CN219909526U - A kind of glass curtain wall hanging structure - Google Patents
A kind of glass curtain wall hanging structure Download PDFInfo
- Publication number
- CN219909526U CN219909526U CN202320858532.3U CN202320858532U CN219909526U CN 219909526 U CN219909526 U CN 219909526U CN 202320858532 U CN202320858532 U CN 202320858532U CN 219909526 U CN219909526 U CN 219909526U
- Authority
- CN
- China
- Prior art keywords
- aluminum alloy
- bearing beam
- curtain wall
- load
- integrally formed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000011521 glass Substances 0.000 title claims abstract description 49
- 229910000838 Al alloy Inorganic materials 0.000 claims abstract description 105
- 230000002787 reinforcement Effects 0.000 claims description 14
- 239000000565 sealant Substances 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 4
- 229910045601 alloy Inorganic materials 0.000 description 2
- 239000000956 alloy Substances 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
Description
技术领域Technical field
本实用新型涉及玻璃幕墙技术领域,具体为一种玻璃幕墙挂接结构。The utility model relates to the technical field of glass curtain walls, specifically a glass curtain wall mounting structure.
背景技术Background technique
玻璃幕墙是一种美观新颖的建筑墙体装饰方法,玻璃幕墙在挂接安装时,铝合金支架结构需要连接到幕墙的墙面上。Glass curtain wall is a beautiful and novel method of building wall decoration. When the glass curtain wall is mounted and installed, the aluminum alloy bracket structure needs to be connected to the wall of the curtain wall.
例如公告号为:CN217461103U(名为单元式玻璃幕墙横向挂接结构),包括挂码、转接头以及连接件,挂码和转接头卡接并通过定位螺钉固定,连接件固定连接在单元立柱上,并与转接头卡接,挂码挂接在地台码上,所述挂码包括挂钩、腹板和翼板,所述翼板设置在腹板的两端,翼板的端部设置有第一折边,腹板、翼板以及第一折边围成横向通槽,所述挂钩和翼板分别设置在腹板的两侧,挂钩的开口朝下;所述腹板上设置有第一圆孔,用于与转接头螺纹连接,所述转接头呈工字型结构,包括底板、筋板以及两个圆柱体,底板上设置有螺纹孔,所述螺纹孔与挂码腹板上的第一圆孔相对应;底板的一面连接有筋板,筋板的另一端设有两个圆柱体,两个圆柱体分别位于筋板的两侧,所述底板的长度和厚度与挂码的横向通槽相匹配,所述筋板长度小于挂码的横向通槽的口径尺寸,所述连接件包括连接板和C型头,连接板上设置有第二圆孔,用于穿入螺钉与单元立柱连接;C型头由背板、侧板和第二折边构成,连接板的一端连接有背板,背板的两端分别连有侧板,侧板的前端设有折边,所述C型头具有朝外的开口,C型头内部具有两个弧形槽,分别位于开口的两侧。For example, the announcement number is: CN217461103U (named unitized glass curtain wall transverse mounting structure), which includes hanging codes, adapters and connectors. The hanging codes and adapters are snapped together and fixed by positioning screws, and the connectors are fixedly connected to the unit columns. , and is connected with the adapter, and the hanging code is connected to the platform code. The hanging code includes a hook, a web and a wing. The wing is arranged at both ends of the web, and the end of the wing is provided with The first flange, the web, the wing plate and the first flange form a transverse slot, the hooks and the flanges are respectively arranged on both sides of the web, and the openings of the hooks face downward; a third flange is provided on the web. A round hole for threaded connection with the adapter. The adapter has an I-shaped structure and includes a bottom plate, a rib plate and two cylinders. A threaded hole is provided on the bottom plate, and the threaded hole is connected to the hanging code web. Corresponding to the first round hole; one side of the bottom plate is connected with a rib plate, and the other end of the rib plate is provided with two cylinders. The two cylinders are located on both sides of the rib plate. The length and thickness of the bottom plate are consistent with the hanging code. The length of the rib plate is smaller than the diameter of the transverse slot of the hanging code. The connector includes a connecting plate and a C-shaped head. The connecting plate is provided with a second round hole for inserting screws. Connected to the unit column; the C-shaped head is composed of a back plate, a side plate and a second flange. One end of the connecting plate is connected to the back plate, and both ends of the back plate are connected to side plates. The front end of the side plate is provided with a flange. The C-shaped head has an outward opening, and there are two arc-shaped grooves inside the C-shaped head, respectively located on both sides of the opening.
上述幕墙挂接结构在使用的过程中只是进行横向的挂接固定,挂接结构对玻璃幕墙的支撑强度欠佳,导致幕墙挂接的牢固度较差的问题,为此,我们提供一种玻璃幕墙挂接结构。The above-mentioned curtain wall mounting structure is only horizontally mounted and fixed during use. The support strength of the mounting structure to the glass curtain wall is poor, resulting in the problem of poor curtain wall mounting firmness. For this reason, we provide a glass curtain wall Curtain wall mounting structure.
实用新型内容Utility model content
本实用新型的目的在于提供一种玻璃幕墙挂接结构,以解决上述背景技术中提出的现有的幕墙挂接结构在使用的过程中只是进行横向的挂接固定,挂接结构对玻璃幕墙的支撑强度欠佳,导致幕墙挂接的牢固度较差的问题。The purpose of this utility model is to provide a glass curtain wall hanging structure to solve the problem that the existing curtain wall hanging structure proposed in the above background technology only performs horizontal hanging and fixing during use, and the hanging structure has a negative impact on the glass curtain wall. The poor support strength leads to the problem of poor firmness of the curtain wall hanging.
为实现上述目的,本实用新型提供如下技术方案:一种玻璃幕墙挂接结构,包括幕墙玻璃板和铝合金承载梁,铝合金承载梁的内部设置有玻璃板架设槽,玻璃板架设槽与铝合金承载梁一体成型设置;In order to achieve the above purpose, the present utility model provides the following technical solution: a glass curtain wall hanging structure, including a curtain wall glass plate and an aluminum alloy load-bearing beam. A glass plate erection slot is provided inside the aluminum alloy load-bearing beam, and the glass plate erection slot is connected with the aluminum alloy load-bearing beam. The alloy load-bearing beam is set in one piece;
还包括:Also includes:
铝合金立柱,其安装在所述铝合金承载梁的后端面上,且铝合金立柱的两侧外壁上均设置有横向支撑梁,横向支撑梁与铝合金立柱一体成型设置,横向支撑梁与铝合金承载梁支撑接触;An aluminum alloy column is installed on the rear end surface of the aluminum alloy load-bearing beam, and transverse support beams are provided on both sides of the outer walls of the aluminum alloy column. The transverse support beam and the aluminum alloy column are integrally formed, and the transverse support beam and the aluminum alloy column are integrally formed. Alloy load-bearing beam supports contact;
十字定位接槽,其设置在所述铝合金承载梁后端的中心位置上,十字定位接槽与铝合金承载梁一体成型设置,且铝合金立柱与十字定位接槽的连接位置上设置有十字插接块,十字插接块与铝合金立柱一体成型设置;The cross positioning slot is arranged at the center of the rear end of the aluminum alloy load-bearing beam. The cross positioning slot is integrally formed with the aluminum alloy load-bearing beam, and a cross insert is provided at the connection position between the aluminum alloy column and the cross positioning slot. The connecting block, the cross plug block and the aluminum alloy column are integrally formed;
端位凹槽,其设置在所述铝合金承载梁的两端位置上,端位凹槽设置有两个,且两个端位凹槽之间设置有插接凹槽,插接凹槽和端位凹槽均与铝合金承载梁一体成型设置。End-position grooves are provided at both ends of the aluminum alloy load-bearing beam. There are two end-position grooves, and a plug-in groove is provided between the two end-position grooves. The plug-in groove and The end grooves are integrally formed with the aluminum alloy load-bearing beam.
优选的,所述横向支撑梁的内部螺孔中安装有加固螺栓,加固螺栓与铝合金承载梁的连接位置上设置有加固接孔,加固接孔与铝合金承载梁一体成型设置。Preferably, reinforcement bolts are installed in the internal screw holes of the transverse support beams, and reinforcement holes are provided at the connection positions between the reinforcement bolts and the aluminum alloy load-bearing beams. The reinforcement holes are integrally formed with the aluminum alloy load-bearing beams.
