CN217662237U - Automatic spraying system for ore transportation road - Google Patents
Automatic spraying system for ore transportation road Download PDFInfo
- Publication number
- CN217662237U CN217662237U CN202121426336.6U CN202121426336U CN217662237U CN 217662237 U CN217662237 U CN 217662237U CN 202121426336 U CN202121426336 U CN 202121426336U CN 217662237 U CN217662237 U CN 217662237U
- Authority
- CN
- China
- Prior art keywords
- water
- road
- spray
- water storage
- ore
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses an ore deposit road automatic spray system is equipped with the main ore deposit road of connecting the mining site industrial area in the mining site, is equipped with the water spray subassembly along part or whole main ore deposit road, the water spray subassembly is equipped with the person in charge that sprays that arranges along main ore deposit road, it passes through the pipe connection retaining jar to spray person in charge one end, it sets for the riser that upwards extends to connect at the interval of being responsible for to spray, the end fixing of riser has the shower nozzle, the riser is equipped with the mounting with spraying the person in charge hookup location, the position of retaining jar is higher than the position of every shower nozzle. The utility model has the advantages of system simple structure, it is convenient to implement to reform transform, can greatly improve the mine site environment, the simple operation, the later maintenance of also being convenient for simultaneously.
Description
Technical Field
The utility model relates to an aspect is administered to mine road dust fall, production site raise dust, is suitable for technical field such as various mine road dust fall, production site dust removals.
Background
The method is used for creating a good mining area production operation environment, avoiding the problems of environmental pollution, occupational health and the like caused by the running of a production site and vehicles, and meeting the requirements of mining area environment protection, safe production, occupational health and the like. The mine branch works of the Hunan conch cement Limited company seriously fulfill the national relevant legal standards and the national visual inspection and other management requirements of the ministry of group mineral resources, further realize the clean and dustless production requirements of a mining area and improve the ecological environment construction of the mining area. Mine exploitation is along with platform propulsion and descending, and the production area changes at any time, but ordinary fixed road spraying system can't follow the platform and remove, but does not be applicable to along with mine exploitation movable road automatic spraying system at present, in order to realize mine safety in production, environmental protection, occupational health and clean production requirement, the mine branch factory plans to be in mine 245 and 270 main mine road, 1#2 feed opening square installation is portable and realize automatic spraying system, can realize automatic spraying dust fall every day.
Disclosure of Invention
The utility model aims to solve the technical problem that realize one kind and can realize automatic system for main fortune ore deposit road sprays, parts such as all dust fall shower nozzles, fixing device and pipelines all adopt to open the dismantlement formula and connect to along with the change of mine exploitation platform can convenient shift position realization recycle.
In order to realize the purpose, the utility model discloses a technical scheme be: fortune ore deposit road automatic spray system is equipped with the main fortune ore deposit road of connecting the mining site industrial area in the mining site, is equipped with water spray assembly along part or whole main fortune ore deposit road, water spray assembly is equipped with and sprays the person in charge along main fortune ore deposit road arrangement, it passes through the pipe connection retaining jar to spray the person in charge one end, it sets for the riser that the distance connection upwards extends to spray every interval of being responsible for, the end fixing of riser has the shower nozzle, the riser is equipped with the mounting with spraying the person in charge hookup location, the position of retaining jar is higher than the position of every shower nozzle.
The spray head is a rain bird spray head, the height of the vertical pipe is 1.3-2 meters, the vertical pipe is arranged on the spray main pipe at intervals of 12-22 meters, and the fixing piece is a cement pier.
The mining site is internally provided with at least one crusher, damage sprayers for spraying water mist to the upper part of the crusher are fixed beside the crusher, the damage sprayers are connected with a water storage container through pipelines, and the position of the water storage container is higher than that of each damage sprayer.
The pipeline of water storage container and damaged spray thrower to and every sprays all to be equipped with electric control valve and manual valve on being responsible for the pipeline of being connected with the retaining jar, every electric control valve connection director, controller and connection director's control panel install in the control chamber.
Each vertical pipe is provided with an electromagnetic valve and a ball valve, and the control end of each electromagnetic valve is connected with a controller through a signal line.
The water storage container is connected with a water pump positioned in the water pool through a pipeline, a float switch is arranged in the water storage container and connected with a controller, and the controller is connected with the water pump and outputs a driving signal to the water pump.
The water storage tank is connected with a water pump positioned in the water pool through a pipeline, a floating ball switch is arranged in the water storage container and connected with a controller, and the controller is connected with the water pump and outputs a driving signal to the water pump.
And a ditch is arranged beside the main ore conveying road and guides water to the water pool.
The utility model has the advantages of detachable reuse, system simple structure, the implementation is reformed transform conveniently, can greatly improve the mine site environment, the simple operation, the later maintenance of also being convenient for simultaneously.
Drawings
The following brief descriptions of the contents expressed by each drawing and the marks in the drawings in the present specification are as follows:
FIG. 1 is a schematic diagram of an automatic spraying system for a mine transportation road;
FIG. 2 is a schematic view of a water spraying assembly;
the labels in the above figures are: 1. a water storage container; 2. a damage sprayer; 3. a feed opening; 4. a crusher; 5. a water storage tank; 6. a main ore transportation road; 7. a mine site work area; 8. a water pool; 9. a water pump; 10. a spray head; 11. a riser; 12. an electromagnetic valve; 13. a ball valve; 14. a fixing member; 15. and (4) spraying a main pipe.
Detailed Description
The following description of the embodiments with reference to the drawings is intended to illustrate the present invention in further detail, such as the shapes and structures of the components, the mutual positions and connections between the components, the functions and working principles of the components, the manufacturing process, and the operation and use methods, etc., so as to help those skilled in the art understand the present invention more completely, accurately and deeply.
The automatic ore conveying road spraying system is characterized in that a water spraying assembly is arranged along a main ore conveying road 6 which is arranged in a mine and connected with a mine work area 7, whether the main ore conveying road 6 is provided with the water spraying system or not can be designed according to needs, the water spraying assembly can be arranged on each main ore conveying road 6, and the water spraying assembly can be arranged on only part of the main ore conveying roads 6. The mine site area 7 is a working area in the mine site and may be, for example, a 245 stope, a 245 explosive bin, a 270 platform, a small crusher 4, etc.
The water spray subassembly is equipped with and sprays and is responsible for 15 along main ore carrying road 6 arranges, sprays and is responsible for 15 one end and passes through pipe connection water storage tank 5, and water storage tank 5 can install in the 3 platform east sides of broken feed opening of 2#, and the length is wide high: 6m 3m, volume 54m3, water capacity can reach 54 tons. The main spray pipe 15 is connected with an upward extending vertical pipe 11 at set intervals, for example, one vertical pipe 11 is arranged at intervals of 12-22 meters, preferably one vertical pipe 11 is arranged at intervals of 18 meters, the height of each vertical pipe is the same, the height is 1.3-2 meters, the height of a spray head 10 at the top end of each vertical pipe 11 is preferably controlled to be 1.6 meters, the spray head 10 can be provided with a rain bird 8005 spray head 10 (rotating 180 degrees), the flow rate is 2.54-8.24m3/h, and the spray radius is 17.4-24.7 meters.
The position of the water storage tank 5 is higher than that of each spray head 10, so that water can be sprayed by utilizing self weight, only water needs to be injected into the water storage tank 5 regularly, 70 spray heads 10 are installed at present, through rough calculation, the water consumption of each spray head 10 is 96.52-313m & lt 3 & gt/h, and the water is stored into the water tank for at least 2 times per hour. Put into mounting 14 with every riser 11 and the 15 hookup location of spraying the person in charge, easy to assemble location, the preferred cement mound of mounting 14, through flange butt joint spray piping in the cement mound, but along with the propulsion of platform and the descending segment reality use of removing at any time, improved spray assembly availability factor and life-span greatly.
In addition, a spraying device can be added to the crushers 4, namely, a damage sprayer 2 for spraying water mist to the upper side of each crusher 4 is fixed beside each crusher 4, the damage sprayer 2 is connected with a water storage container 1 through a pipeline, and the position of the water storage container 1 is higher than that of each damage sprayer 2.
The pipelines of the water storage container 1 and the damaged sprayer 2 and the pipeline of each spraying main pipe 15 connected with the water storage tank 5 are respectively provided with an electric control valve and a manual valve, each electric control valve is connected with a controller, and the controller and a control panel connected with the controller are arranged in the control chamber. Because of having the control panel, can through input parameter automatic control spraying, can guarantee the accuracy and the promptness of spraying water, for example spray mode can spray according to interval circulation or spray simultaneously, spray 8-11 in the morning, 13-17 in the afternoon: 30, middle class 19, each time spraying time is 3-5 minutes, stopping for 10-15 minutes, and carrying out interval circulating spraying, wherein the specific spraying time can be adjusted according to the actual situation on site, and can be manually controlled by local control operation due to the manual invention.
All be equipped with solenoid valve 12 and ball valve 13 on every riser 11, the control end of solenoid valve 12 all passes through signal line connection controller, then whether every riser 11 also can independent control sprays water, and every group sprays and can realize automatic and manual control, also can conveniently maintain independent every riser 11, shower nozzle 10, maintain.
The water storage container 1 and the water storage tank 5 are both provided with automatic water replenishing systems, namely, the water storage container 1 and the water storage tank 5 are connected with a water pump 9 in the water pool 8 through pipelines, floating ball switches are arranged in the water storage container 1 and the water storage tank 5 and are connected with a controller, and the controller is connected with the water pump 9 and outputs a driving signal to the water pump 9. DN110 check valve and gate valve are installed at the water outlet of the water pump 9, which plays a role in protecting the water pump 9 and facilitates later maintenance. The water storage function can be automatically controlled by utilizing the float switch, and the water pump 9 is independently controlled or automatically controlled by a time control panel when being started or stopped. In order to save water, a ditch can be arranged beside the main ore conveying road 6, the ditch guides water to the water tank 8, rainwater and sprayed accumulated water flow back to the water tank 8 to be recycled, and water resources are saved.
The present invention has been described above with reference to the accompanying drawings, and it is to be understood that the invention is not limited to the specific embodiments described above, and that the invention is not limited to the specific embodiments described above, but rather is intended to cover various insubstantial modifications of the inventive method and solution, or its application to other applications without modification.
Claims (8)
1. Fortune ore deposit road automatic spray system is equipped with the main fortune ore deposit road of connecting the mining site workplace in the mining site, its characterized in that: be equipped with the water spray subassembly along part or whole main fortune ore road, the water spray subassembly is equipped with the person in charge that sprays that arranges along main fortune ore road, it passes through pipe connection water storage tank to spray person in charge's one end, it sets for the riser that upwards extends to connect at every interval the distance to spray the person in charge, the end fixing of riser has the shower nozzle, the riser is equipped with the mounting with spray person in charge hookup location, the position of water storage tank is higher than the position of every shower nozzle.
2. The automatic spraying system of the ore carrying road according to claim 1, characterized in that: the shower nozzle is a rain bird shower nozzle, the height of each vertical pipe is 1.3-2 m, each vertical pipe is arranged on the main spraying pipe at intervals of 12-22 m, and the fixing piece is a cement pier.
3. The ore carrying road automatic spray system according to claim 1 or 2, characterized in that: the mining site is internally provided with at least one crusher, damage sprayers for spraying water mist to the upper part of the crusher are fixed beside the crusher, the damage sprayers are connected with a water storage container through pipelines, and the position of the water storage container is higher than that of each damage sprayer.
4. The automatic ore conveying road spraying system according to claim 3, wherein: the pipeline of water storage container and damaged spray thrower to and every sprays all to be equipped with electric control valve and manual valve on being responsible for the pipeline of being connected with the retaining jar, every electric control valve connection director, controller and connection director's control panel install in the control chamber.
5. The ore carrying road automatic spraying system of claim 4, characterized in that: each vertical pipe is provided with an electromagnetic valve and a ball valve, and the control end of each electromagnetic valve is connected with a controller through a signal line.
6. The automatic ore conveying road spraying system according to claim 5, wherein: the water storage container is connected with a water pump positioned in the water pool through a pipeline, a floating ball switch is arranged in the water storage container and connected with a controller, and the controller is connected with the water pump and outputs a driving signal to the water pump.
7. The automatic ore conveying road spraying system according to claim 6, wherein: the water storage tank is connected with a water pump positioned in the water pool through a pipeline, a float switch is arranged in the water storage container and is connected with a controller, and the controller is connected with the water pump and outputs a driving signal to the water pump.
8. The automatic ore conveying road spraying system according to claim 7, wherein: and a ditch is arranged beside the main ore conveying road and guides water to a water pool.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121426336.6U CN217662237U (en) | 2021-06-25 | 2021-06-25 | Automatic spraying system for ore transportation road |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121426336.6U CN217662237U (en) | 2021-06-25 | 2021-06-25 | Automatic spraying system for ore transportation road |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217662237U true CN217662237U (en) | 2022-10-28 |
Family
ID=83702547
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121426336.6U Active CN217662237U (en) | 2021-06-25 | 2021-06-25 | Automatic spraying system for ore transportation road |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217662237U (en) |
-
2021
- 2021-06-25 CN CN202121426336.6U patent/CN217662237U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101884965A (en) | Automatic spraying system for open train and control method thereof | |
CN101884963A (en) | Spaying system with spray head cleaning device and control method thereof | |
CN201855766U (en) | Automatic spray system of open train | |
CN217662237U (en) | Automatic spraying system for ore transportation road | |
CN211025579U (en) | Green construction intelligent spraying dust suppression system | |
CN210087371U (en) | High-efficient automatic dust removal atomizer is used in metal mining | |
CN204751993U (en) | Bridge crane workshop is cross -platform to sweep device with walking on stage | |
CN109695468A (en) | Underground coal mine is sprayed ground remote centralized control system | |
CN205530661U (en) | Novel easily desilting prevents rain sewage well | |
CN215797150U (en) | Automatic spraying system of bucket-wheel stacker reclaimer | |
CN217499985U (en) | Inverted mobile flushing system and drainage box culvert with flushing function | |
CN203127578U (en) | Coal storing bunker | |
CN104314311B (en) | For the liftable level of tower machine of constructing 360 ° of spray equipments | |
CN114852729A (en) | Construction waste treatment device based on building engineering | |
CN214929610U (en) | Automatic cleaning device for large-scale mining automobile tires | |
CN207566496U (en) | Foundation of stacker-reclaimer equipment | |
CN211895231U (en) | Intelligent water adding device for water tank of storage yard loading and unloading equipment | |
CN210707325U (en) | Full-automatic non-contact cleaning device for large-scale engineering vehicle of steel plant | |
CN209797795U (en) | solar spraying device for maintaining pier body | |
CN204943042U (en) | A kind of white clay slurrying pipe connection system | |
CN204357130U (en) | For the liftable level of tower machine of constructing 360 ° of spray equipments | |
CN110509897A (en) | Steel plant's heavy construction vehicle Full-automatic non-contact cleaning device | |
CN218805718U (en) | Wheel washing machine | |
CN220245559U (en) | Matrix asphalt oiling platform | |
CN220633555U (en) | Explosion-proof dust suppression safety device of semi-closed dry coal shed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |