CN216109631U - Climbing frame - Google Patents

Climbing frame Download PDF

Info

Publication number
CN216109631U
CN216109631U CN202121673818.1U CN202121673818U CN216109631U CN 216109631 U CN216109631 U CN 216109631U CN 202121673818 U CN202121673818 U CN 202121673818U CN 216109631 U CN216109631 U CN 216109631U
Authority
CN
China
Prior art keywords
tube
long
lateral wall
side walls
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121673818.1U
Other languages
Chinese (zh)
Inventor
沈海晏
吕光利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Techen Technology Co Ltd
Original Assignee
Shenzhen Techen Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Techen Technology Co Ltd filed Critical Shenzhen Techen Technology Co Ltd
Priority to CN202121673818.1U priority Critical patent/CN216109631U/en
Application granted granted Critical
Publication of CN216109631U publication Critical patent/CN216109631U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a climbing frame which comprises scaffold boards, an upright rod, a protective net, a power system, a guide rail and a plurality of guide seats, wherein the upright rod comprises long pipes and a joint pipe, the ends of the two long pipes are connected through the joint pipe, the peripheral side walls of the long pipes and the joint pipe respectively comprise a pair of first side walls which are symmetrically arranged and a pair of second side walls which are symmetrically arranged, the first side walls and the second side walls of the long pipes and the first side walls and the second side walls of the joint pipe are identical in shape and matched in size so as to enable the joint pipe to be sleeved with the long pipes, and the section outline of the first side walls is in an arch shape facing to the first side walls on the opposite sides, so that the compressive strength of the whole upright rod can be improved.

Description

Climbing frame
Technical Field
The utility model relates to the field of buildings, in particular to a climbing frame.
Background
The vertical rod is a component of engineering construction engineering and is a standing rod. The vertical rod is responsible for the bearing of the whole climbing frame, so that certain requirements are imposed on the strength of the climbing frame. The main rectangular pipe that is of present pole setting, the lateral wall trompil of rectangular pipe is used for the installation to climb other structures of frame, and the lateral wall of trompil is often compressed, and in the present rectangular pipe, this lateral wall is flat-plate-like, and intensity is not very high.
SUMMERY OF THE UTILITY MODEL
The present invention is directed to a climbing frame, which overcomes the above-mentioned drawbacks of the prior art.
The technical scheme adopted by the utility model for solving the technical problems is as follows: the utility model provides a structure one kind climbs frame, includes scaffold board, pole setting, protection network, driving system and guide rail and a plurality of guide holder, the pole setting includes long tube and adapter tube, two the tip of long tube is through one the adapter tube is connected, the lateral wall all includes a pair of first lateral wall that the symmetry set up and a pair of second lateral wall that the symmetry set up all around of long tube and adapter tube, the long tube first lateral wall second lateral wall and adapter tube first lateral wall the shape of second lateral wall is the same and the size matches and is in order to make the adapter tube with the adapter tube cup joints, the section profile of first lateral wall is the orientation offside the arch of first lateral wall, the long tube first lateral wall sets up one row of first mounting hole along self length direction.
Preferably, the first side wall includes two arc-shaped portions and a central flat plate portion located between the two arc-shaped portions, the two arc-shaped portions are respectively connected to the pair of second side walls, and the central flat plate portion of the long tube is provided with a row of the first mounting holes.
Preferably, the position where the arc part is connected with the second side wall is transited by an arc corner.
Preferably, one end of the joint pipe is formed with a chamfer formed by cutting from the second side wall to the opposite direction of the second side wall, so that the joint pipe is sleeved in the long pipe.
Preferably, the central flat plate part of the long pipe is respectively provided with second mounting holes near two ends, and a row of the first mounting holes are uniformly arranged between the second mounting holes at two ends at intervals;
and after the joint pipe is sleeved at the end part of the long pipe and the second mounting hole of the long pipe is aligned with the third mounting hole of the joint pipe extending into the long pipe, the joint pipe and the long pipe can be fixed through bolts matched with the second mounting hole and the third mounting hole.
Preferably, the central flat plate portion of the long tube is further provided with welding holes near two ends, and the long tube and the adapter tube can be welded and fixed through the welding holes after the adapter tube is sleeved in the end portion of the long tube.
Preferably, the first mounting holes in one row are uniformly distributed at intervals along the length direction of the long pipe.
Preferably, the long pipe and the adapter pipe are integrally formed by high-strength aluminum alloy materials in an extrusion mode.
The climbing frame has the following beneficial effects: in the utility model, the upright rod is realized by connecting the long pipe with the joint pipe, and the first side wall which is easy to be pressed in the peripheral side walls of the joint pipe and the long pipe is arched, so that the pressing strength of the whole upright rod can be improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the provided drawings without creative efforts:
FIG. 1 is a schematic structural view after assembly of a long tube and a coupling tube;
FIG. 2 is a schematic structural view of the elongated tube prior to assembly with the coupler tube;
figure 3 is a schematic cross-sectional view of a long tube.
Detailed Description
To facilitate an understanding of the utility model, the utility model will now be described more fully with reference to the accompanying drawings. Exemplary embodiments of the utility model are shown in the drawings. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete. It should be understood that the embodiments and specific features in the embodiments of the present invention are described in detail in the present application, but not limited to the present application, and the features in the embodiments and specific features in the embodiments of the present invention may be combined with each other without conflict.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the utility model herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the utility model.
The terms including ordinal numbers such as "first", "second", and the like used in the present specification may be used to describe various components, but the components are not limited by the terms. These terms are used only for the purpose of distinguishing one constituent element from other constituent elements. For example, a first component may be named a second component, and similarly, a second component may also be named a first component, without departing from the scope of the present invention.
The frame of climbing of aluminum alloy pole setting of this embodiment, including scaffold board, connecting plate, turn over board, aluminum alloy pole setting, protection screen frame, connecting elements, driving system and guide rail and a plurality of guide holder, scaffold board, connecting plate, turn over board, protection screen frame, connecting elements, driving system and guide rail and a plurality of guide holder, these structures are prior art, and this is novel in about the setting of these structures the same with common above-mentioned structure, and the event is no longer repeated, and the improvement point of this embodiment is mainly concentrated on the pole setting.
Referring to fig. 1-2, the vertical rod comprises a long tube 1 and a joint tube 2, wherein the long tube 1 and the joint tube 2 are integrally formed by high-strength aluminum alloy materials in an extrusion manner.
The ends of the two long pipes 1 are connected through one joint pipe 2, for example, the long pipe 1 is sleeved with the joint pipe 2, and the long pipe 1 and the joint pipe 2 can be welded and/or fixed by bolts after being sleeved.
Specifically, in the present embodiment, the adapter tube 2 can be sleeved on the ends of the two long tubes 1 at the same time to connect the two long tubes 1. For example, in the present embodiment, the adapter tube 2 is sleeved inside the end portions of the two long tubes 1 at the same time, and it is understood that in other embodiments, the adapter tube 2 may also be sleeved outside the end portions of the two long tubes 1 at the same time.
In this embodiment, the peripheral side wall of the adapter tube 2 matches the peripheral side wall of the long tube 1 in shape and size to realize the sleeve joint of the long tube 1 and the adapter tube 2. The peripheral side walls of the long pipe 1 and the joint pipe 2 respectively comprise a pair of first side walls and a pair of second side walls, the first side walls and the second side walls are symmetrically arranged, referring to fig. 2-3, the peripheral side walls of the long pipe 1 and the joint pipe 2 respectively comprise an upper side wall, a lower side wall, a left side wall and a right side wall, the first side walls are left and right side walls, and the second side walls are upper and lower side walls. The utility model discloses a long pipe joint, including long pipe 1 first lateral wall set up a row of first mounting hole 101 along self length direction, long pipe 1 first lateral wall second lateral wall and adapter tube 2 first lateral wall the same and the size matching of second lateral wall is in order to guarantee adapter tube 2 with long pipe 1 cup joints.
In this embodiment, in order to improve the strength, the cross-sectional profiles of the first side walls of the long pipe 1 and the joint pipe 2 are both arched toward the opposite first side wall. Since the peripheral side walls of the long tube 1 and the adapter tube 2 are uniform in shape, the following description will be given by taking only the long tube 1 as an example.
Referring to fig. 3, the first side wall includes two arc-shaped portions and a central flat plate portion located between the two arc-shaped portions, the two arc-shaped portions are respectively connected to a pair of the second side walls, and it is further preferable that the positions where the arc-shaped portions are connected to the second side walls are transited by arc-shaped corners.
The central flat plate part of the long pipe 1 is provided with a row of the first mounting holes 101, and the first mounting holes 101 are uniformly distributed at intervals along the length direction of the long pipe 1. The first mounting hole 101 is used for mounting with other structures of the climbing frame. The central flat plate part of the long tube 1 is respectively provided with second mounting holes 102 near two ends, and a row of the first mounting holes 101 are uniformly arranged between the second mounting holes 102 at two ends at intervals.
Correspondingly, the central flat plate part of the adapter tube 2 is provided with a plurality of third mounting holes 201, and after the adapter tube 2 is sleeved on the end part of the long tube 1 and the second mounting hole 102 of the long tube 1 and the adapter tube 2 extend into the third mounting hole 201 of the long tube 1 to be aligned, the adapter tube 2 and the long tube 1 can be fixed by bolts matched with the second mounting hole 102 and the third mounting hole 201.
Preferably, the central flat plate portion of the long tube 1 is further provided with welding holes 103 near two ends, and the long tube 1 and the adapter tube 2 can be welded and fixed through the welding holes 103 after the adapter tube 2 is sleeved in the end portion of the long tube 1.
Preferably, for the convenience of installation, a chamfer formed by cutting from the second side wall to the opposite direction of the second side wall is formed at the end of the adapter tube 2, so that the adapter tube 2 is sleeved in the long tube 1.
In conclusion, the climbing frame disclosed by the utility model has the following beneficial effects: in the utility model, the upright rod is realized by connecting the long pipe with the joint pipe, and the first side walls which are easy to be pressed in the peripheral side walls of the joint pipe and the long pipe are arched, so that the pressed strength of the whole upright rod can be improved, the strength of the upright rod is considered while the light weight, the corrosion resistance and the low maintenance cost are realized, and the length of the upright rod can be expanded by connecting the two long pipes together by using the joint pipe according to the requirements, so that the upright rod can be applied to various different scenes.
While the present invention has been described with reference to the embodiments shown in the drawings, the present invention is not limited to the embodiments, which are illustrative and not restrictive, and it will be apparent to those skilled in the art that various changes and modifications can be made therein without departing from the spirit and scope of the utility model as defined in the appended claims.

Claims (8)

1. The utility model provides a climbing frame, includes scaffold board, pole setting, protection network, driving system and guide rail and a plurality of guide holder, its characterized in that, the pole setting includes long tube and adapter tube, two the tip of long tube is through one the adapter tube is connected, the lateral wall all around of long tube and adapter tube all includes a pair of first lateral wall that the symmetry set up and a pair of second lateral wall that the symmetry set up, the long tube first lateral wall second lateral wall and adapter tube first lateral wall the shape of second lateral wall is the same and size matches in order to make the adapter tube with the long tube cup joints, the section profile of first lateral wall is orientation offside the arch of first lateral wall, the long tube first lateral wall sets up one row of first mounting hole along self length direction.
2. The creeper of claim 1, wherein the first side wall includes two arcuate portions and a central flat portion located between the two arcuate portions, the two arcuate portions are respectively connected to a pair of the second side walls, and a row of the first mounting holes is formed in the central flat portion of the long tube.
3. The creeper of claim 2, wherein the location where the curved portion connects to the second side wall transitions through a curved corner.
4. The creeper of claim 1, wherein one end of the connector tube is formed with a chamfer cut from the second side wall toward the opposite side wall to facilitate the insertion of the connector tube into the elongated tube.
5. The creeper of claim 2, wherein the central flat plate portion of the long pipe is provided with second mounting holes near two ends, and a row of the first mounting holes are evenly arranged between the second mounting holes at two ends;
and after the joint pipe is sleeved at the end part of the long pipe and the second mounting hole of the long pipe is aligned with the third mounting hole of the joint pipe extending into the long pipe, the joint pipe and the long pipe can be fixed through bolts matched with the second mounting hole and the third mounting hole.
6. The creeper of claim 2, wherein the central flat portion of the long tube further has welding holes near two ends, and the adapter tube is sleeved in the end of the long tube and then can be welded and fixed to the long tube through the welding holes.
7. The creeper of claim 1, wherein the row of first mounting holes are evenly spaced along the length of the long tube.
8. The creeper of claim 1, wherein the long tube and the adapter tube are integrally formed by extrusion from a high strength aluminum alloy material.
CN202121673818.1U 2021-07-22 2021-07-22 Climbing frame Expired - Fee Related CN216109631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121673818.1U CN216109631U (en) 2021-07-22 2021-07-22 Climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121673818.1U CN216109631U (en) 2021-07-22 2021-07-22 Climbing frame

Publications (1)

Publication Number Publication Date
CN216109631U true CN216109631U (en) 2022-03-22

Family

ID=80722873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121673818.1U Expired - Fee Related CN216109631U (en) 2021-07-22 2021-07-22 Climbing frame

Country Status (1)

Country Link
CN (1) CN216109631U (en)

Similar Documents

Publication Publication Date Title
CN208056606U (en) The connection structure of adhesion type lifting scaffold protection network
CN102337781A (en) Tool-type combined and attached lifting scaffold
CN216109631U (en) Climbing frame
US20040041142A1 (en) Fence panel and connector therefor
CN212078637U (en) Frame of climbing that contracted pipe connects pole setting to constitute
CN211774976U (en) Cable clamp node for stay cable and stay bar in beam string
CN208347296U (en) A kind of belt lacing rod piece
CN210086797U (en) Climbing frame connecting piece
CN208733881U (en) A kind of setting multiple tracks is kept out the wind the Super High super-span single layer cable curtain wall of steel truss
CN211524031U (en) Climbing frame of aluminum alloy upright stanchion
CN220644987U (en) Keel butt joint structure with stable connection
CN214989582U (en) Novel reassembling type elevator guard gate
CN211114363U (en) Keel is fixed to environmental protection panel for building of adjustable mounting height
CN217105518U (en) Assembled steel construction beam column node structure
CN220958873U (en) Multi-split air conditioner installation structure
CN217850429U (en) Agricultural greenhouse's section bar connecting elements
CN215055660U (en) Lattice type quick support frame for steel structure construction
CN214365101U (en) Assembled edge guardrail
CN2327751Y (en) Supporting truss of electric ascending/descending scaffold
CN215290639U (en) Telescopic steel support structure for building
CN210263388U (en) Board house connection fixing structure built temporarily
CN214302742U (en) Protective frame system without drawknot unloading on wall surface
CN220203377U (en) Novel connecting piece for climbing frame
CN219045294U (en) Construction is with climbing frame
CN220827904U (en) Precast concrete member dry-type quick connecting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220322