优选的,所述铝合金立柱与插接凹槽的连接位置上设置有组合插块,组合插块与铝合金立柱一体成型设置,端位凹槽和插接凹槽的内部分别设置有横向螺孔和纵向螺孔,横向螺孔和纵向螺孔均与铝合金承载梁一体成型设置。Preferably, a combination insert block is provided at the connection position between the aluminum alloy column and the plug-in groove. The combination plug-in block and the aluminum alloy column are integrally formed, and transverse screws are respectively provided inside the end groove and the plug-in groove. Holes and longitudinal screw holes, transverse screw holes and longitudinal screw holes are all integrally formed with the aluminum alloy load-bearing beam.
优选的,所述横向螺孔和纵向螺孔的内部分别安装有横向螺栓和纵向螺栓,铝合金立柱通过横向螺栓和纵向螺栓与铝合金承载梁固定连接。Preferably, transverse bolts and longitudinal bolts are respectively installed inside the transverse screw holes and the longitudinal screw holes, and the aluminum alloy column is fixedly connected to the aluminum alloy load-bearing beam through the transverse bolts and longitudinal bolts.
优选的,所述铝合金立柱的后端外壁上设置有挂接安装板,挂接安装板与铝合金立柱一体成型设置。Preferably, a mounting mounting plate is provided on the outer wall of the rear end of the aluminum alloy column, and the mounting mounting plate and the aluminum alloy column are integrally formed.
优选的,所述幕墙玻璃板通过密封胶与玻璃板架设槽固定连接。Preferably, the curtain wall glass plate is fixedly connected to the glass plate erection groove through sealant.
与现有技术相比,本实用新型的有益效果是:Compared with the existing technology, the beneficial effects of this utility model are:
1、本实用新型通过在横向螺孔和纵向螺孔的内部分别安装上横向螺栓和纵向螺栓,使得用于挂接的铝合金立柱与铝合金承载梁之间被横向螺栓和纵向螺栓双重固定,提高了挂接装置与玻璃幕墙连接的牢固性,克服了现有的幕墙挂接结构在使用的过程中只是进行横向的挂接固定,挂接结构对玻璃幕墙的支撑强度欠佳,导致幕墙挂接的牢固度较差的问题。1. In this utility model, transverse bolts and longitudinal bolts are respectively installed inside the transverse screw holes and the longitudinal screw holes, so that the aluminum alloy columns used for hooking and the aluminum alloy load-bearing beams are dually fixed by the transverse bolts and the longitudinal bolts. It improves the firmness of the connection between the hooking device and the glass curtain wall, and overcomes the problem that the existing curtain wall hooking structure only performs horizontal hooking and fixing during use. The hooking structure has poor support strength for the glass curtain wall, resulting in the curtain wall hanging. The problem of poor connection firmness.
2、通过将铝合金立柱安装到铝合金承载梁的后端面上,使得组合插块与插接凹槽对应连接,十字插接块与十字定位接槽对应连接,两个横向支撑梁对铝合金承载梁进行横向支撑,提高了挂接结构对铝合金承载梁的支撑强度。2. By installing the aluminum alloy column to the rear end surface of the aluminum alloy load-bearing beam, the combined plug-in block is connected to the plug-in groove, the cross plug-in block is connected to the cross positioning slot, and the two transverse support beams are connected to the aluminum alloy The load-bearing beam is supported laterally, which improves the support strength of the hinge structure to the aluminum alloy load-bearing beam.
附图说明Description of the drawings
图1为本实用新型的玻璃幕墙挂接结构整体结构示意图;Figure 1 is a schematic diagram of the overall structure of the glass curtain wall hanging structure of the present utility model;
图2为本实用新型的铝合金承载梁结构示意图;Figure 2 is a schematic structural diagram of the aluminum alloy load-bearing beam of the present utility model;
图3为本实用新型的铝合金立柱结构示意图;Figure 3 is a schematic structural diagram of the aluminum alloy column of the present invention;
图4为本实用新型的铝合金承载梁与铝合金立柱连接结构示意图;Figure 4 is a schematic diagram of the connection structure between the aluminum alloy load-bearing beam and the aluminum alloy column of the present invention;
图中:1、幕墙玻璃板;2、铝合金承载梁;3、铝合金立柱;4、横向支撑梁;5、加固螺栓;6、挂接安装板;7、端位凹槽;8、插接凹槽;9、十字定位接槽;10、加固接孔;11、十字插接块;12、组合插块;13、横向螺孔;14、横向螺栓;15、纵向螺孔;16、纵向螺栓;17、玻璃板架设槽。In the picture: 1. Curtain wall glass plate; 2. Aluminum alloy load-bearing beam; 3. Aluminum alloy column; 4. Transverse support beam; 5. Reinforcement bolt; 6. Mounting mounting plate; 7. End groove; 8. Insert Connection groove; 9. Cross positioning connection groove; 10. Reinforcement connection hole; 11. Cross plug-in block; 12. Combination plug-in block; 13. Transverse screw hole; 14. Transverse bolt; 15. Longitudinal screw hole; 16. Longitudinal Bolts; 17. Glass plate erection slot.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example.
请参阅图1-4,本实用新型提供的一种实施例:一种玻璃幕墙挂接结构,包括幕墙玻璃板1和铝合金承载梁2,铝合金承载梁2的内部设置有玻璃板架设槽17,玻璃板架设槽17与铝合金承载梁2一体成型设置;Please refer to Figures 1-4. An embodiment of the present utility model is provided: a glass curtain wall mounting structure, including a curtain wall glass plate 1 and an aluminum alloy load-bearing beam 2. A glass plate erection slot is provided inside the aluminum alloy load-bearing beam 2. 17. The glass plate erection groove 17 and the aluminum alloy load-bearing beam 2 are integrally formed;
还包括:Also includes:
铝合金立柱3,其安装在铝合金承载梁2的后端面上,且铝合金立柱3的两侧外壁上均设置有横向支撑梁4,横向支撑梁4与铝合金立柱3一体成型设置,横向支撑梁4与铝合金承载梁2支撑接触;The aluminum alloy column 3 is installed on the rear end surface of the aluminum alloy load-bearing beam 2, and transverse support beams 4 are provided on both sides of the outer walls of the aluminum alloy column 3. The transverse support beam 4 and the aluminum alloy column 3 are integrally formed. The support beam 4 is in supporting contact with the aluminum alloy load beam 2;
十字定位接槽9,其设置在铝合金承载梁2后端的中心位置上,十字定位接槽9与铝合金承载梁2一体成型设置,且铝合金立柱3与十字定位接槽9的连接位置上设置有十字插接块11,十字插接块11与铝合金立柱3一体成型设置;The cross positioning slot 9 is arranged at the center of the rear end of the aluminum alloy load-bearing beam 2. The cross positioning slot 9 is integrally formed with the aluminum alloy load-bearing beam 2, and is at the connection position between the aluminum alloy column 3 and the cross positioning slot 9. A cross plug block 11 is provided, and the cross plug block 11 and the aluminum alloy column 3 are integrally formed;
端位凹槽7,其设置在铝合金承载梁2的两端位置上,端位凹槽7设置有两个,且两个端位凹槽7之间设置有插接凹槽8,插接凹槽8和端位凹槽7均与铝合金承载梁2一体成型设置。End grooves 7 are provided at both ends of the aluminum alloy load-bearing beam 2. There are two end grooves 7, and a plug-in groove 8 is provided between the two end grooves 7 for plug-in connection. The groove 8 and the end groove 7 are integrally formed with the aluminum alloy load-bearing beam 2 .
使用时,将铝合金立柱安装到铝合金承载梁的后端面上,使得组合插块与插接凹槽对应连接,十字插接块与十字定位接槽对应连接,两个横向支撑梁对铝合金承载梁进行横向支撑,在横向螺孔和纵向螺孔的内部分别安装上横向螺栓和纵向螺栓,使得用于挂接的铝合金立柱与铝合金承载梁之间被横向螺栓和纵向螺栓双重固定。When in use, the aluminum alloy column is installed on the rear end surface of the aluminum alloy load-bearing beam, so that the combined plug-in block is connected to the plug-in groove, the cross plug-in block is connected to the cross positioning slot, and the two transverse support beams are connected to the aluminum alloy The load-bearing beam is supported laterally, and transverse bolts and longitudinal bolts are installed inside the transverse screw holes and the longitudinal screw holes respectively, so that the aluminum alloy columns used for hooking and the aluminum alloy load-bearing beam are double-fixed by transverse bolts and longitudinal bolts.
请参阅图1和图2,横向支撑梁4的内部螺孔中安装有加固螺栓5,加固螺栓5与铝合金承载梁2的连接位置上设置有加固接孔10,加固接孔10与铝合金承载梁2一体成型设置,横向支撑梁4的内部螺孔中安装的加固螺栓5起到加固连接的作用。Please refer to Figure 1 and Figure 2. Reinforcement bolts 5 are installed in the internal screw holes of the transverse support beam 4. Reinforcement holes 10 are provided at the connection positions between the reinforcement bolts 5 and the aluminum alloy load-bearing beam 2. The reinforcement holes 10 are connected to the aluminum alloy The load-bearing beam 2 is integrally formed, and the reinforcing bolts 5 installed in the internal screw holes of the transverse support beam 4 play a role in reinforcing the connection.
请参阅图4,铝合金立柱3与插接凹槽8的连接位置上设置有组合插块12,组合插块12与铝合金立柱3一体成型设置,端位凹槽7和插接凹槽8的内部分别设置有横向螺孔13和纵向螺孔15,横向螺孔13和纵向螺孔15均与铝合金承载梁2一体成型设置,铝合金立柱3与插接凹槽8的连接位置上设置的组合插块12起到与插接凹槽8对应连接的作用。Please refer to Figure 4. A combination plug-in block 12 is provided at the connection position between the aluminum alloy column 3 and the plug-in groove 8. The combination plug-in block 12 is integrally formed with the aluminum alloy column 3. The end groove 7 and the plug-in groove 8 are arranged in one piece. There are transverse screw holes 13 and longitudinal screw holes 15 respectively inside. The transverse screw holes 13 and the longitudinal screw holes 15 are integrally formed with the aluminum alloy load-bearing beam 2. They are provided at the connection position between the aluminum alloy column 3 and the plug-in groove 8. The combined plug-in block 12 plays the role of corresponding connection with the plug-in groove 8.
请参阅图4,横向螺孔13和纵向螺孔15的内部分别安装有横向螺栓14和纵向螺栓16,铝合金立柱3通过横向螺栓14和纵向螺栓16与铝合金承载梁2固定连接,横向螺孔13和纵向螺孔15的内部分别安装的横向螺栓14和纵向螺栓16起到双重固定的作用。Please refer to Figure 4. Transverse bolts 14 and longitudinal bolts 16 are respectively installed inside the transverse screw holes 13 and the longitudinal screw holes 15. The aluminum alloy column 3 is fixedly connected to the aluminum alloy load-bearing beam 2 through the transverse bolts 14 and the longitudinal bolts 16. The transverse screws The transverse bolts 14 and the longitudinal bolts 16 respectively installed inside the holes 13 and the longitudinal screw holes 15 play a dual fixing role.
请参阅图1,铝合金立柱3的后端外壁上设置有挂接安装板6,挂接安装板6与铝合金立柱3一体成型设置,铝合金立柱3的后端外壁上设置的挂接安装板6起到辅助玻璃幕墙挂接安装的作用。Please refer to Figure 1. A mounting mounting plate 6 is provided on the rear outer wall of the aluminum alloy column 3. The mounting plate 6 is integrally formed with the aluminum alloy column 3. A mounting mounting plate 6 is provided on the rear outer wall of the aluminum alloy column 3. The board 6 plays a role in assisting the installation of the glass curtain wall.
请参阅图1和图4,幕墙玻璃板1通过密封胶与玻璃板架设槽17固定连接。Please refer to Figure 1 and Figure 4. The curtain wall glass panel 1 is fixedly connected to the glass panel erection groove 17 through sealant.
工作原理:使用时,将铝合金立柱3安装到铝合金承载梁2的后端面上,使得组合插块12与插接凹槽8对应连接,十字插接块11与十字定位接槽9对应连接,两个横向支撑梁4对铝合金承载梁2进行横向支撑,提高了挂接结构对铝合金承载梁2的支撑强度,接着在横向螺孔13和纵向螺孔15的内部分别安装上横向螺栓14和纵向螺栓16,使得用于挂接的铝合金立柱3与铝合金承载梁2之间被横向螺栓14和纵向螺栓16双重固定,提高了挂接装置与玻璃幕墙连接的牢固性,最后将挂接安装板6通过膨胀螺栓安装到幕墙的墙面上,从而将玻璃幕墙挂接到建筑墙面上,完成玻璃幕墙挂接结构的使用工作。Working principle: When in use, the aluminum alloy column 3 is installed on the rear end surface of the aluminum alloy load-bearing beam 2, so that the combined plug-in block 12 is connected to the plug-in groove 8, and the cross plug-in block 11 is connected to the cross positioning slot 9. , two transverse support beams 4 provide transverse support to the aluminum alloy load-bearing beam 2, which improves the support strength of the hook structure to the aluminum alloy load-bearing beam 2, and then install transverse bolts inside the transverse screw holes 13 and the longitudinal screw holes 15 respectively. 14 and longitudinal bolts 16, so that the aluminum alloy column 3 and the aluminum alloy load-bearing beam 2 used for hooking are double fixed by the transverse bolts 14 and the longitudinal bolts 16, which improves the firmness of the connection between the hooking device and the glass curtain wall. Finally, the The hanging mounting plate 6 is installed on the wall of the curtain wall through expansion bolts, thereby hanging the glass curtain wall on the building wall, completing the use of the glass curtain wall hanging structure.
对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic characteristics of the present invention. Therefore, from any point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the appended claims rather than the above description, and it is therefore intended that all claims falling within the rights All changes within the meaning and scope of the required equivalent elements are included in the present invention. Any reference signs in the claims shall not be construed as limiting the claim in question.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320858532.3U CN219909526U (en) | 2023-04-18 | 2023-04-18 | A kind of glass curtain wall hanging structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320858532.3U CN219909526U (en) | 2023-04-18 | 2023-04-18 | A kind of glass curtain wall hanging structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219909526U true CN219909526U (en) | 2023-10-27 |
Family
ID=88422073
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320858532.3U Expired - Fee Related CN219909526U (en) | 2023-04-18 | 2023-04-18 | A kind of glass curtain wall hanging structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219909526U (en) |
-
2023
- 2023-04-18 CN CN202320858532.3U patent/CN219909526U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102493622B (en) | Wallboard installing component | |
| CN111287356A (en) | Glass curtain wall's sunken wall body system of decorating | |
| CN219909526U (en) | A kind of glass curtain wall hanging structure | |
| CN219033429U (en) | Reinforcing structure of steel frame of wall-mounted toilet tank | |
| CN218061424U (en) | Fish-bellied profile steel supporting beam mold supporting system for cast-in-place floor | |
| CN213460963U (en) | Double pin piping lane trailing arm | |
| CN212336289U (en) | Supporting equipment of assembled PC balcony component | |
| CN219710704U (en) | Connection system of aluminum plate curtain wall panel and framework | |
| CN212641856U (en) | Curtain wall fixing structure | |
| CN220521708U (en) | Frame curtain wall beam installed unordered | |
| CN114592638A (en) | Hanging structure of split type assembly type ceiling | |
| CN223952038U (en) | A support connector and beam connection structure | |
| CN221168574U (en) | Combined frame column operation platform | |
| CN217759472U (en) | Novel curtain wall upright post cross beam fixing corner connector | |
| CN223468922U (en) | Double-layer glass and butt-jointed reinforcement member for fixing the double-layer glass | |
| CN222923987U (en) | Fixed connection structure for building curtain wall engineering | |
| CN222377403U (en) | A pipe hanger for building decoration engineering | |
| CN219909465U (en) | Wall structure convenient to installation has heat preservation effect | |
| CN219118494U (en) | A building decoration curtain wall assembly | |
| CN219281322U (en) | A positioning device for PC components in flue construction | |
| CN215888981U (en) | Steel bar limiting structure for prefabricating structural column | |
| CN223003520U (en) | Beam structure for assembled building | |
| CN222730842U (en) | Prefabricated wall for reducing weight of assembled engineering window surface | |
| CN219471484U (en) | Construction frame for building construction | |
| CN223793912U (en) | Quick reinforcing apparatus of wall body for building engineering |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20231027 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |