CN211524031U - Climbing frame of aluminum alloy upright stanchion - Google Patents

Climbing frame of aluminum alloy upright stanchion Download PDF

Info

Publication number
CN211524031U
CN211524031U CN201921383101.6U CN201921383101U CN211524031U CN 211524031 U CN211524031 U CN 211524031U CN 201921383101 U CN201921383101 U CN 201921383101U CN 211524031 U CN211524031 U CN 211524031U
Authority
CN
China
Prior art keywords
main
connecting rod
pair
rod
aluminum alloy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921383101.6U
Other languages
Chinese (zh)
Inventor
沈海晏
吕光利
朱庚华
钟建都
谢先富
陈恒飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Techen Technology Co Ltd
Original Assignee
Shenzhen Techen Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Techen Technology Co Ltd filed Critical Shenzhen Techen Technology Co Ltd
Priority to CN201921383101.6U priority Critical patent/CN211524031U/en
Application granted granted Critical
Publication of CN211524031U publication Critical patent/CN211524031U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a climbing frame of an aluminum alloy upright stanchion, which comprises a scaffold board, a connecting board, a turning board, an upright stanchion, a protective net frame, a connecting component, a power system, a guide rail and a plurality of guide seats, the upright stanchion comprises main masts (1) and connecting rods (2) used for connecting any two main masts (1), the main rods (1) are formed by high-strength aluminum alloy materials in an extrusion mode, the end parts of the two main rods (1) are connected through one connecting rod (2), the width of the first pair of side walls of the main rod (1) is 30-50mm, the width of the second pair of side walls of the main rod (1) is 50-70mm, realize light in weight, corrosion resistance, maintenance cost low time, compromise the intensity of pole setting, can utilize the connecting rod to link together two pole settings in order to expand pole setting length moreover as required, can be applied to the scene of various differences.

