CN217353843U - Erect hard isolating device of slot-in type railway line fast - Google Patents

Erect hard isolating device of slot-in type railway line fast Download PDF

Info

Publication number
CN217353843U
CN217353843U CN202221187948.9U CN202221187948U CN217353843U CN 217353843 U CN217353843 U CN 217353843U CN 202221187948 U CN202221187948 U CN 202221187948U CN 217353843 U CN217353843 U CN 217353843U
Authority
CN
China
Prior art keywords
connecting rod
rod
rods
vertical
railway line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221187948.9U
Other languages
Chinese (zh)
Inventor
安茂强
田海彬
何杨
邢全利
李朋
赵以斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway No 12 Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway No 12 Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, First Engineering Co Ltd of China Railway No 12 Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN202221187948.9U priority Critical patent/CN217353843U/en
Application granted granted Critical
Publication of CN217353843U publication Critical patent/CN217353843U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model provides a fast erection slot type hard isolation device for a railway line, which belongs to the technical field of railway construction devices and comprises two groups of shielding assemblies which are respectively arranged at two sides of the railway line and are longitudinally arranged along the railway line, wherein each group of shielding assemblies comprises a base, a vertical rod, a longitudinal rod, a baffle, a connecting rod and an oblique rod; a plurality of vertical rods are inserted on the top surface of the base along the longitudinal direction; the longitudinal rods comprise inner longitudinal rods and outer longitudinal rods, and the inner longitudinal rods are vertically connected with the inner sides of the vertical rods; the baffle is arranged between two adjacent vertical rods; go up connecting rod, well connecting rod and lower connecting rod setting in the outside of montant, the equal perpendicular to baffle of connecting rod, last connecting rod and the lower connecting rod in the adjacent two sets of connecting rods are connected through the down tube that alternately sets up, and well connecting rod in the multiunit connecting rod passes through the outside vertical pole and connects. The device has simple structure and reasonable stress, can create safe construction environment, and ensures the construction safety and the construction rapidity near a railway line.

Description

Erect hard isolating device of slot-in type railway line fast
Technical Field
The utility model belongs to the technical field of railway construction equipment, especially, relate to a erect hard isolating device of slot-in type railway line fast.
Background
At present, railway line stations face increasing requirements for reconstruction and extension, construction near railway lines needs to follow the management and control of railway systems, and construction time is reasonably arranged. However, in general, the construction window period near the railway line is very short, and it is difficult to satisfy the construction schedule of the construction department, resulting in delay of the construction progress. Therefore, it is necessary to isolate the relationship between the railway line and the construction site in a reasonable manner, thereby creating a safe construction environment and solving the limitation of the railway window period.
When the railway line is constructed at a railway station or near a railway line, adverse factors such as overuse of machines and tools, personnel mobility, construction product splashing and the like can cause unsafe train operation and unsafe constructors and machinery. In order to ensure the safety of personnel and machines in a construction site, a hard isolation device is required to be arranged near a railway line.
SUMMERY OF THE UTILITY MODEL
The utility model provides a erect hard isolating device of slot-in type railway line fast, its simple structure, atress are reasonable, can establish safe construction environment, guarantee near railway line construction safety and construction rapidity to all parts are all kinds of construction utensil of often using in the construction, have advantages such as detachability, construction rapidity, cyclic utilization nature, can effectively practice thrift construction cost and engineering time.
The utility model provides a fast erection slot type hard isolating device for a railway line, which comprises two groups of shielding assemblies which are respectively arranged at two sides of the railway line and are longitudinally arranged along the railway line, wherein each group of shielding assemblies comprises a base, a vertical rod, a longitudinal rod, a baffle, a connecting rod and an oblique rod; a plurality of vertical rods are inserted on the top surface of the base along the longitudinal direction; the longitudinal rods comprise inner longitudinal rods and outer longitudinal rods, and the inner longitudinal rods are vertically connected with the inner sides of the vertical rods; the baffle is arranged between two adjacent vertical rods; go up connecting rod, well connecting rod and lower connecting rod setting in the outside of montant, the equal perpendicular to baffle of connecting rod, the last connecting rod in two sets of adjacent connecting rods is connected through the down tube of cross arrangement with lower connecting rod, and well connecting rod in the multiunit connecting rod passes through the outside vertical pole to be connected.
Furthermore, every group shelters from the subassembly equidistant extension montant that is provided with, connects through horizontal vaulting pole between the both sides extension montant.
Furthermore, the lengthened vertical rods are formed by lengthening the vertical rods at preset intervals.
Furthermore, an inserting rod is fixed on the top surface of the base, a slot of a hollow structure is formed in the bottom end of the vertical rod, and the slot is matched with the inserting rod.
Furthermore, the inner side longitudinal rod and the vertical rod, the connecting rod and the vertical rod, the upper connecting rod and the inclined rod, the lower connecting rod and the inclined rod, the middle connecting rod and the outer side longitudinal rod and the lengthened vertical rod and the transverse support rod are connected by the bowl buckle joint.
Further, the base is the I-steel, and montant, vertical pole, connecting rod and down tube are the steel pipe, and the baffle is various steel sheet.
Furthermore, the base is formed by transversely splicing a plurality of I-shaped steels.
The utility model discloses following beneficial effect has:
the hard isolation device for quickly erecting the slot type railway line is simple in structure, reasonable in stress, quick and convenient to construct, high in engineering application cost performance, capable of well achieving isolation between a construction site and the railway line, creating a safe construction environment, guaranteeing construction safety and construction rapidity near the railway line, effectively eliminating potential safety hazards caused by the fact that machines and tools use adverse factors such as overrun, personnel flow and construction product splashing, and accordingly guaranteeing safety of both railway operation and construction personnel near the railway. And all parts are various construction appliances frequently used in construction, have the advantages of detachability, construction rapidity, recycling and the like, and can effectively save construction cost and construction time.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the prior art descriptions will be briefly described below, it is obvious that the drawings in the following descriptions are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic structural view of a slot-in type railway line hard isolation device for rapid erection;
FIG. 2 is a front view of a fast setting slot hard isolation device for a railway line;
FIG. 3 is a side view of a quick set up slotted railway line hard isolation device;
FIG. 4 is a state diagram of the vertical rod not being inserted into the insertion rod;
FIG. 5 is a state diagram of the vertical rod and the insertion rod;
fig. 6 is a partially enlarged view of fig. 5.
Icon: base 1, montant 2, vertical pole 3, baffle 4, connecting rod 5, down tube 6, horizontal vaulting pole 7, peg graft pole 8.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The embodiment provides a fast erection slot type hard isolating device for a railway line, which comprises two groups of shielding assemblies, wherein the two groups of shielding assemblies are respectively arranged on two sides of the railway line and are longitudinally arranged along the railway line, and each group of shielding assemblies comprises a base 1, a vertical rod 2, a longitudinal rod 3, a baffle 4, a connecting rod 5 and an oblique rod 6; a plurality of vertical rods 2 are inserted on the top surface of the base 1 along the longitudinal direction; the longitudinal rods 3 comprise inner longitudinal rods and outer longitudinal rods, and the inner longitudinal rods are vertically connected with the inner sides of the vertical rods 2; the baffle 4 is arranged between two adjacent vertical rods 2; go up connecting rod, well connecting rod and lower connecting rod setting in the outside of montant 2, connecting rod 5 all is perpendicular to baffle 4, and the last connecting rod in adjacent two sets of connecting rods 5 is connected through the down bracing 6 that sets up alternately with the connecting rod down, and well connecting rod in the multiunit connecting rod 5 is connected through the outside vertical pole.
Further, every group shelters from the subassembly on the equidistant extension montant that is provided with, connects through horizontal vaulting pole 7 between the both sides extension montant to provide bigger horizontal support stability, improve horizontal antidumping ability, guarantee the wholeness of structure.
Furthermore, the lengthened vertical rod is formed by lengthening the vertical rods 2 at preset intervals.
Further, an inserting rod 8 is fixed on the top surface of the base 1, a slot of a hollow structure is formed in the bottom end of the vertical rod 2, and the slot is matched with the inserting rod 8. The length of the insertion rod 8 is not less than 15cm, the length of the vertical rod 2 is 2.5m, and one vertical rod 2 is arranged in every 2m along the direction of the base 1.
Further, montant 2, vertical pole 3, connecting rod 5, down tube 6, horizontal vaulting pole 7 are standard scaffold steel pipe, all adopt the bowl lock joint to connect between inboard vertical pole and montant 2, between connecting rod 5 and montant 2, between upper junction pole and the down tube 6, between lower junction pole and the down tube 6, between well connecting rod and the outside vertical pole, between extension montant and the horizontal vaulting pole 7.
Further, base 1 is the I-steel, adopts steel mill standard type steel member, and the size is kept apart highly reasonable selection according to the construction, can adopt many I-steels horizontal concatenation to form to increase the counter weight, provide bigger horizontal antidumping effect. The baffle 4 is a color steel plate.
The construction process of the fast erection slot type railway line hard isolation device is as follows:
1. mounting and embedding I-shaped steel, and welding the connecting rod 5 on the I-shaped steel;
2. the vertical rod 2 is inserted on the connecting rod 5, and the longitudinal rod 3 and the connecting rod 5 are fixedly connected with the vertical rod 2 through the bowl buckle joint;
3. the transverse stay bar 4 is fixedly connected with the lengthened vertical bar through the bowl buckle joint;
4. installing a color steel plate, and fixedly connecting the inclined rod 6 with the upper connecting rod and the lower connecting rod through the bowl buckle joint;
5. and an outer longitudinal rod outside the inclined rod 6 is installed.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.

Claims (7)

1. A fast erection slot type hard isolation device for a railway line is characterized by comprising two groups of shielding assemblies which are respectively arranged on two sides of the railway line and are longitudinally arranged along the railway line, wherein each group of shielding assemblies comprises a base, a vertical rod, a longitudinal rod, a baffle, a connecting rod and an inclined rod;
a plurality of vertical rods are inserted on the top surface of the base along the longitudinal direction;
the longitudinal rods comprise inner longitudinal rods and outer longitudinal rods, and the inner longitudinal rods are vertically connected with the inner sides of the vertical rods;
the baffle is arranged between two adjacent vertical rods;
go up connecting rod, well connecting rod and lower connecting rod setting in the outside of montant, the equal perpendicular to baffle of connecting rod, last connecting rod and the lower connecting rod in the adjacent two sets of connecting rods are connected through the down tube that alternately sets up, and well connecting rod in the multiunit connecting rod passes through the outside vertical pole and connects.
2. The hard isolating device for quickly erecting the slot-in type railway line as claimed in claim 1, wherein the shielding assemblies of each group are provided with vertical extension bars at equal intervals, and the vertical extension bars at two sides are connected through a transverse stay bar.
3. The hard isolating device for a quickly erected slot-in type railway line as claimed in claim 2, wherein the elongated vertical rods are formed by elongating the vertical rods spaced apart by a predetermined distance.
4. The hard isolating device for quickly erecting the slot-type railway line as recited in claim 3, wherein the top surface of the base is fixed with a plug-in rod, the bottom end of the vertical rod is provided with a slot with a hollow structure, and the slot is matched with the plug-in rod.
5. The hard isolating device for quickly erecting a slot-in type railway line as recited in claim 4, wherein the inner longitudinal rod and the vertical rod, the connecting rod and the vertical rod, the upper connecting rod and the diagonal rod, the lower connecting rod and the diagonal rod, the middle connecting rod and the outer longitudinal rod, and the elongated vertical rod and the transverse stay rod are connected by means of a bowl-shaped joint.
6. The hard isolating device for quickly erecting the slot-in type railway line according to claim 5, wherein the base is made of I-shaped steel, the vertical rods, the longitudinal rods, the connecting rods and the inclined rods are made of steel pipes, and the baffle is made of color steel plates.
7. The hard isolating device for a quickly erected slot type railway line according to claim 5, wherein the base is formed by transversely splicing a plurality of I-shaped steels.
CN202221187948.9U 2022-05-18 2022-05-18 Erect hard isolating device of slot-in type railway line fast Active CN217353843U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221187948.9U CN217353843U (en) 2022-05-18 2022-05-18 Erect hard isolating device of slot-in type railway line fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221187948.9U CN217353843U (en) 2022-05-18 2022-05-18 Erect hard isolating device of slot-in type railway line fast

Publications (1)

Publication Number Publication Date
CN217353843U true CN217353843U (en) 2022-09-02

Family

ID=83012336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221187948.9U Active CN217353843U (en) 2022-05-18 2022-05-18 Erect hard isolating device of slot-in type railway line fast

Country Status (1)

Country Link
CN (1) CN217353843U (en)

Similar Documents

Publication Publication Date Title
CN103669832B (en) A kind of standard type Bailey bracket assembled jacking formwork system
CN206070790U (en) A kind of anti-buckling steel plate seismic structural wall, earthquake resistant wall of ribbed stiffener
CN102733397A (en) Inner supporting connecting element with variable dimension and force transmission direction for retaining and protecting foundation pit
CN103362298A (en) Mobile tower scaffold with circular disc connecting device
CN217353843U (en) Erect hard isolating device of slot-in type railway line fast
CN210857934U (en) Cage type scaffold
CN104453089A (en) Steel beam device of steel structure house
CN204825919U (en) Strut foundation ditch and enclose purlin structure of shearing
CN212295776U (en) Assembled protection canopy
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN211286595U (en) OKS warm steel plate die carrier
CN109930687B (en) Independent support structure for assembled building construction and construction method
CN202745061U (en) Inner supporting connection piece capable of varying size and force transmission direction and used for protecting foundation pit
CN203626212U (en) Pier stud construction operation platform quick to disassemble and assemble
CN202866085U (en) Light-weight roof supporting structure
CN105239763A (en) Scaffold for modularized construction of air separation cold box
CN104314183A (en) Building frame structure
CN217557951U (en) Building engineering isolating device
CN205063047U (en) Real abdomen girder steel factory building capital node of individual layer
CN215733389U (en) High vertical drop cable pipe laying structure
CN219080927U (en) Scaffold frame fast-assembling structure
CN216426559U (en) High tower crane adapter sleeve of security
CN103114712B (en) Buckle steel platform support system and construction method thereof
CN216429236U (en) Rail guard is used in civil engineering construction
CN220889484U (en) Template supporting system with outer extending platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant