CN114345052A - Tower crane automatic spray system and construction method - Google Patents

Tower crane automatic spray system and construction method Download PDF

Info

Publication number
CN114345052A
CN114345052A CN202210139006.1A CN202210139006A CN114345052A CN 114345052 A CN114345052 A CN 114345052A CN 202210139006 A CN202210139006 A CN 202210139006A CN 114345052 A CN114345052 A CN 114345052A
Authority
CN
China
Prior art keywords
tower crane
pipe
water supply
water
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210139006.1A
Other languages
Chinese (zh)
Inventor
朱文芹
石锋
张超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huajiang Construction Group Co ltd
Original Assignee
Jiangsu Huajiang Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huajiang Construction Group Co ltd filed Critical Jiangsu Huajiang Construction Group Co ltd
Priority to CN202210139006.1A priority Critical patent/CN114345052A/en
Publication of CN114345052A publication Critical patent/CN114345052A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

本发明提供一种塔吊自动喷淋系统及施工方法,在雨水收纳槽的弹性侧板与塔吊立柱之间设撑扩囊袋,可通过控制撑扩囊袋的气压控制汇水面积;通过竖管限位箍将供水竖管与限位竖板及塔吊横筋连接牢固;在连接限位槽内设置转动滚轴,并在连接限位槽与塔吊横筋之间设置槽底定位栓;可通过吊板控位索控制悬吊撑板及除尘水管和养护水管的高度;在悬吊撑板的下表面焊接挡风侧板,并在挡风侧板上设置控水风管;框架供水管依次穿过移动撑柱上的供水管抱箍,并可借助墙侧喷头进行建筑临边喷淋除尘;在防护栏面向行车道侧设置栏侧供水管及栏侧喷头,在防护栏的顶端设置栏顶供水管和栏顶喷头。本发明可提高施工效率、改善喷淋除尘安装质量、提高喷淋除尘效果。

Figure 202210139006

The invention provides an automatic spraying system and a construction method for a tower crane. A support and expansion bag is arranged between the elastic side plate of the rainwater storage tank and the tower crane column, and the water catchment area can be controlled by controlling the air pressure of the support and expansion bag; The limit hoop firmly connects the water supply standpipe with the limit vertical plate and the tower crane horizontal bar; a rotating roller is set in the connection limit groove, and the groove bottom positioning bolt is set between the connection limit groove and the tower crane horizontal bar; it can pass the hanging plate The position control cable controls the height of the suspension support plate, the dust removal water pipe and the maintenance water pipe; the windshield side plate is welded on the lower surface of the suspension support plate, and the water control air pipe is set on the windshield side plate; the frame water supply pipe passes through in turn Move the water supply pipe hoop on the support column, and use the wall side nozzle to spray and dedust the building edge; set the side water supply pipe and the side nozzle on the side of the guardrail facing the traffic lane, and set up the top of the guardrail for water supply Tube and bar top sprinklers. The invention can improve the construction efficiency, improve the installation quality of spray dust removal, and improve the effect of spray dust removal.

Figure 202210139006

Description

塔吊自动喷淋系统及施工方法Tower crane automatic spray system and construction method

技术领域technical field

本发明涉及建筑施工领域,尤其是涉及塔吊自动喷淋系统及施工方法。The invention relates to the field of building construction, in particular to a tower crane automatic spraying system and a construction method.

背景技术Background technique

在建筑工程施工时,为降低施工区域内扬尘污染,提高建筑施工现场大气环境质量,常需采取系列场地喷淋除尘措施。塔吊喷淋作为一种施工除尘技术,已在工程中得到了较为普遍的应用,在现场施工时,如何改善施工现场的防尘效果、降低施工安装难度、提高除尘质量,一直是工程控制的重点和难点。During the construction of construction projects, in order to reduce the dust pollution in the construction area and improve the atmospheric environment quality of the construction site, it is often necessary to take a series of site spraying and dust removal measures. As a construction dust removal technology, tower crane spray has been widely used in engineering. During on-site construction, how to improve the dust-proof effect of the construction site, reduce the difficulty of construction and installation, and improve the quality of dust removal has always been the focus of engineering control. and difficulties.

现有技术中已有一种智能塔吊喷淋系统,包括塔吊、水管喷淋系统、扬尘监测系统、智能控制器、电磁阀,通过扬尘监测系统采集周围环境的扬尘数据信息,并传送到智能控制器,从而控制电磁阀开启和关闭水管喷淋系统。该技术虽可达到防尘降尘的效果,但该技术难以实现场地组合喷淋除尘、未能解决塔吊喷淋体系快速安装,以及塔吊控制性喷淋等问题。There is an intelligent tower crane spray system in the prior art, which includes a tower crane, a water pipe spray system, a dust monitoring system, an intelligent controller, and a solenoid valve. The dust monitoring system collects the dust data information of the surrounding environment and transmits it to the intelligent controller. , so as to control the solenoid valve to open and close the water pipe spray system. Although this technology can achieve the effect of dust prevention and dust reduction, it is difficult to realize the combined spraying and dust removal of the site, and it cannot solve the problems of rapid installation of the tower crane spray system and controlled spraying of the tower crane.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于提供一种提高施工效率、改善喷淋除尘安装质量、提高喷淋除尘效果的塔吊自动喷淋系统及施工方法。The purpose of the present invention is to provide a tower crane automatic spray system and construction method which can improve the construction efficiency, improve the installation quality of spray dust removal, and improve the effect of spray dust removal.

为解决上述技术问题,本发明提供了一种塔吊自动喷淋系统施工方法,包括以下步骤:In order to solve the above-mentioned technical problems, the present invention provides a construction method of a tower crane automatic spray system, comprising the following steps:

步骤一、施工准备:勘测确定施工塔吊的平面位置,计算塔吊喷淋系统的供水压力,制备施工所需的材料和装置;Step 1. Construction preparation: survey and determine the plane position of the construction tower crane, calculate the water supply pressure of the tower crane spray system, and prepare the materials and devices required for the construction;

步骤二、施工塔吊布设:在地基土体上自下向上依次布设塔吊立柱、塔吊横臂和反力横梁,并沿塔吊立柱高度方向间隔设置塔吊横筋,分别在塔吊立柱与塔吊横臂之间、塔吊立柱与反力横梁之间设置塔吊拉索,在反力横梁下部设置配重块体;Step 2. Construction tower crane layout: Lay tower crane columns, tower crane transverse arms and reaction beams in sequence from bottom to top on the foundation soil, and set tower crane transverse bars at intervals along the height direction of the tower crane columns, respectively between the tower crane column and the tower crane transverse arms, A tower crane cable is arranged between the tower crane column and the reaction force beam, and a counterweight block is arranged at the lower part of the reaction force beam;

步骤三、供水箱系统布设:在地基土体上布设供水箱,并使供水箱分别与落水管、自来水管连通;供水竖管经加压泵与供水箱连通,并通过竖管限位箍将供水竖管与限位竖板及塔吊横筋连接牢固;在供水竖管的顶端设置万向流体阀,并使万向流体阀的下表面与连接限位槽内的转动滚轴相接;在连接限位槽与塔吊横筋之间设置槽底定位栓;落水管的顶端与雨水收纳槽底部的汇集水槽连通;Step 3: Layout of the water supply tank system: Arrange the water supply tank on the foundation soil, and connect the water supply tank with the downspout and the tap water pipe respectively; The vertical pipe is firmly connected with the limit vertical plate and the tower crane horizontal bar; a universal fluid valve is set at the top of the water supply vertical pipe, and the lower surface of the universal fluid valve is connected with the rotating roller in the connection limit groove; A groove bottom positioning bolt is arranged between the position groove and the tower crane transverse rib; the top of the downspout is connected with the collecting water groove at the bottom of the rainwater storage groove;

步骤四、横向喷水系统布设:在塔吊横臂的下方设置悬吊撑板,使悬吊撑板的上表面与伸缩内管连接;使伸缩内管套设于固定外管的内部,并使吊板控位索的一端依次穿过固定外管、伸缩内管后与悬吊撑板连接,使吊板控位索的另一端与第一卷拉机连接;在悬吊撑板的上表面分别铺设除尘水管和养护水管,并在除尘水管上设置向上喷水的除尘喷头,在养护水管上设置向下喷水的养护喷头;使横向连接管一端与万向流体阀连通,另一端通过管道转换体与除尘水管、养护水管连通,并在除尘水管和养护水管上分别设置水管控制阀;Step 4. Layout of the horizontal water spray system: a suspension support plate is set under the cross arm of the tower crane, so that the upper surface of the suspension support plate is connected with the telescopic inner pipe; the telescopic inner pipe is sleeved inside the fixed outer pipe, and the One end of the hanging plate position control cable passes through the fixed outer tube and the telescopic inner tube in turn and is connected with the suspension support plate, so that the other end of the hanging plate position control cable is connected with the first winding machine; on the upper surface of the suspension support plate Lay the dust removal water pipe and the maintenance water pipe respectively, and set the dust removal nozzle that sprays water upwards on the dust removal water pipe, and the maintenance nozzle that sprays water downwards on the maintenance water pipe; make one end of the horizontal connection pipe communicate with the universal fluid valve, and the other end through the pipe The conversion body is communicated with the dust removal water pipe and the maintenance water pipe, and water pipe control valves are respectively arranged on the dust removal water pipe and the maintenance water pipe;

步骤五、防风控制装置布设:在悬吊撑板背离塔吊立柱端的下表面连接挡风侧板,并在挡风侧板与悬吊撑板之间设置挡板转轴;在挡风侧板面向养护喷头的侧面上设置控水风管,并使控水风管的吹风孔面向塔吊立柱侧;Step 5. Layout of the windproof control device: connect the windshield side plate on the lower surface of the suspension support plate away from the end of the tower crane column, and set the baffle shaft between the windshield side plate and the suspension support plate; face the maintenance on the windshield side plate A water control air duct is set on the side of the nozzle, and the blowing hole of the water control air duct faces the side of the tower crane column;

步骤六、建筑临边喷淋系统布设:将移动撑柱与移位底板垂直连接,并在移动撑柱与移位底板之间设置补强撑筋,在移动撑柱背离补强撑筋侧设置供水管抱箍,在移位底板的下表面可转动的设置移位滚轮;使框架供水管依次穿过移动撑柱侧面的供水管抱箍;使框架供水管的一端采用管端封闭体封闭,另一端与外部供水设备连通;先推移相邻框架柱之间移动撑柱的纵向位置,再采用限位螺栓将移位底板与框架楼板连接,然后向框架供水管供水,借助墙侧喷头进行建筑临边喷淋除尘;Step 6. Layout of the building edge spray system: connect the movable support column vertically with the displacement bottom plate, and set up a reinforcing support bar between the moving support column and the displaced bottom plate, and set it on the side of the moving support column away from the reinforcement support bar For the water supply pipe hoop, a shift roller is rotatably arranged on the lower surface of the displacement bottom plate; the frame water supply pipe is passed through the water supply pipe hoop on the side of the movable support column in turn; one end of the frame water supply pipe is closed by a pipe end closure body, The other end is connected to the external water supply equipment; firstly, move the longitudinal position of the moving support column between the adjacent frame columns, and then use limit bolts to connect the displacement bottom plate and the frame floor plate, and then supply water to the frame water supply pipe, and use the wall side sprinkler to carry out construction Edge spray dust removal;

步骤七、便道除尘体系布设:在临时地面上设置防护栏,并在防护栏面向行车道方向设置栏侧槽筋,在防护栏的顶端设置栏顶槽筋,并在栏顶槽筋与防护栏之间设置槽筋连接槽;将栏侧供水管依次穿过栏侧槽筋,并在栏侧供水管远离防护栏的一侧设置栏侧喷头;在栏顶槽筋的上表面铺设栏顶供水管,并在栏顶供水管远离防护栏的一侧设置栏顶喷头。Step 7. Layout of the dust removal system for the access road: set up a guardrail on the temporary ground, set up the side groove rib on the guardrail facing the direction of the traffic lane, set the top groove rib on the top of the guardrail, and set the top groove rib and guardrail on the top of the guardrail. A groove rib connection groove is set between them; the water supply pipe on the side of the fence is passed through the groove rib on the side of the fence in turn, and the side nozzle is set on the side of the water supply pipe on the side of the fence away from the protective fence; on the upper surface of the groove rib on the top of the fence pipe, and set the top nozzle on the side of the top water supply pipe away from the guardrail.

本发明的有益效果在于:The beneficial effects of the present invention are:

(1)本发明在雨水收纳槽的弹性侧板与塔吊立柱之间设置撑扩囊袋,可通过控制撑扩囊袋的气压控制汇水面积,提高雨水收纳效率;同时,本发明采用收纳雨水与自来水作为喷淋水源,实现了水资源的组合运用。(1) In the present invention, the expansion bag is arranged between the elastic side plate of the rainwater storage tank and the tower crane column, and the catchment area can be controlled by controlling the air pressure of the expansion bag, so as to improve the rainwater storage efficiency; With tap water as the spray water source, the combined use of water resources is realized.

(2)本发明通过竖管限位箍将供水竖管与限位竖板及塔吊横筋连接牢固,降低了供水竖管安装的难度;同时,本发明万向流体阀的下表面与连接限位槽内的转动滚轴相接,并在连接限位槽与塔吊横筋之间设置槽底定位栓,提升了万向流体阀安装定位的准确度,减小了转动损伤。(2) The present invention firmly connects the water supply vertical pipe with the limit vertical plate and the tower crane horizontal bar through the vertical pipe limit hoop, which reduces the difficulty of installing the water supply vertical pipe; at the same time, the lower surface of the universal fluid valve of the present invention is connected to the limit The rotating rollers in the groove are connected, and the groove bottom positioning bolt is arranged between the connection limit groove and the tower crane transverse rib, which improves the installation and positioning accuracy of the universal fluid valve and reduces the rotation damage.

(3)本发明可通过吊板控位索控制悬吊撑板的高度,实现了除尘水管和养护水管高度的二次控制;同时,本发明除尘喷头和养护喷头可分别向上喷水和向下喷水,拓展了喷淋系统的适用范围。(3) The present invention can control the height of the suspension support plate through the hanging plate control cable, and realize the secondary control of the height of the dust removal water pipe and the maintenance water pipe; at the same time, the dust removal nozzle and the maintenance nozzle of the present invention can spray water upward and downward respectively. Water spraying expands the scope of application of the spraying system.

(4)本发明在悬吊撑板背离塔吊立柱端的下表面焊接挡风侧板,并在挡风侧板面向养护喷头的侧面上设置控水风管,可通过控水风管向喷淋水吹风,降低了刮风环境对喷淋施工的影响。(4) In the present invention, the windshield side plate is welded on the lower surface of the suspension support plate away from the end of the tower crane column, and the water control air pipe is arranged on the side of the windshield side plate facing the maintenance nozzle, which can spray water through the water control air pipe. The blower reduces the influence of the windy environment on the spray construction.

(5)本发明使框架供水管依次穿过移动撑柱上的供水管抱箍,并可借助墙侧喷头进行建筑临边喷淋除尘,解决了建筑临边死角部位的补充喷淋除尘。(5) The present invention makes the frame water supply pipe pass through the water supply pipe hoop on the moving support column in turn, and can use the wall side nozzle to spray and dedust the building edge, which solves the supplementary spraying and dust removal of the dead corner of the building.

(6)本发明在防护栏面向行车道侧设置栏侧供水管及栏侧喷头,在防护栏的顶端设置栏顶供水管和栏顶喷头,可实现对施工便道的组合喷淋,改善了便道的喷淋除尘效果。(6) In the present invention, the side water supply pipe and the side nozzle are arranged on the side of the guardrail facing the driving lane, and the top water supply pipe and the top sprinkler are arranged at the top of the guardrail, which can realize the combined spraying of the construction access road and improve the access road. spray dust removal effect.

附图说明Description of drawings

图1是本发明塔吊喷淋系统布设施工流程图;Fig. 1 is the construction flow chart of tower crane sprinkler system layout of the present invention;

图2是图1塔吊喷淋系统示意图;Fig. 2 is a schematic diagram of the tower crane spray system of Fig. 1;

图3是图2竖管限位箍与供水竖管连接结构示意图;3 is a schematic diagram of the connection structure between the standpipe limit hoop of FIG. 2 and the water supply standpipe;

图4是图2悬吊撑板与吊板控位索连接结构示意图;Fig. 4 is a schematic diagram of the connection structure of the suspension support plate of Fig. 2 and the position control cable of the suspension plate;

图5是图2除尘水管与养护水管布设平面示意图;Figure 5 is a schematic plan view of the layout of the dust removal water pipe and the maintenance water pipe in Figure 2;

图6是图2挡风侧板与控水风管连接结构示意图;Fig. 6 is a schematic diagram of the connection structure between the windshield side plate and the water control air duct of Fig. 2;

图7是图2建筑临边喷淋系统立面图;Fig. 7 is an elevation view of the edge spraying system of the building of Fig. 2;

图8是图1便道除尘体系布设示意图。FIG. 8 is a schematic diagram of the layout of the dust removal system for the access road in FIG. 1 .

图中:1-地基土体;2-塔吊立柱;3-塔吊横臂;4-反力横梁;5-塔吊横筋;6-塔吊拉索;7-配重块体;8-供水箱;9-落水管;10-自来水管;11-供水竖管;12-加压泵;13-竖管限位箍;14-限位竖板;15-万向流体阀;16-连接限位槽;17-转动滚轴;18-槽底定位栓;19-雨水收纳槽;20-汇集水槽;21-弹性侧板;22-撑扩囊袋;23-悬吊撑板;24-伸缩内管;25-固定外管;26-吊板控位索;27-第一卷拉机;28-除尘水管;29-养护水管;30-除尘喷头;31-养护喷头;32-横向连接管;33-管道转换体;34-水管控制阀;35-挡风侧板;36-挡板转轴;37-控水风管;38-吹风孔;39-侧板拉索;40-第二卷拉机;41-移动撑柱;42-移位底板;43-补强撑筋;44-供水管抱箍;45-移位滚轮;46-框架供水管;47-管端封闭体;48-框架柱;49-限位螺栓;50-框架楼板;51-墙侧喷头;52-临时地面;53-防护栏;54-栏侧槽筋;55-栏顶槽筋;56-槽筋连接槽;57-栏侧供水管;58-栏侧喷头;59-栏顶供水管;60-栏顶喷头;61-限位箍板;62-箍板转轴;63-箍板紧固栓;64-管侧垫板;65-刚性底板;66-喷淋漏水孔;67-限位隼板;68-撑柱连接筋;69-连筋转轴。In the picture: 1- foundation soil; 2- tower crane column; 3- tower crane cross arm; 4- reaction force beam; 5- tower crane cross bar; 6- tower crane cable; 7- counterweight block; 8- water supply tank; 9 -Downpipe; 10-Water Pipe; 11-Water Supply Standpipe; 12-Pressurized Pump; 13-Standpipe Limiting Hoop; 14-Limiting Vertical Plate; 15-Universal Fluid Valve; - Rotating Roller; 18 - Positioning Bolt at the Bottom of the Tank; 19 - Rainwater Storage Tank; 20 - Collecting Water Tank; 21 - Elastic Side Plate; -Fixed outer pipe; 26- Hanging plate control cable; 27- First coil pulling machine; 28- Dust removal water pipe; 29- Maintenance water pipe; 30- Dust removal nozzle; 31- Maintenance nozzle; Conversion body; 34- water pipe control valve; 35- windshield side plate; 36- baffle shaft; 37- water control air duct; 38- blowing hole; 39- side plate cable; 40- second winding machine; 41 -Moving support column; 42- Displacement bottom plate; 43- Reinforcing support bar; 44- Water supply pipe hoop; 45- Displacement roller; 46- Frame water supply pipe; -Limiting bolt; 50-Frame floor; 51-Wall side sprinkler; 52-Temporary ground; 53-Guardrail; 54-Column side groove bar; 55-Column top groove bar; Side water supply pipe; 58-column side nozzle; 59-column top water supply pipe; 60-column top nozzle; 61-limit hoop plate; 62-hoop plate rotating shaft; 63-hoop plate fastening bolt; 64-pipe side pad ; 65- Rigid bottom plate; 66- Sprinkler leakage hole; 67- Limiting falcon plate; 68- Column connecting bar;

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by those of ordinary skill in the art fall within the protection scope of the present invention.

本领域技术人员应理解的是,在本发明的揭露中,术语“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”等指示的方位或位置关系是基于附图所示的方位或位置关系,其仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此上述术语不能理解为对本发明的限制。It should be understood by those skilled in the art that in the disclosure of the present invention, the terms "portrait", "horizontal", "upper", "lower", "front", "rear", "left", "right", " The orientation or positional relationship indicated by vertical, horizontal, top, bottom, inner, outer, etc. is based on the orientation or positional relationship shown in the accompanying drawings, which are only for the convenience of describing the present invention and The description is simplified rather than indicating or implying that the device or element referred to must have a particular orientation, be constructed and operate in a particular orientation, and thus the above terms should not be construed as limiting the invention.

可以理解的是,术语“一”应理解为“至少一”或“一个或多个”,即在一个实施例中,一个元件的数量可以为一个,而在另外的实施例中,该元件的数量可以为多个,术语“一”不能理解为对数量的限制。It should be understood that the term "a" should be understood as "at least one" or "one or more", that is, in one embodiment, the number of an element may be one, while in another embodiment, the number of the element may be one. The number may be plural, and the term "one" should not be understood as a limitation on the number.

如图1-8所述,本发明提供了一种塔吊自动喷淋系统施工方法,包括以下步骤:As shown in Figures 1-8, the present invention provides a construction method for a tower crane automatic spray system, comprising the following steps:

步骤一、施工准备:勘测确定施工塔吊的平面位置,计算塔吊喷淋系统的供水压力,制备施工所需的材料和装置;Step 1. Construction preparation: survey and determine the plane position of the construction tower crane, calculate the water supply pressure of the tower crane spray system, and prepare the materials and devices required for the construction;

步骤二、施工塔吊布设:在地基土体1上自下向上依次布设塔吊立柱2、塔吊横臂3和反力横梁4,并沿塔吊立柱2高度方向均匀间隔设置塔吊横筋5,分别在塔吊立柱2与塔吊横臂3之间、塔吊立柱2与反力横梁4之间设置塔吊拉索6,在反力横梁4下部设置配重块体7;Step 2. Construction tower crane layout: On the foundation soil body 1, the tower crane column 2, the tower crane cross arm 3 and the reaction beam 4 are sequentially arranged from bottom to top, and the tower crane cross bars 5 are arranged at uniform intervals along the height direction of the tower crane column 2, respectively on the tower crane column. 2 and the tower crane cross arm 3, between the tower crane column 2 and the reaction force beam 4, a tower crane cable 6 is arranged, and a counterweight block 7 is arranged at the lower part of the reaction force beam 4;

具体的,塔吊拉索6一端连接于塔吊立柱2的顶端,另一端连接于塔吊横臂3远离塔吊立柱2的一端或连接于反力横梁4远离塔吊立柱2的一端,通过塔吊拉索6对塔吊横臂3以及反力横梁4的远端进行拉扯,保证塔吊横臂3以及反力横梁4处于水平状态,同时配重块体7位于反力横梁4远离塔吊立柱2的一端,并通过配重块体7维持塔吊立柱2两侧的稳定性。Specifically, one end of the tower crane cable 6 is connected to the top of the tower crane column 2, and the other end is connected to the end of the tower crane cross arm 3 away from the tower crane column 2 or to the end of the reaction beam 4 away from the tower crane column 2. The far ends of the tower crane beam 3 and the reaction force beam 4 are pulled to ensure that the tower crane beam 3 and the reaction force beam 4 are in a horizontal state, and the counterweight block 7 is located at the end of the reaction beam 4 away from the tower crane column 2, and is The weight body 7 maintains the stability of both sides of the tower crane column 2 .

步骤三、供水箱系统布设:在地基土体1上布设供水箱8,并使供水箱8分别与落水管9、自来水管10连通;供水竖管11经加压泵12与供水箱8连通,并通过竖管限位箍13将供水竖管11与限位竖板14及塔吊横筋5连接牢固;在供水竖管11的顶端设置万向流体阀15,并使万向流体阀15的下表面与连接限位槽16内的转动滚轴17相接;在连接限位槽16与塔吊横筋5之间设置长度可调的槽底定位栓18;落水管9的顶端与雨水收纳槽19底部的汇集水槽20连通,并在雨水收纳槽19的弹性侧板21与塔吊立柱2之间设撑扩囊袋22;需要收纳雨水时,通过外部压气设备对撑扩囊袋22及弹性侧板21施加撑扩压力,增大汇水面积;当收集的雨水不满足喷淋供水需要时,通过自来水管10对供水箱8进行补充供水;Step 3, water supply tank system layout: arrange the water supply tank 8 on the foundation soil body 1, and make the water supply tank 8 communicate with the downpipe 9 and the water supply pipe 10 respectively; The water supply vertical pipe 11 is firmly connected with the limiting vertical plate 14 and the tower crane cross bars 5 through the vertical pipe limit hoop 13; The rotating roller 17 in the connection limit groove 16 is connected; between the connection limit groove 16 and the tower crane cross bar 5, a groove bottom positioning bolt 18 with adjustable length is arranged; 20 is connected, and a support and expansion bag 22 is set between the elastic side plate 21 of the rainwater storage tank 19 and the tower crane column 2; when rainwater needs to be stored, the support and expansion bag 22 and the elastic side plate 21 are provided with a support and expansion device through external air pressure equipment. When the collected rainwater does not meet the needs of spray water supply, the water supply tank 8 is supplemented with water through the tap water pipe 10;

具体的,竖管限位箍13将供水竖管11与限位竖板14连接在一起,而限位竖板14连接至塔吊横筋5上,因此通过竖管限位箍13以及限位竖板14使得供水竖管11固定至塔吊横筋5上;连接限位槽16呈环形结构设置,万向流体阀15的下部位于连接限位槽16环形结构的内部,且转动滚轴17可相对于连接限位槽16进行滚动,使得万向流体阀15下表面接触转动滚轴17时,可以通过转动滚轴17带动万向流体阀15相对于连接限位槽16进行周向的转动,便于万向流体阀15朝向各个方向;弹性侧板21呈倾斜设置,使雨水收纳槽19呈“倒梯形”结构,通过对撑扩囊袋22进行充放气的操作,使得弹性侧板21的倾斜角度出现改变,进而调整雨水收纳槽19对雨水的收集面积。Specifically, the standpipe limiting hoop 13 connects the water supply standpipe 11 and the limiting vertical plate 14 together, and the limiting vertical plate 14 is connected to the tower crane cross bar 5, so the vertical pipe limiting hoop 13 and the limiting vertical plate 14. Make the water supply vertical pipe 11 fixed on the tower crane cross bar 5; the connection limit groove 16 is arranged in a ring structure, the lower part of the universal fluid valve 15 is located inside the ring structure of the connection limit groove 16, and the rotating roller 17 can be connected relative to the connection limit groove 16. The limit groove 16 rolls so that when the lower surface of the universal fluid valve 15 contacts the rotating roller 17, the universal fluid valve 15 can be rotated relative to the connecting limit groove 16 by rotating the roller 17, which is convenient for the universal rotation. The fluid valve 15 faces in all directions; the elastic side plate 21 is inclined, so that the rainwater storage tank 19 has an “inverted trapezoid” structure. change, and then adjust the collection area of the rainwater storage tank 19 for the rainwater.

其中,本方案的供水箱8一端外接有供水设备,以保证雨水储备不足时,可以通过供水设备进行除尘、养护的喷水操作。Wherein, one end of the water supply tank 8 in this scheme is connected with a water supply equipment to ensure that when the rainwater reserve is insufficient, the water supply equipment can be used for dust removal and water spraying operations for maintenance.

步骤四、横向喷水系统布设:在塔吊横臂3的下方设置悬吊撑板23,并使悬吊撑板23的上表面与伸缩内管24焊接连接;使伸缩内管24套设于固定外管25的内部,并使吊板控位索26的一端依次穿过固定外管25、伸缩内管24后与悬吊撑板23连接牢固,使吊板控位索26的另一端与第一卷拉机27连接;在悬吊撑板23的上表面分别铺设除尘水管28和养护水管29,并在除尘水管28上设置向上喷水的除尘喷头30,在养护水管29上设置向下喷水的养护喷头31;使横向连接管32一端与万向流体阀15连通,另一端通过管道转换体33与除尘水管28、养护水管29连通,并在除尘水管28和养护水管29上分别设置水管控制阀34;Step 4. Layout of the horizontal water spray system: a suspension support plate 23 is arranged below the cross arm 3 of the tower crane, and the upper surface of the suspension support plate 23 is welded to the telescopic inner pipe 24; the telescopic inner pipe 24 is sleeved on the fixed Inside the outer tube 25, make one end of the hanging plate position control cable 26 pass through the fixed outer tube 25 and the telescopic inner tube 24 in sequence and then connect firmly with the suspension support plate 23, so that the other end of the hanging plate position control cable 26 is connected to the first A coiler 27 is connected; a dust removal water pipe 28 and a maintenance water pipe 29 are respectively laid on the upper surface of the suspension support plate 23, and a dust removal nozzle 30 that sprays water upward is arranged on the dust removal water pipe 28, and a downward spray is arranged on the maintenance water pipe 29. Water conservation nozzle 31; one end of the transverse connection pipe 32 is communicated with the universal fluid valve 15, and the other end is communicated with the dust removal water pipe 28 and the maintenance water pipe 29 through the pipe conversion body 33, and water pipes are respectively provided on the dust removal water pipe 28 and the maintenance water pipe 29. control valve 34;

具体的,通过加压泵12将供水箱8内的水沿着供水竖管11向上抽取,使得水依次沿着供水竖管11、万向流体阀15、横向连接管32流动至管道转换体33处,并通过管道转换体33将水流分别输送至除尘水管28、养护水管29内,随后通过水管控制阀34对除尘水管28、养护水管29的启闭进行控制,以便于控制除尘水管28、养护水管29上的除尘喷头30、养护喷头31进行喷水操作。Specifically, the water in the water supply tank 8 is pumped upward along the water supply standpipe 11 by the pressurizing pump 12 , so that the water flows along the water supply standpipe 11 , the universal fluid valve 15 , and the transverse connecting pipe 32 to the pipeline conversion body 33 in sequence. The water flow is transported to the dedusting water pipe 28 and the maintenance water pipe 29 respectively through the pipe conversion body 33, and then the opening and closing of the dedusting water pipe 28 and the maintenance water pipe 29 are controlled by the water pipe control valve 34, so as to control the dedusting water pipe 28 and the maintenance water pipe 29. The dust removal nozzle 30 and the maintenance nozzle 31 on the water pipe 29 perform water spraying operation.

步骤五、防风控制装置布设:在悬吊撑板23背离塔吊立柱2端的下表面焊接连接挡风侧板35,并在挡风侧板35与悬吊撑板23之间设置挡板转轴36,使得挡风侧板35可通过挡板转轴36相对于悬吊撑板23进行转动;在挡风侧板35面向养护喷头31的侧面上设置控水风管37,并使控水风管37的吹风孔38面向塔吊立柱2侧,使挡风侧板35远离悬吊撑板23的一端通过侧板拉索39与第二卷拉机40连接;当需要在刮风天气进行喷淋施工时,先采用侧板拉索39控制挡风侧板35与悬吊撑板23的夹角,再通过控水风管37向喷淋水吹风;Step 5. Layout of the windproof control device: Welding and connecting the windshield side plate 35 on the lower surface of the suspension support plate 23 away from the 2 end of the tower crane column, and set the baffle shaft 36 between the windshield side plate 35 and the suspension support plate 23, The windshield side plate 35 can be rotated relative to the suspension support plate 23 through the baffle shaft 36; the water control air duct 37 is arranged on the side of the windshield side plate 35 facing the maintenance nozzle 31, and the water control air duct 37 is The blowing hole 38 faces the side of the tower crane column 2, so that the end of the windshield side plate 35 away from the suspension support plate 23 is connected to the second winding machine 40 through the side plate cable 39; when it is necessary to carry out spray construction in windy weather, First use the side panel cable 39 to control the angle between the windshield side panel 35 and the suspension brace 23, and then blow the spray water through the water control air duct 37;

具体的,当外界风向为从挡风侧板35吹向塔吊立柱2时,通过挡风侧板35对外界的风进行阻挡,当外界风向为从塔吊立柱2吹向挡风侧板35时,通过控水风管37的吹风孔38向塔吊立柱2一侧进行吹风,以抵御外界的风向,保证除尘喷头30、养护喷头31喷水的朝向稳定。Specifically, when the outside wind direction blows from the windshield side plate 35 to the tower crane column 2, the outside wind is blocked by the windshield side plate 35, and when the outside wind direction is from the tower crane column 2 to the windshield side plate 35, The blowing hole 38 of the water control air duct 37 is blown to the side of the tower crane column 2 to resist the wind direction of the outside world and ensure the water spraying direction of the dust removal nozzle 30 and the maintenance nozzle 31 is stable.

值得一提的是,第二卷拉机40设置于塔吊横臂3上,本方案的控水风管37外接有鼓风设备,通过鼓风设备吹出风,并通过吹风孔38向外输送。It is worth mentioning that the second winder 40 is arranged on the cross arm 3 of the tower crane, and the water control air duct 37 of this solution is externally connected with a blowing device, and the air is blown out through the blowing device and conveyed to the outside through the blowing hole 38 .

步骤六、建筑临边喷淋系统布设:将移动撑柱41与移位底板42垂直焊接连接,并在移动撑柱41与移位底板42之间设置补强撑筋43,在移动撑柱41背离补强撑筋43侧设置供水管抱箍44,在移位底板42的下表面可转动的设置移位滚轮45;使框架供水管46依次穿过移动撑柱41侧面的供水管抱箍44;使框架供水管46的一端采用管端封闭体47封闭,另一端与外部供水设备连通;先推移相邻框架柱48之间移动撑柱41的纵向位置,再采用限位螺栓49将移位底板42与框架楼板50连接牢固,然后向框架供水管46供水,借助墙侧喷头51进行建筑临边喷淋除尘;Step 6. Arrangement of the spray system on the building edge: connect the movable support column 41 and the displacement bottom plate 42 by vertical welding, and set up a reinforcing support rib 43 between the movable support column 41 and the displacement bottom plate 42. A water supply pipe hoop 44 is arranged on the side away from the reinforcing brace 43, and a displacement roller 45 is rotatably arranged on the lower surface of the displacement bottom plate 42; Make one end of the frame water supply pipe 46 closed with a pipe end closure body 47, and the other end is communicated with the external water supply equipment; first move the longitudinal position of the support column 41 between the adjacent frame columns 48, and then use the limit bolt 49 to displace the The bottom plate 42 is firmly connected with the frame floor plate 50, and then water is supplied to the frame water supply pipe 46, and the building edge is sprayed and dedusted with the help of the wall side nozzle 51;

步骤七、便道除尘体系布设:在临时地面52上设置防护栏53,并在防护栏53面向行车道方向设置栏侧槽筋54,在防护栏53的顶端设置栏顶槽筋55,并在栏顶槽筋55与防护栏53之间设置槽筋连接槽56;将栏侧供水管57依次穿过栏侧槽筋54,并在栏侧供水管57远离防护栏53的一侧设置栏侧喷头58;在栏顶槽筋55的上表面铺设栏顶供水管59,并在栏顶供水管59远离防护栏53的一侧设置栏顶喷头60。Step 7. Layout of the dust removal system on the sidewalk: set up a guardrail 53 on the temporary ground 52, and set the side groove ribs 54 on the guardrail 53 facing the direction of the traffic lane, set the top groove rib 55 on the top of the guardrail 53, and set the top groove ribs 55 on the top of the guardrail 53. A groove rib connecting groove 56 is set between the top groove rib 55 and the guard rail 53; 58; Lay the top water supply pipe 59 on the upper surface of the rail top groove rib 55, and set the rail top nozzle 60 on the side of the rail top water supply pipe 59 away from the guardrail 53.

本发明还公开了一种塔吊自动喷淋系统,包括在雨水收纳槽19的弹性侧板21与塔吊立柱2之间设撑扩囊袋22,可通过控制撑扩囊袋22的气压控制汇水面积;通过竖管限位箍13将供水竖管11与限位竖板14及塔吊横筋5连接牢固;在连接限位槽16内设置转动滚轴17,并在连接限位槽16与塔吊横筋5之间设置槽底定位栓18;可通过吊板控位索26控制悬吊撑板23及除尘水管28和养护水管29的高度;在悬吊撑板23的下表面焊接挡风侧板35,并在挡风侧板35上设置控水风管37;框架供水管46依次穿过移动撑柱41上的供水管抱箍44,并可借助墙侧喷头51进行建筑临边喷淋除尘;在防护栏53面向行车道侧设置栏侧供水管57及栏侧喷头58,在防护栏53的顶端设置栏顶供水管59和栏顶喷头60。The present invention also discloses an automatic spraying system for a tower crane, which includes a support and expansion bag 22 between the elastic side plate 21 of the rainwater storage tank 19 and the tower crane column 2, and the water catchment can be controlled by controlling the air pressure of the support and expansion bag 22. The water supply vertical pipe 11 is firmly connected with the limit vertical plate 14 and the tower crane cross bar 5 through the stand pipe limit hoop 13; the rotating roller 17 is arranged in the connection limit groove 16, and the connection limit groove 16 is connected with the tower crane cross bar. The groove bottom positioning bolt 18 is arranged between the 5; the height of the suspension support plate 23 and the dust removal water pipe 28 and the maintenance water pipe 29 can be controlled by the hanging plate control cable 26; the windshield side plate 35 is welded on the lower surface of the suspension support plate 23 , and set the water control air pipe 37 on the windshield side plate 35; the frame water supply pipe 46 passes through the water supply pipe hoop 44 on the movable support column 41 in turn, and can use the wall side nozzle 51 to spray and dedust the building edge; A fence-side water supply pipe 57 and a fence-side spray head 58 are installed on the side of the guardrail 53 facing the traffic lane, and a fence-side water supply pipe 59 and a fence-side spray head 60 are installed at the top end of the guardrail 53 .

地基土体1为硬塑状态的粘性土。The foundation soil 1 is a cohesive soil in a hard plastic state.

塔吊立柱2采用强度等级为Q345B、厚度为20mm的钢板轧制而成。The tower crane column 2 is rolled from a steel plate with a strength grade of Q345B and a thickness of 20mm.

塔吊横臂3采用强度等级为Q345B的箱型钢梁。The tower crane cross arm 3 adopts the box-shaped steel beam with the strength grade of Q345B.

反力横梁4采用强度等级为Q345B的箱型钢梁。The reaction beam 4 is a box-shaped steel beam with a strength grade of Q345B.

塔吊横筋5采用强度等级为Q345B的H型钢钢梁。The cross bar 5 of the tower crane adopts the H-shaped steel beam with the strength grade of Q345B.

塔吊拉索6和侧板拉索39分别采用直径为60mm和20mm的钢丝绳制成。The tower crane cable 6 and the side plate cable 39 are made of steel wire ropes with diameters of 60mm and 20mm, respectively.

配重块体7采用强度等级为C35钢筋混凝土材料制备,横断面呈矩形。The counterweight block 7 is made of reinforced concrete with a strength grade of C35, and the cross section is rectangular.

供水箱8采用厚度为0.2mm的铁皮轧制而成。The water supply tank 8 is formed by rolling iron sheets with a thickness of 0.2 mm.

落水管9和自来水管10均采用直径为90mm的PVC管。Both the downpipe 9 and the water pipe 10 are PVC pipes with a diameter of 90 mm.

供水竖管11采用直径为120mm钢管轧制而成。The water supply vertical pipe 11 is rolled from a steel pipe with a diameter of 120 mm.

加压泵12采用小型加压泵。As the pressurizing pump 12, a small pressurizing pump is used.

竖管限位箍13包括两块的圆弧形的限位箍板61,并使限位箍板61的一端通过箍板转轴62与限位竖板14连接,另一端与箍板紧固栓63连接,在限位箍板61的内侧壁上设置管侧垫板64;限位箍板61采用厚度1mm的钢板轧制而成,高度为4cm,内侧壁与管侧垫板64粘贴连接,管侧垫板64采用厚度1mm的橡胶片或土工布。The standpipe limit hoop 13 includes two arc-shaped limit hoop plates 61, and one end of the limit hoop plate 61 is connected to the limit vertical plate 14 through the hoop plate rotating shaft 62, and the other end is connected with the hoop plate fastening bolt 63 connection, the tube side backing plate 64 is set on the inner side wall of the limit hoop plate 61; the limit hoop plate 61 is rolled from a steel plate with a thickness of 1mm, the height is 4cm, and the inner side wall and the tube side backing plate 64 are pasted and connected, The tube side backing plate 64 is made of rubber sheet or geotextile with a thickness of 1 mm.

限位竖板14采用厚度为10mm的钢板轧制而成,与塔吊横筋5垂直焊接连接。The limit vertical plate 14 is rolled from a steel plate with a thickness of 10 mm, and is vertically welded to the tower crane cross bar 5 .

万向流体阀15采用360°塔吊流体阀。Universal fluid valve 15 adopts 360° tower crane fluid valve.

连接限位槽16采用厚度20mm的钢板轧制而成,上表面设置直径20mm的球形转动滚轴17,下表面与槽底定位栓18焊接连接;槽底定位栓18包括直径30mm的螺杆和螺母,并使螺母两侧螺杆的紧固方向相反。The connection limit groove 16 is rolled from a steel plate with a thickness of 20mm, the upper surface is provided with a spherical rotating roller 17 with a diameter of 20mm, and the lower surface is welded to the groove bottom positioning bolt 18; the groove bottom positioning bolt 18 includes a screw and a nut with a diameter of 30mm , and make the tightening direction of the screws on both sides of the nut opposite.

雨水收纳槽19包括刚性底板65和弹性侧板21,并在刚性底板65的下部设置汇集水槽20,使刚性底板65与弹性侧板21粘贴连接。刚性底板65采用厚度为2mm的钢板轧制而成。弹性侧板21采用厚度为1mm的橡胶板轧制而成。The rainwater storage tank 19 includes a rigid bottom plate 65 and an elastic side plate 21 , and a water collecting tank 20 is provided at the lower part of the rigid bottom plate 65 , and the rigid bottom plate 65 and the elastic side plate 21 are bonded and connected. The rigid bottom plate 65 is rolled from a steel plate with a thickness of 2 mm. The elastic side plate 21 is made by rolling a rubber plate with a thickness of 1 mm.

汇集水槽20采用厚度为2mm的钢板轧制而成,横断面呈矩形,宽度为1m、高度为0.5m。The collecting water tank 20 is formed by rolling a steel plate with a thickness of 2 mm, and has a rectangular cross section, a width of 1 m, and a height of 0.5 m.

撑扩囊袋22采用厚度1mm的橡胶片缝合成圆柱形腔体,并使撑扩囊袋22与外部压气设备连通。The expansion bag 22 is sewn into a cylindrical cavity by using a rubber sheet with a thickness of 1 mm, and the expansion bag 22 is communicated with an external air pressure device.

悬吊撑板23采用厚度10mm的钢板轧制而成,并在悬吊撑板23上预设直径10mm的喷淋漏水孔66,与除尘水管28和养护水管29绑扎连接或粘贴连接或焊接连接。The suspension support plate 23 is rolled from a steel plate with a thickness of 10 mm, and a spray water leakage hole 66 with a diameter of 10 mm is preset on the suspension support plate 23, and is connected with the dust removal water pipe 28 and the maintenance water pipe 29 by binding or bonding or welding connection. .

伸缩内管24和固定外管25均采用壁厚为2mm的钢管轧制而成,在伸缩内管24顶端的外侧壁上和固定外管25内侧壁上分别设置限位隼板67,内径分别为100mm和120mm。The telescopic inner tube 24 and the fixed outer tube 25 are both rolled by steel pipes with a wall thickness of 2 mm. Limiting falcon plates 67 are respectively provided on the outer side wall of the top end of the telescopic inner tube 24 and on the inner side wall of the fixed outer tube 25, and the inner diameters are respectively 100mm and 120mm.

吊板控位索26采用直径为20mm的钢丝绳。The hanging plate control cable 26 adopts a steel wire rope with a diameter of 20 mm.

第一卷拉机27和第二卷拉机40均采用卷扬机。Both the first winding and pulling machine 27 and the second winding and pulling machine 40 use hoists.

除尘水管28和养护水管29均采用直径为60mm的钢管。Both the dust removal water pipe 28 and the maintenance water pipe 29 are steel pipes with a diameter of 60 mm.

横向连接管32采用直径为100mm的钢管。The transverse connecting pipe 32 is a steel pipe with a diameter of 100 mm.

管道转换体33采用管道三通,钢管轧制而成。The pipe conversion body 33 is made of pipe tee and steel pipe rolling.

除尘喷头30和养护喷头31分别采用180°折射喷头和360°旋转喷头。The dust removal nozzle 30 and the maintenance nozzle 31 respectively adopt a 180° refraction nozzle and a 360° rotating nozzle.

水管控制阀34采用水力控制阀。The water pipe control valve 34 is a hydraulic control valve.

挡风侧板35采用厚度为1mm的钢板轧制而成。The windshield side plate 35 is formed by rolling a steel plate with a thickness of 1 mm.

挡板转轴36采用合页或铰链,转轴直径为2mm。The baffle shaft 36 adopts hinges or hinges, and the diameter of the shaft is 2mm.

控水风管37采用直径60mm的钢管或PVC管,一端封闭,另一端与外部的鼓风设备连通。The water control air pipe 37 adopts a steel pipe or PVC pipe with a diameter of 60 mm, one end is closed, and the other end is connected with the external blowing equipment.

吹风孔38孔径为2mm。The diameter of the blow hole 38 is 2mm.

移动撑柱41采用规格为150×150×7×10的H型钢或钢管轧制而成,在纵向相邻的移动撑柱41之间设置撑柱连接筋68,并在撑柱连接筋68与移动撑柱41相接处设置连筋转轴69。撑柱连接筋68采用厚度1mm的钢板轧制而成,宽度为60mm。连筋转轴69采用直径20mm的转轴。The movable struts 41 are rolled from H-beam or steel pipes with a size of 150×150×7×10. Between the longitudinally adjacent movable struts 41, strut connecting ribs 68 are arranged, and the strut connecting ribs 68 are connected with each other. A connecting rod rotating shaft 69 is provided at the joint of the moving struts 41 . The strut connecting rib 68 is rolled from a steel plate with a thickness of 1mm and a width of 60mm. The connecting rod rotating shaft 69 adopts a rotating shaft with a diameter of 20 mm.

移位底板42采用厚度10mm的钢板轧制而成,宽度为0.5m,长度为1m。The displacement bottom plate 42 is rolled from a steel plate with a thickness of 10 mm, with a width of 0.5 m and a length of 1 m.

补强撑筋43采用直径为30mm的钢管轧制而成。The reinforcing rib 43 is formed by rolling a steel pipe with a diameter of 30 mm.

供水管抱箍44采用管箍或喉箍。The water supply pipe hoop 44 adopts a pipe hoop or a throat hoop.

移位滚轮45采用3寸的万向球轮。The shift roller 45 adopts a 3-inch universal ball wheel.

框架供水管46采用直径为60mm的钢管。The frame water supply pipe 46 is a steel pipe with a diameter of 60 mm.

管端封闭体47采用内径与框架供水管相同的管帽,与框架供水管46粘贴连接。The pipe end closing body 47 adopts a pipe cap with the same inner diameter as the frame water supply pipe, and is connected to the frame water supply pipe 46 by sticking.

框架柱48采用钢筋混凝土材料,混凝土强度等级为C35。The frame column 48 is made of reinforced concrete, and the concrete strength grade is C35.

限位螺栓49采用内径为22mm的螺栓。The limit bolt 49 is a bolt with an inner diameter of 22 mm.

框架楼板50采用钢筋混凝土材料,混凝土强度等级为C35。The frame floor 50 is made of reinforced concrete, and the concrete strength grade is C35.

墙侧喷头51采用360°旋转喷头。The wall side sprinkler 51 adopts a 360° rotating sprinkler.

临时地面52为混凝土地面,混凝土强度等级为C30,厚度30cm。The temporary ground 52 is a concrete ground with a concrete strength grade of C30 and a thickness of 30 cm.

防护栏53采用钢护栏,直径为100mm。The guardrail 53 adopts a steel guardrail with a diameter of 100mm.

栏侧槽筋54采用厚度为2mm的钢板轧制而成,横断面呈圆弧形,圆心角为180~270°;The bar side groove rib 54 is rolled from a steel plate with a thickness of 2mm, the cross section is circular arc, and the central angle is 180-270°;

栏顶槽筋55采用厚度10mm的钢板轧制而成,横断面呈圆弧形,圆心角为30°,下表面与槽筋连接槽56连接,沿临时地面52纵向通长布设;槽筋连接槽56套设于防护栏53的顶端。The top groove rib 55 is rolled from a steel plate with a thickness of 10mm, the cross section is circular, the central angle is 30°, the lower surface is connected with the groove rib connecting groove 56, and is longitudinally arranged along the temporary ground 52; The groove 56 is sleeved on the top of the guard rail 53 .

栏侧供水管57和栏顶供水管59均采用直径60mm的橡胶管。The water supply pipe 57 on the side of the fence and the water supply pipe 59 on the top of the fence are rubber pipes with a diameter of 60 mm.

栏侧喷头58和栏顶喷头60均采用360°旋转喷头。The column side nozzles 58 and the column top nozzles 60 both use 360° rotating nozzles.

箍板转轴62采用不锈钢转动轴承。The hoop plate rotating shaft 62 adopts a stainless steel rotating bearing.

箍板紧固栓63采用直径为20mm的螺杆轧制而成。The hoop plate fastening bolt 63 is rolled with a screw with a diameter of 20 mm.

限位隼板67采用厚度为10mm的钢板轧制而成,高度为15mm。The limit falcon plate 67 is rolled from a steel plate with a thickness of 10mm and a height of 15mm.

本发明不局限于上述最佳实施方式,任何人在本发明的启示下都可得出其他各种形式的产品,但不论在其形状或结构上作任何变化,凡是具有与本申请相同或相近似的技术方案,均落在本发明的保护范围之内。The present invention is not limited to the above-mentioned best embodiment, and anyone can obtain other various forms of products under the inspiration of the present invention, but no matter if any changes are made in its shape or structure, all products with the same or similar characteristics as those of the present application can be obtained. Similar technical solutions all fall within the protection scope of the present invention.

Claims (10)

1.一种塔吊自动喷淋系统施工方法,其特征在于,包括以下步骤:1. a tower crane automatic spray system construction method, is characterized in that, comprises the following steps: 步骤一、施工准备:勘测确定施工塔吊的平面位置,计算塔吊喷淋系统的供水压力,制备施工所需的材料和装置;Step 1. Construction preparation: survey and determine the plane position of the construction tower crane, calculate the water supply pressure of the tower crane spray system, and prepare the materials and devices required for the construction; 步骤二、施工塔吊布设:在地基土体(1)上自下向上依次布设塔吊立柱(2)、塔吊横臂(3)和反力横梁(4),并沿塔吊立柱(2)高度方向间隔设置塔吊横筋(5),分别在塔吊立柱(2)与塔吊横臂(3)之间、塔吊立柱(2)与反力横梁(4)之间设置塔吊拉索(6),在反力横梁(4)下部设置配重块体(7);Step 2. Layout of the construction tower crane: Arrange the tower crane column (2), the tower crane transverse arm (3) and the reaction beam (4) on the foundation soil body (1) in order from bottom to top, and space them along the height direction of the tower crane column (2). The tower crane cross bars (5) are arranged, and the tower crane cables (6) are respectively arranged between the tower crane column (2) and the tower crane transverse arm (3), and between the tower crane column (2) and the reaction force beam (4). (4) The lower part is provided with a counterweight block (7); 步骤三、供水箱系统布设:在地基土体(1)上布设供水箱(8),并使供水箱(8)分别与落水管(9)、自来水管(10)连通;供水竖管(11)经加压泵(12)与供水箱(8)连通,并通过竖管限位箍(13)将供水竖管(11)与限位竖板(14)及塔吊横筋(5)连接牢固;在供水竖管(11)的顶端设置万向流体阀(15),并使万向流体阀(15)的下表面与连接限位槽(16)内的转动滚轴(17)相接;在连接限位槽(16)与塔吊横筋(5)之间设置槽底定位栓(18);落水管(9)的顶端与雨水收纳槽(19)底部的汇集水槽(20)连通;Step 3. Layout of the water supply tank system: Arrange the water supply tank (8) on the foundation soil body (1), and make the water supply tank (8) communicate with the downpipe (9) and the water pipe (10) respectively; the water supply vertical pipe (11) The pressurized pump (12) is communicated with the water supply tank (8), and the water supply vertical pipe (11) is firmly connected with the limit vertical plate (14) and the tower crane cross bar (5) through the vertical pipe limit hoop (13); A universal fluid valve (15) is arranged at the top of the water supply vertical pipe (11), and the lower surface of the universal fluid valve (15) is connected with the rotating roller (17) in the connection limit groove (16); A groove bottom positioning bolt (18) is arranged between the limiting groove (16) and the tower crane transverse rib (5); the top of the downpipe (9) is communicated with the collecting water groove (20) at the bottom of the rainwater storage groove (19); 步骤四、横向喷水系统布设:在塔吊横臂(3)的下方设置悬吊撑板(23),使悬吊撑板(23)的上表面与伸缩内管(24)连接;使伸缩内管(24)套设于固定外管(25)的内部,并使吊板控位索(26)的一端依次穿过固定外管(25)、伸缩内管(24)后与悬吊撑板(23)连接,使吊板控位索(26)的另一端与第一卷拉机(27)连接;在悬吊撑板(23)的上表面分别铺设除尘水管(28)和养护水管(29),并在除尘水管(28)上设置向上喷水的除尘喷头(30),在养护水管(29)上设置向下喷水的养护喷头(31);使横向连接管(32)一端与万向流体阀(15)连通,另一端通过管道转换体(33)与除尘水管(28)、养护水管(29)连通,并在除尘水管(28)和养护水管(29)上分别设置水管控制阀(34);Step 4. Layout of the horizontal water spray system: a suspension support plate (23) is arranged below the horizontal arm (3) of the tower crane, so that the upper surface of the suspension support plate (23) is connected with the telescopic inner pipe (24); The pipe (24) is sleeved inside the fixed outer pipe (25), and one end of the hanging plate control cable (26) passes through the fixed outer pipe (25), the telescopic inner pipe (24) and the suspension support plate in sequence. (23) connection, so that the other end of the hanging plate control cable (26) is connected with the first winding machine (27); on the upper surface of the hanging support plate (23), a dust removal water pipe (28) and a maintenance water pipe (28) are respectively laid. 29), and a dust removal nozzle (30) that sprays water upwards is set on the dust removal water pipe (28), and a maintenance nozzle (31) that sprays water downward is set on the maintenance water pipe (29); The universal fluid valve (15) is communicated with, and the other end is communicated with the dust removal water pipe (28) and the maintenance water pipe (29) through the pipe conversion body (33), and water pipe control is respectively provided on the dust removal water pipe (28) and the maintenance water pipe (29). valve (34); 步骤五、防风控制装置布设:在悬吊撑板(23)背离塔吊立柱(2)端的下表面连接挡风侧板(35),并在挡风侧板(35)与悬吊撑板(23)之间设置挡板转轴(36);在挡风侧板(35)面向养护喷头(31)的侧面上设置控水风管(37),并使控水风管(37)的吹风孔(38)面向塔吊立柱(2)侧;Step 5. Layout of the windproof control device: connect the windshield side plate (35) on the lower surface of the end of the suspension brace plate (23) away from the tower crane column (2), and connect the windshield side plate (35) with the suspension brace plate (23). A baffle shaft (36) is arranged between ); a water control air duct (37) is arranged on the side of the windshield side plate (35) facing the maintenance nozzle (31), and the blow holes (37) of the water control air duct (37) are arranged 38) Facing the side of the tower crane column (2); 步骤六、建筑临边喷淋系统布设:将移动撑柱(41)与移位底板(42)垂直连接,并在移动撑柱(41)与移位底板(42)之间设置补强撑筋(43),在移动撑柱(41)背离补强撑筋(43)侧设置供水管抱箍(44),在移位底板(42)的下表面可转动的设置移位滚轮(45);使框架供水管(46)依次穿过移动撑柱(41)侧面的供水管抱箍(44);使框架供水管(46)的一端采用管端封闭体(47)封闭,另一端与外部供水设备连通;先推移相邻框架柱(48)之间移动撑柱(41)的纵向位置,再采用限位螺栓(49)将移位底板(42)与框架楼板(50)连接,然后向框架供水管(46)供水,借助墙侧喷头(51)进行建筑临边喷淋除尘;Step 6. Arrangement of the spray system on the edge of the building: connect the movable support column (41) to the displacement bottom plate (42) vertically, and set up reinforcing ribs between the movable support column (41) and the displacement bottom plate (42). (43), a water supply pipe hoop (44) is provided on the side of the moving support column (41) away from the reinforcing support rib (43), and a shift roller (45) is rotatably provided on the lower surface of the shift bottom plate (42); Make the frame water supply pipe (46) pass through the water supply pipe hoop (44) on the side of the movable support column (41) in turn; make one end of the frame water supply pipe (46) closed with a pipe end closure (47), and the other end is connected to the external water supply The equipment is connected; first move the longitudinal position of the moving support column (41) between the adjacent frame columns (48), and then use the limit bolts (49) to connect the displacement bottom plate (42) with the frame floor (50), and then connect the displacement bottom plate (42) to the frame floor (50), The water supply pipe (46) supplies water, and uses the wall side nozzles (51) to spray and dedust the building edges; 步骤七、便道除尘体系布设:在临时地面(52)上设置防护栏(53),并在防护栏(53)面向行车道方向设置栏侧槽筋(54),在防护栏(53)的顶端设置栏顶槽筋(55),并在栏顶槽筋(55)与防护栏(53)之间设置槽筋连接槽(56);将栏侧供水管(57)依次穿过栏侧槽筋(54),并在栏侧供水管(57)远离防护栏(53)的一侧设置栏侧喷头(58);在栏顶槽筋(55)的上表面铺设栏顶供水管(59),并在栏顶供水管(59)远离防护栏(53)的一侧设置栏顶喷头(60)。Step 7. Layout of the dust removal system for the access road: a protective fence (53) is arranged on the temporary ground (52), and a side groove rib (54) is arranged on the protective fence (53) facing the direction of the roadway, and at the top of the protective fence (53) A rail top groove rib (55) is provided, and a groove rib connecting groove (56) is arranged between the rail top groove rib (55) and the guard rail (53); the rail side water supply pipe (57) is passed through the rail side groove rib in sequence (54), and set the column side nozzle (58) on the side of the column side water supply pipe (57) away from the guardrail (53); lay the column top water supply pipe (59) on the upper surface of the column top groove rib (55), And a rail top spray head (60) is arranged on the side of the rail top water supply pipe (59) away from the guard rail (53). 2.根据权利要求1所述的塔吊自动喷淋系统施工方法,其特征在于:塔吊拉索6一端连接于塔吊立柱2的顶端,另一端连接于塔吊横臂3远离塔吊立柱2 的一端或连接于反力横梁4远离塔吊立柱2的一端,配重块体7位于反力横梁4远离塔吊立柱2的一端。2. The construction method of the tower crane automatic sprinkler system according to claim 1 is characterized in that: one end of the tower crane cable 6 is connected to the top of the tower crane column 2, and the other end is connected to one end or connection of the tower crane cross arm 3 away from the tower crane column 2. At the end of the reaction force beam 4 away from the tower crane column 2 , the counterweight block 7 is located at the end of the reaction force beam 4 away from the tower crane column 2 . 3.根据权利要求1所述的塔吊自动喷淋系统施工方法,其特征在于:在雨水收纳槽(19)的弹性侧板(21)与塔吊立柱(2)之间设撑扩囊袋(22);需要收纳雨水时,通过外部压气设备对撑扩囊袋(22)及弹性侧板(21)施加撑扩压力,增大汇水面积;当收集的雨水不满足喷淋供水需要时,通过自来水管(10)对供水箱(8)进行补充供水。3. The construction method of the tower crane automatic sprinkler system according to claim 1, characterized in that: between the elastic side plate (21) of the rainwater storage tank (19) and the tower crane column (2), a support bag (22) is provided ); when it is necessary to receive rainwater, the expansion pressure is applied to the expansion bag (22) and the elastic side plate (21) through the external air pressure equipment to increase the catchment area; when the collected rainwater does not meet the needs of spray water supply, the The tap water pipe (10) supplies water to the water supply tank (8). 4.根据权利要求1所述的塔吊自动喷淋系统施工方法,其特征在于:连接限位槽(16)呈环形结构设置,万向流体阀(15)的下部位于连接限位槽(16)环形结构的内部,且转动滚轴(17)可相对于连接限位槽(16)进行滚动。4. The construction method of the tower crane automatic sprinkler system according to claim 1, characterized in that: the connection limit groove (16) is arranged in a ring structure, and the lower part of the universal fluid valve (15) is located in the connection limit groove (16) Inside the annular structure, the rotating roller (17) can roll relative to the connecting limit groove (16). 5.根据权利要求1所述的塔吊自动喷淋系统施工方法,其特征在于:挡风侧板(35)远离悬吊撑板(23)的一端通过侧板拉索(39)与第二卷拉机(40)连接;当需要在刮风天气进行喷淋施工时,先采用侧板拉索(39)控制挡风侧板(35)与悬吊撑板(23)的夹角,再通过控水风管(37)向喷淋水吹风。5. The construction method of the tower crane automatic sprinkler system according to claim 1, characterized in that: one end of the windshield side plate (35) away from the suspension support plate (23) passes through the side plate cable (39) and the second coil The pulling machine (40) is connected; when it is necessary to carry out spray construction in windy weather, the side plate cable (39) is used to control the angle between the windshield side plate (35) and the suspension support plate (23), and then the The water control air duct (37) blows the spray water. 6.根据权利要求1所述的塔吊自动喷淋系统施工方法,其特征在于:竖管限位箍(13)包括两块圆弧形的限位箍板(61),并使限位箍板(61)的一端通过箍板转轴(62)与限位竖板(14)连接,另一端与箍板紧固栓(63)连接,在限位箍板(61)的内侧壁上设置管侧垫板(64)。6. The method for constructing an automatic sprinkler system for tower cranes according to claim 1, wherein the standpipe limit hoop (13) comprises two arc-shaped limit hoop plates (61), and the limit hoop plates are made to One end of (61) is connected to the limit vertical plate (14) through the hoop plate rotating shaft (62), and the other end is connected to the hoop plate fastening bolt (63). backing plate (64). 7.根据权利要求1所述的塔吊自动喷淋系统施工方法,其特征在于:雨水收纳槽(19)包括刚性底板(65)和弹性侧板(21),并在刚性底板(65)的下部设置汇集水槽(20)。7. The construction method of the tower crane automatic sprinkler system according to claim 1, wherein the rainwater storage tank (19) comprises a rigid bottom plate (65) and an elastic side plate (21), and is located at the lower part of the rigid bottom plate (65) Set the collection sink (20). 8.根据权利要求1所述的塔吊自动喷淋系统施工方法,其特征在于:管道转换体(33)采用管道三通;所述除尘喷头(30)和养护喷头(31)分别采用180°折射喷头和360°旋转喷头。8. The construction method of the tower crane automatic sprinkler system according to claim 1, characterized in that: the pipeline conversion body (33) adopts a pipeline tee; the dust removal nozzle (30) and the maintenance nozzle (31) respectively adopt 180° refraction Sprinkler and 360° rotating sprinkler. 9.根据权利要求1所述的塔吊自动喷淋系统施工方法,其特征在于:栏侧槽筋(54)横断面呈圆弧形,圆心角为180~270°;所述栏顶槽筋(55)下表面与槽筋连接槽(56)连接,所述栏侧喷头(58)和栏顶喷头(60)均采用360°旋转喷头。9. The construction method of the tower crane automatic sprinkler system according to claim 1, characterized in that: the cross section of the rail side groove rib (54) is arc-shaped, and the central angle is 180-270°; the rail top groove rib (54) 55) The lower surface is connected with the groove rib connecting groove (56), and the column side nozzles (58) and the column top nozzles (60) both use 360° rotating nozzles. 10.一种塔吊自动喷淋系统,其特征在于:通过权利要求1-9任一项所述的塔吊自动喷淋系统施工方法获得。10. A tower crane automatic spray system, characterized in that: obtained by the construction method of the tower crane automatic spray system according to any one of claims 1-9.
CN202210139006.1A 2022-02-15 2022-02-15 Tower crane automatic spray system and construction method Pending CN114345052A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210139006.1A CN114345052A (en) 2022-02-15 2022-02-15 Tower crane automatic spray system and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210139006.1A CN114345052A (en) 2022-02-15 2022-02-15 Tower crane automatic spray system and construction method

Publications (1)

Publication Number Publication Date
CN114345052A true CN114345052A (en) 2022-04-15

Family

ID=81092901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210139006.1A Pending CN114345052A (en) 2022-02-15 2022-02-15 Tower crane automatic spray system and construction method

Country Status (1)

Country Link
CN (1) CN114345052A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314311A (en) * 2014-10-29 2015-01-28 龙元建设集团股份有限公司 Height-adjustable horizontal 360-degree spraying device for construction tower crane
CN204549897U (en) * 2015-04-10 2015-08-12 陕西华山建设有限公司 A kind of skyscraper automatic spray dust collector based on tower crane
CN205461539U (en) * 2016-01-12 2016-08-17 中国建筑第二工程局有限公司 Tower crane high altitude sprays dust fall system
CN206108753U (en) * 2016-09-30 2017-04-19 天元建设集团有限公司 A tower crane intelligence spraying system that is used for concrete maintenance and building site to remove dust
CN109750686A (en) * 2019-01-07 2019-05-14 上海建工一建集团有限公司 A kind of tower crane is connected the construction method and structure of shared stand column pile with support
CN211025579U (en) * 2019-08-30 2020-07-17 四川师范大学 Green construction intelligent spraying dust suppression system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314311A (en) * 2014-10-29 2015-01-28 龙元建设集团股份有限公司 Height-adjustable horizontal 360-degree spraying device for construction tower crane
CN204549897U (en) * 2015-04-10 2015-08-12 陕西华山建设有限公司 A kind of skyscraper automatic spray dust collector based on tower crane
CN205461539U (en) * 2016-01-12 2016-08-17 中国建筑第二工程局有限公司 Tower crane high altitude sprays dust fall system
CN206108753U (en) * 2016-09-30 2017-04-19 天元建设集团有限公司 A tower crane intelligence spraying system that is used for concrete maintenance and building site to remove dust
CN109750686A (en) * 2019-01-07 2019-05-14 上海建工一建集团有限公司 A kind of tower crane is connected the construction method and structure of shared stand column pile with support
CN211025579U (en) * 2019-08-30 2020-07-17 四川师范大学 Green construction intelligent spraying dust suppression system

Similar Documents

Publication Publication Date Title
CN205531315U (en) Detachable reinforced truss floor deck support system
CN103123016B (en) Construction method for laying gas pipelines along bridge
CN111305322A (en) Construction structure and construction method for mounting large-diameter steel pipe by adopting shield tunnel
CN111472530A (en) A flower basket tie rod I-beam cantilever bearing frame for construction engineering and its installation method
CN209585718U (en) A multifunctional foundation pit protection shed
CN214573967U (en) Large-volume concrete pouring chute device for ultra-thick bottom plate of deep foundation pit in narrow field
CN107237461A (en) A kind of full suspending rotary steel structure stairway structure and construction method
CN110184934A (en) Cast-in-place Bent Cap formwork system and construction method
CN212336672U (en) I-steel overhanging bearing frame of basket pull rod for constructional engineering
CN114345052A (en) Tower crane automatic spray system and construction method
CN104213711A (en) Pit pump long-distance-suspended pump pipe swinging concreting construction technology for high-rise buildings
CN110424722A (en) Integral assembling large form narrow space wall and construction method
CN109930488B (en) Construction method of inclined cable tower construction structure system
CN209555779U (en) Sprinkler maintenance device for cast-in-place reinforced concrete guardrail
CN218540786U (en) Hot melt adhesive coiled material waterproof system for controlling spraying anchor base plane of open-cut tunnel
CN211159051U (en) High-altitude spraying system for construction site
CN211891342U (en) Closed steam curing system for prefabricated box girder
CN101761230B (en) Adjustable supporting structure of cast-in-place concrete hanging template
CN115522720A (en) Gate-type movable scaffold suitable for complex working conditions and erection method
CN112177066B (en) Non-excavation in-situ repair construction method for inspection well shaft
CN211897895U (en) Movable bridge cantilever arm bottom construction platform
CN211415639U (en) Case roof beam surface sprays curing means
CN219518232U (en) Material field spraying device
CN110184920B (en) Construction method of flower basket integrated anti-collision guardrail
CN210916936U (en) Bridge floor patching device is used in bridge construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20220415