CN212078637U - Frame of climbing that contracted pipe connects pole setting to constitute - Google Patents
Frame of climbing that contracted pipe connects pole setting to constitute Download PDFInfo
- Publication number
- CN212078637U CN212078637U CN202020099126.XU CN202020099126U CN212078637U CN 212078637 U CN212078637 U CN 212078637U CN 202020099126 U CN202020099126 U CN 202020099126U CN 212078637 U CN212078637 U CN 212078637U
- Authority
- CN
- China
- Prior art keywords
- pipe
- contracted
- connecting pipe
- pole setting
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The utility model discloses a climbing frame composed of a pipe contracting joint vertical rod, which comprises a scaffold plate, a connecting plate, a turning plate, a vertical rod, a protective net frame, a power system, a guide rail and a plurality of wall attaching guide seats, wherein each vertical rod is formed by connecting a plurality of connecting pipes (4) in sequence, the inside of each connecting pipe (4) is hollow, the head part of each connecting pipe (4) is contracted, and the size of the outer wall of the contracted pipe part is matched with the size of the inner wall of the uncontracted pipe part, so that the contracted pipe part at the head part of each connecting pipe (4) can be sleeved with the uncontracted pipe part at the tail part of another connecting pipe (4), when the vertical rod is lengthened, the two connecting pipes (4) are utilized for butt joint, the contracted pipe part at the head part of one connecting pipe (4) can be sleeved with the uncontracted pipe part at the tail part of another, the connection is simple, and one accessory is omitted.
Description
Technical Field
The utility model relates to a climb the frame field, especially relate to a draw and connect frame of climbing that the pole setting is constituteed.
Background
The vertical rod is a component of engineering construction engineering and is a vertical rod, and the vertical rod is an important component of the building climbing frame. Referring to fig. 1-2, the conventional vertical rod mainly includes two main rods 1 and a connecting rod 2 for connecting any two main rods 1, the ends of the two main rods 1 are connected through the connecting rod 2, the connecting rod 2 is simultaneously sleeved in the ends of the two main rods 1, and after being sleeved, the two main rods are connected through a pair of clamping plates 3, the pair of clamping plates 3 are fixed on a pair of side walls of the ends of the two main rods 1 through bolts, and the assembling mode of the vertical rod is very troublesome and the parts are too scattered.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model lies in, to the above-mentioned defect of prior art, a frame that climbs that the pole setting is constituteed is connected to the draw is provided.
The utility model provides a technical scheme that its technical problem adopted is: the climbing frame comprises a scaffold plate, a connecting plate, a turning plate, a vertical rod, a protective net frame, a power system, a guide rail and a plurality of wall-attached guide seats, wherein each vertical rod is formed by sequentially connecting a plurality of connecting pipes, each connecting pipe is hollow inside and is sleeved with the head of each connecting pipe, the size of the outer wall of each pipe-shrinking part is matched with the size of the inner wall of each pipe-shrinking part, and the pipe-shrinking part at the head of each connecting pipe can be sleeved with the part, at the tail part of the other connecting pipe, of each connecting pipe.
Preferably, the sleeved pipe reducing part and the non-pipe reducing part are locked by a connecting piece.
Preferably, each connecting pipe is a rectangular pipe, a row of mounting holes are formed in a pair of side edges, with the smaller width, of the rectangular pipe, and the row of mounting holes are arranged in a straight line along the length direction of the connecting pipe.
Preferably, the connecting member is a bolt, and the bolt passes through the mounting holes of the pipe contracting part and the non-contracting part to connect the pipe contracting part and the non-contracting part together.
Preferably, each connecting pipe is formed by extrusion of high-strength aluminum alloy material.
The utility model discloses a draw and connect climbing frame that pole setting is constituteed has following beneficial effect: the utility model discloses in the head of each connecting pipe draw, and draw the outer wall size of partial and not draw the inner wall size of partial to match, so when the pole setting adds long, utilize two connecting pipes to dock, the draw part of the head of one of them connecting pipe can cup joint with the not draw part of the afterbody of another connecting pipe can, compare among the prior art, connect simply, lacked a accessory.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the provided drawings without creative efforts:
fig. 1 is a schematic view of a connection structure of a main pole and a connection pole in the prior art;
fig. 2 is a schematic structural view of a connection of two main rods through a connecting rod in the prior art;
fig. 3 is a schematic structural view of a climbing frame composed of the vertical rods of the pipe contracting joint of the present invention.
Detailed Description
In order to facilitate understanding of the present invention, the present invention will be described more fully hereinafter with reference to the accompanying drawings. Exemplary embodiments of the present invention are shown in the drawings. The invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete. It should be understood that the embodiments and specific features in the embodiments of the present invention are described in detail in the present application, but not limited to the present application, and the technical features in the embodiments and specific features in the embodiments of the present invention can be combined with each other without conflict.
It is noted that the terms "leading," "trailing," and the like are used herein for descriptive purposes only. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention.
The utility model discloses a draw and connect frame of climbing that pole setting is constituteed, including scaffold board, connecting plate, turn over board, aluminum alloy pole setting, protection screen frame, connecting elements, driving system and guide rail and a plurality of guide holder, scaffold board, connecting plate, turn over board, protection screen frame, connecting elements, driving system and guide rail and a plurality of guide holder, these structures are prior art, and this is novel in about the setting of these structures the same with common above-mentioned structure, so no longer describe, the improvement point of this embodiment is mainly concentrated on the pole setting.
Referring to fig. 3, each of the vertical rods is formed by connecting a plurality of connecting pipes 4 in sequence, each of the connecting pipes 4 is hollow, the head of each of the connecting pipes 4 is contracted, and the outer wall of the contracted pipe portion is matched with the inner wall of the non-contracted pipe portion in size, so that the contracted pipe portion at the head of each of the connecting pipes 4 can be sleeved with the non-contracted pipe portion at the tail of another connecting pipe 4, wherein the sleeved contracted pipe portion and the non-contracted pipe portion are locked by a connecting piece 5.
Specifically, in this embodiment, each of the connecting pipes 4 is formed by extruding a high-strength aluminum alloy material, so that the strength of the vertical rod is considered while the weight is light, the corrosion resistance is achieved, and the maintenance cost is low. The part of the vertical rod head which is contracted with the part which is not contracted with the pipe is transited by a table-shaped structure. Each connecting pipe 4 is a rectangular pipe, an inward-concave arc-shaped groove is generated when the connecting pipe is extruded on the larger pair of side edges of the width of the rectangular pipe, a row of mounting holes 41 are formed in the smaller pair of side edges of the width of the rectangular pipe, and the row of mounting holes 41 are arranged in a straight shape along the length direction of the connecting pipe 4. The connecting piece 5 is a bolt which passes through the mounting holes 41 of the pipe reducing part and the non-pipe reducing part and then connects the pipe reducing part and the non-pipe reducing part together.
To sum up, the utility model discloses a draw and connect climbing frame that pole setting is constituteed has following beneficial effect: the utility model discloses in the head of each connecting pipe draw, and draw the outer wall size of partial and not draw the inner wall size of partial to match, so when the pole setting adds long, utilize two connecting pipes to dock, the draw part of the head of one of them connecting pipe can cup joint with the not draw part of the afterbody of another connecting pipe can, compare among the prior art, connect simply, lacked a accessory.
While the embodiments of the present invention have been described with reference to the accompanying drawings, the present invention is not limited to the above-described embodiments, which are merely illustrative and not restrictive, and many modifications may be made by one skilled in the art without departing from the spirit and scope of the present invention as defined in the appended claims.
Claims (5)
1. The utility model provides a frame of climbing that reducing pipe connects pole setting to form, includes scaffold board, connecting plate, turns over board, pole setting, protection screen frame, driving system and guide rail and a plurality of wall guide holder that attaches, its characterized in that, each the pole setting is connected in order by many connecting pipes (4) and is formed, each connecting pipe (4) inside cavity, and each the head of connecting pipe (4) is contracted the pipe, and the outer wall size that contracts the pipe part matches with the inner wall size that does not contract the pipe part, so that each the contracted pipe part of connecting pipe (4) head can cup joint with the part of not contracting of another connecting pipe (4) afterbody.
2. The creeper according to claim 1, wherein the sleeved shrink tube portion and the non-shrink tube portion are locked by a connector (5).
3. The climbing frame according to claim 2, wherein each connecting pipe (4) is a rectangular pipe, a row of mounting holes (41) are formed in a pair of side edges of the rectangular pipe with smaller width, and the row of mounting holes (41) are arranged in a straight line along the length direction of the connecting pipe (4).
4. The creeper according to claim 3, wherein the connector (5) is a bolt that passes through the mounting holes (41) of the contracted and uncontracted tube portions to connect the contracted and uncontracted tube portions together.
5. The creeper according to claim 1, wherein each connecting tube (4) is formed by extrusion from a high-strength aluminum alloy material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020099126.XU CN212078637U (en) | 2020-01-16 | 2020-01-16 | Frame of climbing that contracted pipe connects pole setting to constitute |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020099126.XU CN212078637U (en) | 2020-01-16 | 2020-01-16 | Frame of climbing that contracted pipe connects pole setting to constitute |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212078637U true CN212078637U (en) | 2020-12-04 |
Family
ID=73569612
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020099126.XU Active CN212078637U (en) | 2020-01-16 | 2020-01-16 | Frame of climbing that contracted pipe connects pole setting to constitute |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212078637U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113070827A (en) * | 2021-03-15 | 2021-07-06 | 广州飞机维修工程有限公司 | Repairing and positioning device for airplane seat slide rail beam |
CN114457998A (en) * | 2022-03-03 | 2022-05-10 | 安徽安久模架科技有限公司 | Metal climbing frame convenient to assemble and used for high-rise building construction |
-
2020
- 2020-01-16 CN CN202020099126.XU patent/CN212078637U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113070827A (en) * | 2021-03-15 | 2021-07-06 | 广州飞机维修工程有限公司 | Repairing and positioning device for airplane seat slide rail beam |
CN113070827B (en) * | 2021-03-15 | 2024-05-14 | 广州飞机维修工程有限公司 | Repairing and positioning device for aircraft seat slide rail beam |
CN114457998A (en) * | 2022-03-03 | 2022-05-10 | 安徽安久模架科技有限公司 | Metal climbing frame convenient to assemble and used for high-rise building construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212078637U (en) | Frame of climbing that contracted pipe connects pole setting to constitute | |
CN211341133U (en) | Node structure of circular steel tube truss | |
CN201896490U (en) | Tent | |
CN210564913U (en) | Interior decoration piece of tower cylinder of wind driven generator | |
WO2011162670A2 (en) | Truss structure and a connection arrangement for such a structure | |
CN213979298U (en) | Foldable and spliced miniature fire station | |
CN210117798U (en) | Sleeve type connecting joint of steel structure | |
CN216109631U (en) | Climbing frame | |
CN211524031U (en) | Climbing frame of aluminum alloy upright stanchion | |
CN214169888U (en) | Pipe joint safety fastening fastener for scaffold | |
CN212983573U (en) | Multifunctional connecting joint of aluminum alloy bridge | |
CN104234189B (en) | A kind of four tubular truss structures of prefabricated house | |
CN211037553U (en) | Composite material cylinder structure | |
CN211313583U (en) | Covering or awning on a car, boat, etc. room bearing structure that can install fast | |
CN203766907U (en) | Cross connection joint | |
CN208396007U (en) | Connecting device for steel frame beam column with through partition plate | |
CN209457160U (en) | A kind of splicing node of assembled steel tubular truss lower edge crossbeam and lower edge chord member | |
CN214365381U (en) | Fence convenient to equipment | |
CN211899393U (en) | Assembled building wallboard | |
CN213573130U (en) | But quick assembly disassembly faces frontier defense guardrail | |
CN215442729U (en) | Welding sleeve for connecting reinforcing steel bar and building component | |
CN215331455U (en) | Frame body structure for large-span high formwork | |
CN220790122U (en) | Corrosion-resistant building structure | |
CN221193956U (en) | Laminated wood arc beam structure | |
CN213298495U (en) | Split type connecting clamping piece for assembling greenhouse |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PP01 | Preservation of patent right |
Effective date of registration: 20230413 Granted publication date: 20201204 |
|
PP01 | Preservation of patent right |