CN217353340U CN202221095851.5U CN202221095851U CN217353340U CN 217353340 U CN217353340 U CN 217353340U CN 202221095851 U CN202221095851 U CN 202221095851U CN 217353340 U CN217353340 U CN 217353340U
Authority
CN
China
Prior art keywords
clamping
arm
hanging
mounting hole
pendant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221095851.5U
Other languages
Chinese (zh)
Inventor
黎能聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Lianzhu Group Co ltd
Original Assignee
Guangdong Lianzhu Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Lianzhu Group Co ltd filed Critical Guangdong Lianzhu Group Co ltd
Priority to CN202221095851.5U priority Critical patent/CN217353340U/en
Application granted granted Critical
Publication of CN217353340U publication Critical patent/CN217353340U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/244Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to an architectural decoration engineering technical field especially relates to a hang structure futilely. A dry hanging structure comprises an angle connector, a first hanging piece and a second hanging piece, wherein the rear end face of the angle connector is fixedly connected with a building wall, and one side, far away from the building wall, of the angle connector is detachably connected with the first hanging piece; the second pendant includes clamping part, connecting portion, bearing portion and joint portion, the clamping part include the linking arm and set up respectively in the first centre gripping arm and the second centre gripping arm of both sides around the linking arm. The structure of hanging futilely can effectively improve the connection stability of pendant to improve the installation stability of stone material, the stone material is difficult to appear crooked, guarantees the roughness of decorating the wall, has solved among the current structure of hanging futilely that the pendant connection stability is poor and lead to the stone material installation unstable, take place crooked easily, influence the problem of the roughness of decorating the wall.

Description

Dry hanging structure
Technical Field
The utility model relates to an architectural decoration engineering technical field especially relates to a hang structure futilely.
Background
The stone dry hanging is a new construction technology in wall decoration, the method uses metal hanging parts to hang facing stone on wall or on steel frame, the principle is that main stress points are set on the main structure, the stone is fixed on the building by metal hanging parts to form the stone decorative curtain wall. In the structure is hung futilely to current stone material, only connect through the retaining member between the pendant simply, the connection stability between the pendant is poor, leads to the installation of stone material unstable easily, and the stone material takes place crooked easily to the roughness of stone material decoration wall has seriously been influenced.
SUMMERY OF THE UTILITY MODEL
Problem to the background art provides, the utility model aims to provide a hang structure futilely can effectively improve the connection stability of pendant to improve the installation stability of stone material, the stone material is difficult to appear crooked, guarantees the roughness of decorating the wall, has solved among the current structure of hanging futilely that pendant connection stability is poor and lead to the stone material installation unstable, take place crooked easily, influence the problem of the roughness of decorating the wall.
To achieve the purpose, the utility model adopts the following technical proposal:
a dry hanging structure comprises a corner connector, a first hanging piece and a second hanging piece, wherein the rear end face of the corner connector is fixedly connected with a building wall, and one side, far away from the building wall, of the corner connector is detachably connected with the first hanging piece;
the second pendant comprises a clamping part, a connecting part, a supporting part and a clamping part, the clamping part comprises a connecting arm, and a first clamping arm and a second clamping arm which are respectively arranged at the front side and the rear side of the connecting arm, the first clamping arm is connected with the upper end of the connecting part, the connecting arm is fixedly connected with the upper end of the first pendant, a clamping cavity is formed between the first clamping arm and the second clamping arm, clamping blocks are respectively arranged at one sides of the first clamping arm and the second clamping arm, which face the clamping cavity, and the first pendant is clamped in the clamping cavity by the clamping block arranged on the first clamping arm and the clamping block arranged on the second clamping arm;
the supporting part is connected to the lower end of the connecting part, one side, close to the first pendant, of the supporting part is provided with a butting block, and the butting block is butted with the front end face of the first pendant;
the clamping portion is connected to one side, away from the first hanging piece, of the connecting portion, and the clamping portion is fixedly connected with the stone.
It is further explained that the corner connector comprises a first vertical portion and a first parallel portion which are perpendicular to each other, the first hanging piece comprises a second vertical portion and a second parallel portion which are perpendicular to each other, the first vertical portion is fixedly connected with the building wall, the second parallel portion is connected with the upper end face of the first parallel portion, the connecting arm is fixedly connected with the upper end face of the second vertical portion, and the clamping blocks of the first clamping arm and the clamping blocks of the second clamping arm are respectively clamped on the upper portion of the second vertical portion.
Furthermore, a first mounting groove is formed in one side, facing the clamping cavity, of each of the first clamping arm and the second clamping arm, a first mounting convex block matched with the first mounting groove is arranged on one side, away from the clamping cavity, of each clamping block, and the first mounting convex block is clamped in the first mounting groove;
one side of the clamping block, which is close to the clamping cavity, is provided with a plurality of first clamping salient points, the first clamping salient points are positioned in the clamping cavity, and the first clamping salient points are abutted to the upper part of the second vertical part.
Furthermore, a second mounting groove is formed in one side, facing the first hanger, of the supporting portion, a second mounting convex block matched with the second mounting groove is arranged on one side, away from the first hanger, of the abutting block, the second mounting convex block is clamped in the second mounting groove, a plurality of second clamping convex points are arranged on one side, close to the first hanger, of the abutting block, and the second clamping convex points are located outside the second mounting groove and abut against the front end face of the second vertical portion.
Further, the building wall further comprises an anchoring piece, wherein a first mounting hole penetrates through the first vertical portion, a second mounting hole is formed in the building wall, the anchoring piece penetrates through the second mounting hole after penetrating through the first mounting hole, and the first vertical portion is fixedly mounted on the building wall.
Further, the locking device further comprises a locking piece, wherein a third mounting hole is formed in the first parallel portion in a penetrating mode, a fourth mounting hole is formed in the second parallel portion, and the locking piece sequentially penetrates through the fourth mounting hole and the third mounting hole to fixedly mount the second parallel portion on the upper end face of the first parallel portion;
the fourth mounting hole extends along the front-back direction and is a waist-shaped hole.
Furthermore, the upper end surface of the second parallel part is provided with a convex pattern which is in a sawtooth shape.
In a further description, the connecting device further comprises a fastener, a fifth mounting hole penetrates through the connecting arm, and the fastener penetrates through the fifth mounting hole to fixedly connect the connecting arm with the upper end face of the second vertical portion.
Further, the clamping portion comprises a connecting strip and a clamping strip which are perpendicular to each other, one end of the connecting strip is connected with one side, away from the first hanging piece, of the connecting portion, the other end of the connecting strip is connected to the middle of the clamping strip, a clamping groove matched with the clamping strip is formed in the back face of the stone, and the clamping strip is clamped in the clamping groove.
Compared with the prior art, the embodiment of the utility model has following beneficial effect:
1. the clamping part, the supporting part and the clamping part are arranged on the second pendant, the first pendant is clamped by the clamping block positioned on the first clamping arm and the clamping block positioned on the second clamping arm while the connecting arm is fixedly connected with the upper end of the first pendant, in addition, the supporting of the second pendant can be realized from the lower part by the abutting block arranged on the supporting part, the connection stability between the second pendant and the first pendant is effectively ensured by the upper clamping acting force and the lower supporting acting force, the stable installation of the stone can be realized by the first pendant and the second pendant through the corner connectors because the clamping part is connected to one side of the connecting part away from the first pendant, the connection stability of the pendants can be effectively improved by the dry-hanging structure, the installation stability of the pendants is improved, the deflection of the stone is not easy to occur, the flatness of a decorative wall surface is ensured, and the problems that the instable installation of the stone is caused by the poor connection stability of the pendants in the existing dry-hanging structure are solved, The problem that the decorative wall surface is easy to be inclined and the flatness of the decorative wall surface is influenced;
2. the angle brace is buckled with two L-shaped components of the first hanging piece, the clamping block of the first clamping arm and the clamping block of the second clamping arm are respectively clamped at the upper part of the second vertical part, stable connection and support can be formed between the angle brace and the first hanging piece and between the first hanging piece and the second hanging piece, and the stability of a dry hanging structure can be ensured even after the second hanging piece connected with the stone is hung, so that the dry hanging effect of the stone is further ensured;
3. through setting up first installation lug at the grip block, realize installing the grip block in corresponding first centre gripping arm or second centre gripping arm, through setting up first centre gripping bump, first centre gripping bump and the upper portion butt of the vertical portion of second to the grip block that the realization is located first centre gripping arm and the grip block that is located second centre gripping arm is with first pendant centre gripping in the centre gripping cavity, and effectively prevents to take place to slide between vertical portion of second and the grip block.
Drawings
Fig. 1 is a schematic view of a dry-hang structure according to an embodiment of the present invention;
fig. 2 is a schematic view of a dry-hang structure according to an embodiment of the present invention;
FIG. 3 is an enlarged schematic view at A of FIG. 2;
fig. 4 is a schematic top view of a first suspension member according to an embodiment of the present invention;
wherein: corner connector 1, first vertical portion 11, first parallel portion 12, first hanger 2, second vertical portion 21, second parallel portion 22, fourth mounting hole 221, convex pattern 222, second hanger 3, clamping portion 31, connecting arm 311, first clamping arm 312, first mounting groove 3121, second clamping arm 313, clamping cavity 314, clamping block 315, first mounting bump 3151, first clamping bump 3152, connecting portion 32, supporting portion 33, abutting block 331, second mounting bump 3311, second clamping bump 3312, second mounting groove 332, clamping portion 34, connecting strip 341, clamping strip 342, anchoring member 4, locking member 5, fastening member 6, building wall 7, stone 8, clamping groove 81, and marble glue 82.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present invention, and should not be construed as limiting the present invention.
In the description of the present invention, it is to be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships illustrated in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, features defined as "first" and "second" may explicitly or implicitly include one or more of the features for distinguishing between descriptive features, non-sequential, non-trivial and non-trivial.
In the description of the present invention, "a plurality" means two or more unless otherwise specified.
As shown in fig. 1 to 4, a dry hanging structure comprises an angle connector 1, a first hanging piece 2 and a second hanging piece 3, wherein the rear end face of the angle connector 1 is fixedly connected with a building wall 7, and one side of the angle connector 1, which is far away from the building wall 7, is detachably connected with the first hanging piece 2;
the second hanger 3 comprises a clamping portion 31, a connecting portion 32, a supporting portion 33 and a clamping portion 34, the clamping portion 31 comprises a connecting arm 311, and a first clamping arm 312 and a second clamping arm 313 which are respectively arranged at the front side and the rear side of the connecting arm 311, the first clamping arm 312 is connected with the upper end of the connecting portion 32, the connecting arm 311 is fixedly connected with the upper end of the first hanger 2, a clamping cavity 314 is formed between the first clamping arm 312 and the second clamping arm 313, clamping blocks 315 are respectively arranged on one sides of the first clamping arm 312 and the second clamping arm 313 facing the clamping cavity 314, and the first hanger 2 is clamped in the clamping cavity 314 by the clamping blocks 315 arranged on the first clamping arm 312 and the clamping blocks 315 arranged on the second clamping arm 313;
the supporting part 33 is connected to the lower end of the connecting part 32, a butting block 331 is installed on one side of the supporting part 33 close to the first hanging part 2, and the butting block 331 is butted against the front end face of the first hanging part 2;
the clamping portion 34 is connected to one side, away from the first hanging member 2, of the connecting portion 32, and the clamping portion 34 is fixedly connected with the stone 8.
By providing the clamping portion 31, the supporting portion 33 and the clamping portion 34 on the second hanger 3, the first hanger 2 is clamped by the clamping block 315 located on the first clamping arm 312 and the clamping block 315 located on the second clamping arm 313 while the connecting arm 311 is fixedly connected with the upper end of the first hanger 2, and furthermore, by the abutting block 331 installed on the supporting portion 33, the second hanger 3 can be supported from below, the upper clamping force and the lower supporting force effectively ensure the connection stability between the second hanger 3 and the first hanger 2, since the clamping portion 34 is connected to the side of the connecting portion 32 away from the first hanger 2, the stable installation of the stone material 8 can be realized by the corner brace 1, the first hanger 2 and the second hanger 3, the dry hanging structure can effectively improve the connection stability of the hangers, thereby improve the installation stability of stone material 8, stone material 9 is difficult to appear crooked, guarantees the roughness of decorating the wall, has solved among the current dry-hang structure pendant connection stability poor and lead to the stone material installation unstable, take place crooked easily, influence the problem of the roughness of decorating the wall.
To explain further, the corner connector 1 includes a first vertical portion 11 and a first parallel portion 12 that are perpendicular to each other, the first hanger 2 includes a second vertical portion 21 and a second parallel portion 22 that are perpendicular to each other, the first vertical portion 11 is fixedly connected to the building wall 7, the second parallel portion 22 is connected to the upper end surface of the first parallel portion 12, the connecting arm 311 is fixedly connected to the upper end surface of the second vertical portion 21, and the clamping block 315 of the first clamping arm 312 and the clamping block 315 of the second clamping arm 313 are respectively clamped to the upper portion of the second vertical portion 21.
Through angle sign indicating number 1 with the subassembly looks lock of two "L" types of first pendant 2, just connecting arm 311 with the up end fixed connection of the vertical portion 21 of second, the grip block 315 of first grip arm 312 with the grip block 315 of second grip arm 313 centre gripping respectively in the upper portion of the vertical portion 21 of second, angle sign indicating number 1 with between the first pendant 2 with can form stable connection and support between the second pendant 3, even articulated be connected with stone material 8 behind the second pendant 3, also can guarantee the stability of hanging the structure futilely, further guarantee the effect that the stone material hung futilely.
More specifically, a first mounting groove 3121 is respectively formed on one side of the first holding arm 312 and one side of the second holding arm 313 facing the holding cavity 314, a first mounting protrusion 3151 matching with the first mounting groove 3121 is formed on one side of the holding block 315 facing away from the holding cavity 314, and the first mounting protrusion 3151 is snapped into the first mounting groove 3121;
a plurality of first clamping convex points 3152 are arranged on one side of the clamping block 315 close to the clamping cavity 314, the first clamping convex points 3152 are located in the clamping cavity 314, and the first clamping convex points 3152 are abutted against the upper portion of the second vertical portion 21.
The clamping block 315 is provided with the first mounting convex block 3151, so that the clamping block 315 is mounted on the corresponding first clamping arm 312 or the corresponding second clamping arm 313, and the first clamping convex point 3152 is arranged to abut against the upper part of the second vertical part 21, so that the clamping block 315 located on the first clamping arm 312 and the clamping block 315 located on the second clamping arm 313 clamp the first pendant 2 in the clamping cavity 314, and the slippage between the second vertical part 21 and the clamping block 315 is effectively prevented.
More specifically, a second mounting groove 332 is formed on a side of the supporting portion 33 facing the first hanging member 2, a second mounting protrusion 3311 matching with the second mounting groove 332 is formed on a side of the abutting block 331 away from the first hanging member 2, the second mounting protrusion 3311 is clamped in the second mounting groove 332, a plurality of second clamping protrusions 3312 are formed on a side of the abutting block 331 close to the first hanging member 2, and the second clamping protrusions 3312 are located outside the second mounting groove 332 and abut against a front end surface of the second vertical portion 21.
Through the setting of butt joint piece 331 the second installation lug 3311, the realization will butt joint piece 331 install in bearing 33, through setting up second centre gripping bump 3312, second centre gripping bump 3312 with the preceding terminal surface looks butt of the vertical portion 21 of second, thereby realize butt joint piece 331 is right second pendant 3 has certain bearing capacity, and effectively prevents the vertical portion 21 of second with take place to slide between the butt joint piece 331, guarantee the stability that the stone material hung futilely.
Further, the building wall comprises an anchoring part 4, wherein a first mounting hole is formed in the first vertical part 11 in a penetrating manner, a second mounting hole is formed in the building wall 7, the anchoring part 4 penetrates through the first mounting hole and then penetrates into the second mounting hole, and the first vertical part 11 is fixedly mounted on the building wall 7.
Through setting up anchoring member 4 can realize fixed connection between angle sign indicating number 1 and the building wall 7, connection stability is strong, specifically, anchoring member 4 is expansion bolts, can with angle sign indicating number 1 is fixed in steadily on the building wall 7.
More specifically, the locking device further includes a locking element 5, a third mounting hole penetrates through the first parallel portion 12, a fourth mounting hole 221 penetrates through the second parallel portion 22, and the locking element 5 sequentially penetrates through the fourth mounting hole 221 and the third mounting hole to fixedly mount the second parallel portion 22 on the upper end surface of the first parallel portion 12;
the fourth mounting hole 221 extends in the front-back direction, and the fourth mounting hole 221 is a kidney-shaped hole.
The angle brace 1 and the first hanging piece 2 can be detachably connected through the locking piece 5, the connection stability is high, the hanging stability of the angle brace 1 and the first hanging piece 2 is guaranteed, the fourth mounting hole 221 is a waist-shaped hole, the fourth mounting hole 221 extends in the front-back direction, when the angle brace is installed, the front-back position of the first hanging piece 2 can be adjusted by adjusting the mounting position of the locking piece 5 in the fourth mounting hole 221, so that the position of the stone is adjusted, and the flatness of the whole stone is adjusted; specifically, the locking member 5 is a bolt, and can stably fix the first hanger to the corner bracket.
Preferably, the upper end surface of the second parallel portion 22 is provided with a raised pattern 222, and the raised pattern 222 is saw-toothed.
The serrated ribs 222 are arranged on the upper end surface of the second parallel portion 22, so that the friction force on the surface of the second parallel portion 22 can be increased, the locking piece 5 is not easy to slip after being locked, the connection stability of the second parallel portion 22 and the first parallel portion 12 is ensured, the structural stability of dry hanging of the stone is ensured, and the stone is prevented from being inclined.
In a further description, the connecting device further includes a fastener 6, a fifth mounting hole is formed through the connecting arm 311, and the fastener 6 passes through the fifth mounting hole and then fixedly connects the connecting arm 311 and the upper end surface of the second vertical portion 21.
Through setting up fastener 6 can realize second pendant 3 with the fixed connection of first pendant 2, connection stability is strong, guarantees second pendant 3 with the stability that articulates of first pendant 2, specifically, locking piece 5 is the screw, can with linking arm 311 is fixed in steadily the up end of the vertical portion 21 of second.
Further, the clamping portion 34 includes a connecting strip 341 and a clamping strip 342 that are perpendicular to each other, one end of the connecting strip 341 is connected to one side of the connecting portion 32 away from the first hanging member 2, the other end of the connecting strip 341 is connected to the middle portion of the clamping strip 342, a clamping groove 81 that is matched with the clamping strip 342 is formed in the back of the stone material 8, and the clamping strip 342 is clamped in the clamping groove 81.
Through setting up card strip 342 realizes the fixed connection of joint portion 34 and stone material 8, connection stability is strong, preferably, can also fill marble in draw-in groove 81 and glue 82, use marble glue 82 with the stone material with card strip 342 is fixed, further improves the second pendant 3 can not drop with the fixed stability of stone material 8, guarantees that stone material 8 can not drop.
Preferably, the first hanger 2 and the second hanger 3 are made of aluminum alloy.
The aluminum alloy material has the characteristics of light weight and high strength, and is corrosion-resistant, sturdy and durable, first pendant 2 with second pendant 3 all adopts the aluminum alloy material, makes first pendant 2 with second pendant 3 is non-deformable in the installation, and mounting structure stability is strong, and has reduced the replacement cost and the cost of maintenance of consumptive material.
The technical principle of the present invention has been described above with reference to specific embodiments. The description is made for the purpose of illustrating the principles of the invention and should not be construed in any way as limiting the scope of the invention. Based on the explanations herein, those skilled in the art will be able to conceive of other embodiments of the present invention without any inventive effort, which would fall within the scope of the present invention.

Claims (9)

1. A dry hanging structure is characterized by comprising an angle connector, a first hanging piece and a second hanging piece, wherein the rear end face of the angle connector is fixedly connected with a building wall, and one side, far away from the building wall, of the angle connector is detachably connected with the first hanging piece;
the second pendant comprises a clamping part, a connecting part, a supporting part and a clamping part, the clamping part comprises a connecting arm, and a first clamping arm and a second clamping arm which are respectively arranged at the front side and the rear side of the connecting arm, the first clamping arm is connected with the upper end of the connecting part, the connecting arm is fixedly connected with the upper end of the first pendant, a clamping cavity is formed between the first clamping arm and the second clamping arm, clamping blocks are respectively arranged at one sides of the first clamping arm and the second clamping arm, which face the clamping cavity, and the first pendant is clamped in the clamping cavity by the clamping block arranged on the first clamping arm and the clamping block arranged on the second clamping arm;
the supporting part is connected to the lower end of the connecting part, one side, close to the first pendant, of the supporting part is provided with a butting block, and the butting block is butted with the front end face of the first pendant;
the clamping portion is connected to one side, far away from the first hanging piece, of the connecting portion, and the clamping portion is fixedly connected with the stone.
2. The dry hanging structure according to claim 1, wherein the corner connector comprises a first vertical portion and a first parallel portion which are perpendicular to each other, the first hanging member comprises a second vertical portion and a second parallel portion which are perpendicular to each other, the first vertical portion is fixedly connected with the building wall, the second parallel portion is connected with the upper end face of the first parallel portion, the connecting arm is fixedly connected with the upper end face of the second vertical portion, and the clamping block of the first clamping arm and the clamping block of the second clamping arm are respectively clamped on the upper portion of the second vertical portion.
3. The dry hanging structure according to claim 2, wherein the first clamping arm and the second clamping arm are respectively provided with a first mounting groove on one side facing the clamping cavity, and a first mounting convex block matched with the first mounting groove is arranged on one side of the clamping block away from the clamping cavity and is clamped in the first mounting groove;
one side of the clamping block, which is close to the clamping cavity, is provided with a plurality of first clamping salient points, the first clamping salient points are positioned in the clamping cavity, and the first clamping salient points are abutted to the upper part of the second vertical part.
4. The dry hanging structure as claimed in claim 2, wherein the supporting portion is provided with a second mounting groove at a side facing the first hanging member, the abutting block is provided with a second mounting protrusion matching with the second mounting groove at a side facing away from the first hanging member, the second mounting protrusion is clamped in the second mounting groove, a plurality of second clamping protrusions are arranged at a side of the abutting block close to the first hanging member, and the second clamping protrusions are located at the outer part of the second mounting groove and abut against the front end face of the second vertical portion.
5. The dry-hang structure as claimed in claim 2, further comprising an anchor, wherein the first vertical portion has a first mounting hole formed therethrough, the building wall has a second mounting hole formed therethrough, and the anchor passes through the first mounting hole and then penetrates the second mounting hole to fixedly mount the first vertical portion to the building wall.
6. The dry-hang structure as claimed in claim 2, further comprising a locking member, wherein the first parallel portion has a third mounting hole formed therethrough, the second parallel portion has a fourth mounting hole formed therethrough, and the locking member passes through the fourth mounting hole and the third mounting hole in sequence to fixedly mount the second parallel portion on the upper end surface of the first parallel portion;
the fourth mounting hole extends along the front-back direction and is a waist-shaped hole.
7. The dry hang structure of claim 6, wherein the upper end surface of the second parallel portion is provided with a raised pattern, the raised pattern being saw-toothed.
8. The dry-hang structure as claimed in claim 2, further comprising a fastener, wherein the connecting arm is provided with a fifth mounting hole in a penetrating manner, and the fastener passes through the fifth mounting hole and then fixedly connects the connecting arm with the upper end surface of the second vertical portion.
9. The dry hanging structure according to claim 1, wherein the clamping portion comprises a connecting strip and a clamping strip which are perpendicular to each other, one end of the connecting strip is connected with one side of the connecting portion, which is far away from the first hanging member, the other end of the connecting strip is connected to the middle of the clamping strip, a clamping groove matched with the clamping strip is arranged on the back surface of the stone, and the clamping strip is clamped in the clamping groove.
CN202221095851.5U 2022-05-09 2022-05-09 Dry hanging structure Active CN217353340U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221095851.5U CN217353340U (en) 2022-05-09 2022-05-09 Dry hanging structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221095851.5U CN217353340U (en) 2022-05-09 2022-05-09 Dry hanging structure

Publications (1)

Publication Number Publication Date
CN217353340U true CN217353340U (en) 2022-09-02

Family

ID=83011090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221095851.5U Active CN217353340U (en) 2022-05-09 2022-05-09 Dry hanging structure

Country Status (1)

Country Link
CN (1) CN217353340U (en)

Similar Documents

Publication Publication Date Title
CN108396931B (en) Dry hanging device for building wall tile
CN214696609U (en) Wallboard connecting buckle
CN111005489A (en) Ceiling connecting piece, ceiling assembly and ceiling assembly
CN215670736U (en) Novel plug-in type dry-hanging stone structure
CN217353340U (en) Dry hanging structure
CN109322428B (en) Window wall system unit type curtain wall and installation method thereof
CN215166993U (en) Back-bolt type stone curtain wall hanging structure and stone curtain wall
CN214738784U (en) Concatenation formula sunshine room frame convenient to installation
CN215631256U (en) Novel dry-hanging assembly for rock plate
CN211899196U (en) Ceiling connecting piece, ceiling assembly and ceiling assembly
CN211735914U (en) Decoration exhibition wall
CN113622579A (en) Fastening type light gauge steel hangs member
CN218234150U (en) Adjustable bearing pendant structure
CN219909526U (en) Glass curtain wall hanging structure
CN216949254U (en) Dry-hanging stone system
CN212897089U (en) Connection structure and connecting piece of rail system and ceiling keel
CN217924306U (en) Stone curtain wall hanging installation structure
CN213572783U (en) Composite board mounting assembly
CN217400069U (en) A stabilize wall structure of hanging for decorative board concatenation
CN110805179A (en) Hanging type aluminum plate curtain wall connecting structure
CN215888906U (en) Card inserting structure of assembled aluminum honeycomb ceiling
CN213296824U (en) Stone curtain wall dry hanging assembly
CN216111625U (en) Rod mortise and tenon type connecting structure
CN218374618U (en) Concatenation formula 90 degrees folding face unit glass curtain wall mounting structure
CN219569414U (en) Quick installation structure and installation system for wall steel plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant