CN211025579U - Green construction intelligent spraying dust suppression system - Google Patents

Green construction intelligent spraying dust suppression system Download PDF

Info

Publication number
CN211025579U
CN211025579U CN201921432913.5U CN201921432913U CN211025579U CN 211025579 U CN211025579 U CN 211025579U CN 201921432913 U CN201921432913 U CN 201921432913U CN 211025579 U CN211025579 U CN 211025579U
Authority
CN
China
Prior art keywords
spray
water
foundation pit
water supply
tower crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921432913.5U
Other languages
Chinese (zh)
Inventor
罗琪
霍海娥
洪俊鹏
况俊豪
栾海莹
杨江帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Normal University
Original Assignee
Sichuan Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Normal University filed Critical Sichuan Normal University
Priority to CN201921432913.5U priority Critical patent/CN211025579U/en
Application granted granted Critical
Publication of CN211025579U publication Critical patent/CN211025579U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Spray Control Apparatus (AREA)

Abstract

The utility model relates to a building site construction dust fall system, specifically be a green construction intelligence spraying dust fall system, including water supply mechanism, spray mechanism and the water supply network who communicates water supply mechanism and spray mechanism, water supply mechanism includes the rainwater irrigation canals and ditches, communicates the sedimentation tank of rainwater irrigation canals and ditches of intercommunication sedimentation tank, spray mechanism includes foundation ditch spray assembly, tower crane spray assembly, place enclosure spray assembly and scaffold spray assembly, foundation ditch spray assembly includes a plurality of foundation ditch shower nozzles, foundation ditch water pump and the foundation ditch delivery pipe of arranging at the construction foundation ditch, foundation ditch water pump passes through foundation ditch delivery pipe and communicates water supply mechanism, another communicates foundation ditch shower nozzle; the tower crane spraying assembly, the site enclosing wall spraying assembly and the scaffold spraying assembly respectively comprise a spray head, a water pump, and a water pump and a water supply pipe which are communicated with the spray head. The utility model discloses a solve above-mentioned problem, provide a green construction intelligence spraying dust fall system.

Description

绿色施工智能喷雾降尘系统Green construction intelligent spray dust suppression system

技术领域technical field

本实用新型涉及工地施工降尘系统,具体为一种绿色施工智能喷雾降尘系统。The utility model relates to a construction site dust reduction system, in particular to a green construction intelligent spray dust reduction system.

背景技术Background technique

建筑施工现场产生的扬尘是导致建筑工人罹患职业病和城市空气污染的重要原因之一。据统计研究,我国城市空气污染和施工现场扬尘排放有密切的关系,施工扬尘是导致城市雾霾的重要原因之一,在城市扬尘贡献率方面建筑业扬尘的贡献率达到32%。因此,施工现场的降尘治理问题亟待解决。Dust from construction sites is one of the important causes of occupational diseases and urban air pollution among construction workers. According to statistical research, my country's urban air pollution is closely related to the emission of dust on construction sites. Construction dust is one of the important causes of urban smog. In terms of the contribution rate of urban dust, the contribution rate of construction dust reaches 32%. Therefore, the problem of dust control at the construction site needs to be solved urgently.

目前工地上常用的降尘方法主要有道路硬化、洒水车洒水、密目网遮盖等,洒水车洒水不但费水费人力,效果也较差,降尘范围有限。At present, the commonly used dust reduction methods on construction sites mainly include road hardening, watering by sprinklers, and cover with dense mesh nets.

实用新型内容Utility model content

本实用新型为了解决上述问题,提供一种绿色施工智能喷雾降尘系统。In order to solve the above problems, the utility model provides a green construction intelligent spray dust reduction system.

本实用新型提供基础方案是:绿色施工智能喷雾降尘系统,包括第一供水机构、喷淋机构以及连通第一供水机构与喷淋机构的供水管网,其特征在于:所述第一供水机构包括雨水沟渠、连通雨水沟渠的沉淀池以及连通沉淀池的雨水池,所述喷淋机构包括基坑喷淋组件、塔吊喷淋组件、场地围墙喷淋组件以及脚手架喷淋组件,所述基坑喷淋组件包括若干布置于施工基坑的基坑喷头、基坑水泵以及基坑供水管,所述基坑水泵通过基坑供水管一头连通第一供水机构,另一头连通基坑喷头;所述塔吊喷淋组件、场地围墙喷淋组件以及脚手架喷淋组件均包括喷头、水泵以及连通喷淋头的水泵与供水管。The basic solution provided by the utility model is: a green construction intelligent spray dust reduction system, which includes a first water supply mechanism, a spray mechanism and a water supply pipe network connecting the first water supply mechanism and the spray mechanism, and is characterized in that: the first water supply mechanism includes Rainwater ditches, sedimentation tanks connected to the rainwater ditches, and rainwater tanks connected to the sedimentation tanks, the spraying mechanism includes foundation pit spraying components, tower crane spraying components, site wall spraying components and scaffolding spraying components, the foundation pit spraying components The shower assembly includes a number of foundation pit nozzles, a foundation pit water pump and a foundation pit water supply pipe arranged in the construction foundation pit. One end of the foundation pit water pump is connected to the first water supply mechanism through the foundation pit water supply pipe, and the other end is connected to the foundation pit nozzle; the tower crane The sprinkler assembly, the site wall sprinkler assembly and the scaffold sprinkler assembly all include a sprinkler head, a water pump, and a water pump and a water supply pipe connected to the sprinkler head.

进一步,所述基坑喷淋组件的基坑喷头距离基坑边缘0.4-0.5m,所述基坑喷头的高度为1.9-2.1m,基坑喷头的间距为5m,所述基坑喷头的喷雾量为49-89cc/min,所述基坑喷头的孔径为0.2mm。Further, the foundation pit nozzle of the foundation pit spray assembly is 0.4-0.5m away from the edge of the foundation pit, the height of the foundation pit nozzle is 1.9-2.1m, the spacing between the foundation pit nozzles is 5m, and the spray of the foundation pit nozzle is 5m. The amount is 49-89cc/min, and the hole diameter of the nozzle of the foundation pit is 0.2mm.

进一步,所述基坑供水管的孔径为9.52mm。Further, the diameter of the water supply pipe of the foundation pit is 9.52 mm.

进一步,所述场地围墙喷淋组件的喷头布置于高2-3m的围墙上且间隔3m布置。Further, the sprinklers of the site enclosure wall sprinkler assembly are arranged on the enclosure wall with a height of 2-3m and are arranged at an interval of 3m.

进一步,所述脚手架喷淋组件的喷头布置于脚手架上,脚手架喷淋组件的喷头每四层布置一道且每一道的喷头间隔3m布置。Further, the sprinkler heads of the scaffolding spray assembly are arranged on the scaffold, and the sprinkler heads of the scaffold sprinkler assembly are arranged one every four layers and the sprinkler heads of each lane are arranged at an interval of 3m.

进一步,所述喷淋机构还包括除尘雾炮,所述除尘雾炮连通所述第一供水机构。Further, the spraying mechanism further includes a dust-removing fog cannon, and the dust-removing fog cannon is connected to the first water supply mechanism.

进一步,所述塔吊喷淋组件的喷头设置于塔吊的悬臂上,远离旋转塔吊的旋转中心的位置喷头布置比靠近旋转中心的更为密集。Further, the sprinkler heads of the tower crane spray assembly are arranged on the cantilever of the tower crane, and the sprinkler heads are arranged more densely at positions far from the rotation center of the rotating tower crane than those close to the rotation center.

进一步,塔吊喷淋组件还包括蓄水筒与二次水泵,所述蓄水筒设置于塔吊的塔身上,塔吊喷淋组件的水泵固定于地面,所述水泵的出水管连通蓄水筒,所述二次水泵的进水管设置于蓄水筒内,所述二次水泵的出水管连通塔吊喷淋组件的喷头。Further, the tower crane spray assembly also includes a water storage cylinder and a secondary water pump, the water storage cylinder is arranged on the tower body of the tower crane, the water pump of the tower crane spray assembly is fixed on the ground, and the water outlet pipe of the water pump is connected to the water storage cylinder, so The water inlet pipe of the secondary water pump is arranged in the water storage tank, and the water outlet pipe of the secondary water pump is connected to the spray head of the tower crane spray assembly.

进一步,塔吊喷淋组件还包括蓄水机构与第二供水机构,蓄水机构包括固定在塔吊悬臂下方的导轨,安装在导轨上的若干折叠支架,固定在折叠支架下端面的蓄水软槽,蓄水软槽设有出水头以及与吊钩的运输机构相抵的收折推板;第二供水机构包括紧锁吊钩的吊索、容纳液体的槽体以及固定在吊钩的运输机构上的吸水组件,吸水组件包括在槽体升到最高处可伸入槽体吸水管,连通蓄水软槽的出水管,连通吸水管与出水管的水泵。Further, the tower crane spray assembly also includes a water storage mechanism and a second water supply mechanism. The water storage mechanism includes a guide rail fixed under the tower crane cantilever, a number of folding brackets installed on the guide rail, and a water storage soft tank fixed on the lower end face of the folding bracket, The soft water storage tank is provided with a water outlet and a folding push plate that is in contact with the transport mechanism of the hook; the second water supply mechanism includes a sling for locking the hook, a tank body for accommodating liquid, and a water supply mechanism fixed on the transport mechanism of the hook. The water absorption assembly includes a water suction pipe that can extend into the tank body when the tank body rises to the highest point, a water outlet pipe connected to the water storage soft tank, and a water pump connected to the water suction pipe and the water outlet pipe.

与现有技术相比,本方案的优点在于:Compared with the prior art, the advantages of this solution are:

本方案避免了人工清扫降尘和洒水车洒水产生的人工费用;另一方面,利用雨水回收系统可加强对水资源的循环利用能力,保护了水资源。该系统对降低施工现场的扬尘有明显的效果,符合绿色施工的要求,对于推进建筑施工的文明化进程,实现智慧城市具有一定的现实意义。This scheme avoids the labor cost of manual cleaning and dust reduction and sprinkler watering; on the other hand, the use of rainwater recovery system can strengthen the recycling capacity of water resources and protect water resources. The system has a significant effect on reducing the dust on the construction site, meets the requirements of green construction, and has certain practical significance for promoting the civilized process of building construction and realizing a smart city.

其中塔吊喷淋组件从高空喷淋降尘,解决现有技术中无法对高空除尘的缺点,进一步降低了施工现场对周围环境的影响。Among them, the tower crane spray component sprays dust from a high altitude, which solves the disadvantage that the high-altitude dust cannot be removed in the prior art, and further reduces the impact of the construction site on the surrounding environment.

附图说明Description of drawings

图1为本实用新型绿色施工智能喷雾降尘系统实施例的结构示意图。FIG. 1 is a schematic structural diagram of an embodiment of the green construction intelligent spray dust reduction system of the present invention.

图2为塔吊喷淋组件结构示意图。Figure 2 is a schematic structural diagram of a tower crane spray assembly.

图3为实施例2中塔吊喷淋组件的结构示意图。FIG. 3 is a schematic structural diagram of a tower crane spray assembly in Embodiment 2. FIG.

图4为实施例3中塔吊喷淋组件的结构示意图。FIG. 4 is a schematic structural diagram of a tower crane spray assembly in Embodiment 3. FIG.

图5为图4中的蓄水机构的结构示意图。FIG. 5 is a schematic structural diagram of the water storage mechanism in FIG. 4 .

图6为自动喷淋系统的流程图。Figure 6 is a flow chart of the automatic sprinkler system.

具体实施方式Detailed ways

下面通过具体实施方式进一步详细的说明:The following is a further detailed description through specific embodiments:

实施例1基本如附图1所示:Embodiment 1 is basically as shown in accompanying drawing 1:

本实施例以某独栋住宅建筑为实施对象,该工程占地面积约为3529.8m2,基坑占地面积约为1500m2,共9层,建筑总高度为27m,计划总工期为273工日。This example takes a single-family residential building as the implementation object. The project covers an area of about 3529.8m2, the foundation pit covers an area of about 1500m2, a total of 9 floors, a total building height of 27m, and a planned total construction period of 273 working days.

实施例1包括第一供水机构、喷淋机构以及连通第一供水机构与喷淋机构的供水管网,如图1所示其中喷淋机构包括基坑喷淋组件1、塔吊喷淋组件2、场地围墙喷淋组件3以及脚手架喷淋组件,基坑喷淋组件用于降低土方开挖时的扬尘控制,基坑喷淋组件包括若干布置于施工基坑的基坑喷淋头、基坑水泵以及基坑供水管,基坑喷淋头设置在距基坑边缘0.5m处的位置,基坑喷淋头1的高度为2m,基坑喷淋头1之间的间距为3m,基坑喷淋头1为孔径0.2mm、喷雾量为49-89cc/min的高压雾化喷头,基坑供水管2为φ9.52mm的PE管,基坑水泵为立式管道泵ISG65-100。并在现场布置传感器,当基坑的扬尘浓度过大时,如图1所示基坑周围的传感器8接收到信号,通过GPRS无线传输向控制中心发出信号,由控制中心发出指令,开启基坑周围的喷淋组件。Embodiment 1 includes a first water supply mechanism, a spray mechanism, and a water supply pipe network connecting the first water supply mechanism and the spray mechanism. As shown in FIG. 1, the spray mechanism includes a foundation pit spray assembly 1, a tower crane spray assembly 2, The site wall spraying assembly 3 and the scaffolding spraying assembly, the foundation pit spraying assembly is used to reduce the dust control during earthwork excavation, the foundation pit spraying assembly includes a number of foundation pit sprinklers arranged in the construction foundation pit, and the foundation pit water pump And the foundation pit water supply pipe, the foundation pit sprinkler head is set at a position 0.5m away from the edge of the foundation pit, the height of the foundation pit sprinkler head 1 is 2m, the spacing between the foundation pit sprinkler heads 1 is 3m, the foundation pit spray The shower head 1 is a high-pressure atomizing nozzle with a diameter of 0.2mm and a spray volume of 49-89cc/min, the foundation pit water supply pipe 2 is a PE pipe with a diameter of 9.52mm, and the foundation pit water pump is a vertical pipeline pump ISG65-100. And sensors are arranged on site. When the dust concentration of the foundation pit is too large, the sensor 8 around the foundation pit as shown in Figure 1 receives the signal, sends a signal to the control center through GPRS wireless transmission, and the control center issues an instruction to open the foundation pit. surrounding sprinkler components.

第一供水机构包括与市政给水管网连通的供水管以及设置于工地内的雨水池5,优先选用雨水池5供水,当雨水池5蓄水不足以供给时,采用市政给水管网供水。雨水先流入沉淀池中6,经过沉淀池6沉淀在流入雨水池5中,最后由雨水池泵7供往各处。雨水池还为设置于该工程进出口的洗车槽9供水。The first water supply mechanism includes a water supply pipe connected to the municipal water supply pipe network and a rainwater pool 5 set in the construction site. The rainwater pool 5 is preferably used for water supply. When the rainwater pool 5 is insufficient for water supply, the municipal water supply pipe network is used for water supply. The rainwater first flows into the sedimentation tank 6, passes through the sedimentation tank 6 and is deposited in the inflow rainwater tank 5, and is finally supplied to various places by the rainwater tank pump 7. The rainwater pool also supplies water to the car wash tank 9 set at the entrance and exit of the project.

塔吊喷淋组件如图2所示,塔吊喷淋组件的喷头02布置在塔吊的悬臂04上,远离旋转塔吊的旋转中心03的位置喷头02布置比靠近旋转中心的更为密集。雨水池的水先经过水泵01加压后沿塔身上的水管立杆到塔吊悬臂上的横管中,输送到喷头进行喷淋,水管立管与横管之间通过360°旋转接头进行连接,以适应塔吊悬臂旋转时立管与横管之间的位移变化。利用悬臂覆盖范围广、可自由旋转、喷洒高度高的特点,悬臂上的喷头喷出的水雾可吸附空气中弥漫的扬尘颗粒,湿润地面,防止扬尘再度飘到空中,从而更进一步的达到降尘目的。塔吊喷淋组件供水管的材质为PPR,在转角位置采用可360°旋转的接头,喷头02的型号为YWYT-BB-1/4-6.5-PP,水泵01为立式管道泵ISG65-100。The tower crane sprinkler assembly is shown in Figure 2. The sprinkler heads 02 of the tower crane sprinkler assembly are arranged on the cantilever 04 of the tower crane, and the sprinkler heads 02 are arranged more densely at the position far from the rotation center 03 of the rotating tower crane than near the rotation center. The water in the rainwater tank is first pressurized by the water pump 01, and then goes along the water pipe vertical rod on the tower body to the horizontal pipe on the tower crane cantilever, and then is transported to the sprinkler for spraying. Adapt to the displacement change between the riser and the horizontal tube when the tower crane cantilever rotates. Taking advantage of the cantilever's wide coverage, free rotation and high spray height, the water mist sprayed by the nozzle on the cantilever can absorb the dust particles in the air, moisten the ground, and prevent the dust from floating into the air again, thereby further reducing dust. Purpose. The material of the water supply pipe of the tower crane sprinkler assembly is PPR, and a 360° rotatable joint is used at the corner position. The model of the sprinkler head 02 is YWYT-BB-1/4-6.5-PP, and the water pump 01 is a vertical pipeline pump ISG65-100.

场地围墙喷淋组件是尽量减少工地内的扬尘扩散到外面,以免污染城市环境,影响居民生活。该系统架设在场地外围的围墙上,围墙的高度为2.5m,喷淋头之间的间距为3米。The purpose of the site fence spray components is to minimize the spread of dust in the construction site to the outside, so as not to pollute the urban environment and affect the lives of residents. The system is erected on a fence at the periphery of the site with a height of 2.5m and a spacing of 3m between sprinklers.

喷淋组件包括φ9.52mm的PE管供水管、喷雾量为49-89cc/min的高压雾化喷头以及型号为ISG65-100的立式管道水泵,由市政给水管网或雨水池供水,优先选用雨水供水喷淋。The spray components include PE pipe water supply pipes with a diameter of 9.52mm, high-pressure atomizing nozzles with a spray volume of 49-89cc/min, and vertical pipeline water pumps with a model of ISG65-100. The water supply is supplied by the municipal water supply network or rainwater pool, which is preferred. Rainwater water spray.

主体阶段在建筑物外面搭设的脚手架上架设脚手架喷淋组件的喷头,喷头每隔3m布置一个。一方面可进行雾化喷淋,降低主体阶段建设中造成的高空扬尘;另一方面可用于消防喷淋。In the main stage, the sprinklers of the scaffolding sprinkler components are erected on the scaffolds erected outside the building, and the sprinklers are arranged every 3m. On the one hand, it can be atomized and sprayed to reduce the high-altitude dust caused by the construction of the main stage; on the other hand, it can be used for fire spraying.

脚手架喷淋组件的喷头型号为YWYT-BB-1/4-6.5-PP,供水管为PPR,水泵为ISG65-100的立式管道泵。喷头每隔四层布置一道,每一道的喷头间隔3m布置,本文中一道是指位于建筑物上一层的一条供水管,且该条供水管布置有若干喷头。The nozzle model of the scaffolding sprinkler assembly is YWYT-BB-1/4-6.5-PP, the water supply pipe is PPR, and the water pump is a vertical pipeline pump of ISG65-100. The sprinkler heads are arranged every four floors, and the sprinkler heads of each lane are arranged at an interval of 3m. In this paper, one sprinkler refers to a water supply pipe located on the upper floor of the building, and this water supply pipe is arranged with several sprinklers.

施工现场某地方扬尘浓度较高,或者采用基坑喷淋组件、脚手架喷淋组件以及塔吊喷淋组件进行喷淋仍达不到理想的效果时可采用除尘雾炮机。雾炮机可喷出雾化液滴,增加空气湿度,与扬尘结合然后落到地面。通常放置在施工现场的出入口、搅拌区域以及材料加工区域或者道路两旁。本实施例中,将除尘雾炮机设置在基坑的西北角以及东南角,可通过手动或者一体式按钮遥控控制开启。除尘雾炮机的底部放置有水桶,其水源可由市政管网提供。If the dust concentration is high in a certain place on the construction site, or the spraying of foundation pit spraying components, scaffolding spraying components and tower crane spraying components still cannot achieve the desired effect, a dust collector can be used. The fog cannon can spray atomized droplets, increase the air humidity, combine with the dust and then fall to the ground. It is usually placed at the entrance and exit of the construction site, the mixing area and the material processing area or on both sides of the road. In this embodiment, the dust-removing fog cannons are set at the northwest corner and the southeast corner of the foundation pit, and can be controlled by manual or integrated button remote control. A bucket is placed at the bottom of the dust collector and fog cannon, and its water source can be provided by the municipal pipe network.

为了使本实施例自动运行,可安装相应的自动喷淋系统,自动喷淋系统由传感器、GPRS无线传输模块、控制中心等部分组成,其原理为传感器实时监测其范围内的PM2.5浓度值,并将数值传到控制中心的进行实时记录,当PM2.5的浓度高于上限值时,控制中心控制相应喷淋机构的相应组件的水泵启动进行供水。当传感器连续5分钟监测到PM2.5的浓度值已经恢复到正常水平之后,便由控制中心向水泵发出指令停止喷水。其具体流程如图6所示。In order to make this embodiment run automatically, a corresponding automatic sprinkler system can be installed. The automatic sprinkler system is composed of sensors, GPRS wireless transmission modules, control centers and other parts. The principle is that the sensor monitors the PM2.5 concentration value within its range in real time. , and transmit the value to the control center for real-time recording. When the concentration of PM2.5 is higher than the upper limit, the control center controls the water pump of the corresponding component of the corresponding spray mechanism to start water supply. When the sensor detects that the concentration of PM2.5 has returned to the normal level for 5 consecutive minutes, the control center sends an instruction to the water pump to stop spraying water. The specific process is shown in Figure 6.

实施例2,降尘系统除塔吊喷淋组件外与实施例1相同。如图3所示,塔吊喷淋组件包括设置于地面的水泵11、设置于塔吊的悬臂上的喷头14、连接水泵与喷头的供水管13、蓄水筒与二次水泵,蓄水筒设置于塔吊的塔身上,水泵的出水管连通蓄水筒,二次水泵的进水管设置于蓄水筒内,所述二次水泵的出水管连通塔吊喷淋组件的喷头。Example 2, the dust suppression system is the same as Example 1 except for the tower crane spray assembly. As shown in FIG. 3 , the tower crane spray assembly includes a water pump 11 arranged on the ground, a sprinkler head 14 arranged on the cantilever of the tower crane, a water supply pipe 13 connecting the water pump and the sprinkler head, a water storage tank and a secondary water pump, and the water storage tank is arranged in the On the tower body of the tower crane, the water outlet pipe of the water pump is connected to the water storage tank, the water inlet pipe of the secondary water pump is arranged in the water storage tank, and the water outlet pipe of the secondary water pump is connected to the nozzle of the tower crane spray assembly.

本实施例主要是增加了蓄水筒与二次水泵,主要是为了降低设备的投入,因此塔吊不高时,地面塔吊就能充分供水,但到一定高度后,如果不采用空中二次蓄水的方式,就需要较高成本的高压水泵以及高压水管,因此本实施例采用设置蓄水筒与二次水泵,接力蓄水。This embodiment mainly adds a water storage tank and a secondary water pump, mainly to reduce the investment of equipment. Therefore, when the tower crane is not high, the ground tower crane can fully supply water, but after a certain height, if the secondary water storage in the air is not used In this way, a high-cost high-pressure water pump and a high-pressure water pipe are required. Therefore, in this embodiment, a water storage tank and a secondary water pump are used to relay water storage.

实施例3,降尘系统除塔吊喷淋组件外与实施例1相同。如图4与图5所示,塔吊喷淋组件包括设置于地面的水泵31、设置悬臂的喷头(图中未示出)连接水泵与喷头的供水管32,这一套组件在塔吊高度较低时可以很好的供水,但在施工建筑逐渐升高,塔吊也随之升高后,供水的水压也要增高,随着水压的增高,所需的水泵31与供水管32的价格就急速提升。Example 3, the dust suppression system is the same as Example 1 except for the tower crane spray assembly. As shown in Figures 4 and 5, the tower crane spray assembly includes a water pump 31 arranged on the ground, a cantilevered sprinkler head (not shown in the figure) and a water supply pipe 32 connecting the water pump and the sprinkler head. This set of components has a lower height of the tower crane. However, when the construction building gradually rises and the tower crane rises, the water pressure of the water supply will also increase. As the water pressure increases, the price of the required water pump 31 and water supply pipe 32 will increase Rapid ascent.

为了节省成本与合理利用资源,本实施例中的塔吊喷淋组件还包括蓄水机构与第二供水机构,蓄水机构包括固定在塔吊悬臂下方的导轨,安装在导轨上的若干折叠支架37,折叠支架优选为铝合金材质,采用粘胶与绳索固定在折叠支架37下端面的蓄水软槽35,蓄水软槽设有若干出水头36以及与吊钩的运输机构310相抵的收折推板3101,收折推板3101优选是固定在最外侧的折叠支架上,当运输机构带动吊钩滑动时,运输机构310会通过收折推板3101推动折叠支架37,最终使蓄水软槽收折起来,避免蓄水机构影响塔吊的正常运作;第二供水机构包括紧锁吊钩的吊索39、容纳液体的槽体38以及固定在吊钩的运输机构上的吸水组件,槽体38优选为不锈钢材质,吸水组件包括在槽体升到最高处可伸入槽体吸水管381,连通蓄水软槽的出水管,连通吸水管381与出水管的水泵,因为运输机构始终都在吊钩的上方,当吊钩通过吊索吊起槽体,吸水管381会自然落入槽体38中,而此处的水泵由于泵水的高度较低,因此可直接选用轻小型的水泵,降低成本。In order to save costs and utilize resources reasonably, the tower crane spray assembly in this embodiment also includes a water storage mechanism and a second water supply mechanism. The water storage mechanism includes a guide rail fixed under the tower crane cantilever, and several folding brackets 37 installed on the guide rail. The folding bracket is preferably made of aluminum alloy, and is fixed on the water storage tank 35 on the lower end face of the folding bracket 37 by glue and rope. Plate 3101, the folding push plate 3101 is preferably fixed on the outermost folding bracket, when the transport mechanism drives the hook to slide, the transport mechanism 310 will push the folding bracket 37 through the folding push plate 3101, and finally the water storage soft tank is closed. Fold it up to prevent the water storage mechanism from affecting the normal operation of the tower crane; the second water supply mechanism includes a sling 39 for locking the hook, a tank 38 for accommodating liquid, and a water absorption component fixed on the transport mechanism of the hook, and the tank 38 is preferably Made of stainless steel, the water absorption assembly includes a water suction pipe 381 that can extend into the tank body when the tank body rises to the highest point, a water outlet pipe connecting the water storage soft tank, and a water pump connecting the water suction pipe 381 and the water outlet pipe, because the transport mechanism is always on the hook. When the hook lifts the tank body through the sling, the suction pipe 381 will naturally fall into the tank body 38, and the water pump here can directly choose a light and small water pump due to the low height of the pump to reduce the cost. .

使用时,工人在地面上将水注入槽体38中,然后指挥塔吊降下吊钩,将吊索39连接到吊钩上,塔吊吊起槽体38,借助塔吊自身的动力升高喷洒用的水,升高至一定位置后,吸水组件的吸水管381伸入槽体中,此时启动吸水组件的水泵,将槽体中的水注入蓄水软槽中,蓄水软槽中的从出水头36流出,由于此时塔吊的高度较高,因此从出水头36流出的水在落至地面前会自行分解成为细小的水滴,从而达到降尘的目的。当无需降尘时,就取下吊索以及槽体。塔吊的吊钩在水平滑动时,能通过运输机构推动折叠支架,使蓄水机构自行折叠,避免影响塔吊的正常运行。When in use, the worker injects water into the tank body 38 on the ground, and then instructs the tower crane to lower the hook, connect the sling 39 to the hook, the tower crane lifts the tank body 38, and uses the power of the tower crane to raise the water for spraying. , after rising to a certain position, the water suction pipe 381 of the water absorption assembly extends into the tank body, at this time, the water pump of the water absorption assembly is started, and the water in the tank body is injected into the water storage soft tank, and the water outlet in the water storage soft tank is from the water head 36 flows out. Since the height of the tower crane is high at this time, the water flowing out from the water outlet 36 will decompose into fine water droplets by itself before falling to the ground, so as to achieve the purpose of dust reduction. Remove the sling and trough when no dust suppression is required. When the hook of the tower crane slides horizontally, it can push the folding bracket through the transport mechanism, so that the water storage mechanism can be folded by itself, so as to avoid affecting the normal operation of the tower crane.

以上所述的仅是本实用新型的实施例,方案中公知的具体结构及特性等常识在此未作过多描述,所属领域普通技术人员知晓申请日或者优先权日之前发明所属技术领域所有的普通技术知识,能够获知该领域中所有的现有技术,并且具有应用该日期之前常规实验手段的能力,所属领域普通技术人员可以在本申请给出的启示下,结合自身能力完善并实施本方案,一些典型的公知结构或者公知方法不应当成为所属领域普通技术人员实施本申请的障碍。应当指出,对于本领域的技术人员来说,在不脱离本发明结构的前提下,还可以作出若干变形和改进,这些也应该视为本发明的保护范围,这些都不会影响本发明实施的效果和专利的实用性。本申请要求的保护范围应当以其权利要求的内容为准,说明书中的具体实施方式等记载可以用于解释权利要求的内容。The above are only the embodiments of the present invention, and the common knowledge such as the well-known specific structures and characteristics in the scheme has not been described too much here. Those of ordinary skill in the art know that the invention belongs to the technical field before the filing date or the priority date. General technical knowledge, be able to know all the prior art in this field, and have the ability to apply conventional experimental means before the date, those of ordinary skill in the art can perfect and implement this scheme in combination with their own abilities under the enlightenment given in this application However, some typical well-known structures or well-known methods should not be obstacles to those skilled in the art from practicing the present application. It should be pointed out that for those skilled in the art, some modifications and improvements can be made without departing from the structure of the present invention. These should also be regarded as the protection scope of the present invention, and these will not affect the implementation of the present invention. Effectiveness and utility of patents. The scope of protection claimed in this application shall be based on the content of the claims, and the descriptions of the specific implementation manners in the description can be used to interpret the content of the claims.

Claims (9)

1.绿色施工智能喷雾降尘系统,包括第一供水机构、喷淋机构以及连通第一供水机构与喷淋机构的供水管网,其特征在于:所述第一供水机构包括雨水沟渠、连通雨水沟渠的沉淀池以及连通沉淀池的雨水池,所述喷淋机构包括基坑喷淋组件、塔吊喷淋组件、场地围墙喷淋组件以及脚手架喷淋组件,所述基坑喷淋组件包括若干布置于施工基坑的基坑喷头、基坑水泵以及基坑供水管,所述基坑水泵通过基坑供水管一头连通第一供水机构,另一头连通基坑喷头;所述塔吊喷淋组件、场地围墙喷淋组件以及脚手架喷淋组件均包括喷头、水泵以及为水泵供水的供水管。1. A green construction intelligent spray dust suppression system, comprising a first water supply mechanism, a spray mechanism and a water supply pipe network connecting the first water supply mechanism and the spray mechanism, it is characterized in that: the first water supply mechanism comprises a rainwater ditch, a communication rainwater ditch The sedimentation tank and the rainwater tank connected to the sedimentation tank, the spray mechanism includes a foundation pit spray assembly, a tower crane spray assembly, a site wall spray assembly and a scaffold spray assembly, and the foundation pit spray assembly includes a number of The foundation pit nozzle, the foundation pit water pump and the foundation pit water supply pipe of the construction foundation pit, the foundation pit water pump is connected to the first water supply mechanism through the foundation pit water supply pipe, and the other end is connected to the foundation pit nozzle; the tower crane spray assembly, the site wall The spray assembly and the scaffold spray assembly include a spray head, a water pump, and a water supply pipe for supplying water to the water pump. 2.根据权利要求1所述的绿色施工智能喷雾降尘系统,其特征在于:所述基坑喷淋组件的基坑喷头距离基坑边缘0.4-0.5m,所述基坑喷头的高度为1.9-2.1m,基坑喷头的间距为5m,所述基坑喷头的喷雾量为49-89cc/min,所述基坑喷头的孔径为0.2mm。2. The green construction intelligent spray dust suppression system according to claim 1, wherein the foundation pit nozzle of the foundation pit spray assembly is 0.4-0.5m away from the edge of the foundation pit, and the height of the foundation pit nozzle is 1.9- 2.1m, the spacing of the foundation pit nozzles is 5m, the spray volume of the foundation pit nozzles is 49-89cc/min, and the hole diameter of the foundation pit nozzles is 0.2mm. 3.根据权利要求2所述的绿色施工智能喷雾降尘系统,其特征在于:所述基坑供水管的孔径为9.52mm。3 . The intelligent spray dust reduction system for green construction according to claim 2 , wherein the diameter of the water supply pipe of the foundation pit is 9.52 mm. 4 . 4.根据权利要求1所述的绿色施工智能喷雾降尘系统,其特征在于:所述场地围墙喷淋组件的喷头布置于高2-3m的围墙上且间隔3m布置。4 . The green construction intelligent spray dust reduction system according to claim 1 , wherein the sprinkler heads of the site enclosure wall sprinkler assembly are arranged on the enclosure wall with a height of 2-3m and are arranged at an interval of 3m. 5 . 5.根据权利要求1所述的绿色施工智能喷雾降尘系统,其特征在于:所述脚手架喷淋组件的喷头布置于脚手架上,脚手架喷淋组件的喷头每四层布置一道且每一道的喷头间隔3m布置。5. The intelligent spray dust suppression system for green construction according to claim 1, characterized in that: the sprinkler heads of the scaffold spray assembly are arranged on the scaffold, and the sprinkler heads of the scaffold sprinkler assemblies are arranged once every four floors and the sprinkler heads of each lane are spaced apart. 3m layout. 6.根据权利要求5所述的绿色施工智能喷雾降尘系统,其特征在于:所述喷淋机构还包括除尘雾炮,所述除尘雾炮连通所述第一供水机构。6 . The intelligent spray dust reduction system for green construction according to claim 5 , wherein the spray mechanism further comprises a dust-removing fog cannon, and the dust-removal fog cannon is connected to the first water supply mechanism. 7 . 7.根据权利要求1所述的绿色施工智能喷雾降尘系统,其特征在于:所述塔吊喷淋组件的喷头设置于塔吊的悬臂上,远离旋转塔吊的旋转中心的位置喷头布置比靠近旋转中心的更为密集。7. The intelligent spray dust suppression system for green construction according to claim 1, wherein the sprinkler head of the tower crane spray assembly is arranged on the cantilever of the tower crane, and the sprinkler head is arranged farther away from the rotation center of the rotating tower crane than the sprinkler head close to the rotation center. more dense. 8.根据权利要求1所述的绿色施工智能喷雾降尘系统,其特征在于:塔吊喷淋组件还包括蓄水筒与二次水泵,所述蓄水筒设置于塔吊的塔身上,塔吊喷淋组件的水泵固定于地面,所述水泵的出水管连通蓄水筒,所述二次水泵的进水管设置于蓄水筒内,所述二次水泵的出水管连通塔吊喷淋组件的喷头。8. The green construction intelligent spray dust suppression system according to claim 1, characterized in that: the tower crane spray assembly further comprises a water storage tank and a secondary water pump, the water storage tank is arranged on the tower body of the tower crane, and the tower crane spray assembly The water pump of the secondary water pump is fixed on the ground, the water outlet pipe of the water pump is connected to the water storage tank, the water inlet pipe of the secondary water pump is arranged in the water storage tank, and the water outlet pipe of the secondary water pump is connected to the spray head of the tower crane spray assembly. 9.根据权利要求1所述的绿色施工智能喷雾降尘系统,其特征在于:塔吊喷淋组件还包括蓄水机构与第二供水机构,所述蓄水机构包括固定在塔吊悬臂下方的导轨,安装在导轨上的若干折叠支架,固定在折叠支架下端面的蓄水软槽,所述蓄水软槽设有出水头以及与吊钩的运输机构相抵的收折推板;所述第二供水机构包括紧锁吊钩的吊索、容纳液体的槽体以及固定在吊钩的运输机构上的吸水组件,所述吸水组件包括在槽体升到最高处可伸入槽体吸水管,连通蓄水软槽的出水管,连通吸水管与出水管的水泵。9. The green construction intelligent spray dust suppression system according to claim 1, characterized in that: the tower crane spray assembly further comprises a water storage mechanism and a second water supply mechanism, and the water storage mechanism comprises a guide rail fixed under the tower crane cantilever. Several foldable brackets on the guide rail are fixed on the soft water tank on the lower end surface of the folding bracket, the soft water tank is provided with a water outlet and a folding push plate that is in contact with the transport mechanism of the hook; the second water supply mechanism It includes a sling for locking the hook, a tank body for accommodating liquid, and a water absorption assembly fixed on the transport mechanism of the hook. The water outlet pipe of the soft tank is connected to the water pump of the suction pipe and the water outlet pipe.
CN201921432913.5U 2019-08-30 2019-08-30 Green construction intelligent spraying dust suppression system Expired - Fee Related CN211025579U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921432913.5U CN211025579U (en) 2019-08-30 2019-08-30 Green construction intelligent spraying dust suppression system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921432913.5U CN211025579U (en) 2019-08-30 2019-08-30 Green construction intelligent spraying dust suppression system

Publications (1)

Publication Number Publication Date
CN211025579U true CN211025579U (en) 2020-07-17

Family

ID=71560094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921432913.5U Expired - Fee Related CN211025579U (en) 2019-08-30 2019-08-30 Green construction intelligent spraying dust suppression system

Country Status (1)

Country Link
CN (1) CN211025579U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114191908A (en) * 2021-11-02 2022-03-18 中国黄金集团建设有限公司 Construction dustproof system
CN114345052A (en) * 2022-02-15 2022-04-15 江苏华江建设集团有限公司 Tower crane automatic spray system and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114191908A (en) * 2021-11-02 2022-03-18 中国黄金集团建设有限公司 Construction dustproof system
CN114345052A (en) * 2022-02-15 2022-04-15 江苏华江建设集团有限公司 Tower crane automatic spray system and construction method

Similar Documents

Publication Publication Date Title
CN206477298U (en) A kind of construction site scaffold spray system
CN211025579U (en) Green construction intelligent spraying dust suppression system
WO2018049588A1 (en) Arm type watering cart for gardens
CN207042128U (en) The system that construction site carries out spraying and dedusting using climbing frame and fire main
CN206090430U (en) Semi -automatic afforestation watering lorry
CN210448528U (en) Automatic raise dust prevention of building site sprays equipment
CN209155397U (en) High spray efficiency tower crane spray system
CN202756007U (en) Totally enclosed type dust catching device
CN110172942A (en) A kind of environment protection multifunctional reducing dust lowering car integrating watering fog gun hydraulic giant
CN204690662U (en) A kind of building site atomizing de-dusting apparatus
CN210544008U (en) Dust suppression device for railway
CN110270179A (en) A kind of railway dust-arrest device
CN211447938U (en) Hydraulic engineering safety facility of prevention conflagration
CN212175644U (en) Dust fall equipment for construction
CN211537038U (en) Tower crane spray set
CN221085046U (en) A high-efficiency and environmentally friendly dust removal device for concrete production
CN215916829U (en) Tower crane equipment with watering dust fall function
CN223780916U (en) A high-level fire-fighting water tank for forest fire prevention
CN213375789U (en) Efficient spraying dust fall fence
CN217759926U (en) Triple anti-falling type lifting climbing frame with automatic induction high-pressure water mist dust settling system
CN219992325U (en) Municipal bridge spraying machine
CN218687677U (en) Dustproof water curtain wall
CN217839029U (en) Environment-friendly dust collector for hot splashing device
CN212632154U (en) Multifunctional dust removal protection device for civil construction site
CN216617568U (en) Movable dust removal device for tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant