CN210263388U - Board house connection fixing structure built temporarily - Google Patents

Board house connection fixing structure built temporarily Download PDF

Info

Publication number
CN210263388U
CN210263388U CN201920711078.2U CN201920711078U CN210263388U CN 210263388 U CN210263388 U CN 210263388U CN 201920711078 U CN201920711078 U CN 201920711078U CN 210263388 U CN210263388 U CN 210263388U
Authority
CN
China
Prior art keywords
channel beam
fixing structure
right channel
trough
entablature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920711078.2U
Other languages
Chinese (zh)
Inventor
王井龙
王井国
霍妍佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920711078.2U priority Critical patent/CN210263388U/en
Application granted granted Critical
Publication of CN210263388U publication Critical patent/CN210263388U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a fixed knot constructs is connected to board house of buildding temporarily, including two entablature that are parallel to each other, two be fixed with opening down and left channel beam and the right channel beam that is parallel to each other, two respectively between the both ends of entablature the entablature is square tubular construction, two the lower surface of entablature is close to both ends and has all opened the through-hole, and has alternate same root plastic tubing between two through-holes, is provided with the electric wire in the plastic tubing, the both ends lower surface of left side channel beam and right channel beam all is provided with C shaped steel stand, and the bottom mounting of C shaped steel stand has the opening upwards and the second right channel beam and the left channel beam of second that is parallel to each other. The utility model provides the high water and electricity leakage prevention effect of device makes to set up double-deck insulator between the entablature of electric wire and iron on the one hand, secondly because of the plastic tubing mouth of pipe down, consequently reduced the intraductal possibility of rainwater entering to the water and electricity leakage prevention effect of activity has been improved greatly.

Description

Board house connection fixing structure built temporarily
Technical Field
The utility model relates to a building technical field especially relates to a fixed knot constructs is connected to board house of buildding temporarily.
Background
The existing movable board house is formed by splicing a plurality of boards, and is often used for temporary buildings due to the characteristics of simple structure, easy disassembly and the like. When the board concatenation activity overlap joint of the corner of current activity board house, adopt the connecting piece or the right angle connecting piece overlap joint of an angle bar shape usually, connect like this and also can effectively link together each board, but from the outward appearance stand out one, influence holistic pleasing to the eye, this kind of connection is firm inadequately moreover, and the atress is concentrated in the corner. Moreover, cable routing such as the wires of the portable house is usually arranged outside the board, and is easily damaged or exposed to the air due to touch, so that unsafe factors exist.
The retrieved Chinese patent No. CN201721007457.0 discloses a movable house connecting component, which comprises a square fixing seat and a connecting pipe connected with the fixing seat; circular through-hole has all been seted up to every face of fixing base, just every face of fixing base all is provided with four at least bolted connection holes, but the junction of the device is convenient for peg graft the installation, but dampproofing and waterproofing effect is extremely poor, in case inside intake, can cause great potential safety hazards such as electric leakage.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a board house connection fixing structure built temporarily.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a board house connection fixed knot who builds temporarily constructs, includes two entablatures that are parallel to each other, two be fixed with left channel beam and right channel beam that the opening is decurrent and parallel to each other respectively between the both ends of entablature, two entablature is square tubular structure, two the lower surface of entablature is close to both ends and all opens the through-hole, and has alternate same plastic tubing between two through-holes, is provided with the electric wire in the plastic tubing, and the circumference outer wall of plastic tubing is close to both ends and all has cup jointed waterproof ring, the both ends lower surface of left channel beam and right channel beam all is provided with the C shaped steel stand, and the bottom mounting of C shaped steel stand has the opening upwards and parallel second right channel beam and the left channel beam of second of each other.
Preferably, both ends of the left trough beam and the right trough beam are welded with baffles matched with the cross section shapes of the left trough beam and the right trough beam.
Preferably, the left channel beam, the right channel beam and the two upper cross beams form a top frame, and screw holes distributed at equal intervals are formed in the upper surfaces of the left channel beam and the right channel beam.
Preferably, the lower surfaces of the left trough beam and the right trough beam are clamped with side panels.
Preferably, both ends of the left trough beam and the right trough beam are provided with a top clamping plate and a top corner protection plate which are welded together, and both ends of the second left trough beam and the second right trough beam are provided with a bottom clamping plate and a bottom corner protection plate which are welded together.
Preferably, the same front panel is clamped between the top clamping plate and the bottom clamping plate.
Compared with the prior art, the utility model provides a fixed knot constructs is connected to board house of buildding temporarily possesses following beneficial effect:
1. through setting up the plastic tubing of pegging graft between two through-holes to the water and electricity leakage prevention effect of device has been improved, made on the one hand and set up double-deck insulator between the entablature of electric wire and iron, secondly because of the plastic tubing mouth of pipe is down, consequently reduced the intraductal possibility of rainwater entering, thereby improved the water and electricity leakage prevention effect of activity greatly.
2. Through setting up at the front and with the top cardboard and the end cardboard at the back to let the installation of positive panel more convenient, only need with its joint between top cardboard and end cardboard can, avoid traditional curb plate or panel installation to need can fix it on the frame through the screw or the rivet that density is very big, improved the convenience of dismouting.
3. Through the right trough beam and the left trough beam which are of the trough-shaped structures, when the side panel is installed, the side panel only needs to be clamped in the trough, and then waterproof glue is extruded from the junction, so that the installation is convenient and rapid.
The part that does not relate to in the device all is the same with prior art or can adopt prior art to realize, the utility model discloses simple structure, the installation of being convenient for and water-proof effects are good.
Drawings
Fig. 1 is a schematic view of an assembly structure of a temporarily built board room connecting and fixing structure top assembly provided by the utility model;
fig. 2 is a schematic view of a top view structure of a temporarily constructed board room connection fixing structure provided by the present invention;
fig. 3 is the utility model provides a spatial structure schematic diagram of fixed knot constructs bottom subassembly is connected to board house of buildding temporarily.
In the figure: 1-upper beam, 2-top clamping plate, 3-plastic pipe, 4-left channel beam, 5-through hole, 6-electric wire, 7-C type steel upright post, 8-right channel beam, 9-top angle guard plate, 10-baffle, 11-screw hole, 12-front panel, 13-second right channel beam, 14-second left channel beam, 15-side panel, 16-lower beam, 17-bottom clamping plate and 18-bottom angle guard plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Example 1
Referring to fig. 1-3, a temporarily built plank house connecting and fixing structure comprises two upper crossbeams 1 which are parallel to each other, a left trough beam 4 and a right trough beam 8 which are parallel to each other and have downward openings are respectively fixed between two ends of the two upper crossbeams 1, the two upper crossbeams 1 are of a square tube structure, through holes 5 are respectively formed in the lower surfaces of the two upper crossbeams 1 close to the two ends, a same plastic tube 3 is inserted between the two through holes 5, electric wires 6 are arranged in the plastic tube 3, waterproof rings are respectively sleeved on the outer circumferential wall of the plastic tube 3 close to the two ends, so that the waterproof and electric leakage effects of the device are greatly improved, on one hand, a double-layer insulator is arranged between the electric wires and the iron upper crossbeams 1, on the other hand, the possibility of rainwater entering the tubes is reduced, C-shaped steel upright posts 7 are respectively arranged on the lower surfaces of the two ends of the left trough beam 4 and the right trough beam 8, and second right trough beam.
The utility model discloses in, the baffle 10 rather than section shape looks adaptation is all welded at the both ends of left trough beam 4 and right trough beam 8 to prevented that the rainwater that oozes down from getting into the inside of flute profile crossbeam, guaranteed that the inside of trough beam can not intake and the wall infiltration.
Wherein, the left trough beam 4, the right trough beam 8 and the two upper cross beams 1 form a frame at the top, and the upper surfaces of the left trough beam 4 and the right trough beam 8 are provided with screw holes 11 distributed at equal intervals for installing a top plate.
Wherein, the lower surface of left trough beam 4 and right trough beam 8 all is blocked to have side board 15.
Example 2
Referring to fig. 1 and 3, in this embodiment, compared with embodiment 1, the temporarily built board house connecting and fixing structure further includes a top clamping board 2 and a top corner protection board 9 which are welded together and are arranged at both ends of the left channel beam 4 and the right channel beam 8, and a bottom clamping board 17 and a bottom corner protection board 18 which are welded together and are arranged at both ends of the second left channel beam 14 and the second right channel beam 13.
Wherein, the joint has same positive panel 12 between top cardboard 2 and the end cardboard 17 to let the installation of positive panel more convenient, only need with its joint between top cardboard 2 and end cardboard 17 can, avoid traditional curb plate or panel installation to need can fix it on the frame through the screw or the rivet that the density is very big, improved the convenience of dismouting.
The working principle is as follows: when the combined type C-shaped steel upright post is used, two upper cross beams 1, a left channel beam 4 and a right channel beam 8 are firstly arranged into a rectangular frame structure, then four C-shaped steel upright posts 7 are fixed on the lower surface of the rectangular frame and are close to four corners, finally two side panels 15 are clamped in clamping grooves of the left channel beam 4 and the right channel beam 8, then a top clamping plate 2 and a top angle protection plate 9 which are welded into a right-angle shape are fixed on two opposite sides of the rectangular frame and are close to the four corners through bolts, then components corresponding to the bottom are combined into a bottom frame, and then the bottom ends of the four C-shaped steel upright posts 7 are fixed through bolts; finally, the front panel 12 is clamped between the top clamping plate 2 and the bottom clamping plate 17; when the device needs to be wired and the electric appliance is installed, the head of the electric wire 6 inserted into the plastic pipe 3 in advance is electrified, the other end of the electric wire is connected into the electric appliance, the installation is convenient, and the electric wire does not need to be extracted when the electric wire is detached.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. A temporarily built board house connecting and fixing structure comprises two upper cross beams (1) which are parallel to each other, it is characterized in that a left channel beam (4) and a right channel beam (8) which are provided with downward openings and are parallel to each other are respectively fixed between the two ends of the two upper cross beams (1), the two upper cross beams (1) are of square tube structures, through holes (5) are respectively arranged on the lower surfaces of the two upper cross beams (1) near the two ends, a plastic pipe (3) is inserted between the two through holes (5), an electric wire (6) is arranged in the plastic pipe (3), waterproof rings are sleeved on the outer wall of the circumference of the plastic pipe (3) close to the two ends, the lower surfaces of the two ends of the left trough beam (4) and the right trough beam (8) are respectively provided with a C-shaped steel upright post (7), and a second right channel beam (13) and a second left channel beam (14) which are provided with upward openings and are parallel to each other are fixed at the bottom end of the C-shaped steel upright post (7).
2. The temporarily built board room connecting and fixing structure is characterized in that baffle plates (10) matched with the cross section shapes of the left trough beam (4) and the right trough beam (8) are welded at two ends of the left trough beam and the right trough beam respectively.
3. The temporarily built board room connecting and fixing structure is characterized in that the left channel beam (4), the right channel beam (8) and the two upper cross beams (1) form a frame at the top, and screw holes (11) are formed in the upper surfaces of the left channel beam (4) and the right channel beam (8) and are distributed at equal intervals.
4. The temporarily built board room connecting and fixing structure is characterized in that the lower surfaces of the left channel beam (4) and the right channel beam (8) are clamped with side panels (15).
5. The temporarily built board room connecting and fixing structure is characterized in that both ends of the left channel beam (4) and the right channel beam (8) are provided with a top clamping plate (2) and a top corner protection plate (9) which are welded together, and both ends of the second left channel beam (14) and the second right channel beam (13) are provided with a bottom clamping plate (17) and a bottom corner protection plate (18) which are welded together.
6. A temporarily built board room connecting and fixing structure as claimed in claim 5, wherein the same front panel (12) is clamped between the top clamping plate (2) and the bottom clamping plate (17).
CN201920711078.2U 2019-05-17 2019-05-17 Board house connection fixing structure built temporarily Expired - Fee Related CN210263388U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920711078.2U CN210263388U (en) 2019-05-17 2019-05-17 Board house connection fixing structure built temporarily

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920711078.2U CN210263388U (en) 2019-05-17 2019-05-17 Board house connection fixing structure built temporarily

Publications (1)

Publication Number Publication Date
CN210263388U true CN210263388U (en) 2020-04-07

Family

ID=70025188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920711078.2U Expired - Fee Related CN210263388U (en) 2019-05-17 2019-05-17 Board house connection fixing structure built temporarily

Country Status (1)

Country Link
CN (1) CN210263388U (en)

Similar Documents

Publication Publication Date Title
US3856981A (en) Power panel arrangement
CN209837290U (en) Connecting piece for assembling house frame combination
CN210263388U (en) Board house connection fixing structure built temporarily
CN108661180B (en) Roof of container house
CN210052454U (en) High definition LED barrier screen
CN210273341U (en) Construction operation layer power cable handing equipment
CN219344309U (en) Multifunctional upright post for photovoltaic power generation type fence device
CN209816909U (en) Composite cable utility tunnel unit and composite cable utility tunnel
CN214124671U (en) Cable lead-up wire protection sleeve
CN216689028U (en) Railing structure convenient to fast assembly
CN106836480B (en) Steel structure bracket and steel structure supporting structure
CN218952560U (en) Locate inside modularization spatial structure of building
CN211115434U (en) Corrosion-resistant aluminum alloy door and window easy to assemble and disassemble
CN216215605U (en) Cable bridge frame elbow structure
CN220747895U (en) Safety protection device for building site management
CN215630909U (en) Large decorative line mounting structure of glass curtain wall
KR20080039771A (en) High voltage cable supporter
CN212562772U (en) Novel baffle and road construction plastic steel enclose fender
CN210530046U (en) Component type curtain wall
CN211949094U (en) Novel sound insulation building curtain wall
CN210562597U (en) Upper cantilever connecting unit of assembled balcony
CN216290011U (en) Cable bridge connecting structure
CN216109631U (en) Climbing frame
CN210568248U (en) Both arms lamp pole with illumination function
CN215817303U (en) Ladder-type bridge frame for increasing cable laying space

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200407