CN207360375U - A kind of constructing tunnel rubble transport vehicle - Google Patents
A kind of constructing tunnel rubble transport vehicle Download PDFInfo
- Publication number
- CN207360375U CN207360375U CN201721058265.2U CN201721058265U CN207360375U CN 207360375 U CN207360375 U CN 207360375U CN 201721058265 U CN201721058265 U CN 201721058265U CN 207360375 U CN207360375 U CN 207360375U
- Authority
- CN
- China
- Prior art keywords
- fixed
- car body
- bearing
- rubble
- bearing plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Underground Or Underwater Handling Of Building Materials (AREA)
Abstract
It the utility model is related to a kind of transport vehicle, more particularly to a kind of constructing tunnel rubble transport vehicle.The big and constructing tunnel rubble transport vehicle of convenient transport blowing safety the technical problem to be solved by the present invention is to provide a kind of capacity.In order to solve the above-mentioned technical problem, the utility model provides such a constructing tunnel rubble transport vehicle, includes car body, wheel, the first bearing bar, the second bearing bar, discharge mechanism, shakes off mechanism, leaning device and bearing plate;Car body top is provided with feed inlet, and wheel is fixed in car body outer bottom;First bearing bar is fixed in the one end of car body inner bottom surface, and the second bearing bar is fixed in the other end of car body inner bottom surface;Discharge mechanism for pouring out rubble is fixed in car body one side wall.The utility model has reached capacity greatly and the effect of convenient transport blowing safety.
Description
Technical field
It the utility model is related to a kind of transport vehicle, more particularly to a kind of constructing tunnel rubble transport vehicle.
Background technology
Tunnel is to be built in underground or underwater or in massif, places an iron railway or build highway what is passed through for motor vehicles
Building.Mountain tunnel, submerged tunnel and city tunnel three major types can be divided into according to its position.To reduce the distance and avoiding
Steep gradient and passed through under the mountain ridge or hills be known as mountain tunnel;For river crossing or straits under river or seabed passes through
Referred to as submerged tunnel;It is known as city tunnel by metropolitan needs and what is passed through in Urban Underground to adapt to railway.This three classes
It is mountain tunnel to be built in tunnel most.
When mountain tunnel is constructed, it will usually produce the sillars such as rubble, in order to avoid rubble hinders constructing tunnel, therefore need
Rubble is transported out of into tunnel.
The rubble that cutting tunnel produces is large number of, it is necessary to be transported using transport vehicle, and existing common transport vehicle exists
Blowing inconvenience when rubble being poured out rubble behind tunnel is left in transport, and worker is easily injured by a crashing object in blowing by in-car rubble, in order to
Ensure the personal safety of worker, therefore there is an urgent need for research and develop the constructing tunnel rubble transport vehicle of a kind of convenient transport and blowing safety.
Utility model content
(1) technical problems to be solved
The utility model is easily lacked for blowing inconvenience when overcoming the rubble to pour out transport vehicle, worker by what in-car rubble injured by a crashing object
Point, and the constructing tunnel rubble of convenient transport blowing safety big the technical problem to be solved by the present invention is to provide a kind of capacity
Transport vehicle.
(2) technical solution
In order to solve the above-mentioned technical problem, the utility model provides such a constructing tunnel rubble transport vehicle, including
There are car body, wheel, the first bearing bar, the second bearing bar, discharge mechanism, shake off mechanism, leaning device and bearing plate;Car body top
Feed inlet is provided with, wheel is fixed in car body outer bottom;First bearing bar is fixed in the one end of car body inner bottom surface, the second bearing bar
It is fixed in the other end of car body inner bottom surface;Discharge mechanism for pouring out rubble is fixed in car body one side wall, and bearing plate is affixed
At the top of the first bearing bar and the second bearing bar, shake off mechanism and be fixed in bearing plate;Leaning device is fixed in another side wall of car body,
And output terminal is connected with bearing plate.
Preferably, discharge mechanism includes baffle and retaining ring;Car body one side wall is provided with the discharge port poured out for rubble, and goes out
Catching groove is further opened with above material mouth;Baffle is hinged with one sidepiece of car body, and is located at discharge port bottom;Retaining ring is with baffle away from car body
Side is hinged;Retaining ring coordinates with catching groove for inserting.
Preferably, shake off mechanism and include bearing frame, connecting rod, cam, motor, roller, fixed block, elastic component, catch bar
With shake off plate;Pilot hole is offered on bearing plate, bearing frame is fixed in bearing plate bottom surface, and connecting rod is fixed in one sidepiece of bearing frame,
Motor is fixed in connecting rod, and cam is sequentially connected with motor output end;Shake off plate and be positioned over load-bearing plate top surface, catch bar is through guiding
Hole is fixed in plate, and roller is fixed in catch bar bottom, and roller is rolled with cam and connected;Fixed block is fixed in catch bar,
And between bearing plate and roller;Elastic component one end is fixed in bearing plate, and the other end is consolidated around catch bar with fixed block
Connect.
Preferably, leaning device includes attachment fastener, fixed pull ring, fixed pulley and bracing wire;Fixed pulley is fixed in car body
At the top of one side wall, it is outer away from discharge mechanism one side wall that attachment fastener is vertically fixed in car body;Bracing wire one end is fixed in
Bearing plate, the other end is affixed around fixed pulley and fixed pull ring, fixed pull ring and attachment fastener snapping.
Preferably, which has further included electric pushrod, and the second bearing bar is replaced with electronic push away
Bar.
Operation principle:When needing rubble in tunnel to be transported using the transport vehicle, transport vehicle is moved to tunnel
Interior, rubble is put into car body and is temporarily stored by worker by feed inlet, is then moved transport vehicle and is left tunnel, is moved to and puts
After putting the place of rubble, worker opens discharge mechanism, and rubble pours out car body by discharge mechanism, but since rubble excessively can not be complete
When portion pours out, worker pulls leaning device, and leaning device drives bearing plate to tilt, and bearing plate produces slope after tilting leads to rubble
Inclined bearing plate is crossed to tumble out of car body, but still some rubbles are stuck in car body and can not tumble after generation inclination, because
This worker, which starts, shakes off mechanism, shakes off mechanism and rubble is shaken, rubble is produced gap by shaking, so that more smoothly
Tumbled out of car body, haveed the function that more easily to shake off rubble.
Because discharge mechanism includes baffle and retaining ring;Car body one side wall is provided with the discharge port poured out for rubble, and discharges
Catching groove is further opened with above mouthful;Baffle is hinged with one sidepiece of car body, and is located at discharge port bottom;Retaining ring is with baffle away from car body one
Side is hinged;Retaining ring coordinates with catching groove for inserting;When needing that rubble is poured out car body by discharge mechanism, worker opens retaining ring,
Baffle is separated with car body, so as to open discharge port, rubble is poured out by discharge port, when rubble falls out of car body
After the completion of falling, baffle is blocked discharge port by worker, and fastener is buckled on catching groove, baffle is fixed in discharge port, from
And discharge port is blocked, prepare for transport next time.
Because shake off mechanism to include bearing frame, connecting rod, cam, motor, roller, fixed block, elastic component, catch bar and tremble
Fall plate;Pilot hole is offered on bearing plate, bearing frame is fixed in bearing plate bottom surface, and connecting rod is fixed in one sidepiece of bearing frame, motor
Connecting rod is fixed in, cam is sequentially connected with motor output end;Shake off plate and be positioned over load-bearing plate top surface, catch bar is consolidated through pilot hole
It is connected to plate, roller is fixed in catch bar bottom, and roller is rolled with cam and connected;Fixed block is fixed in catch bar, and position
Between bearing plate and roller;Elastic component one end is fixed in bearing plate, and the other end is affixed around catch bar and fixed block;When
Rubble can not be successfully from discharge port tumble when, start motor, motor drive cam rotation so that drive catch bar to shake off plate into
Row promotes, and shakes off plate and is subject to the promotion of catch bar the gap between rubble is changed, so as to reach so as to shake off to rubble
To the effect that rubble is shaken off out to car body from bearing plate.
Because leaning device includes attachment fastener, fixed pull ring, fixed pulley and bracing wire;Fixed pulley is fixed in car body side
At the top of wall, it is outer away from discharge mechanism one side wall that attachment fastener is vertically fixed in car body;Bracing wire one end is fixed in load-bearing
Plate, the other end is affixed around fixed pulley and fixed pull ring, fixed pull ring and attachment fastener snapping;When rubble needs to pour out car body
When, worker pulls fixed pull ring, fixed pull ring is pulled bracing wire, drives bearing plate to be tilted along hinge joint by bracing wire, works as inclination
To after certain angle, start worker and be buckled in fixed pull ring on the attachment fastener of lower section, so that the gradient of fixed bearing plate, makes
Rubble can tumble out car body by inclined bearing plate, and when rubble, which falls, to be finished, worker selects the attachment fastener button of top
Firmly fixed pull ring, makes bearing plate return balance.
Because the constructing tunnel rubble transport vehicle has further included electric pushrod, the second bearing bar is replaced with into electric pushrod;
When worker uses fixed pull ring, it is difficult to pull because the weight of rubble is excessive, is done manual work at the same time by electric pushrod and worker, make to hold
Weight plate tilts, and reduces the operating pressure of worker.
The control mode of the utility model is controlled by manually starting and turning off the switch, the wiring diagram of dynamical element with
The offer of power supply belongs to the common knowledge of this area, and the utility model is mainly used to protect mechanical device, so this practicality
It is new not to be explained control mode and wiring arrangement.
(3) beneficial effect
The utility model has reached the effect of the rubble of convenience in transport constructing tunnel generation, and rubble is poured out by discharge mechanism
Car body, leaning device, which can enable bearing plate produce angle of inclination, makes rubble pour out car body along bearing plate, shakes off mechanism energy
Enough prevent rubble from being blocked during tumbling, car body can not be poured out, using shaking off mechanism by space change between rubble,
Rubble is set more easily to tumble discharging out of car body, worker operates away from discharge mechanism, ensure that security during blowing, each machine
Structure linkage makes practicality be strengthened, the more standby ability for completing transport crushed stones.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the utility model.
Fig. 2 is the main structure diagram of the utility model discharge mechanism.
Fig. 3 is the main structure diagram that the utility model shakes off mechanism.
Fig. 4 is the main structure diagram of the utility model leaning device.
Fig. 5 is second of main structure diagram of the utility model.
Mark in attached drawing for:1- car bodies, 2- wheels, the first bearing bars of 3-, the second bearing bars of 4-, 5- discharge mechanisms, 51-
Baffle, 52- discharge ports, 53- retaining rings, 54- catching grooves, 6- shake off mechanism, 61- bearing frames, 62- connecting rods, 63- cams, 64- motors,
65- rollers, 66- fixed blocks, 67- elastic components, 68- catch bars, 69- pilot holes, 610- shake off plate, 7- leaning devices, and 71- is fixed
Fastener, 72- fixed pull rings, 73- fixed pulleys, 74- bracing wires, 8- feed inlets, 9- bearing plates, 10- electric pushrods.
Embodiment
The utility model is further described with reference to the accompanying drawings and examples.
Embodiment 1
A kind of constructing tunnel rubble transport vehicle, as shown in Figs. 1-5, includes car body 1, wheel 2, the first bearing bar 3, second
Bearing bar 4, discharge mechanism 5, shake off mechanism 6, leaning device 7 and bearing plate 9;The top of car body 1 is provided with feed inlet 8, and wheel 2 is affixed
In 1 outer bottom of car body;First bearing bar 3 is fixed in the one end of 1 inner bottom surface of car body, and the second bearing bar 4 is fixed in bottom in car body 1
The other end in face;Discharge mechanism 5 for pouring out rubble is fixed in 1 one side wall of car body, and bearing plate 9 is fixed in the first bearing bar
3 and the top of the second bearing bar 4, shake off mechanism 6 and be fixed in bearing plate 9;Leaning device 7 is fixed in 1 another side wall of car body, and exports
End is connected with bearing plate 9.
Discharge mechanism 5 includes baffle 51 and retaining ring 53;1 one side wall of car body is provided with the discharge port 52 poured out for rubble, and
The top of discharge port 52 is further opened with catching groove 54;Baffle 51 is hinged with 1 one sidepiece of car body, and is located at 52 bottom of discharge port;Retaining ring 53
It is hinged with baffle 51 away from 1 side of car body;Retaining ring 53 coordinates with catching groove 54 for inserting.
Shake off mechanism 6 and include bearing frame 61, connecting rod 62, cam 63, motor 64, roller 65, fixed block 66, elastic component
67th, catch bar 68 and plate 610 is shaken off;Pilot hole 69 is offered on bearing plate 9, bearing frame 61 is fixed in 9 bottom surface of bearing plate, connecting rod
62 are fixed in 61 1 sidepiece of bearing frame, and motor 64 is fixed in connecting rod 62, and cam 63 is sequentially connected with 64 output terminal of motor;Shake off plate
610 are positioned over 9 top surface of bearing plate, and catch bar 68 is fixed in plate 610 through pilot hole 69, and roller 65 is fixed in catch bar 68
Bottom, and roller 65 is rolled with cam 63 and connected;Fixed block 66 is fixed in catch bar 68, and positioned at bearing plate 9 and roller 65 it
Between;67 one end of elastic component is fixed in bearing plate 9, and the other end is affixed around catch bar 68 and fixed block 66.
Leaning device 7 includes attachment fastener 71, fixed pull ring 72, fixed pulley 73 and bracing wire 74;Fixed pulley 73 is fixed in
At the top of 1 one side wall of car body, it is outer away from 5 one side wall of discharge mechanism that attachment fastener 71 is vertically fixed in car body 1;Bracing wire 74 1
End is fixed in bearing plate 9, and the other end is affixed around fixed pulley 73 and fixed pull ring 72, fixed pull ring 72 and attachment fastener 71
Snapping.
The constructing tunnel rubble transport vehicle has further included electric pushrod 10, and the second bearing bar 4 is replaced with electric pushrod 10.
Operation principle:When needing rubble in tunnel to be transported using the transport vehicle, transport vehicle is moved to tunnel
Interior, rubble is put into car body 1 and is temporarily stored by worker by feed inlet 8, is then moved transport vehicle and is left tunnel, is moved to
Behind the place for placing rubble, worker opens discharge mechanism 5, and rubble pours out car body 1 by discharge mechanism 5, but since rubble is excessive
When can not all pour out, worker pulls leaning device 7, and leaning device 7 drives bearing plate 9 to tilt, and bearing plate 9 produces oblique after tilting
Slope makes rubble be tumbled by inclined bearing plate 9 out of car body 1 to go out, but still some rubbles are stuck in car body 1 after generation inclination
It is interior to tumble, thus worker start shake off mechanism 6, shake off mechanism 6 and rubble shaken, make rubble pass through shake produce between
Gap, so as to more smoothly tumble out of car body 1, has haveed the function that more easily to shake off rubble.
Because discharge mechanism 5 includes baffle 51 and retaining ring 53;1 one side wall of car body is provided with the discharge port poured out for rubble
52, and the top of discharge port 52 is further opened with catching groove 54;Baffle 51 is hinged with 1 one sidepiece of car body, and is located at 52 bottom of discharge port;Button
Ring 53 is hinged with baffle 51 away from 1 side of car body;Retaining ring 53 coordinates with catching groove 54 for inserting;When need by discharge mechanism 5 will
When rubble pours out car body 1, worker opens retaining ring 53, baffle 51 is separated with car body 1, so as to open discharge port 52, makes broken
Stone can be poured out by discharge port 52, and after the completion of rubble drops out of car body 1, baffle 51 is blocked discharge port 52 by worker, and
Fastener is buckled on catching groove 54, baffle 51 is fixed in discharge port 52, so as to block discharge port 52, is done for transport next time
Prepare.
Because shaking off mechanism 6 includes bearing frame 61, connecting rod 62, cam 63, motor 64, roller 65, fixed block 66, elasticity
Part 67, catch bar 68 and shake off plate 610;Pilot hole 69 is offered on bearing plate 9, bearing frame 61 is fixed in 9 bottom surface of bearing plate, even
Bar 62 is fixed in 61 1 sidepiece of bearing frame, and motor 64 is fixed in connecting rod 62, and cam 63 is sequentially connected with 64 output terminal of motor;Shake off
Plate 610 is positioned over 9 top surface of bearing plate, and catch bar 68 is fixed in plate 610 through pilot hole 69, and roller 65 is fixed in catch bar
68 bottoms, and roller 65 is rolled with cam 63 and connected;Fixed block 66 is fixed in catch bar 68, and positioned at bearing plate 9 and roller 65
Between;67 one end of elastic component is fixed in bearing plate 9, and the other end is affixed around catch bar 68 and fixed block 66;When rubble without
When method is smoothly tumbled from discharge port 52, start motor 64, motor 64 is rotated with moving cam 63, so as to drive catch bar 68 to shaking off
Plate 610 is promoted, and is shaken off plate 610 and is subject to the promotion of catch bar 68 to send out the gap between rubble so as to shake off to rubble
It is raw to change, so as to reach the effect that rubble is shaken off out to car body 1 from bearing plate 9.
