CN217557951U - Building engineering isolating device - Google Patents
Building engineering isolating device Download PDFInfo
- Publication number
- CN217557951U CN217557951U CN202221134893.5U CN202221134893U CN217557951U CN 217557951 U CN217557951 U CN 217557951U CN 202221134893 U CN202221134893 U CN 202221134893U CN 217557951 U CN217557951 U CN 217557951U
- Authority
- CN
- China
- Prior art keywords
- tie
- building engineering
- groove
- draw
- slot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model belongs to the technical field of building engineering, especially, be a building engineering isolating device, including supporting legs, support column, tie-beam and baffle, the surface of tie-beam is provided with slot and draw-in groove respectively, and the medial surface joint of draw-in groove has two bulb poles, and the slot sets up and extends to the both ends of tie-beam along the length direction of tie-beam, and the welding has the scute between the up end of supporting legs and the surface of support column, and the quantity of tie-beam is two sets of, and one side that the medial surface of tie-beam is close to the draw-in groove is provided with the breach. The utility model discloses a set up slot and draw-in groove, realize can loading this device longitudinal arrangement on mobile platform, along with mobile platform's marcing, all isolating device can roll-off one by one, forms transverse arrangement subaerial, can accomplish when needs keep apart the building engineering of great area and operate on the ground without operating personnel, very uses manpower sparingly, has greatly accelerated the speed of keeping apart building engineering, and is very practical.
Description
Technical Field
The utility model relates to a building engineering technical field specifically is a building engineering isolating device.
Background
With the continuous development of society, the building industry has been developed vigorously, and the building engineering is to newly build or reconstruct buildings or roads, and when constructing roads, the roads need to be isolated, and when isolating roads, an isolation device is needed, so that potential safety hazards are reduced through the isolation device. When the building engineering of great area needs to be kept apart, adopt current isolating device to need a large amount of operating personnel to put, unusual trouble, keep apart building engineering's speed is slower, and is not practical enough.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a building engineering isolating device needs a large amount of operating personnel to carry out the problem of putting when having solved the building engineering of keeping apart great area.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a building engineering isolating device, includes supporting legs, support column, tie-beam and baffle, the surface of tie-beam is provided with slot and draw-in groove respectively, the medial surface joint of draw-in groove has two bulb poles, the slot sets up and extends to the both ends of tie-beam along the length direction of tie-beam, the welding has the scute between the up end of supporting legs and the surface of support column.
As an optimized technical scheme of the utility model, the quantity of tie-beam is two sets of.
As a preferred technical scheme of the utility model, one side that the medial surface of tie-beam is close to the draw-in groove is provided with the breach.
As an optimized technical scheme of the utility model, the surface of supporting legs, the surface of support column and the surface of tie-beam are all made the plastic-blasting and are handled.
Compared with the prior art, the utility model provides a building engineering isolating device possesses following beneficial effect:
this building engineering isolating device through setting up slot and draw-in groove, realizes can loading this device longitudinal arrangement on mobile platform, along with moving platform's marcing, all isolating device can roll-off one by one, forms transverse arrangement subaerial, can accomplish when needs keep apart the building engineering of great area and operate on the ground without operating personnel, and very use manpower sparingly has greatly accelerated the speed of keeping apart building engineering, and is very practical.
Drawings
FIG. 1 is a schematic view of the vertical arrangement of the present invention;
FIG. 2 is a schematic view of the lateral arrangement of the present invention;
fig. 3 is a schematic view of the groove of the present invention.
In the figure: 1. supporting legs; 2. a support pillar; 3. a connecting beam; 4. a baffle plate; 5. a trench; 6. a card slot; 7. a double-ball rod; 8. a gusset; 9. and (4) a notch.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides the following technical solutions: the utility model provides a building engineering isolating device, includes supporting legs 1, support column 2, tie-beam 3 and baffle 4, and the surface of tie-beam 3 is provided with slot 5 and draw-in groove 6 respectively, and the medial surface joint of draw-in groove 6 has two bulb poles 7, and slot 5 sets up and extends to the both ends of tie-beam 3 along the length direction of tie-beam 3, and the welding has scute 8 between the up end of supporting legs 1 and the surface of support column 2.
In this embodiment, the baffle 4 blocks the building engineering to play a role in isolating the building engineering, the groove 5 provides an installation position and a sliding path for the double-bulb rod 7 in the adjacent isolating device, two groups of adjacent isolating devices are connected together, and one end of the double-bulb rod 7 connected into the groove 5 can rotate in a certain angle, the groove 5 and the clamping groove 6 are arranged, so that the two groups of adjacent isolating devices can be converted into longitudinal arrangement from transverse arrangement, and the double-bulb rod 7 fixed in position by the clamping groove 6 and the double-bulb rod 7 capable of sliding in the groove 5 are arranged in each group of isolating devices, so that the devices can be longitudinally arranged and loaded on the mobile platform, along with the advancing of the mobile platform, all the isolating devices can slide out one by one to form transverse arrangement on the ground, when the building engineering with a large area needs to be isolated, the operation of operators is not needed, the manpower is greatly saved, the speed of isolating the building engineering is greatly accelerated, the supporting leg 8 is very practical, and improves the bending moment of the supporting leg 1, so that the supporting leg 2 is not easy to bend and deform between the supporting leg 1.
Specifically, the number of the connection beams 3 is two.
In this embodiment, the support columns 2 are fixed together by the connecting beams 3, the specifications of all the connecting beams 3 on each group of isolating devices are completely the same, and during assembly, the connecting beams 3 on two adjacent groups of isolating devices are installed in a staggered manner according to the rule that the grooves 5 of the two groups of isolating devices are inserted into the double-bulb rods 7 of the other group of isolating devices, namely, the connecting beams 3 on the grooves 5 of the first group of isolating devices are installed on the upper parts of the first group of isolating devices, and then the connecting beams 3 on the grooves 5 of the second group of isolating devices are installed on the lower parts of the second group of isolating devices, so that the heights of the top ends of the two adjacent isolating devices, which are placed on the ground, are equal after the two adjacent isolating devices are connected through the double-bulb rods 7.
Specifically, a notch 9 is formed in one side, close to the clamping groove 6, of the inner side surface of the connecting beam 3.
In this embodiment, the notch 9 ensures that the end of the double-ball rod 7 inserted into the slot 6 is only fixed in position and can still rotate.
Specifically, the outer surfaces of the supporting legs 1, the supporting columns 2 and the connecting beams 3 are subjected to plastic spraying treatment.
In this embodiment, the plastic spraying treatment can improve the surface oxidation resistance of the supporting legs 1, the supporting columns 2 and the connecting beams 3, and prolong the service life of the device.
The utility model discloses a theory of operation and use flow: when the isolation device is used, a plurality of groups of isolation devices are longitudinally arranged and loaded on a mobile platform, the grooves 5 on the first group of isolation devices and the second group of isolation devices are fixed between the double-ball-head rods 7 in the clamping grooves 6 to move relatively, so that the first group of isolation devices can move out of the mobile platform from the side faces of the second group of isolation devices, when the double-ball-head rods 7 are positioned at the end faces of the grooves 5 on the connecting beam 3, the double-ball-head rods 7 are pulled to be parallel and level with the length direction of the connecting beam 3, and meanwhile, the second group of isolation devices are pulled to move out of the side faces of the third group of isolation devices.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (4)
1. The utility model provides a building engineering isolating device, includes supporting legs (1), support column (2), tie-beam (3) and baffle (4), its characterized in that: the surface of tie-beam (3) is provided with slot (5) and draw-in groove (6) respectively, the medial surface joint of draw-in groove (6) has two bulb poles (7), slot (5) set up and extend to the both ends of tie-beam (3) along the length direction of tie-beam (3), the welding has scute (8) between the up end of supporting legs (1) and the surface of support column (2).
2. A construction work spacer as defined in claim 1, wherein: the number of the connecting beams (3) is two.
3. A building engineering insulation as claimed in claim 1, wherein: and a notch (9) is formed in one side, close to the clamping groove (6), of the inner side surface of the connecting beam (3).
4. A building engineering insulation as claimed in claim 1, wherein: the outer surfaces of the supporting legs (1), the outer surfaces of the supporting columns (2) and the outer surfaces of the connecting beams (3) are subjected to plastic spraying treatment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221134893.5U CN217557951U (en) | 2022-05-12 | 2022-05-12 | Building engineering isolating device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221134893.5U CN217557951U (en) | 2022-05-12 | 2022-05-12 | Building engineering isolating device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217557951U true CN217557951U (en) | 2022-10-11 |
Family
ID=83474546
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221134893.5U Active CN217557951U (en) | 2022-05-12 | 2022-05-12 | Building engineering isolating device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217557951U (en) |
-
2022
- 2022-05-12 CN CN202221134893.5U patent/CN217557951U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110552709B (en) | Self-advancing type integral station passing method and device suitable for large-diameter shield machine | |
CN109210274B (en) | Pipe jacking pipeline butt joint device and method | |
CN109441497B (en) | Complete equipment for advanced support and transportation without repeated support and transportation method | |
CN105297744B (en) | A kind of large deep foundation pit assembled type steel support system | |
CN203361592U (en) | Sliding platform used for installing arch-shaped roof truss of steel structure | |
CN114411970A (en) | Beam column node structure of steel construction assembly type structure | |
CN217557951U (en) | Building engineering isolating device | |
CN104358328B (en) | All-steel four-steel pipe multistage mountable overlong buckling-restrained brace | |
CN107587885B (en) | Two-lining trolley structure in standard section of tunnel and assembling method | |
CN103741719A (en) | Reinforcing cage guiding moving system and method | |
CN113152931A (en) | Two-layer steel structure room of easy dismouting | |
CN210562178U (en) | Shield constructs to pass through existing bridge pile pulling device | |
CN210660096U (en) | Integral station-crossing device of shield tunneling machine | |
CN111206591B (en) | Assembled integral translation supporting system for pipe gallery foundation pit and construction method | |
CN209523753U (en) | The purlin vehicle of mating trolley translation after a kind of shield machine | |
CN210165095U (en) | Regulation formula grout sleeve test support | |
CN216446473U (en) | Can a plurality of mobilizable construction work platform of erectting on girder steel side by side | |
CN210152663U (en) | Modular rectangle top iron structure | |
CN215444056U (en) | Long-distance air-propelled station-crossing shield tunneling machine bracket | |
CN216938148U (en) | Auxiliary pushing device for bending arc of steel bar of prefabricated part | |
CN210342722U (en) | Adjustable supporting device for assembly type building | |
CN217353843U (en) | Erect hard isolating device of slot-in type railway line fast | |
CN207277893U (en) | A kind of section steel platform formwork erecting structure for high-altitude overhanging | |
CN201507142U (en) | Stabilizing device of high-voltage telegraph pole | |
CN211143836U (en) | Steel house room bearing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |