CN217396539U - Material handling device for building engineering - Google Patents

Material handling device for building engineering Download PDF

Info

Publication number
CN217396539U
CN217396539U CN202220360563.1U CN202220360563U CN217396539U CN 217396539 U CN217396539 U CN 217396539U CN 202220360563 U CN202220360563 U CN 202220360563U CN 217396539 U CN217396539 U CN 217396539U
Authority
CN
China
Prior art keywords
baffle
casing
handle
admittedly
construction engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220360563.1U
Other languages
Chinese (zh)
Inventor
郑梓嘉
许子哲
郑晓锋
赖欢欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Chenguang Construction Co ltd
Original Assignee
Guangdong Chenguang Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Chenguang Construction Co ltd filed Critical Guangdong Chenguang Construction Co ltd
Priority to CN202220360563.1U priority Critical patent/CN217396539U/en
Application granted granted Critical
Publication of CN217396539U publication Critical patent/CN217396539U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a material handling device for building engineering relates to handling technical field, which comprises a housin, the inside sliding connection of casing has the baffle, the upper end of baffle is equipped with the piece admittedly, the upper end of casing is seted up flutedly. In the utility model, the baffle, the handle block, the groove, the bolt pile, the bolt head, the connecting rod, the handle, the spring, the lock hole, the long plate and the pull rod are arranged; promote the piece and drive baffle upward movement, the pulling handle will be tied the head and insert the inside of lockhole, can fix the baffle, prevent that the building material of eminence from taking place the condition that drops when the transport, improved the protectiveness to building material, economic cost has been reduced, two sets of long boards and pull rod can make things convenient for handling device to carry out positive and negative direction and remove simultaneously, need not to turn around the operation, staff's work load has been reduced, work efficiency is improved, and then handling device's practicality has been improved.