Because leaning device 7 includes attachment fastener 71, fixed pull ring 72, fixed pulley 73 and bracing wire 74;Fixed pulley 73 is solid
It is connected at the top of 1 one side wall of car body, it is outer away from 5 one side wall of discharge mechanism that attachment fastener 71 is vertically fixed in car body 1;Bracing wire
74 one ends are fixed in bearing plate 9, and the other end is affixed around fixed pulley 73 and fixed pull ring 72, fixed pull ring 72 and fixing buckle
71 snapping of part;When rubble needs to pour out car body 1, worker pulls fixed pull ring 72, fixed pull ring 72 is pulled bracing wire 74, passes through
Bracing wire 74 drives bearing plate 9 to be tilted along hinge joint, after being tilted a certain angle, starts worker and fixed pull ring 72 is buckled in lower section
Attachment fastener 71 on so that the gradient of fixed bearing plate 9, enables rubble to tumble out car body by inclined bearing plate 9
1, when rubble, which falls, to be finished, worker selects the attachment fastener 71 of top to clasp fixed pull ring 72, bearing plate 9 is returned balance.
Because the constructing tunnel rubble transport vehicle has further included electric pushrod 10, the second bearing bar 4 is replaced with into electronic push away
Bar 10;When worker uses fixed pull ring 72, it is difficult to pull because the weight of rubble is excessive, by electric pushrod 10 and worker at the same time
Workmanship, tilts bearing plate 9, reduces the operating pressure of worker.
The control mode of the utility model is controlled by manually starting and turning off the switch, the wiring diagram of dynamical element with
The offer of power supply belongs to the common knowledge of this area, and the utility model is mainly used to protect mechanical device, so this practicality
It is new not to be explained control mode and wiring arrangement.
Embodiment described above only expresses the preferred embodiment of the utility model, its description is more specific and detailed,
But it should not be interpreted as limiting the scope of the present invention.It should be pointed out that for the common of this area
For technical staff, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these are all
Belong to the scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (5)
- A kind of 1. constructing tunnel rubble transport vehicle, it is characterised in that include car body (1), wheel (2), the first bearing bar (3), Second bearing bar (4), discharge mechanism (5), shake off mechanism (6), leaning device (7) and bearing plate (9);It is provided with the top of car body (1) Feed inlet (8), wheel (2) are fixed in car body (1) outer bottom;First bearing bar (3) is fixed in one end of car body (1) inner bottom surface Portion, the second bearing bar (4) are fixed in the other end of car body (1) inner bottom surface;Discharge mechanism (5) for pouring out rubble is fixed in Car body (1) one side wall, bearing plate (9) are fixed at the top of the first bearing bar (3) and the second bearing bar (4), and it is affixed to shake off mechanism (6) In bearing plate (9);Leaning device (7) is fixed in car body (1) another side wall, and output terminal is connected with bearing plate (9).
- 2. a kind of constructing tunnel rubble transport vehicle according to claim 1, it is characterised in that discharge mechanism (5) includes Baffle (51) and retaining ring (53);Car body (1) one side wall is provided with the discharge port (52) poured out for rubble, and above discharge port (52) also Offer catching groove (54);Baffle (51) is hinged with (1) one sidepiece of car body, and is located at discharge port (52) bottom;Retaining ring (53) and gear Plate (51) is hinged away from car body (1) side;Retaining ring (53) coordinates with catching groove (54) for inserting.
- 3. a kind of constructing tunnel rubble transport vehicle according to claim 2, it is characterised in that shake off mechanism (6) and include Bearing frame (61), connecting rod (62), cam (63), motor (64), roller (65), fixed block (66), elastic component (67), catch bar (68) and plate (610) is shaken off;Pilot hole (69) is offered on bearing plate (9), bearing frame (61) is fixed in bearing plate (9) bottom surface, Connecting rod (62) is fixed in (61) one sidepiece of bearing frame, and motor (64) is fixed in connecting rod (62), and cam (63) is exported with motor (64) End is sequentially connected;Shake off plate (610) and be positioned over bearing plate (9) top surface, catch bar (68) is fixed in through pilot hole (69) Plate (610), roller (65) is fixed in catch bar (68) bottom, and roller (65) is rolled with cam (63) and connected;Fixed block (66) Catch bar (68) is fixed in, and between bearing plate (9) and roller (65);Elastic component (67) one end is fixed in bearing plate (9), the other end is affixed around catch bar (68) and fixed block (66).
- 4. a kind of constructing tunnel rubble transport vehicle according to claim 3, it is characterised in that leaning device (7) includes Attachment fastener (71), fixed pull ring (72), fixed pulley (73) and bracing wire (74);Fixed pulley (73) is fixed in car body (1) one side wall Top, attachment fastener (71) are vertically fixed in car body (1) outside away from discharge mechanism (5) one side wall;Bracing wire (74) one end Portion is fixed in bearing plate (9), and the other end is affixed around fixed pulley (73) and fixed pull ring (72), and fixed pull ring (72) is with fixing Fastener (71) snapping.
- 5. a kind of constructing tunnel rubble transport vehicle according to claim 4, it is characterised in that the constructing tunnel rubble transports Car has further included electric pushrod (10), and the second bearing bar (4) is replaced with electric pushrod (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721058265.2U CN207360375U (en) | 2017-08-23 | 2017-08-23 | A kind of constructing tunnel rubble transport vehicle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721058265.2U CN207360375U (en) | 2017-08-23 | 2017-08-23 | A kind of constructing tunnel rubble transport vehicle |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207360375U true CN207360375U (en) | 2018-05-15 |
Family
ID=62422333
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721058265.2U Expired - Fee Related CN207360375U (en) | 2017-08-23 | 2017-08-23 | A kind of constructing tunnel rubble transport vehicle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207360375U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108891619A (en) * | 2018-08-21 | 2018-11-27 | 福建中资新能源动力制造有限公司 | Transport vehicle and car body support mechanism |
CN110667675A (en) * | 2019-11-08 | 2020-01-10 | 广西建工集团冶金建设有限公司 | Raw materials conveyer for building engineering |
CN110755668A (en) * | 2019-11-28 | 2020-02-07 | 衡阳丰联精细化工有限公司 | Dangerous waste treatment device |
-
2017
- 2017-08-23 CN CN201721058265.2U patent/CN207360375U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108891619A (en) * | 2018-08-21 | 2018-11-27 | 福建中资新能源动力制造有限公司 | Transport vehicle and car body support mechanism |
CN108891619B (en) * | 2018-08-21 | 2024-03-22 | 福建中资新能源动力制造有限公司 | Carrier vehicle and vehicle body bearing mechanism |
CN110667675A (en) * | 2019-11-08 | 2020-01-10 | 广西建工集团冶金建设有限公司 | Raw materials conveyer for building engineering |
CN110755668A (en) * | 2019-11-28 | 2020-02-07 | 衡阳丰联精细化工有限公司 | Dangerous waste treatment device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207360375U (en) | A kind of constructing tunnel rubble transport vehicle | |
CN203296813U (en) | Winze device with automatic ore drawing and blockage preventing functions | |
CN205894083U (en) | A material promotion transfer device for foundation ditch excavation dregs | |
CN106629134A (en) | Underground mine continuous ore drawing equipment | |
CN214521131U (en) | Powder feeding device for concrete mixing plant | |
CN106861874B (en) | A kind of traffic route, which is built, uses lithotripsy apparatus | |
CN213160977U (en) | Commercial concrete waste recycling system | |
CN206254333U (en) | A kind of concrete material feeding device | |
JP2007144255A (en) | Crusher | |
CN207154108U (en) | A kind of grains of sand high throughput screening devices for building | |
CN207329831U (en) | Coal is unloaded device more than a kind of tower Sampling Machine of automobile coal as received | |
CN211755613U (en) | Steel ball supplementing device of cement ball mill | |
CN212759574U (en) | Material screening machine of glass crusher | |
CN214554056U (en) | Pug ball mill for ceramic manufacture | |
CN110104399B (en) | Hopper conveying equipment for circularly conveying materials to high place | |
CN107166955A (en) | A kind of VN alloy automatic charging system and loading method | |
CN204689155U (en) | Concrete waste material reclaims transferring device | |
CN210558128U (en) | Buffering blanking mechanism of slagging-off machine | |
CN204238219U (en) | Concreting distributing machine | |
CN209289521U (en) | A kind of mixed mud rabbling mechanism | |
CN210213835U (en) | Hopper transportation equipment for circularly conveying materials to high position | |
CN103421913A (en) | Steel slag full-roller treatment technology and slag removing device | |
CN208453999U (en) | A kind of sandy soil raw material feeding apparatus | |
CN205948472U (en) | Sand and stone separator | |
CN106282448B (en) | A kind of blast furnace granulated slag Full-automatic picking slag method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180515 Termination date: 20180823 |
|
CF01 | Termination of patent right due to non-payment of annual fee |