangular frame; 30-side protective mesh sheet;
31-a first hinge; 32-a second hinge; 33-a third hinge;
34-fourth hinge.
Detailed Description
As shown in fig. 1 to 7, the present invention includes a hanging basket disposed between two adjacent bridge sections 1, wherein the hanging basket includes a movable supporting frame and a foldable hanging basket body, and a lifting driver disposed on the movable supporting frame and used for driving the foldable hanging basket body to move up and down;
the foldable hanging basket body comprises a limiting part arranged between two adjacent bridge sections 1, a middle hanging frame arranged on the limiting part, two side hanging frames symmetrically arranged on the front side and the rear side of the middle hanging frame, and a folder used for folding and unfolding the side hanging frames.
In this embodiment, it should be noted that the bulkhead 26 between two adjacent bridge sections 1 is constructed by arranging the basket, and before the bulkhead 26 is constructed, the folding hanging basket body is folded to ensure that the volume of the folding hanging basket body is minimum, the folding hanging basket body after being folded can be conveniently put between two adjacent bridge sections 1 through a narrow space between the two adjacent bridge sections 1, after the foldable hanging basket body is put down in place, the foldable hanging basket body is unfolded, so that the volume of the foldable hanging basket body is maximized, a worker can conveniently construct the transverse partition plate 26 in the unfolded foldable hanging basket body, the problem that an operation platform cannot be erected during construction of the conventional transverse partition plate 26 is solved, the construction difficulty of the worker is effectively reduced, the safety is good, the construction quality of the transverse partition plate 26 is conveniently ensured, and further the construction quality of a bridge is ensured;
the foldable hanging basket body is driven to lift by arranging the lifting driver, so that the foldable hanging basket body is prevented from being manually moved to lift, time and labor are saved, and the using effect is good;
the hanging basket is driven to freely move on the bridge section 1 through the movable support frame, the walking wheels 3 are locked after the hanging basket is moved in place, the hanging basket is prevented from moving in the using process, time and labor are saved, safety is good, and popularization and use are facilitated.
As shown in fig. 1, in the present embodiment, the mobile support frame includes a box frame 2, and a plurality of road wheels 3 disposed at the bottom of the box frame 2 and used for driving the box frame 2 to move on the bridge segment 1.
In this embodiment, the road wheels 3 are preferably universal wheels with brakes in practical use.
As shown in fig. 1, 2 and 3, in the present embodiment, the limiting portion includes two first limiting rods 4 arranged in parallel, and a connecting plate 5 and a connecting rod 6 for connecting the two first limiting rods 4, the two first limiting rods 4 are both located between two adjacent bridge sections 1, the connecting plate 5 is located in the middle of the first limiting rods 4, the number of the connecting rods 6 is two, and the two connecting rods 6 are symmetrically arranged on the front and rear sides of the connecting plate 5.
In this embodiment, it should be noted that, the distance between the two first limiting rods 4 is smaller than the width of the box-shaped frame 2, so that the lifting driver passes through the bottom of the box-shaped frame 2 to drive the foldable basket body to lift.
In the embodiment, in actual use, the two first limiting rods 4 are arranged in a left-right manner, the bottom surface of one end of each first limiting rod 4 is attached to the top surface of one bridge section 1 of the two adjacent bridge sections 1, the bottom surface of the other end of each first limiting rod 4 is attached to the top surface of the other bridge section 1 of the two adjacent bridge sections 1, the two first limiting rods 4 are arranged to limit the foldable hanging basket body after the foldable hanging basket body descends in place while the foldable hanging basket body is controlled to ascend and descend by the ascending and descending driver, so that the foldable hanging basket body is overlapped on the two bridge sections 1, the stability is good, the foldable hanging basket body is prevented from swinging in the air, and the use safety of the hanging basket is convenient to ensure;
in this embodiment, the connecting plate 5 and the connecting rod 6 are arranged to strengthen the integrity of the foldable hanging basket body, the connecting plate 5 is used for providing a mounting position for the traction motor 17 of the traction mechanism, and the connecting rod 6 is used for conveniently connecting the foldable hanging basket body with the steel wire rope 24 of the lifting driver.
As shown in fig. 1 and 2, in this embodiment, the middle hanging frame includes a middle bottom plate 7 and two connecting members symmetrically disposed on the left and right sides of the middle bottom plate 7, and the two connecting members correspond to the two first limiting rods 4 one to one;
each connecting part comprises two vertical rods 8 and a horizontal rod 9 arranged between the two vertical rods 8, the bottoms of the two vertical rods 8 are fixedly connected with the top of the middle bottom plate 7, the tops of the two vertical rods 8 are fixedly connected with the bottom of the first limiting rod 4, and a middle protective net 10 is arranged between the two vertical rods 8.
In this embodiment, it should be noted that a ladder stand is arranged on any one of the two connecting components, the ladder stand includes two vertical plates 27 and a plurality of pedals 28 which are all arranged between the two vertical plates 27, the two vertical plates 27 correspond to the two vertical rods 8 one by one, the vertical plates 27 are fixedly connected with the vertical rods 8, the plurality of pedals 28 are arranged along the height direction of the vertical plates 27, and the ladder stand is arranged to facilitate a worker to get in and out of the hanging basket.
In this embodiment, form a adapting unit through two vertical poles 8, a plurality of horizon bars 9 and middle part protection net piece 10, the adapting unit acts as the left side board and the right side board that the frame was hung at the middle part, is guaranteeing when foldable hanging flower basket body protective effect, has effectively alleviateed the dead weight of foldable hanging flower basket body, excellent in use effect.
As shown in fig. 1, 2 and 6, in this embodiment, two of the side hanging frames have the same structure, each of the side hanging frames includes a side bottom plate 11, and a first side guard plate 12, a second side guard plate 13 and a third side guard plate 25 which are all vertically arranged with respect to the side bottom plate 11, the first side guard plate 12, the second side guard plate 13 and the third side guard plate 25 are sequentially hinged, the first side guard plate 12 and the third side guard plate 25 are arranged in parallel, the first side guard plate 12 and the second side guard plate 13 are vertically arranged, one end of the side bottom plate 11 in the width direction is hinged to one end of the middle bottom plate 7, and the bottom of the second side guard plate 13 is hinged to the other end of the side bottom plate 11 in the width direction.
In this embodiment, hang the frame through two lateral parts that set up in the front and back both sides of frame at the middle part, effectively increased the inner space of foldable hanging flower basket body, and be convenient for guarantee the balance of foldable hanging flower basket body.
In this embodiment, the first side guard plate 12, the second side guard plate 13 and the third side guard plate 25 have the same structure, and the first side guard plate 12, the second side guard plate 13 and the third side guard plate 25 all include the rectangular frame 29 and the side protection net 30 arranged in the rectangular frame 29, so that when the protection effect of the first side guard plate 12, the second side guard plate 13 and the third side guard plate 25 is ensured, the dead weight of the side hanging frame is effectively reduced, and further the dead weight of the folding hanging basket body is reduced.
In this embodiment, the first side guard plate 12 and the third side guard plate 25 have the same size, and the second side guard plate 13 and the first side guard plate 12 may have the same size or may have different sizes.
In this embodiment, in actual use, one end of the first side guard plate 12 in the height direction is hinged to one end of the second side guard plate 13 in the height direction through the first hinge 31, one end of the third side guard plate 25 in the height direction is hinged to the other end of the second side guard plate 13 in the height direction through the second hinge 32, one end of the side bottom plate 11 in the width direction is hinged to one end of the middle bottom plate 7 through the third hinge 33, and the bottom of the second side guard plate 13 is hinged to the other end of the side bottom plate 11 in the width direction through the fourth hinge 34.
As shown in fig. 1, 2, 5, 6 and 7, in the present embodiment, the number of the folders is two, and the two folders correspond to the two side hanging frames one to one;
each folder comprises two mounting rods 14, a second limiting rod 15, a limiter and a traction mechanism, wherein the second limiting rod 15 is sleeved on each mounting rod 14 and is in running fit with the mounting rod 14, the limiter is arranged on the vertical rod 8 and is used for limiting the first side guard plate 12 and the third side guard plate 25, and the traction mechanism is arranged on the connecting plate 5;
the two mounting rods 14 are symmetrically arranged at the left end and the right end of the side bottom plate 11, the mounting rods 14 and the side bottom plate 11 are arranged in parallel, one end of the second limiting rod 15 is in running fit with the mounting rods 14, the other end of the second limiting rod 15 is in sliding fit with the vertical rod 8, and a sliding groove 16 matched with the second limiting rod 15 is formed in the vertical rod 8 along the length direction of the vertical rod.
In this embodiment, it should be noted that, the height of the sliding groove 16 is smaller than the height of the vertical rod 8, when the second limiting rod 15 is located at the bottom end of the sliding groove 16, the top surface of the side bottom plate 11 of the side hanging frame is flush with the top surface of the middle bottom plate 7 of the middle hanging frame, 180 ° is located between the side bottom plate 11 and the middle bottom plate 7, when the second limiting rod 15 moves upward along the height direction of the sliding groove 16, the second limiting rod 15 pulls the end of the side bottom plate, which is far away from the middle bottom plate 7, through the installation rod 14, to move upward, an included angle between the side bottom plate 11 and the middle bottom plate 7 is gradually reduced, and the included angle between the side bottom plate 11 and the middle bottom plate 7 is an obtuse angle.
In this embodiment, in practical use, the second limiting rod 15 includes a sleeve section 15-1, a connecting rod section 15-2 and a sliding rod section 15-3, which are connected in sequence, the sleeve section 15-1 is sleeved on the mounting rod 14, the sleeve section 15-1 is rotatably matched with the mounting rod 14, the sliding rod section 15-3 is in a T-shaped structure, the sliding groove 16 is in a T-shaped structure matched with the sliding rod section 15-3, and the sliding rod section 15-3 is in sliding fit with the sliding groove 16.
As shown in fig. 6, in this embodiment, the number of the stoppers is two, and the two stoppers correspond to the vertical rods 8 of the two connecting members one to one;
each stopper comprises two limiting screws 20, the two limiting screws 20 correspond to the two vertical rods 8 of each connecting component one by one, the limiting screws 20 are in threaded connection with the vertical rods 8, and threaded holes for mounting the limiting screws 20 are formed in the vertical rods 8.
In this embodiment, the limit screw 20 is laid perpendicularly with vertical pole 8, limit screw 20 and the threaded fit of vertical pole 8, stretch out the length that vertical pole 8 is close to the side of lateral part hanging frame through adjusting limit screw 20, it is spacing to first side protection board 12 and third side protection board 25 when foldable hanging flower basket body expandes, make the contained angle between first side protection board 12 and the second side protection board 13, and the contained angle between third side protection board 25 and the second side protection board 13 is the right angle, first side protection board 12, third side protection board 25 all are located between limit screw 20 and the second gag lever post 15, be convenient for guarantee the safety in utilization of foldable hanging flower basket body.
As shown in fig. 1, fig. 2, fig. 3 and fig. 4, in this embodiment, the traction mechanism includes a traction motor 17 disposed on the connecting plate 5, a reel 18 sleeved on an output shaft of the traction motor 17, and a traction rope 19 wound on the reel 18, one end of the traction rope 19 is fixedly connected to the reel 18, and the other end of the traction rope 19 is fixedly connected to the top of the second side guard plate 13.
In this embodiment, when the foldable basket body needs to be folded, the traction motor 17 is operated to work so that the traction rope 19 is wound on the reel 18 to lift the second side guard plate 13, so as to fold the foldable basket body and reduce the volume of the foldable basket body.
As shown in fig. 1, 2, 3 and 4, in the present embodiment, the lifting driver includes two lifting driving mechanisms, and the two lifting driving mechanisms correspond to the two connecting rods 6 one by one;
each lifting driving mechanism comprises a mounting plate 21 arranged at the top of the box-shaped frame 2, a winch 22 and a fixed pulley 23 which are arranged on the mounting plate 21, and a steel wire rope 24 connected between the winch 22 and the connecting rod 6, wherein the fixed pulley 23 is positioned on the inner side of the winch 22, one end of the steel wire rope 24 is fixedly connected with the middle part of the connecting rod 6, and the other end of the steel wire rope 24 is wound on a winding drum of the winch 22 through the fixed pulley 23.
The utility model discloses during the specific use, mainly include following step:
step one, folding foldable hanging flower basket body:
step 101, adjusting the limit screws 20 of the two limiters to enable the limit screws 20 to extend into the vertical rod 8, enabling the inner side surface of the first side protection plate 12 to be attached to the inner side surface of the second side protection plate 13, and enabling the inner side surface of the third side protection plate 25 to be attached to the inner side surface of the second side protection plate 13;
102, operating the traction motors 17 of the two folders to work, enabling the reel 18 to wind the traction rope 19 to drive the second side protection plate 13 to move upwards, and enabling the included angle between the side bottom plate 11 and the middle bottom plate 7 to be changed from a flat angle to an obtuse angle, so that the overall length of the foldable hanging basket body is reduced, and the foldable hanging basket body is folded;
step two, adjusting the position of the movable support frame:
the travelling wheels 3 at the bottom of the box-shaped frame 2 are operated to move, and the position of the movable support frame is adjusted, so that the folded hanging basket body is positioned above a gap between two adjacent bridge sections 1;
step three, the lowering of the folded folding hanging basket body:
operating the winches 22 of the two lifting driving mechanisms to work, so that a steel wire rope 24 wound on the winches 22 is loosened, and the folded hanging basket body passes through a gap between two adjacent bridge sections 1 and is placed between the two adjacent bridge sections 1 until the bottom surface of the second limiting rod 15 of the folded hanging basket body is attached to the top surfaces of the bridge sections 1, so that the folded hanging basket body is placed;
step four, unfolding the folding hanging basket body:
step 401, operating the traction motors 17 of the two folders in reverse, loosening the traction ropes 19 wound on the reels 18, descending the second side guard plate 13 and the side bottom plate 11 of the folding type hanging basket body under the action of self gravity, and driving the sliding rod section 15-3 of the second limiting rod 15 to slide downwards along the height direction of the sliding chute 16 by descending the side bottom plate 11 until the sliding rod section 15-3 is attached to the bottom surface of the sliding chute 16; wherein, when the sliding rod section 15-3 is jointed with the bottom surface of the sliding chute 16, the top surface of the side bottom plate 11 is flush with the top surface of the middle bottom plate 7;
step 402, enabling a worker to enter the middle hanging frame of the folding hanging basket body through the ladder stand on the middle hanging frame, and adjusting the first side protection plate 12 and the third side protection plate 25 of the side hanging frame to enable the first side protection plate 12 and the third side protection plate 25 to be vertically arranged with the second side protection plate 13;
step 403, adjusting the limit screws 20 of the two limiters to enable the limit screws 20 to extend out of the vertical rod 8 to be close to the side face of the side hanging frame, and further enabling the first side guard plate 12 and the third side guard plate 25 to be located between the limit screws 20 and the second limit rods 15, so as to complete the unfolding of the folding hanging basket body;
step five, constructing a diaphragm plate: constructing the diaphragm 26 in the unfolded folding hanging basket body until the construction of the diaphragm 26 is finished;
step six, folding the folding hanging basket body again: after the diaphragm plate 26 is constructed, the worker climbs onto the bridge section 1 through the crawling ladder on the middle hanging frame, and folds the foldable hanging basket body again according to the method in the step one to complete the folding of the foldable hanging basket body again;
step seven, lifting the folded folding hanging basket body:
and reversely working the windlasss 22 of the two lifting driving mechanisms in the third operation step to enable the steel wire rope 24 to be wound on the windlasss 22, and enabling the steel wire rope 24 to be wound on the windlasss 22 to drive the folded hanging basket body to pass through the gap between the two adjacent bridge sections 1 and to ascend to the bridge sections 1, so that the construction of the diaphragm plate 26 is completed.
The utility model has simple structure and reasonable design, the cross baffle between two adjacent bridge sections is constructed by arranging the hanging basket, the hanging basket comprises a movable support frame, a folding hanging basket body and a lifting driver, before the construction of the cross baffle, the folding hanging basket body is folded to ensure that the volume of the folding hanging basket body is minimum, the folded folding hanging basket body is convenient to pass through the narrow space between two adjacent bridge sections and is placed between two adjacent bridge sections, after the folding hanging basket body is placed in place, the folding hanging basket body is unfolded to ensure that the volume of the folding hanging basket body is maximum, the construction of the cross baffle in the unfolded folding hanging basket body is convenient for workers, the problem that an operation platform can not be set up when the existing cross baffle is constructed is solved, the construction difficulty of the workers is effectively reduced, the safety is good, and the construction quality of the cross baffle is convenient to ensure, thereby ensuring the construction quality of the bridge.
The above, only be the preferred embodiment of the utility model discloses a it is not right the utility model discloses do any restriction, all according to the utility model discloses any simple modification, change and the equivalent structure change of technical essence to what above embodiment was done all still belong to the utility model discloses in technical scheme's the protection scope.

Claims (9)

1. The utility model provides a hanging flower basket is used in bridge diaphragm construction, is including setting up the hanging flower basket between two adjacent bridge sections (1), its characterized in that: the hanging basket comprises a movable support frame, a foldable hanging basket body and a lifting driver which is arranged on the movable support frame and is used for driving the foldable hanging basket body to move up and down;
the foldable hanging basket body comprises a limiting part arranged between two adjacent bridge sections (1), a middle hanging frame arranged on the limiting part, two side hanging frames symmetrically arranged on the front side and the rear side of the middle hanging frame, and a folder used for folding and unfolding the side hanging frames.
2. The hanging basket for bridge diaphragm construction according to claim 1, wherein: the movable support frame comprises a box-shaped frame (2) and a plurality of travelling wheels (3) which are arranged at the bottom of the box-shaped frame (2) and used for driving the box-shaped frame (2) to move on the bridge section (1).
3. The hanging basket for bridge diaphragm construction according to claim 1, wherein: spacing portion includes two first gag lever post (4) that the parallel was laid to and be used for connecting plate (5) and connecting rod (6) of two first gag lever posts (4), two first gag lever post (4) all are located between two adjacent bridge sections (1), connecting plate (5) are located the middle part of first gag lever post (4), the quantity of connecting rod (6) is two, two connecting rod (6) symmetry sets up both sides around connecting plate (5).
4. The hanging basket for bridge diaphragm construction according to claim 3, wherein: the middle hanging frame comprises a middle bottom plate (7) and two connecting parts which are symmetrically arranged on the left side and the right side of the middle bottom plate (7), and the two connecting parts are in one-to-one correspondence with the two first limiting rods (4);
each connecting component comprises two vertical rods (8) and a horizontal rod (9) arranged between the two vertical rods (8), the bottoms of the two vertical rods (8) are fixedly connected with the top of the middle bottom plate (7), the tops of the two vertical rods (8) are fixedly connected with the bottom of the first limiting rod (4), and a middle protective net (10) is arranged between the two vertical rods (8).
5. The hanging basket for bridge diaphragm construction according to claim 4, wherein: the two side hanging frames are identical in structure, each side hanging frame comprises a side bottom plate (11), and a first side protection plate (12), a second side protection plate (13) and a third side protection plate (25) which are vertically arranged with the side bottom plate (11), the first side protection plate (12), the second side protection plate (13) and the third side protection plate (25) are sequentially hinged, the first side protection plate (12) and the third side protection plate (25) are arranged in parallel, the first side protection plate (12) and the second side protection plate (13) are vertically arranged, one end of the side bottom plate (11) in the width direction is hinged with one end of the middle bottom plate (7), and the bottom of the second side protection plate (13) is hinged with the other end of the side bottom plate (11) in the width direction.
6. The hanging basket for bridge diaphragm construction according to claim 4, wherein: the number of the folders is two, and the two folders correspond to the two side hanging frames one by one;
each folder comprises two mounting rods (14), a second limiting rod (15) which is sleeved on each mounting rod (14) and is in running fit with the mounting rod (14), a limiter which is arranged on the vertical rod (8) and is used for limiting the first side guard plate (12) and the third side guard plate (25), and a traction mechanism which is arranged on the connecting plate (5);
the two installation rods (14) are symmetrically arranged at the left end and the right end of the side bottom plate (11), the installation rods (14) and the side bottom plate (11) are arranged in parallel, one end of the second limiting rod (15) is in running fit with the installation rods (14), the other end of the second limiting rod (15) is in sliding fit with the vertical rod (8), and a sliding groove (16) matched with the second limiting rod (15) is formed in the vertical rod (8) along the length direction of the vertical rod.
7. The hanging basket for bridge diaphragm construction according to claim 6, wherein: the number of the limiters is two, and the two limiters correspond to the vertical rods (8) of the two connecting components one by one;
each stopper all includes two limiting screw (20), two limiting screw (20) and every two vertical pole (8) one-to-one of adapting unit, limiting screw (20) and vertical pole (8) threaded connection, just set up the screw hole that supplies limiting screw (20) to install on vertical pole (8).
8. The hanging basket for bridge diaphragm construction according to claim 6, wherein: the traction mechanism comprises a traction motor (17) arranged on the connecting plate (5), a reel (18) sleeved on an output shaft of the traction motor (17), and a traction rope (19) wound on the reel (18), wherein one end of the traction rope (19) is fixedly connected with the reel (18), and the other end of the traction rope (19) is fixedly connected with the top of the second side protection plate (13).
9. The hanging basket for bridge diaphragm construction according to claim 3, wherein: the lifting driver comprises two lifting driving mechanisms, and the two lifting driving mechanisms correspond to the two connecting rods (6) one by one;
every lifting drive mechanism all includes mounting panel (21), hoist engine (22) and fixed pulley (23) all set up on mounting panel (21) that set up at box frame (2) top to and connect wire rope (24) between hoist engine (22) and connecting rod (6), fixed pulley (23) are located the inboard of hoist engine (22), the middle part fixed connection of the one end of wire rope (24) and connecting rod (6), the other end of wire rope (24) passes through fixed pulley (23) and twines on the reel of hoist engine (22).
CN202221042715.XU 2022-04-29 2022-04-29 Hanging basket for bridge diaphragm construction Active CN217378594U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221042715.XU CN217378594U (en) 2022-04-29 2022-04-29 Hanging basket for bridge diaphragm construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221042715.XU CN217378594U (en) 2022-04-29 2022-04-29 Hanging basket for bridge diaphragm construction

Publications (1)

Publication Number Publication Date
CN217378594U true CN217378594U (en) 2022-09-06

Family

ID=83108713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221042715.XU Active CN217378594U (en) 2022-04-29 2022-04-29 Hanging basket for bridge diaphragm construction

Country Status (1)

Country Link
CN (1) CN217378594U (en)

Similar Documents

Publication Publication Date Title
CN114961334B (en) High-altitude large-span overhanging structure closed protection dismantling system and construction method thereof
CN104577876B (en) Plug-in hanging basket for live working of helicopter
CN107201719A (en) Overpass anti-collision wall formwork hoisting conveyance and anti-collision wall construction method
CN111119043A (en) External suspension operation platform for anti-collision wall construction
CN217378594U (en) Hanging basket for bridge diaphragm construction
CN206784172U (en) Overpass anti-collision wall formwork hoisting conveyance
CN206359150U (en) A kind of hanging basket system
CN111236613A (en) Protection platform for building construction and use method thereof
CN213596814U (en) Movable three-dimensional crossing type multipurpose suspension bridge construction platform
CN207047702U (en) A kind of bridge construction scaoffold
CN213417588U (en) Bridge bottom surface construction platform
CN2270772Y (en) Lattice framed structure integral lifting device
CN209854554U (en) Supplementary car of installing and removing of template
CN212832684U (en) Self-propelled combined lifting multifunctional aerial work platform truck
JPH11147690A (en) Low head space reinforcing bar building-in device
CN210759347U (en) Mounting equipment
WO2013172690A2 (en) Cart for painting inner surface of tank
CN219952606U (en) Safety platform for beam slab prefabricated field
CN220926075U (en) Portal crane for PC assembly type building
CN214990034U (en) Full-automatic feeding winch device
CN216157124U (en) High altitude faces limit post construction operating means
CN217975293U (en) Portable lifting frame for building
CN219156359U (en) Self-climbing construction crane for elevator steel structure well
CN217896272U (en) Foldable mobile platform for T-beam hogging moment tensioning
CN215212192U (en) Safe operation platform of suspension type distribution electronic box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant