CN211025579U - Green construction intelligent spraying dust suppression system - Google Patents

Green construction intelligent spraying dust suppression system Download PDF

Info

Publication number
CN211025579U
CN211025579U CN201921432913.5U CN201921432913U CN211025579U CN 211025579 U CN211025579 U CN 211025579U CN 201921432913 U CN201921432913 U CN 201921432913U CN 211025579 U CN211025579 U CN 211025579U
Authority
CN
China
Prior art keywords
water
spray
spraying
foundation pit
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921432913.5U
Other languages
Chinese (zh)
Inventor
罗琪
霍海娥
洪俊鹏
况俊豪
栾海莹
杨江帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Normal University
Original Assignee
Sichuan Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Normal University filed Critical Sichuan Normal University
Priority to CN201921432913.5U priority Critical patent/CN211025579U/en
Application granted granted Critical
Publication of CN211025579U publication Critical patent/CN211025579U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Spray Control Apparatus (AREA)

Abstract

The utility model relates to a building site construction dust fall system, specifically be a green construction intelligence spraying dust fall system, including water supply mechanism, spray mechanism and the water supply network who communicates water supply mechanism and spray mechanism, water supply mechanism includes the rainwater irrigation canals and ditches, communicates the sedimentation tank of rainwater irrigation canals and ditches of intercommunication sedimentation tank, spray mechanism includes foundation ditch spray assembly, tower crane spray assembly, place enclosure spray assembly and scaffold spray assembly, foundation ditch spray assembly includes a plurality of foundation ditch shower nozzles, foundation ditch water pump and the foundation ditch delivery pipe of arranging at the construction foundation ditch, foundation ditch water pump passes through foundation ditch delivery pipe and communicates water supply mechanism, another communicates foundation ditch shower nozzle; the tower crane spraying assembly, the site enclosing wall spraying assembly and the scaffold spraying assembly respectively comprise a spray head, a water pump, and a water pump and a water supply pipe which are communicated with the spray head. The utility model discloses a solve above-mentioned problem, provide a green construction intelligence spraying dust fall system.

Description

Green construction intelligent spraying dust suppression system
Technical Field
The utility model relates to a building site construction dust fall system specifically is a green construction intelligence spraying dust fall system.
Background
The dust generated at the construction site is one of the important causes of occupational diseases of construction workers and urban air pollution. According to statistical research, the urban air pollution and the emission of the dust on the construction site in China have close relationship, the construction dust is one of the important reasons for causing the urban haze, and the contribution rate of the building dust in the aspect of the contribution rate of the urban dust reaches 32%. Therefore, the dust fall treatment problem in the construction site needs to be solved urgently.
At present, the common dust fall method in the construction site mainly comprises road hardening, sprinkling by a sprinkler, covering by a dense mesh net and the like, and sprinkling by the sprinkler not only costs water and manpower, but also has poor effect and limited dust fall range.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a solve above-mentioned problem, provide a green construction intelligence spraying dust fall system.
The utility model provides a basic scheme is: green construction intelligence spraying dust fall system includes first water supply mechanism, sprays the mechanism and communicates first water supply mechanism and spray the water supply network of mechanism, its characterized in that: the first water supply mechanism comprises a rainwater ditch, a sedimentation tank communicated with the rainwater ditch and a rainwater tank communicated with the sedimentation tank, the spraying mechanism comprises a foundation pit spraying assembly, a tower crane spraying assembly, a field enclosure spraying assembly and a scaffold spraying assembly, the foundation pit spraying assembly comprises a plurality of foundation pit spray heads arranged on a construction foundation pit, a foundation pit water pump and a foundation pit water supply pipe, one end of the foundation pit water pump is communicated with the first water supply mechanism through the foundation pit water supply pipe, and the other end of the foundation pit water pump is communicated with the foundation pit spray heads; the tower crane spraying assembly, the site enclosing wall spraying assembly and the scaffold spraying assembly respectively comprise a spray head, a water pump, and a water pump and a water supply pipe which are communicated with the spray head.
Further, the distance between a foundation pit spray head of the foundation pit spray assembly and the edge of a foundation pit is 0.4-0.5m, the height of the foundation pit spray head is 1.9-2.1m, the distance between the foundation pit spray heads is 5m, the spray volume of the foundation pit spray head is 49-89cc/min, and the aperture of the foundation pit spray head is 0.2 mm.
Further, the aperture of the foundation pit water supply pipe is 9.52 mm.
Furthermore, the spray heads of the spraying assembly for the field enclosing wall are arranged on the enclosing wall with the height of 2-3m and are arranged at intervals of 3 m.
Furthermore, the shower nozzle of scaffold frame spray assembly arranges on the scaffold frame, and every four layers of shower nozzle of scaffold frame spray assembly arrange one and every shower nozzle interval 3m of saying arranges.
Further, the spraying mechanism further comprises a dust removal fog gun, and the dust removal fog gun is communicated with the first water supply mechanism.
Further, the shower nozzle of tower crane spray assembly sets up on the cantilever of tower crane, and the position shower nozzle of the rotation center of keeping away from rotatory tower crane arranges more densely than being close to the rotation center.
Further, the tower crane spray assembly still includes a water storage section of thick bamboo and secondary water pump, a water storage section of thick bamboo sets up on the body of the tower of tower crane, and tower crane spray assembly's water pump is fixed in ground, the outlet pipe intercommunication water storage section of thick bamboo of water pump, secondary water pump's inlet tube sets up in a water storage section of thick bamboo, secondary water pump's outlet pipe intercommunication tower crane spray assembly's shower nozzle.
Further, the tower crane spraying assembly also comprises a water storage mechanism and a second water supply mechanism, wherein the water storage mechanism comprises a guide rail fixed below a tower crane cantilever, a plurality of folding supports arranged on the guide rail, and a water storage soft groove fixed on the lower end surface of each folding support, and the water storage soft groove is provided with a water outlet head and a folding push plate abutted against the conveying mechanism of the lifting hook; the second water supply mechanism includes the hoist cable of tight lock lifting hook, holds the cell body of liquid and fixes the subassembly that absorbs water on the transport mechanism of lifting hook, and the subassembly that absorbs water includes and rises to the most significant department at the cell body and can stretch into the cell body and absorb water the pipe, and the outlet pipe of the soft groove of intercommunication retaining, the intercommunication absorb water the water pump of pipe and outlet pipe.
Compared with the prior art, the scheme has the advantages that:
the scheme avoids the labor cost caused by manual cleaning for dust fall and sprinkling water by the sprinkling truck; on the other hand, the rainwater recovery system can be used for enhancing the recycling capacity of water resources, so that the water resources are protected. This system has obvious effect to the raise dust that reduces the job site, accords with the requirement of green construction, to the civilization process that advances construction, realizes that the wisdom city has certain realistic meaning.
Wherein tower crane spray assembly sprays the dust fall from the high altitude, solves the shortcoming that can't remove dust to the high altitude among the prior art, has further reduced the influence of job site to the surrounding environment.
Drawings
Fig. 1 is the utility model discloses green construction intelligence spraying dust fall system embodiment's schematic structure.
FIG. 2 is a schematic structural diagram of a tower crane spray assembly.
Fig. 3 is a schematic structural view of a tower-suspended spray assembly in embodiment 2.
Fig. 4 is a schematic structural view of a tower-suspended spray assembly in embodiment 3.
Fig. 5 is a schematic structural view of the water storage mechanism of fig. 4.
Fig. 6 is a flow chart of an automatic spray system.
Detailed Description
The following is further detailed by the specific embodiments:
example 1 is substantially as shown in figure 1:
the embodiment takes a certain residential building as an implementation object, the engineering floor area is about 3529.8m2, the foundation pit floor area is about 1500m2, the total building height is 27m, and the total planned construction period is 273 days.
Embodiment 1 includes first water supply mechanism, spray mechanism and the water supply network who communicates first water supply mechanism and spray mechanism, wherein spray mechanism includes foundation ditch spray assembly 1 as shown in fig. 1, tower crane spray assembly 2, place enclosure spray assembly 3 and scaffold spray assembly, foundation ditch spray assembly is used for reducing the raise dust control when the earthwork excavates, foundation ditch spray assembly includes a plurality of foundation ditch shower heads of arranging at the construction foundation ditch, foundation ditch water pump and foundation ditch water supply pipe, foundation ditch shower head sets up the position in the department of 0.5m apart from the foundation ditch edge, foundation ditch spray head 1's height is 2m, the interval between foundation ditch spray head 1 is 3m, foundation ditch spray head 1 is aperture 0.2mm, the high pressure atomization shower nozzle that the spraying volume is 49-cc 89/min, foundation ditch water supply pipe 2 is the PE pipe of phi 9.52mm, the foundation ditch water pump is vertical pipeline pump ISG 65-100. And a sensor is arranged on the site, when the concentration of the raised dust of the foundation pit is too high, the sensor 8 around the foundation pit receives signals as shown in figure 1, the signals are sent to a control center through GPRS wireless transmission, and the control center sends out an instruction to start the spraying components around the foundation pit.
First water supply mechanism includes the delivery pipe with municipal water supply pipe network intercommunication and sets up the rainwater pond 5 in the building site, preferentially chooses 5 water supplies in the rainwater pond, when 5 retaining of rainwater pond are not enough to supply with, adopts municipal water supply pipe network to supply water. Rainwater flows into the sedimentation tank 6 first, is precipitated in the sedimentation tank 6 and flows into the rainwater pool 5, and finally is supplied to all places by the rainwater pool pump 7. The rain pool also supplies water for the car washing groove 9 arranged at the inlet and the outlet of the project.
As shown in figure 2, spray heads 02 of the tower crane spray assembly are arranged on a cantilever 04 of the tower crane, and the spray heads 02 at the position far away from a rotation center 03 of the rotating tower crane are arranged more densely than those close to the rotation center. The water in the rainwater pond is pressurized by the water pump 01 and then is conveyed to the horizontal pipe on the tower crane cantilever along the water pipe vertical rod on the tower body, and the water is sprayed by the spray head, and the water pipe vertical pipe and the horizontal pipe are connected through a 360-degree rotary joint so as to adapt to the displacement change between the vertical pipe and the horizontal pipe when the tower crane cantilever rotates. By utilizing the characteristics of wide coverage range, free rotation and high spraying height of the cantilever, the water mist sprayed by the spray head on the cantilever can adsorb the dust raising particles diffused in the air to wet the ground and prevent the dust from floating in the air again, thereby further achieving the dust settling purpose. The water supply pipe of the tower crane spray assembly is made of PPR, a connector capable of rotating 360 degrees is adopted at a corner position, the type of the spray head 02 is YWYT-BB-1/4-6.5-PP, and the water pump 01 is a vertical pipeline pump ISG 65-100.
The site enclosure spraying component is used for reducing the dust in the construction site as much as possible to be diffused to the outside so as to avoid polluting the urban environment and influencing the life of residents. The system is erected on an enclosing wall on the periphery of a field, the height of the enclosing wall is 2.5m, and the distance between the spray heads is 3 m.
The spray assembly comprises a PE pipe water supply pipe with the diameter of 9.52mm, a high-pressure atomizing nozzle with the spray amount of 49-89cc/min and a vertical pipeline water pump with the model number of ISG65-100, and is supplied with water by a municipal water supply pipe network or a rainwater basin, and preferably sprayed by rainwater.
The main body stage is that spray heads of scaffold spraying components are erected on scaffolds erected outside a building, and the spray heads are arranged every 3 m. On one hand, atomization spraying can be carried out, and high-altitude dust caused in the construction of the main body stage is reduced; and on the other hand, the device can be used for fire-fighting spraying.
The spray head model of the scaffold spray assembly is YWYT-BB-1/4-6.5-PP, the water supply pipe is PPR, and the water pump is a vertical pipeline pump of ISG 65-100. The spray heads are arranged at intervals of four layers, the spray heads of each layer are arranged at intervals of 3m, one layer refers to a water supply pipe positioned on one layer of a building, and the water supply pipe is provided with a plurality of spray heads.
The dust concentration of the dust at a certain place of a construction site is higher, or a dust removal fog gun machine can be adopted when the ideal effect can not be achieved by adopting a foundation pit spraying assembly, a scaffold spraying assembly and a tower crane spraying assembly for spraying. The fog gun can spray atomized liquid drops, increase air humidity, combine with raised dust and then fall to the ground. Are typically placed at the access opening, blending area, and material handling area or on both sides of the roadway at the construction site. In this embodiment, the dust removal fog gun machine is arranged at the northwest corner and the southeast corner of the foundation pit and can be opened through manual or integrated button remote control. The bottom of the dust removal fog gun machine is provided with a bucket, and the water source of the bucket can be provided by a municipal pipe network.
In order to enable the embodiment to automatically operate, a corresponding automatic spraying system can be installed, the automatic spraying system comprises a sensor, a GPRS wireless transmission module, a control center and the like, the principle is that the sensor monitors the PM2.5 concentration value in the range in real time and transmits the value to the control center for real-time recording, and when the PM2.5 concentration is higher than the upper limit value, the control center controls the water pumps of corresponding components of corresponding spraying mechanisms to start to supply water. When the sensor detects that the concentration value of PM2.5 is restored to a normal level continuously for 5 minutes, the control center sends an instruction to the water pump to stop spraying water. The specific flow is shown in fig. 6.
Example 2, the dustfall system was the same as example 1 except for the tower crane spray assembly. As shown in figure 3, the tower crane spray assembly comprises a water pump 11 arranged on the ground, a spray head 14 arranged on a cantilever of the tower crane, a water supply pipe 13 for connecting the water pump and the spray head, a water storage cylinder and a secondary water pump, wherein the water storage cylinder is arranged on a tower body of the tower crane, a water outlet pipe of the water pump is communicated with the water storage cylinder, a water inlet pipe of the secondary water pump is arranged in the water storage cylinder, and a water outlet pipe of the secondary water pump is communicated with the spray head of.
The embodiment mainly increases a water storage cylinder and a secondary water pump, and mainly aims to reduce the investment of equipment, so that when the tower crane is not high, the ground tower crane can supply water fully, but after a certain height, if the mode of aerial secondary water storage is not adopted, a high-pressure water pump with higher cost and a high-pressure water pipe are needed, and therefore the embodiment adopts the arrangement of the water storage cylinder and the secondary water pump and relay water storage.
Example 3, the dustfall system was the same as example 1 except for the tower crane spray assembly. As shown in fig. 4 and 5, the tower crane spray assembly includes a water pump 31 disposed on the ground, and a water supply pipe 32 provided with a cantilever and connecting the water pump and the spray head (not shown in the figure), and this set of assembly can supply water well when the tower crane is low in height, but when the construction building gradually rises, and the tower crane also rises, the water pressure of the water supply also increases, and as the water pressure increases, the prices of the water pump 31 and the water supply pipe 32 are increased rapidly.
In order to save cost and reasonably utilize resources, the tower crane spray assembly in the embodiment further comprises a water storage mechanism and a second water supply mechanism, the water storage mechanism comprises a guide rail fixed below the cantilever of the tower crane, a plurality of folding supports 37 mounted on the guide rail, the folding supports are preferably made of aluminum alloy, a water storage soft groove 35 fixed on the lower end surface of the folding supports 37 by using adhesive and ropes is provided with a plurality of water outlets 36 and a folding push plate 3101 abutting against the transport mechanism 310 of the lifting hook, the folding push plate 3101 is preferably fixed on the folding support on the outermost side, when the transport mechanism drives the lifting hook to slide, the transport mechanism 310 can push the folding supports 37 through the folding push plate 3101, and finally the water storage soft groove is folded, so that the water storage mechanism is prevented from influencing the normal operation; the second water supply mechanism includes the hoist cable 39 of tight lock lifting hook, hold the cell body 38 of liquid and fix the subassembly that absorbs water on the transport mechanism of lifting hook, cell body 38 is preferred to be stainless steel, the subassembly that absorbs water includes and rises to the highest point at the cell body and can stretch into the cell body and absorb water tub 381, the outlet pipe of the soft groove of intercommunication retaining, the intercommunication absorbs water tub 381 and the water pump of outlet pipe, because transport mechanism all is in the top of lifting hook all the time, the cell body is hoisted through the hoist cable to the lifting hook, absorb water tub 381 can fall into naturally in the cell body 38, and the water pump of here is because the height of pump water is lower, consequently can directly choose for use light and.
During the use, the workman pours into the cell body 38 with water subaerial into, then command the tower crane hook that falls, be connected to on the hoist cable 39 the hook, the cell body 38 is hoisted to the tower crane, rise the water of spraying with the help of the power of tower crane self, rise to a locating position after, the pipe 381 that absorbs water of subassembly stretches into in the cell body, start the water pump of subassembly that absorbs water this moment, pour the water in the cell body into the soft groove of retaining, follow the play water head 36 outflow in the soft groove of retaining, because the height of tower crane this moment is higher, consequently follow the water head 36 outflow water and can decompose into tiny water droplet by oneself before falling to ground, thereby reach the purpose of dust fall. When the dust is not needed to fall, the sling and the groove body are taken down. When the lifting hook of tower crane slided in the level, can promote folding support through transport mechanism, make retaining mechanism folding by oneself, avoid influencing the normal operating of tower crane.
The above descriptions are merely examples of the present invention, and common general knowledge in the field of known specific structures and characteristics is not described herein, and those skilled in the art will know all the common technical knowledge in the field of the invention before the application date or priority date, can know all the prior art in this field, and have the ability to apply the conventional experimental means before this date. It should be noted that, for those skilled in the art, without departing from the structure of the present invention, several changes and modifications can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicability of the patent. The scope of the claims of the present application shall be determined by the contents of the claims, and the description of the embodiments and the like in the specification shall be used to explain the contents of the claims.

Claims (9)

1. Green construction intelligence spraying dust fall system includes first water supply mechanism, sprays the mechanism and communicates first water supply mechanism and spray the water supply network of mechanism, its characterized in that: the first water supply mechanism comprises a rainwater ditch, a sedimentation tank communicated with the rainwater ditch and a rainwater tank communicated with the sedimentation tank, the spraying mechanism comprises a foundation pit spraying assembly, a tower crane spraying assembly, a field enclosure spraying assembly and a scaffold spraying assembly, the foundation pit spraying assembly comprises a plurality of foundation pit spray heads arranged on a construction foundation pit, a foundation pit water pump and a foundation pit water supply pipe, one end of the foundation pit water pump is communicated with the first water supply mechanism through the foundation pit water supply pipe, and the other end of the foundation pit water pump is communicated with the foundation pit spray heads; tower crane spray assembly, place enclosure spray assembly and scaffold frame spray assembly all include shower nozzle, water pump and for the delivery pipe of water supply of water pump.
2. The intelligent spraying and dust falling system for green construction according to claim 1, characterized in that: the distance between a foundation pit spray head of the foundation pit spray assembly and the edge of a foundation pit is 0.4-0.5m, the height of the foundation pit spray head is 1.9-2.1m, the distance between the foundation pit spray heads is 5m, the spray volume of the foundation pit spray head is 49-89cc/min, and the aperture of the foundation pit spray head is 0.2 mm.
3. The intelligent spraying and dust falling system for green construction according to claim 2, characterized in that: the aperture of the foundation pit water supply pipe is 9.52 mm.
4. The intelligent spraying and dust falling system for green construction according to claim 1, characterized in that: and the spray heads of the field enclosure spraying assembly are arranged on the enclosure wall with the height of 2-3m and are arranged at intervals of 3 m.
5. The intelligent spraying and dust falling system for green construction according to claim 1, characterized in that: the shower nozzle of scaffold frame spray assembly arranges on the scaffold frame, and every four layers of shower nozzle of scaffold frame spray assembly arrange one and every shower nozzle interval 3m of saying arranges.
6. The intelligent spraying and dust falling system for green construction according to claim 5, characterized in that: the spraying mechanism further comprises a dust removal fog gun which is communicated with the first water supply mechanism.
7. The intelligent spraying and dust falling system for green construction according to claim 1, characterized in that: the shower nozzle of tower crane spray assembly sets up on the cantilever of tower crane, and the position shower nozzle of the rotation center of keeping away from rotatory tower crane arranges more densely than being close to the rotation center.
8. The intelligent spraying and dust falling system for green construction according to claim 1, characterized in that: the tower crane spray assembly further comprises a water storage cylinder and a secondary water pump, the water storage cylinder is arranged on the tower body of the tower crane, the water pump of the tower crane spray assembly is fixed on the ground, the water outlet pipe of the water pump is communicated with the water storage cylinder, the water inlet pipe of the secondary water pump is arranged in the water storage cylinder, and the water outlet pipe of the secondary water pump is communicated with the spray head of the tower crane spray assembly.
9. The intelligent spraying and dust falling system for green construction according to claim 1, characterized in that: the tower crane spraying assembly also comprises a water storage mechanism and a second water supply mechanism, wherein the water storage mechanism comprises a guide rail fixed below a tower crane cantilever, a plurality of folding supports arranged on the guide rail, and a water storage soft groove fixed on the lower end surface of each folding support, and the water storage soft groove is provided with a water outlet head and a folding push plate which is abutted against the conveying mechanism of the lifting hook; the second water supply mechanism includes the hoist cable of tight lock lifting hook, holds the cell body of liquid and fixes the subassembly that absorbs water on the transport mechanism of lifting hook, the subassembly that absorbs water includes and rises to the most significant department at the cell body and can stretch into the cell body and absorb water the pipe, communicates the outlet pipe in soft groove of retaining, communicates the water pump that absorbs water pipe and outlet pipe.
CN201921432913.5U 2019-08-30 2019-08-30 Green construction intelligent spraying dust suppression system Expired - Fee Related CN211025579U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921432913.5U CN211025579U (en) 2019-08-30 2019-08-30 Green construction intelligent spraying dust suppression system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921432913.5U CN211025579U (en) 2019-08-30 2019-08-30 Green construction intelligent spraying dust suppression system

Publications (1)

Publication Number Publication Date
CN211025579U true CN211025579U (en) 2020-07-17

Family

ID=71560094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921432913.5U Expired - Fee Related CN211025579U (en) 2019-08-30 2019-08-30 Green construction intelligent spraying dust suppression system

Country Status (1)

Country Link
CN (1) CN211025579U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114191908A (en) * 2021-11-02 2022-03-18 中国黄金集团建设有限公司 Construction dustproof system
CN114345052A (en) * 2022-02-15 2022-04-15 江苏华江建设集团有限公司 Automatic tower crane spraying system and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114191908A (en) * 2021-11-02 2022-03-18 中国黄金集团建设有限公司 Construction dustproof system
CN114345052A (en) * 2022-02-15 2022-04-15 江苏华江建设集团有限公司 Automatic tower crane spraying system and construction method

Similar Documents

Publication Publication Date Title
CN211025579U (en) Green construction intelligent spraying dust suppression system
CN204876522U (en) Scaffold with structure sprays
CN207667341U (en) A kind of large underground station pit construction sprinkling dust-removing device
CN206279487U (en) A kind of construction streets watering device
CN107433087A (en) High pedestal jib crane automatic following watering dust suppression device for coal operation
CN207042128U (en) The system that construction site carries out spraying and dedusting using climbing frame and fire main
CN205598830U (en) Industrial area ground dust collector is executed to building
CN212383385U (en) Building site dust device for environmental protection
CN204690662U (en) A kind of building site atomizing de-dusting apparatus
CN210544057U (en) Building site is with spraying dust collecting equipment
CN210544008U (en) Dust suppression device for railway
CN205063284U (en) Watering curing means is decorated to building outer wall
CN212175644U (en) Dust fall equipment for construction
CN104314311B (en) For the liftable level of tower machine of constructing 360 ° of spray equipments
CN210507287U (en) Green energy-concerving and environment-protective spraying apparatus for construction
CN209076305U (en) A kind of tower crane water mist dust suppression equipment
CN206307253U (en) A kind of liftable fin keel with interior cleaning apparatus
CN206844034U (en) A kind of civil engineering depositing dust spray system
CN110270179A (en) A kind of railway dust-arrest device
CN215916829U (en) Tower crane equipment with watering dust fall function
CN214261157U (en) Environment-friendly energy-saving dust suppression system for hot-stewing slag process
CN216585139U (en) Mounting structure of outer storage yard spray pipe and rotary joint
CN204357130U (en) For the liftable level of tower machine of constructing 360 ° of spray equipments
CN218188678U (en) Building civil engineering tower crane environmental protection sprays dust device
CN212091448U (en) Dust removal device for concrete raw material storage yard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200717

Termination date: 20210830