Description

Material handling device for building engineering
Technical Field
The utility model relates to a handling device technical field especially relates to a material handling device for building engineering.
Background
Building material is the various materials that use in building engineering, building material is common to be cement and gravel and sand, and in the in-process of building engineering construction, need carry the two, when the material piles up higher, current handling device can't play the guard action to higher material, make its landing in handling easily, lead to building material's waste or damage, economic cost has been increased, simultaneously when the hauling material, need the head that falls to carry out the opposite direction haulage to it, increase staff's work load, work efficiency is reduced, make handling device receive certain limitation when using.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a material handling device for construction engineering.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a material handling device for building engineering, includes the casing, the inside sliding connection of casing has the baffle, the upper end of baffle is equipped with the piece admittedly, the upper end of casing is seted up flutedly, one side of casing is equipped with the peg admittedly, the inside sliding connection of peg admittedly has the tiehead, the one end of tiehead is equipped with the connecting rod admittedly, the one end of connecting rod is equipped with the handle admittedly, be equipped with the spring between tiehead and the peg, the lockhole has all been seted up at one side both ends of baffle, the bottom of casing is equipped with the movable wheel admittedly.
In order to stimulate the carrying device, the utility model discloses the improvement has, one side of casing is rotated and is connected with the long board, one side of long board is equipped with the pull rod admittedly.
In order to facilitate the fixing baffle plate, the utility model discloses the improvement has, tieing head sliding connection in the inside of lockhole, the handle is adorned admittedly in the one end of connecting rod and is kept away from the position of tieing head.
In order to conveniently accomodate the piece, the utility model discloses the improvement has, inside at the recess to piece sliding connection.
For the convenience not equidirectional pulling handling device, the utility model discloses the improvement has, the quantity of long board and pull rod all has two sets ofly, and distributes in the both sides of casing.
In order to fix the long plate, the utility model discloses the improvement has, the outside of casing is provided with fixing device, fixing device is including inserting post and fixed orifices, insert post sliding connection in the inside of long plate, the fixed orifices is seted up in one side of casing.
In order to make the post insert the fixed orifices, the utility model discloses the improvement has, it is the same with the size of fixed orifices to insert the post, the fixed orifices is seted up at one side lower extreme of casing.
Compared with the prior art, the utility model has the advantages and positive effects that,
1. in the utility model, the baffle, the handle block, the groove, the bolt pile, the bolt head, the connecting rod, the handle, the spring, the lock hole, the long plate and the pull rod are arranged; promote the piece and drive baffle upward movement, the pulling handle will be tied the head and insert the inside of lockhole, can fix the baffle, prevent that the building material of eminence from taking place the condition that drops when the transport, improved the protectiveness to building material, economic cost has been reduced, two sets of long boards and pull rod can make things convenient for handling device to carry out positive and negative direction and remove simultaneously, need not to turn around the operation, staff's work load has been reduced, work efficiency is improved, and then handling device's practicality has been improved.
2. The utility model discloses in, through setting up long slab, pull rod, inserting post and fixed orifices, rotate the long slab and make and insert the post and aim at the fixed orifices to make its inside of inserting the fixed orifices, can live the rigidity of long slab, when pulling handling device, can fix the outside at the casing with another a set of long slab, make its normal use that does not influence handling device, improved handling device's flexibility.
Drawings
Fig. 1 is a front view of a material handling device for construction engineering according to the present invention;
fig. 2 is an enlarged view of a portion a in fig. 1 of the material conveying device for construction engineering of the present invention;
fig. 3 is a schematic view of a partial cross-sectional structure of a material handling device for construction engineering according to the present invention;
fig. 4 is an enlarged view of the B position in fig. 3 of the material conveying device for construction engineering of the present invention.
Illustration of the drawings:
1. a housing; 2. a baffle plate; 3. a block is processed; 4. a groove; 5. pile bolting; 6. a bolt head; 7. a connecting rod; 8. a handle; 9. a spring; 10. a lock hole; 11. a movable wheel; 12. a long plate; 13. a pull rod; 14. inserting a column; 15. and (7) fixing holes.
Detailed Description
In order to make the above objects, features and advantages of the present invention more clearly understood, the present invention will be further described with reference to the accompanying drawings and examples. It should be noted that the embodiments and features of the embodiments of the present application may be combined with each other without conflict.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced in other ways than those specifically described herein, and therefore the present invention is not limited to the limitations set forth in the following description of the specific embodiments.
Example one
Referring to fig. 1-4, the present invention provides a technical solution: a material carrying device for building engineering comprises a shell 1, a baffle 2 is connected inside the shell 1 in a sliding mode, a handle block 3 is fixedly arranged at the upper end of the baffle 2, the handle block 3 can be pushed to drive the baffle 2 to move, a groove 4 is formed in the upper end of the shell 1, the handle block 3 is connected inside the groove 4 in a sliding mode, the handle block 3 can be stored inside the groove 4, a stud 5 is fixedly arranged on one side of the shell 1, a stud head 6 is connected inside the stud 5 in a sliding mode, a connecting rod 7 is fixedly arranged at one end of the stud head 6, a handle 8 is fixedly arranged at one end of the connecting rod 7, the position, far away from the stud head 6, of the handle 8 is fixedly arranged at one end of the connecting rod 7, a spring 9 is arranged between the stud head 6 and the stud head 5, lock holes 10 are formed in two ends of one side of the baffle 2, the stud head 6 is connected inside the lock holes 10 in a sliding mode, the connecting rod 7 is driven to move by pulling the handle 8, the bolt head 6 is driven to move to be separated from the inside of the lock holes 10, at this moment, the spring 9 then carries out compression movement, upwards promotes the piece 3 afterwards, makes it drive the baffle 2 upwards move in the inside of casing 1, when the height of baffle 2 is higher than building material alright stop motion, makes the lockhole 10 aim at bolt head 6, loosens the handle 8 afterwards, the spring 9 then carries out the motion of stretching, drives bolt head 6 and slides into the inside of lockhole 10, just fixed the position of baffle 2 this moment, can prevent that the material of eminence from dropping, play good guard action to it.
Referring to fig. 1-3, a movable wheel 11 is fixedly mounted at the bottom of a housing 1, the movable wheel 11 can enable a carrying device to move in multiple directions, one side of the housing 1 is rotatably connected with a long plate 12, the long plate 12 can rotate at one side of the housing 1, a pull rod 13 is fixedly mounted at one side of the long plate 12, the carrying device can be driven to move by pulling the pull rod 13, and two groups of the long plate 12 and the pull rod 13 are distributed at two sides of the housing 1, so that the carrying device can be conveniently pulled in forward and reverse directions, and the flexibility of the carrying device is improved.
Example two
Referring to fig. 1 and 3, a fixing device is disposed outside the housing 1, the fixing device includes an insertion post 14 and a fixing hole 15, the insertion post 14 is slidably connected inside the long plate 12, the fixing hole 15 is disposed at one side of the housing 1, the insertion post 14 and the fixing hole 15 have the same size, the fixing hole 15 is disposed at a lower end of one side of the housing 1, the long plate 12 is rotated to drive the pull rod 13 to move, the long plate 12 is held by the pull rod 13 to pull the carrying device, when the long plate 12 needs to be fixed, the long plate 12 is rotated to align the insertion post 14 with the fixing hole 15 and insert the insertion post into the fixing hole 15, so that the position of the long plate 12 can be fixed, the normal use of the carrying device is not affected, and the flexibility of the carrying device is improved.
The working principle is as follows: when a higher material needs to be protected, the handle 8 is pulled to drive the connecting rod 7 to move, and then the bolt head 6 is driven to move, so that the bolt head is separated from the inside of the lock hole 10, at the moment, the spring 9 is compressed to move, then the handle block 3 is pushed upwards to drive the baffle 2 to move upwards in the shell 1, when the height of the baffle 2 is higher than that of a building material, the baffle can stop moving, so that the lock hole 10 is aligned with the bolt head 6, then the handle 8 is loosened, the spring 9 is stretched to move, the bolt head 6 is driven to slide into the inside of the lock hole 10, at the moment, the position of the baffle 2 is fixed, the material at a high position can be prevented from falling, a good protection effect is achieved, when the carrying device is pulled, the long plate 12 is rotated to drive the pull rod 13 to move, when the pull rod 13 moves to a proper position, the rotation can be stopped, then the pull rod 13 is held to pull the carrying device, when the carrying device needs to be pulled in the opposite direction, firstly one group of long plates 12 are rotated, the inserting columns 14 are aligned to the fixing holes 15 and inserted into the fixing holes 15, at the moment, the positions of one group of long plates 12 are fixed, then the other group of inserting columns 14 are pulled to be separated from the inside of the fixing holes 15, then the other group of long plates 12 are rotated to drive the other group of pull rods 13 to move, when the pull rods 13 move to proper positions, the movement can be stopped, then the carrying device can be pulled, the operation is convenient and simple, turning is not needed during the opposite direction movement, the workload of workers is reduced, the working efficiency is improved, meanwhile, the long plates 12 are fixed on one side of the shell 1, the normal use of the carrying device is not influenced, and the flexibility of the carrying device is improved.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in other forms, and any person skilled in the art may use the above-mentioned technical contents to change or modify the equivalent embodiment into equivalent changes and apply to other fields, but any simple modification, equivalent change and modification made to the above embodiments according to the technical matters of the present invention will still fall within the protection scope of the technical solution of the present invention.

Claims (7)

1. A material handling device for construction engineering, comprising a housing (1), characterized in that: the utility model discloses a lock bolt, including casing (1), inside sliding connection of casing (1) has baffle (2), the upper end of baffle (2) is equipped with admittedly, the upper end of casing (1) is seted up fluted (4), one side of casing (1) is equipped with spud pile (5) admittedly, the inside sliding connection of spud pile (5) has tieing head (6), the one end of tieing head (6) is equipped with connecting rod (7) admittedly, the one end of connecting rod (7) is equipped with handle (8) admittedly, spring (9) are equipped with between tieing head (6) and spud pile (5), lockhole (10) have all been seted up at one side both ends of baffle (2), movable pulley (11) are equipped with admittedly to the bottom of casing (1).
2. The material conveyance device for construction engineering according to claim 1, wherein: one side of the shell (1) is rotatably connected with a long plate (12), and one side of the long plate (12) is fixedly provided with a pull rod (13).
3. The material conveyance device for construction engineering according to claim 1, wherein: the bolt head (6) is connected inside the lock hole (10) in a sliding mode, and the handle (8) is fixedly arranged at the position, far away from the bolt head (6), of one end of the connecting rod (7).
4. The material conveying device for construction engineering according to claim 1, characterized in that: the handle block (3) is connected inside the groove (4) in a sliding mode.
5. The material conveying device for construction engineering according to claim 2, characterized in that: the number of the long plates (12) and the number of the pull rods (13) are two, and the long plates and the pull rods are distributed on two sides of the shell (1).
6. The material conveyance device for construction engineering according to claim 2, wherein: the outside of casing (1) is provided with fixing device, fixing device is including inserting post (14) and fixed orifices (15), insert post (14) sliding connection in the inside of long board (12), one side at casing (1) is seted up in fixed orifices (15).
7. The material conveying device for construction engineering according to claim 6, characterized in that: the size of the inserted column (14) is the same as that of the fixing hole (15), and the fixing hole (15) is formed in the lower end of one side of the shell (1).
CN202220360563.1U 2022-02-22 2022-02-22 Material handling device for building engineering Active CN217396539U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220360563.1U CN217396539U (en) 2022-02-22 2022-02-22 Material handling device for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220360563.1U CN217396539U (en) 2022-02-22 2022-02-22 Material handling device for building engineering

Publications (1)

Publication Number Publication Date
CN217396539U true CN217396539U (en) 2022-09-09

Family

ID=83135851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220360563.1U Active CN217396539U (en) 2022-02-22 2022-02-22 Material handling device for building engineering

Country Status (1)

Country Link
CN (1) CN217396539U (en)

Similar Documents

Publication Publication Date Title
CN201843738U (en) Heavy-object power storage device
CN217396539U (en) Material handling device for building engineering
CN211395395U (en) T-beam hogging moment tensioning device for bridge construction
CN210030178U (en) Artificial ecological floating island
CN207360375U (en) A kind of constructing tunnel rubble transport vehicle
CN109570396A (en) A kind of automatic charging digital control steel bar flexural center
CN211945936U (en) Pipeline hoist and mount portal frame of tunnel utility tunnel construction usefulness
CN203684741U (en) Movable locking device of stage panel
CN204024063U (en) A kind of sand pond dustproof construction of job site
CN110733914A (en) type linkage whole-layout equipment for processing luggage fabric
CN113666027A (en) Construction waste classified storage and transportation device
CN210258503U (en) Reinforcing steel bar placing vehicle
CN210941803U (en) Aerated brick conveyor who facilitates use
CN204608779U (en) The pile driver of building site
CN209367281U (en) A kind of reinforced mesh gripping body
CN207092086U (en) A kind of punching piling machine being readily transported
CN220723257U (en) Assembled elevator structure that installs additional
CN212270823U (en) Dykes and dams heightening device for flood control
CN212951861U (en) Environmental protection brick handling device for building
CN203473790U (en) Magnetic material throwing mechanism
CN212580725U (en) Perforated brick gripping apparatus convenient to transport and build by laying bricks or stones function
CN219326509U (en) Bucket convenient to blanking
CN214021911U (en) Dolomite belt conveyor with screening structure
CN212537256U (en) Geological disaster field detection pile
CN214818499U (en) Material frame for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant