CN212295776U - Assembled protection canopy - Google Patents

Assembled protection canopy Download PDF

Info

Publication number
CN212295776U
CN212295776U CN202020647858.8U CN202020647858U CN212295776U CN 212295776 U CN212295776 U CN 212295776U CN 202020647858 U CN202020647858 U CN 202020647858U CN 212295776 U CN212295776 U CN 212295776U
Authority
CN
China
Prior art keywords
fixedly connected
rod
supporting
protection
fence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020647858.8U
Other languages
Chinese (zh)
Inventor
周进均
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020647858.8U priority Critical patent/CN212295776U/en
Application granted granted Critical
Publication of CN212295776U publication Critical patent/CN212295776U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The utility model relates to an assembled protection canopy, including many stay tubes, fence and protective component, fixed connection can be dismantled to the fence between two adjacent stay tubes, forms the protection passageway between two relative fences, and protective component sets up in the top of protection passageway and can dismantle fixed connection with the stay tube. The protective component comprises a supporting part and a connecting part arranged between the supporting parts, the connecting part is fixedly connected with the supporting part, the supporting part comprises two mutually parallel insertion rods and a connecting rod arranged between the two insertion rods, and a plurality of insertion rods are fixedly connected to the supporting pipe to insert a first limiting pipe. Insert the peg graft pole and establish in first spacing pipe for the supporting part is fixed between two adjacent stay tubes, and the setting of connecting portion has increased protective assembly's structural strength and has formed the protection shed roof simultaneously, can directly lay the building templates on the protection shed roof, has prevented that the falling object from causing the injury to the workman in the protection passageway, simultaneously convenient to detach.

Description

Assembled protection canopy
Technical Field
The utility model belongs to the technical field of the building engineering equipment technique and specifically relates to an assembled protection canopy is related to.
Background
The protection canopy is a protection auxiliary assembly in the building engineering job site, is mainly applied to building site or open air and builds temporarily, like block terminal, reinforcing bar, elevator, carpenter, mixer etc. to prevent that the object that falls from the high altitude from causing the injury to the workman.
In the prior art, for example, chinese patent publication No. CN202431010U discloses a welding protection shed for pipeline under trench in a section prone to collapse and landslide, which includes a protection shed framework made of square steel and welded into a square shape. Four lateral parts and the top of protection canopy adopt the steel sheet welding respectively in the skeleton outside, open in the both sides portion of protection canopy has the door, and the welding pipeline runs through the door, the width of door is greater than the diameter of welding pipeline, has wrapped up insulating rubber on the floorbar of protection canopy and the stand of door.
The above prior art solutions have the following drawbacks: the protective shed is formed by welding steel pipes into a frame, and a steel plate or a wood plate is laid on the top of the frame to form the simple work shed. However, the simple work shed has poor turnover performance, cannot be reused, is inconvenient to disassemble, and does not meet the requirements of modern safe and civilized construction to a certain extent, so that a protection shed convenient to assemble and disassemble is urgently needed.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, one of the purposes of the utility model is to provide an assembled protection canopy has the convenient effect of repeated turnover use, equipment and dismantlement.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
an assembled protective shed comprises a plurality of supporting pipes, fences and protective components, wherein the fences are detachably and fixedly connected between two adjacent supporting pipes, a protective channel is formed between two opposite fences, and the protective components are arranged above the protective channel and are detachably and fixedly connected with the supporting pipes;
the protection assembly comprises support parts and connecting parts arranged between the support parts, the connecting parts are fixedly connected with the support parts, the support parts comprise two parallel insertion rods and connecting rods arranged between the two insertion rods, and a plurality of first limiting pipes for the insertion rods to be inserted are fixedly connected to the supporting pipes.
Through the technical scheme, when the protective shed is installed, the supporting pipes are sequentially and uniformly fixed into two rows according to the standard, the fence is fixed between the two adjacent supporting pipes to form the protective channel, and the construction safety is guaranteed to a certain extent. Then insert the peg graft pole and establish in first spacing pipe for the supporting part is fixed between two adjacent stay tubes, and the setting of connecting portion has increased protective assembly's structural strength and has formed the protection shed roof simultaneously, can directly lay the building templates on the protection shed roof, has prevented that the falling object of high altitude from causing the injury to the workman in the protection passageway. The inserting rod is drawn out from the first limiting pipe, and then the fence is detached from the supporting pipe, so that the detachment work of the protective shed can be completed. Adopt to cup joint between each subassembly to connect, the equipment is all more convenient with the dismantlement, simple manufacture, the operation of being convenient for, but also can repeat the turnover use, the effectual work efficiency who improves installation protection canopy.
The present invention may be further configured in a preferred embodiment as: two ends of the insertion rod along the length direction are respectively and vertically and fixedly connected with a limiting rod, and the limiting rods are inserted into the first limiting pipes and are in sliding fit with the inner walls of the first limiting pipes;
keep away from two first spacing pipes of fence are mutual parallel and level setting, are close to two first spacing pipes of fence are mutual dislocation set.
Through above-mentioned technical scheme, the cooperation of sliding of the inner wall of gag lever post and first spacing pipe has avoided the gag lever post to take place the phenomenon of rocking in first spacing intraductal, has improved the steadiness of connecting, has further improved the structural strength of protection canopy. Four first spacing pipes of fixed connection on the lateral wall of a stay tube simultaneously for the protection canopy can splice according to the demand and prolong the use.
The present invention may be further configured in a preferred embodiment as: the two ends of the connecting rod along the length direction are respectively fixedly connected with the middle part of the insertion rod.
Through above-mentioned technical scheme for the weight of each part of supporting part is balanced, has increased the steadiness of being connected between connecting rod and two peg graft poles.
The present invention may be further configured in a preferred embodiment as: the supporting part further comprises a plurality of reinforcing rods, one ends of the reinforcing rods are fixedly connected with two ends of the insertion rod along the length direction of the insertion rod respectively, and the other ends of the reinforcing rods are fixedly connected with the connecting positions of the connecting rods and the insertion rod at opposite angles.
Through above-mentioned technical scheme, after the protection canopy received external force, the stiffener made difficult appearance rocking phenomenon between connecting rod and the peg graft pole, increased the steadiness that both are connected to the structural strength of supporting part has further been improved.
The present invention may be further configured in a preferred embodiment as: the connecting portion comprises a plurality of cross rods and vertical rods which are perpendicular to each other and fixedly connected, the two ends of each cross rod in the length direction are respectively fixedly connected with the inserting rods, and the vertical rods are uniformly and fixedly connected between the cross rods and are parallel to each other.
Through above-mentioned technical scheme, the setting of horizontal pole and montant has not only increased the structural strength of protection shed roof to a certain extent, can lay the building templates on protection shed roof simultaneously and prevent high altitude junk, has increased the area of contact between protection shed roof and the building templates and has improved the fixed stability of building templates.
The present invention may be further configured in a preferred embodiment as: the connecting part between the transverse rod and the vertical rod is provided with an inserting pipe, one end of the inserting pipe along the length direction of the inserting pipe is close to one side of the vertical rod, the side wall of the inserting pipe is fixedly connected with the transverse rod.
Through above-mentioned technical scheme, when the building templates weight of protection shed top is great, can add the steel pipe between the grafting pipe, increase building templates and the area of contact improvement holding power of protection shed top for the bearing capacity of protection shed is higher.
The present invention may be further configured in a preferred embodiment as: the fence is characterized in that fixing rods are perpendicularly and fixedly connected to four corners of the fence, a plurality of second limiting pipes for the fixing rods to be inserted are fixedly connected to the supporting pipes, and the second limiting pipes are arranged below the first limiting pipes.
Through above-mentioned technical scheme, when the dead lever was inserted and is established in the spacing pipe of second, realized the fence fixed between the stay tube, take the dead lever out from the spacing pipe of second when dismantling simultaneously, can accomplish the turnover use of protection canopy.
The present invention may be further configured in a preferred embodiment as: the supporting tube, the fence and the protection component are all made of square steel tubes.
Through the technical scheme, compared with solid steel such as round steel, the square steel pipe has the advantages that the bending strength and the torsional strength are the same, the weight is lighter, and the square steel pipe is economical section steel. The square steel pipe is used for manufacturing the protective shed, so that the material utilization rate can be improved, the manufacturing process is simplified, and the material and the processing time are saved.
To sum up, the utility model discloses a following at least one useful technological effect:
1. when the protection shed is installed, the supporting pipes are sequentially and uniformly fixed into two rows according to the standard, the fence is fixed between the two adjacent supporting pipes to form a protection channel, and the construction safety is guaranteed to a certain extent. Then insert the peg graft pole and establish in first spacing pipe for the supporting part is fixed between two adjacent stay tubes, and the setting of connecting portion has increased protective assembly's structural strength and has formed the protection shed roof simultaneously, can directly lay the building templates on the protection shed roof, has prevented that the falling object of high altitude from causing the injury to the workman in the protection passageway. The inserting rod is drawn out from the first limiting pipe, and then the fence is detached from the supporting pipe, so that the detachment work of the protective shed can be completed. Adopt to cup joint between each subassembly to connect, the equipment is all more convenient with the dismantlement, simple manufacture, the operation of being convenient for, but also can repeat the turnover use, the effectual work efficiency who improves installation protection canopy.
2. The inner wall of gag lever post and first spacing pipe cooperation of sliding has avoided the gag lever post to take place the phenomenon of rocking in first spacing intraductal, has improved the steadiness of connecting, has further improved the structural strength of protection canopy. Four first spacing pipes of fixed connection on the lateral wall of a stay tube simultaneously for the protection canopy can splice according to the demand and prolong the use.
3. After the external force is received to the protection canopy, the stiffener makes the phenomenon of being difficult for appearing rocking between connecting rod and the inserted link, has increased the steadiness that both connect to the structural strength of supporting part has further been improved.
Drawings
Fig. 1 is a schematic side view of the present invention.
Fig. 2 is a schematic view of the top surface structure of the present invention.
Fig. 3 is a schematic front structural view of the present invention.
Reference numerals: 1. supporting a tube; 11. a first limit tube; 12. a second limiting pipe; 2. a fence; 21. fixing the rod; 3. a guard assembly; 31. a support portion; 311. a plug rod; 312. a connecting rod; 313. a reinforcing bar; 32. a connecting portion; 321. a cross bar; 322. a vertical rod; 323. inserting a pipe; 4. and (4) protecting the channel.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses an assembled protection canopy, including many stay tubes 1, fence 2 and protection component 3. In this embodiment, the supporting tube 1, the fence 2 and the protection component 3 are made of square steel tubes, and compared with solid steel such as round steel, the square steel tubes have the same bending strength and torsion strength and are lighter in weight, so that the square steel tubes are steel with economic cross section. As shown in fig. 2, the support tube 1 has a dimension of 100 × 100mm, and the square steel tube is used to manufacture the protective shed, thereby improving the material utilization rate, simplifying the manufacturing process, and saving the material and the processing time.
Referring to fig. 2, the fences 2 are detachably and fixedly connected between two adjacent supporting pipes 1, a protection channel 4 (see fig. 1) is formed between two opposite fences 2, and the protection component 3 is arranged above the protection channel 4 and detachably and fixedly connected with the supporting pipes 1. The protection component 3 includes a support portion 31 and a connecting portion 32 disposed between the support portions 31, the connecting portion 32 is fixedly connected to the support portion 31, the support portion 31 includes two parallel insertion rods 311 and a connecting rod 312 disposed between the two insertion rods 311, and a plurality of first limiting pipes 11 for the insertion rods 311 to be inserted are fixedly connected to the support pipe 1.
In this embodiment, the size specification of the insertion rod 311 is 50 × 50mm, and further, two ends of the insertion rod 311 along the length direction thereof are respectively and fixedly connected with a limiting rod vertically, and the limiting rod is inserted in the first limiting pipe 11 and is in sliding fit with the inner wall of the first limiting pipe 11. The inner wall of gag lever post and first spacing pipe 11 cooperation of sliding has avoided the gag lever post to take place the phenomenon of rocking in first spacing pipe 11, has improved the steadiness of connecting, has further improved the structural strength of protection canopy. As shown in fig. 1, the two first limiting pipes 11 far away from the fence 2 are arranged in parallel and level with each other, and the two first limiting pipes 11 close to the fence 2 are arranged in a staggered manner. Simultaneously, four first limiting pipes 11 are fixedly connected to the outer side wall of one supporting pipe 1, so that the protective shed can be spliced and lengthened according to requirements.
Referring to fig. 2, both ends of the connection rod 312 along the length direction thereof are respectively fixedly connected with the middle portion of the insertion rod 311, so that the weight of each portion of the support portion 31 is balanced, and the connection stability between the connection rod 312 and the two insertion rods 311 is increased. The supporting portion 31 further includes a plurality of reinforcing rods 313, the size of the reinforcing rods 313 is 30 × 30mm, one end of each of the reinforcing rods 313 is fixedly connected to two ends of the insertion rod 311 along the length direction thereof, and the other end of each of the reinforcing rods 313 is fixedly connected to a joint of the diagonal connecting rod 312 and the insertion rod 311. After the protection shed receives external force, the reinforcing rod 313 prevents the connecting rod 312 and the inserting rod 311 from shaking, so that the connection stability of the connecting rod and the inserting rod is improved, and the structural strength of the supporting part 31 is further improved.
The four corners of the fence 2 are vertically and fixedly connected with fixing rods 21, a plurality of second limiting pipes 12 for the fixing rods 21 to be inserted are fixedly connected to the supporting pipe 1, and the second limiting pipes 12 are arranged below the first limiting pipes 11. When the fixed rod 21 is inserted in the second limiting pipe 12, the fixation of the fence 2 between the supporting pipes 1 is realized, and meanwhile, the fixed rod 21 is drawn out from the second limiting pipe 12 during disassembly, so that the turnover use of the protective shed can be completed.
Referring to fig. 3, the connecting portion 32 includes a plurality of cross bars 321 and vertical bars 322 that are perpendicular to each other and fixedly connected, in this embodiment, the size of the insertion rod 311 is 30 × 30mm, two ends of the cross bar 321 along the length direction are respectively fixedly connected with the insertion rod 311, and the vertical bars 322 are uniformly and fixedly connected between the cross bars 321 and are parallel to each other. The arrangement of the cross rods 321 and the vertical rods 322 not only increases the structural strength of the protective shed roof to a certain extent, but also can lay a building template on the protective shed roof to prevent high-altitude falling objects, and increases the contact area between the protective shed roof and the building template to improve the stability of the fixation of the building template.
Wherein, the junction between horizontal pole 321 and montant 322 is provided with grafting pipe 323, and the one end of grafting pipe 323 along its length direction is connected with montant 322 one side near connecting rod 312 fixed connection, and the lateral wall of grafting pipe 323 is connected with horizontal pole 321 fixed connection. When the building template weight of protection shed top is great, can add the steel pipe between grafting pipe 323, increase the area of contact of building template and protection shed top and improve the holding power for the bearing capacity of protection shed is higher.
The implementation principle of the embodiment is as follows: when the protection shed is installed, a plurality of supporting pipes 1 are sequentially and uniformly fixed into two rows according to the standard, and the fence 2 is fixed between two adjacent supporting pipes 1 to form a protection channel 4, so that the construction safety is ensured to a certain extent. Then insert peg 311 in establishing first spacing pipe 11 again for supporting part 31 is fixed between two adjacent stay tubes 1, and the setting of connecting portion 32 has increased the structural strength of protection component 3 and has formed the protection shed roof simultaneously, can directly lay the building templates on the protection shed roof, has prevented that falling object from causing the injury to the workman in the protection passageway 4.
The inserting rod 311 is drawn out from the first limiting pipe 11, and then the fence 2 is detached from the supporting pipe 1, so that the detachment work of the protective shed can be completed. Adopt to cup joint between each subassembly to connect, the equipment is all more convenient with the dismantlement, simple manufacture, the operation of being convenient for, but also can repeat the turnover use, the effectual work efficiency who improves installation protection canopy.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides an assembled protection canopy, includes many stay tubes (1), fence (2) and protective component (3), its characterized in that: the fences (2) are detachably and fixedly connected between two adjacent supporting tubes (1), a protection channel (4) is formed between two opposite fences (2), and the protection component (3) is arranged above the protection channel (4) and is detachably and fixedly connected with the supporting tubes (1);
the protection component (3) comprises supporting portions (31) and connecting portions (32) arranged between the supporting portions (31), the connecting portions (32) are fixedly connected with the supporting portions (31), each supporting portion (31) comprises two parallel insertion rods (311) and a connecting rod (312) arranged between the two insertion rods (311), and a plurality of first limiting pipes (11) for the insertion rods (311) to insert are fixedly connected to the supporting pipe (1).
2. An assembled shelter as claimed in claim 1, wherein: two ends of the insertion rod (311) in the length direction are respectively and vertically fixedly connected with a limiting rod, and the limiting rods are inserted in the first limiting pipes (11) and are in sliding fit with the inner walls of the first limiting pipes (11);
keep away from two first spacing pipes (11) of fence (2) are mutual parallel and level setting, are close to two first spacing pipes (11) of fence (2) are mutual dislocation set.
3. An assembled shelter as claimed in claim 1, wherein: and two ends of the connecting rod (312) along the length direction are respectively fixedly connected with the middle part of the insertion rod (311).
4. An assembled shelter as claimed in claim 3, wherein: the supporting part (31) further comprises a plurality of reinforcing rods (313), one ends of the reinforcing rods (313) are fixedly connected with two ends of the inserting rod (311) along the length direction of the inserting rod respectively, and the other ends of the reinforcing rods (313) are fixedly connected with the connecting part of the connecting rod (312) and the inserting rod (311) at the opposite angles.
5. An assembled shelter as claimed in claim 2, wherein: connecting portion (32) include many mutually perpendicular fixed connection's horizontal pole (321) and montant (322), horizontal pole (321) along its length direction both ends respectively with peg graft pole (311) fixed connection, montant (322) even fixed connection be in just be parallel to each other between horizontal pole (321).
6. An assembled shelter as claimed in claim 5, wherein: the connecting part between the cross rod (321) and the vertical rod (322) is provided with an inserting pipe (323), one end of the inserting pipe (323) in the length direction is fixedly connected with one side of the vertical rod (322) close to the connecting rod (312), and the side wall of the inserting pipe (323) is fixedly connected with the cross rod (321).
7. An assembled shelter as claimed in claim 1, wherein: the fence is characterized in that fixing rods (21) are fixedly connected to four corners of the fence (2) in a vertical mode, a plurality of second limiting pipes (12) are fixedly connected to the supporting pipe (1) and used for the fixing rods (21) to insert, and the second limiting pipes (12) are arranged below the first limiting pipes (11).
8. An assembled shelter as claimed in claim 7, wherein: the supporting tube (1), the fence (2) and the protection component (3) are all made of square steel tubes.
CN202020647858.8U 2020-04-24 2020-04-24 Assembled protection canopy Expired - Fee Related CN212295776U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020647858.8U CN212295776U (en) 2020-04-24 2020-04-24 Assembled protection canopy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020647858.8U CN212295776U (en) 2020-04-24 2020-04-24 Assembled protection canopy

Publications (1)

Publication Number Publication Date
CN212295776U true CN212295776U (en) 2021-01-05

Family

ID=73963525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020647858.8U Expired - Fee Related CN212295776U (en) 2020-04-24 2020-04-24 Assembled protection canopy

Country Status (1)

Country Link
CN (1) CN212295776U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114482595A (en) * 2021-12-24 2022-05-13 中铁广州工程局集团有限公司 Method for replacing low-height awning of existing business line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114482595A (en) * 2021-12-24 2022-05-13 中铁广州工程局集团有限公司 Method for replacing low-height awning of existing business line

Similar Documents

Publication Publication Date Title
CN105133830A (en) Formwork reinforcing system replacing wood with steel and construction technology thereof in external wall construction
CN212295776U (en) Assembled protection canopy
CN111058555A (en) Windproof fireproof heat-preservation type quick-dismantling assembly building steel structure and splicing method thereof
CN110748063B (en) Assembled steel bar truss floor support plate with support
CN217151153U (en) Steel column construction regularization temporary operation platform
CN215564746U (en) Assembled steel structure ladder cage
CN213062632U (en) Assembled steel truss structure
CN213654364U (en) Many function combination formula removes protection canopy
CN214461778U (en) Assembled roof truss
CN211286595U (en) OKS warm steel plate die carrier
CN209925004U (en) Temporary transverse support and supporting device for double-side-wall pilot tunnel
CN210013444U (en) Closed cantilever scaffold system
CN210117914U (en) Support frame for steel structure concrete platform
CN113431313A (en) External frame structure and construction method thereof
CN112196260A (en) Assembly type template of foreign-style house outer eave concrete structure and construction method thereof
CN213869033U (en) High-altitude edge surrounding structure of assembly type factory building
CN216740618U (en) Steel construction protection scaffold puts up system suitable for light rail station
CN220889484U (en) Template supporting system with outer extending platform
CN216109631U (en) Climbing frame
CN217949077U (en) Side slope protection mobile construction platform convenient to safety
CN220725715U (en) Split-level support assembly climbing frame structure applied to outer wall
CN117386061B (en) Method for assembling large-span concrete roof for basement
CN214614580U (en) Steel construction fast assembly formula house frame of full bolted connection
CN214697030U (en) Orifice protector that can assemble
CN217353843U (en) Erect hard isolating device of slot-in type railway line fast

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210105

CF01 Termination of patent right due to non-payment of annual fee