CN217601475U CN202221553317.4U CN202221553317U CN217601475U CN 217601475 U CN217601475 U CN 217601475U CN 202221553317 U CN202221553317 U CN 202221553317U CN 217601475 U CN217601475 U CN 217601475U
Authority
CN
China
Prior art keywords
wall
fixedly connected
facility
connecting rod
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221553317.4U
Other languages
Chinese (zh)
Inventor
刘建垠
宋其峰
亓学勇
李正兵
姚圆月
桂思清
程影
田效禹
许俊杰
崔月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jintian Industrial Development Shandong Group Co ltd
Original Assignee
Jintian Industrial Development Shandong Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jintian Industrial Development Shandong Group Co ltd filed Critical Jintian Industrial Development Shandong Group Co ltd
Priority to CN202221553317.4U priority Critical patent/CN217601475U/en
Application granted granted Critical
Publication of CN217601475U publication Critical patent/CN217601475U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a land survey and drawing field specifically is a soil renovation solid slope slow flow loses facility. The device includes the backup pad, the inner wall threaded connection of backup pad has adjustment mechanism, adjustment mechanism's outer wall fixedly connected with clamp splice, the outer wall nestification of clamp splice has the connecting rod, the inner wall of connecting rod runs through there is the joint, the spout has been seted up with the connection position that connects to the connecting rod, the outer wall left side fixedly connected with dead lever that connects, eleven groups mouth that leaks have been seted up to the outer wall of dead lever, the top fixedly connected with connecting plate of connecting rod, when the solid slope slowly runs off the facility equipment and finishes, fills up sandy soil in the blank that the multiunit dead lever is constituteed, waters with watering again, then spills the grass seeds that stir and the mixture of fertilizer and earth in the blank again, and the grass seeds will sprout in the short time, grows green planting, and the mesh and the ground laminating that the multiunit dead lever is constituteed simultaneously realizes alleviating the purpose that soil erosion and water runs off.

Description

Land reclamation slope-fixing and slow-flow loss facility
Technical Field
The utility model relates to a firm slope field specifically is a soil renovation firm slope unhurried current loss facility.
Background
When the dams are built, the outer surfaces of most of the dams are the land, and when raining, rainwater washes soil on the outer surfaces of the dams, so that soil particles and water are lost together, the dams are easy to collapse, and slope fixing and loss relieving facilities need to be used.
The existing slope fixing mainly adopts a stone type, a concrete type, an ecological block slope protection type and the like to fix the slope, the ecological block slope protection cost is high, the texture is thick, the financial resources are consumed in large-scale implementation, a spliced frame is needed in order to save the financial resources, green plants can be planted in the frame, the water and soil loss is prevented, and particularly, a facility for soil reclamation and slope fixing and slow flow loss is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a soil renovation solid slope slow loss facility to solve the ecological block bank protection cost that provides in the above-mentioned background art great, and the texture is thick and heavy, large-scale implementation consumes the financial resources, in order to practice thrift the financial resources, needs the frame of a concatenation, and can plant the green problem of planting in the frame.
In order to achieve the above object, the utility model provides a following technical scheme: a facility for soil reclamation, slope fixation and slow runoff loss comprises a supporting plate, wherein an adjusting mechanism is in threaded connection with the inner wall of the supporting plate, a clamping block is fixedly connected to the outer wall of the adjusting mechanism, and a connecting rod is nested on the outer wall of the clamping block;
the inner wall of connecting rod runs through there is the joint, the spout has been seted up with the connection position that connects to the connecting rod, the outer wall left side fixedly connected with dead lever that connects, eleven groups of mouth that leaks are seted up to the outer wall of dead lever, the top fixedly connected with connecting plate of connecting rod.
Preferably, adjustment mechanism includes the threaded rod, the outer wall and the backup pad inner wall threaded connection of threaded rod, the rotatory piece of bottom fixedly connected with of threaded rod, the outer wall nestification of rotatory piece has the adapter sleeve, the bottom fixedly connected with movable block of adapter sleeve, the top edge fixedly connected with clamp splice of movable block, two sets of gag lever posts of the top fixedly connected with of movable block, it is two sets of the gag lever post outer wall is kept away from with the adapter sleeve outer wall.
Preferably, the movable block forms a lifting structure through the rotating block, the connecting sleeve, the two sets of limiting rods and the supporting plate, and the outer walls of the two sets of limiting rods are attached to the inner wall of the supporting plate.
Preferably, four groups of connecting rods are arranged, and the position relationship of the four groups of connecting rods is distributed in an equal angle relative to the movable block.
Preferably, the support plate, the four groups of connecting plates and the four groups of connecting rods are integrally connected.
Preferably, the cross section of the clamping block is L-shaped, and the bottom end of the clamping block is attached to the top end of the joint.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses in, when the equipment of solid slope slowly runs off facility finishes, fill sandy soil in the blank of constituteing the multiunit dead lever, watering will sprinkle again, then spill the mixture of the grass seed that will stir and fertilizer and earth in the blank again, grass seed will sprout in the short time, and the green planting of growing out, the mesh and the ground laminating of multiunit dead lever constitution simultaneously realize alleviating soil erosion and water loss's purpose.
The utility model discloses in, through being provided with the movable block, the staff will connect in the spout in with embedding the connecting rod completely, then with three other piecings imbed the spout in three other connecting rods of three in the whole, rotatory connecting rod, it is rotatory along the inner wall of adapter sleeve to drive rotatory piece, under the spacing of two sets of gag lever posts, drive the movable block motion, so that the movable block drives four group's clamp splice of four and four group's connecting rods and closely laminates, realized fast installation and the dismantlement of solid slope slow loss facility, convenient solid slope slow loss facility's transportation.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic sectional view of the connecting rod of the present invention;
fig. 3 is a schematic view of the connecting sleeve section connecting part explosion structure of the utility model;
fig. 4 is the connecting rod of the present invention with a cross-sectional view illustrating the explosion structure of the connecting portion.
In the figure: 1. a support plate; 2. an adjustment mechanism; 201. a threaded rod; 202. rotating the block; 203. connecting sleeves; 204. a movable block; 205. a limiting rod; 3. a connecting rod; 4. a clamping block; 5. a joint; 6. a chute; 7. fixing the rod; 8. a water leakage port; 9. a connecting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by the staff of ordinary skill in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 4, the present invention provides a technical solution: a facility for soil reclamation, slope fixation and slow loss comprises a supporting plate 1, wherein the inner wall of the supporting plate 1 is in threaded connection with an adjusting mechanism 2, the outer wall of the adjusting mechanism 2 is fixedly connected with a clamping block 4, and the outer wall of the clamping block 4 is nested with a connecting rod 3;
the inner wall of connecting rod 3 runs through and has connect 5, and connecting rod 3 has seted up spout 6 with the connection position that connects 5, connects 5's outer wall left side fixedly connected with dead lever 7, and ten a set of mouth of leaking pipes 8, connecting rod 3's top fixedly connected with connecting plate 9 have been seted up to the outer wall of dead lever 7.
In this embodiment, as shown in fig. 2 and fig. 3, adjustment mechanism 2 includes threaded rod 201, the outer wall and the 1 inner wall threaded connection of backup pad of threaded rod 201, the rotatory piece 202 of bottom fixedly connected with of threaded rod 201, the outer wall nestification of rotatory piece 202 has adapter sleeve 203, the bottom fixedly connected with movable block 204 of adapter sleeve 203, the top edge fixedly connected with clamp splice 4 of movable block 204, two sets of gag lever posts 205 of top fixedly connected with of movable block 204, two sets of gag lever posts 205 outer walls are kept away from with the adapter sleeve 203 outer wall, be favorable to movable block 204 to drive four group's clamp splices 4 and four group's 5 inseparable joints in four group's connecting rods 3, realized fast installation and the dismantlement of the solid slope slow loss facility, the transportation of the convenient solid slope slow loss facility.
In this embodiment, as shown in fig. 2 and fig. 3, the movable block 204 forms a lifting structure with the supporting plate 1 through the rotating block 202, the connecting sleeve 203 and the two sets of limiting rods 205, and the outer walls of the two sets of limiting rods 205 are attached to the inner wall of the supporting plate 1, which is beneficial for rotating the connecting rod 201, and drives the rotating block 202 to rotate along the inner wall of the connecting sleeve 203, and drives the movable block 204 to move under the limiting of the two sets of limiting rods 205.
In this embodiment, as shown in fig. 2, four sets of connecting rods 3 are provided, and the positional relationship of the four sets of connecting rods 3 is distributed at equal angles with respect to the movable block 204, which is beneficial for the four sets of connecting rods 3 to be able to move.
In this embodiment, as shown in fig. 2, the support plate 1, the four groups of connecting plates 9 and the four groups of connecting rods 3 are integrally connected, which is beneficial to fixing the support plate 1, the four groups of connecting plates 9 and the four groups of connecting rods 3 and fast assembling of the slope fixing and slow loss facility.
In this embodiment, as shown in fig. 4, the cross section of the clamping block 4 is "L" shaped, and the bottom end of the clamping block 4 is attached to the top end of the joint 5, so that the movable block 204 drives the clamping block 4 to clamp the joint 5 under the action of the connecting rod 3.
The utility model discloses a use method and advantage: when the facility for land reclamation, slope fixation and slow loss is used, the working process is as follows:
as shown in fig. 1, 2, 3 and 4, when in use, a worker inserts the joints 5 into the sliding grooves 6 in the connecting rods 3 completely, then inserts the other three joints 5 into the sliding grooves 6 in the other three connecting rods 3 completely, rotates the connecting rod 201 to drive the rotating block 202 to rotate along the inner wall of the connecting sleeve 203, and drives the moving block 204 to move under the limit of the two sets of limiting rods 205, so that the moving block 204 drives the four sets of clamping blocks 4 to be tightly attached to the four sets of joints 5 in the four sets of connecting rods 3, thereby realizing the quick installation and disassembly of the slope fixing and slow loss facility and facilitating the transportation of the slope fixing and slow loss facility;
when the slope-fixing and loss-relieving facility is assembled, sandy soil is filled in the blank spaces formed by the multiple groups of fixing rods 7, watering is carried out, then stirred grass seeds and a mixture of fertilizer and soil are scattered in the blank spaces, the grass seeds germinate in a short time and grow green plants, and meanwhile grids formed by the multiple groups of fixing rods 7 are attached to the ground, so that the purpose of relieving water and soil loss is achieved.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. The skilled worker in this industry should understand that the present invention is not limited by the above embodiments, and what is described in the above embodiments and the specification is only the preferred embodiments of the present invention, and does not limit the present invention, without departing from the spirit and scope of the present invention, the present invention can also have various changes and improvements, and these changes and improvements all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a land reclamation fixes a slope and loses facility slowly, includes backup pad (1), its characterized in that: the inner wall of the supporting plate (1) is in threaded connection with an adjusting mechanism (2), the outer wall of the adjusting mechanism (2) is fixedly connected with a clamping block (4), and the outer wall of the clamping block (4) is nested with a connecting rod (3);
the inner wall of connecting rod (3) runs through and has connect (5), spout (6) have been seted up with the connection position that connects (5) in connecting rod (3), the outer wall left side fixedly connected with dead lever (7) that connect (5), eleven groups mouth of leaking (8) have been seted up to the outer wall of dead lever (7), the top fixedly connected with connecting plate (9) of connecting rod (3).
2. The facility of claim 1 for land reclamation, slope stabilization and fluid loss reduction, wherein: adjustment mechanism (2) are including threaded rod (201), the outer wall and backup pad (1) inner wall threaded connection of threaded rod (201), the rotatory piece (202) of bottom fixedly connected with of threaded rod (201), the outer wall nestification of rotatory piece (202) has adapter sleeve (203), the bottom fixedly connected with movable block (204) of adapter sleeve (203), the marginal fixedly connected with clamp splice (4) in top of movable block (204), two sets of gag lever post (205) of top fixedly connected with of movable block (204), it is two sets of gag lever post (205) outer wall and adapter sleeve (203) outer wall are kept away from.
3. The facility of claim 2 for land reclamation, slope stabilization and fluid loss reduction, wherein: the movable block (204) forms a lifting structure with the support plate (1) through the rotating block (202), the connecting sleeve (203) and the two sets of limiting rods (205), and the outer walls of the two sets of limiting rods (205) are attached to the inner wall of the support plate (1).
4. The facility of claim 2 for land reclamation, slope stabilization and fluid loss reduction, wherein: the connecting rods (3) are provided with four groups, and the position relation of the four groups of connecting rods (3) is distributed in an equal angle mode relative to the movable block (204).
5. The facility of claim 1 for land reclamation, slope stabilization and fluid loss reduction, wherein: the supporting plate (1), the four groups of connecting plates (9) and the four groups of connecting rods (3) are connected in an integrated manner.
6. The facility of claim 1 for land reclamation, slope stabilization and slow loss of fluid, wherein: the section of the clamping block (4) is L-shaped, and the bottom end of the clamping block (4) is attached to the top end of the joint (5).
CN202221553317.4U 2022-06-21 2022-06-21 Land reclamation slope-fixing slow-flow-loss facility Active CN217601475U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221553317.4U CN217601475U (en) 2022-06-21 2022-06-21 Land reclamation slope-fixing slow-flow-loss facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221553317.4U CN217601475U (en) 2022-06-21 2022-06-21 Land reclamation slope-fixing slow-flow-loss facility

Publications (1)

Publication Number Publication Date
CN217601475U true CN217601475U (en) 2022-10-18

Family

ID=83590437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221553317.4U Active CN217601475U (en) 2022-06-21 2022-06-21 Land reclamation slope-fixing slow-flow-loss facility

Country Status (1)

Country Link
CN (1) CN217601475U (en)

Similar Documents

Publication Publication Date Title
CN112449786B (en) Novel nest type soil fixing and salt removing soil improvement system and construction method thereof
KR20070033301A (en) Cellular Block Of A Plant Community Type
CN211153146U (en) Agricultural irrigation equipment
CN112160330A (en) Garden construction slope restoration method
CN217601475U (en) Land reclamation slope-fixing slow-flow-loss facility
CN219260880U (en) Reservoir dyke slope soil erosion prevention device
CN216087862U (en) Perpendicular garden structure in building gardens
KR200403507Y1 (en) Cellular Block Of A Plant Community Type
CN114766143A (en) Ecological supporting system of hydraulic engineering
CN212223773U (en) Novel hydraulic engineering side slope protective structure
CN212138540U (en) Device for slope greening
CN104737662B (en) A kind of efficient reclamation method of house site
CN219240700U (en) Reynolds protection pad type ecological slope protection structure
CN217267271U (en) Hydraulic brick structure for ecological slope protection
CN210406449U (en) Afforestation plant fixed knot constructs
CN219679313U (en) Greening device for steep side slope
CN220174022U (en) Highway side slope drip irrigation equipment
CN216292456U (en) Irrigation device for preventing water and soil loss
CN218350284U (en) Sloping field soil and water conservation monitoring devices
CN218417327U (en) Rock green-covering fertilizer-keeping device
CN213718911U (en) Growth container convenient to excavate and transplant for lotus cultivated in a pot
CN211982544U (en) Tree planting equipment for garden construction
CN214245588U (en) Hydraulic engineering soil and water conservation structure
CN219410925U (en) Protection structure for preventing soil erosion and water loss
CN218868814U (en) Modular frame is planted to seedling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A type of land improvement slope stabilization and slow flow loss facility

Effective date of registration: 20230407

Granted publication date: 20221018

Pledgee: Bank of Beijing Co.,Ltd. Jinan Branch

Pledgor: Jintian Industrial Development (Shandong) Group Co.,Ltd.

Registration number: Y2023370000068