Description

Climbing frame of aluminum alloy upright stanchion
Technical Field
The utility model relates to a building field especially relates to a frame of climbing of aluminum alloy pole setting.
Background
The vertical rod is a component of engineering construction engineering and is a standing rod. The pole setting of frame is all the steel component to building at present, and the shortcoming that the steel component pole setting exists is that weight is heavy, easy corrosion, maintenance cost are high.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model lies in, to the above-mentioned defect of prior art, a frame of climbing of aluminum alloy pole setting is provided.
The utility model provides a technical scheme that its technical problem adopted is: the utility model provides a frame that climbs of aluminum alloy pole setting is constructed, includes scaffold board, connecting plate, turns over board, pole setting, protection screen frame, connecting elements, driving system and guide rail and a plurality of guide bracket, the pole setting includes the mobile jib and is used for connecting the connecting rod of two arbitrary mobile jibs, the mobile jib passes through extrusion mode shaping, two by high strength aluminum alloy material the tip of mobile jib is through one the connecting rod is connected, the width of the first pair of lateral wall of mobile jib is 30-50mm, the width of the second pair of lateral wall of mobile jib is 50-70 mm.
Preferably, mobile jib and connecting rod are all inside cavity, one row of first mounting hole has been seted up to the first pair of lateral wall symmetry of mobile jib, one row of first mounting hole is followed the length direction of mobile jib is a style of calligraphy and arranges.
Preferably, the connecting rod is sleeved in the end portions of the two main rods simultaneously, or the connecting rod is sleeved outside the end portions of the two main rods simultaneously.
Preferably, the second pair of side walls of the main rod is provided with a welding hole near the end, and the connecting rod is sleeved in the end of the main rod and then can be welded and fixed with the main rod through the welding hole.
Preferably, the first pair of side walls of the main rod have second mounting holes respectively formed at positions close to two ends of the main rod, the first pair of side walls of the connecting rod have third mounting holes respectively formed at positions close to two ends of the main rod, the connecting rod is sleeved in the end portion of the main rod, and after the second mounting holes of the main rod and the connecting rod extend into the third mounting holes of the main rod to be aligned, the connecting rod and the main rod are fixed through bolts matched with the second mounting holes and the third mounting holes.
Preferably, the second pair of side walls of the main rod is provided with a welding hole near the end, and the connecting rod is sleeved in the end of the main rod and then can be welded and fixed with the main rod through the welding hole;
the first pair of side walls of the main rod are provided with second mounting holes respectively at positions close to two ends of the main rod, the first pair of side walls of the connecting rod are provided with third mounting holes respectively at positions close to two ends of the main rod, the connecting rod is sleeved in the end part of the main rod, and after the second mounting holes of the main rod and the third mounting holes of the connecting rod extending into the main rod are aligned, the connecting rod and the main rod are fixed through bolts matched with the second mounting holes and the third mounting holes.
Preferably, the outer diameter of the connecting rod is matched with the inner diameter of the main rod.
Preferably, the main pole is a rectangular square tube and the pair of narrow side walls thereof is the first pair of side walls of the main pole.
Preferably, the thickness of the first pair of side walls of the stem is greater than the thickness of the second pair of side walls.
Preferably, the row of first mounting holes is uniformly arranged.
The utility model discloses a frame of climbing of aluminum alloy pole setting has following beneficial effect: the utility model discloses a climb frame and include scaffold board, connecting plate, turn over board, pole setting, protection screen frame, connecting elements, driving system and guide rail and a plurality of guide bracket, the pole setting includes the mobile jib and is used for connecting the connecting rod of two arbitrary mobile jibs, and the mobile jib passes through the extrusion mode shaping by high strength aluminum alloy material, the width of the first pair of lateral wall of mobile jib is 30-50mm, and the width of the second pair of lateral wall is 50-70mm, when realizing light in weight, corrosion resistance, maintenance cost hang down, has compromise the intensity of pole setting, can utilize the connecting rod to link together two pole settings in order to extend pole setting length according to the demand in addition, can be applied to the scene of various differences.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the provided drawings without creative efforts:
fig. 1 is a schematic structural view of a vertical rod in an embodiment of the climbing frame made of aluminum alloy vertical rods of the present invention;
FIG. 2 is a schematic view of the main bar separated from the connecting rod;
fig. 3 is a schematic structural diagram of the vertical rod in another embodiment of the climbing frame made of aluminum alloy vertical rods of the present invention.
Detailed Description
In order to facilitate understanding of the present invention, the present invention will be described more fully hereinafter with reference to the accompanying drawings. Exemplary embodiments of the present invention are shown in the drawings. The invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete. It should be understood that the embodiments and specific features in the embodiments of the present invention are described in detail in the present application, but not limited to the present application, and the technical features in the embodiments and specific features in the embodiments of the present invention can be combined with each other without conflict.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention.
The terms including ordinal numbers such as "first", "second", and the like used in the present specification may be used to describe various components, but the components are not limited by the terms. These terms are used only for the purpose of distinguishing one constituent element from other constituent elements. For example, a first component may be named a second component, and similarly, a second component may also be named a first component, without departing from the scope of the present invention.
The frame of climbing of aluminum alloy pole setting of this embodiment, including scaffold board, connecting plate, turn over board, aluminum alloy pole setting, protection screen frame, connecting elements, driving system and guide rail and a plurality of guide holder, scaffold board, connecting plate, turn over board, protection screen frame, connecting elements, driving system and guide rail and a plurality of guide holder, these structures are prior art, and this is novel in about the setting of these structures the same with common above-mentioned structure, and the event is no longer repeated, and the improvement point of this embodiment is mainly concentrated on the pole setting.
Referring to fig. 1, the vertical rod includes a main rod 1 and a connecting rod 2 for connecting any two main rods 1, specifically, the connecting rod 2 may be simultaneously sleeved with the ends of the two main rods 1 to connect the two main rods 1. For example, in the present embodiment, the connecting rod 2 is sleeved inside the end portions of the two main rods 1 at the same time, and it can be understood that, in other embodiments, the connecting rod 2 may also be sleeved outside the end portions of the two main rods 1 at the same time.
In this embodiment, the outer diameter of the connecting rod 2 is matched with the inner diameter of the main rod 1, and both are rectangular square tubes.
The main rod 1 is formed by high-strength aluminum alloy materials in an extrusion mode, the width of a first pair of side walls of the main rod 1 is 30-50mm, preferably 40mm, the width of a second pair of side walls of the main rod 1 is 50-70mm, preferably 60mm, and the strength of the vertical rod is considered while the light weight, the corrosion resistance and the low maintenance cost are achieved.
Wherein, a row of first mounting hole 101 has been seted up to the first pair of lateral wall symmetry of mobile jib 1, a row of first mounting hole 101 is followed the length direction of mobile jib 1 is a style of calligraphy and arranges. Preferably, the row of first mounting holes 101 is uniformly arranged, and the first mounting holes 101 are through holes, such as bolt holes.
The utility model provides a mobile jib 1's length is far greater than connecting rod 2's length, and connecting rod 2's effect is to extend pole setting length, and connecting rod 2 can link together two mobile jib 1. For this reason, in this embodiment, mobile jib 1 and connecting rod 2 are all inside cavity, connecting rod 2 can cup joint simultaneously in two the tip of mobile jib 1 is in order to connect two mobile jib 1.
The connecting mode of the main rod 1 and the connecting rod 2 can adopt welding and/or bolt fixing, and in the embodiment, the welding and bolt fixing mode is adopted simultaneously.
On the one hand, two welding holes 103 are opened at the positions close to the end portions of the second pair of side walls of the main rod 1, and of course, the number of the welding holes 103 is only an illustration, and is not limited thereto. The connecting rod 2 is sleeved in the end part of the main rod 1 and then can pass through the welding hole 103 to weld and fix the main rod 1 and the connecting rod 2.
On the other hand, two second mounting holes 102 are respectively opened on the first pair of side walls of the main lever 1 near both ends of the main lever 1, and third mounting holes 201 are respectively opened on the first pair of side walls of the connecting rod 2 near both ends, for example, in this embodiment, two third mounting holes 201 are opened on the first pair of side walls of the connecting rod 2 near the left end, and two third mounting holes 201 are opened near the right end. The two third mounting holes 201 on the left and the two third mounting holes 201 on the right of the connecting rod 2 are respectively used for connecting different main rods 1. The connecting rod 2 is sleeved on the end of the main rod 1, the second mounting hole 102 of the main rod 1 and the third mounting hole 201 of the main rod 1 are aligned with each other through the connecting rod 2, and then the connecting rod 2 and the main rod 1 are fixed through bolts matched with the second mounting hole 102 and the third mounting hole 201. Specifically, the distance between the two second mounting holes 102 at the same end is equal to the distance between the two third mounting holes 201 at the same end, the connecting rod 2 is sleeved in the end of the main rod 1, so that the two second mounting holes 102 at the end of the main rod 1 and the two third mounting holes 201 of the connecting rod 2 extending into the main rod 1 are aligned, and then the connecting rod 2 and the main rod 1 are fixed by using bolts which pass through the second mounting holes 102 and the third mounting holes 201 and are locked.
For reliability reasons, the narrower pair of side walls of the primary lever 1 is the first pair of side walls of the primary lever 1, i.e. the first mounting hole 101 is made in a 40mm wide pair of side walls. Furthermore, the thickness of the first pair of side walls of the primary lever 1 is greater than the thickness of the second pair of side walls, that is, the thickness of the 40mm wide side walls is greater than the thickness of the 60mm wide side walls.
In order to further improve the stability of the connection, we further optimize on the basis of the foregoing embodiment, referring to fig. 3, in another specific embodiment, the ends of the two main rods 1 are simultaneously connected by a pair of clamping plates 3, and the pair of clamping plates 3 are fixed on a first pair of side walls of the ends of the two main rods 1 by bolts. Specifically, the bolt simultaneously passes through the mounting hole on the splint 3, the second mounting hole 102 of the mobile jib 1, the third mounting hole 201 of the connecting rod 2, namely the bolt locks the splint 3, the mobile jib 1, the connecting rod 2 together, so that the connecting rod 2, the splint 3 can respectively realize the connection of the mobile jib 1 from the inside and the outside.
To sum up, the utility model discloses a frame of climbing of aluminum alloy pole setting has following beneficial effect: the utility model discloses a climb frame and include scaffold board, connecting plate, turn over board, pole setting, protection screen frame, connecting elements, driving system and guide rail and a plurality of guide bracket, the pole setting includes the mobile jib and is used for connecting the connecting rod of two arbitrary mobile jibs, and the mobile jib passes through the extrusion mode shaping by high strength aluminum alloy material, the width of the first pair of lateral wall of mobile jib is 30-50mm, and the width of the second pair of lateral wall is 50-70mm, when realizing light in weight, corrosion resistance, maintenance cost hang down, has compromise the intensity of pole setting, can utilize the connecting rod to link together two pole settings in order to extend pole setting length according to the demand in addition, can be applied to the scene of various differences.
While the embodiments of the present invention have been described with reference to the accompanying drawings, the present invention is not limited to the above-described embodiments, which are merely illustrative and not restrictive, and many modifications may be made by one skilled in the art without departing from the spirit and scope of the present invention as defined in the appended claims.

Claims (10)

1. The utility model provides a frame of climbing of aluminum alloy pole setting, includes scaffold board, connecting plate, turns over board, pole setting, protection screen frame, connecting elements, driving system and guide rail and a plurality of guide holder, its characterized in that, the pole setting includes mobile jib (1) and is used for connecting rod (2) of two arbitrary mobile jibs (1), mobile jib (1) is by high strength aluminum alloy material through extrusion mode shaping, two the tip of mobile jib (1) is through one connecting rod (2) are connected, the width of the first pair of lateral wall of mobile jib (1) is 30-50mm, the width of the second pair of lateral wall of mobile jib (1) is 50-70 mm.
2. The climbing frame of aluminum alloy pole setting of claim 1, characterized in that mobile jib (1) and connecting rod (2) are all inside cavity, a row of first mounting hole (101) has been seted up to the first pair of lateral wall symmetry of mobile jib (1), a row of first mounting hole (101) is a style of calligraphy and arranges along the length direction of mobile jib (1).
3. The climbing frame with the aluminum alloy upright stanchion of claim 2, wherein the connecting rod (2) is sleeved inside the ends of the two main stanchions (1) at the same time, or the connecting rod (2) is sleeved outside the ends of the two main stanchions (1) at the same time.
4. The climbing frame of the aluminum alloy vertical rod according to claim 1, wherein the connecting rod (2) is sleeved in the ends of the two main rods (1) at the same time, the ends of the two main rods (1) are connected through a pair of clamping plates (3), and the pair of clamping plates (3) are fixed on a first pair of side walls of the ends of the two main rods (1) through bolts.
5. The climbing frame with the aluminum alloy upright stanchion of claim 1, wherein the second pair of side walls of the main stanchion (1) is provided with a welding hole (103) near the end, and the main stanchion (1) and the connecting rod (2) can be welded and fixed through the welding hole (103) after the connecting rod (2) is sleeved in the end of the main stanchion (1).
6. The climbing frame of the aluminum alloy upright post according to claim 1, wherein the first pair of side walls of the main post (1) have second mounting holes (102) respectively formed at positions close to two ends of the main post (1), the first pair of side walls of the connecting rod (2) have third mounting holes (201) respectively formed at positions close to two ends, and after the connecting rod (2) is sleeved in the end of the main post (1) and the second mounting holes (102) of the main post (1) and the third mounting holes (201) of the connecting rod (2) extending into the main post (1) are aligned, the connecting rod (2) and the main post (1) can be fixed through bolts matched with the second mounting holes (102) and the third mounting holes (201).
7. The climbing frame with the aluminum alloy upright stanchion of claim 1, wherein the second pair of side walls of the main stanchion (1) is provided with a welding hole (103) near the end, and the main stanchion (1) and the connecting rod (2) can be welded and fixed through the welding hole (103) after the connecting rod (2) is sleeved in the end of the main stanchion (1);
second mounting holes (102) are respectively formed in positions, close to two ends of the main rod (1), of a first pair of side walls of the main rod (1), third mounting holes (201) are respectively formed in positions, close to two ends, of a first pair of side walls of the connecting rod (2), the connecting rod (2) is sleeved into the end portion of the main rod (1) and enables the second mounting holes (102) of the main rod (1) and the connecting rod (2) to stretch into the third mounting holes (201) of the main rod (1) to be aligned, and then the connecting rod (2) and the main rod (1) are fixed through bolts matched with the second mounting holes (102) and the third mounting holes (201).
8. The climbing frame of aluminum alloy vertical rod according to claim 1, characterized in that the outer diameter of the connecting rod (2) is matched with the inner diameter of the main rod (1).
9. The climbing frame of aluminum alloy vertical poles according to claim 1, characterized in that the main pole (1) is a rectangular square tube and its narrow pair of side walls is the first pair of side walls of the main pole (1).
10. The climbing frame of aluminum alloy vertical poles according to claim 1, characterized in that the thickness of the first pair of side walls of the main pole (1) is greater than the thickness of the second pair of side walls.
CN201921383101.6U 2019-08-23 2019-08-23 Climbing frame of aluminum alloy upright stanchion Expired - Fee Related CN211524031U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921383101.6U CN211524031U (en) 2019-08-23 2019-08-23 Climbing frame of aluminum alloy upright stanchion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921383101.6U CN211524031U (en) 2019-08-23 2019-08-23 Climbing frame of aluminum alloy upright stanchion

Publications (1)

Publication Number Publication Date
CN211524031U true CN211524031U (en) 2020-09-18

Family

ID=72439385

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921383101.6U Expired - Fee Related CN211524031U (en) 2019-08-23 2019-08-23 Climbing frame of aluminum alloy upright stanchion

Country Status (1)

Country Link
CN (1) CN211524031U (en)

Similar Documents

Publication Publication Date Title
CN100590277C (en) High-altitude bridge type cantilever scaffold
CN105888080A (en) Assembly type steel pipe casing reinforced concrete combined joint and mounting method
CN102337781A (en) Tool-type combined and attached lifting scaffold
CN211524031U (en) Climbing frame of aluminum alloy upright stanchion
CN212078637U (en) Frame of climbing that contracted pipe connects pole setting to constitute
CN211774976U (en) Cable clamp node for stay cable and stay bar in beam string
CN207846810U (en) A kind of novel ceiling applied on steel construction ceiling framework
CN202401573U (en) Structure of batter brace serving as purline bolt
CN211286273U (en) Horizontal truss with firm structure
CN210564913U (en) Interior decoration piece of tower cylinder of wind driven generator
CN104234189B (en) A kind of four tubular truss structures of prefabricated house
CN208950292U (en) A kind of building built connection structure
CN206503284U (en) A kind of semicircle vertex of a cone combines paulin room with curved surface top
CN216109631U (en) Climbing frame
CN217420247U (en) Pier stud steel reinforcement cage stirrup locator
CN219156233U (en) Independent wall attaching structure of construction elevator and construction building
CN210669345U (en) Electromechanical pipeline support system between big span steel column
CN206828942U (en) Steel construction circular arc bridge
CN206051211U (en) A kind of special extended type wall-attached frame
CN214989582U (en) Novel reassembling type elevator guard gate
CN216196535U (en) Support diagonal rod convenient to disassemble and assemble and used for inner and outer vertical rods of climbing frame
CN216041711U (en) Internal supporting and reinforcing frame for steel structure house
CN205133079U (en) Bracing device behind hanging flower basket support
CN210086687U (en) High-strength lightweight stair board concrete prefabricated part
CN219365329U (en) Large-span protection frame device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200918