CN216949254U - Dry-hanging stone system - Google Patents
Dry-hanging stone system Download PDFInfo
- Publication number
- CN216949254U CN216949254U CN202123214389.4U CN202123214389U CN216949254U CN 216949254 U CN216949254 U CN 216949254U CN 202123214389 U CN202123214389 U CN 202123214389U CN 216949254 U CN216949254 U CN 216949254U
- Authority
- CN
- China
- Prior art keywords
- hanging piece
- stone
- hanging
- plate
- connecting end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a dry hanging stone system, which comprises a stone plate and a dry hanging system, wherein the dry hanging system comprises an anchor plate anchored on a concrete structure wall, a first hanging piece and a second hanging piece, the first hanging piece and the second hanging piece are respectively fixed on the upper side and the lower side of the stone plate, the first hanging piece is also fixed on the anchor plate, a bearing groove is arranged on the first hanging piece, and the second hanging piece is inserted into the bearing groove. Compared with the prior art, through set up the anchor slab on the concrete structure wall for fix first pendant, make the upper end of stone material board fixed, the lower extreme of stone material board is pegged graft on first pendant through the second pendant, thereby under the prerequisite that does not use steel, realize hanging futilely of stone material board, when not only reducing the steel use, still shortened construction period, simple structure moreover.
Description
Technical Field
The utility model relates to a building structure, in particular to a dry-hanging stone system.
Background
The existing buildings adopt stone materials as decorations, and the traditional method can be wet pasting or dry hanging. When the floor is higher, because the dead weight of stone material is great, generally adopt dry-hang. Traditional dry-hang adopts steel as fossil fragments, connects through the pendant, needs to adopt a large amount of steel, is unfavorable for construction operation and cost control.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a dry-hanging stone system, which aims to solve the technical problems of reducing the use of steel, shortening the construction period and having a simple structure.
In order to solve the problems, the utility model adopts the following technical scheme: the utility model provides a hang stone material system futilely, includes stone material board, hangs the system futilely, hang the system futilely and include anchor slab, first pendant, the second pendant of anchor on the concrete structure wall, first pendant and second pendant are fixed respectively on the upper and lower both sides of stone material board, and first pendant still is fixed on the anchor slab, is equipped with on first pendant and holds in the palm the groove, and the second pendant inserts and holds in the palm in the groove.
Further, first pendant includes first link, second link, is equipped with the first rake that extends towards the anchor slab direction between first link and the second link, and on the second link was located to the bearing groove, be equipped with first plug connector on the terminal surface that first link and stone material board are relative, be equipped with first adaptor on the stone material board, be equipped with the first draw-in groove with first plug connector looks adaptation on the first adaptor to make first adaptor pass through first draw-in groove and first plug connector joint, realize being connected stone material board and first pendant fixedly, first pendant passes through the second link and is connected fixedly with the anchor slab.
Further, the length of the second connecting end is smaller than that of the first connecting end.
Furthermore, the second hanging piece comprises a third connecting end and an inserting part, a second inclined part extending towards the direction of the anchor plate is arranged between the third connecting end and the inserting part, and the second hanging piece is inserted into the supporting groove through the inserting part so as to fix the lower side of the stone plate on the corresponding first hanging piece; and the third connecting end is provided with a second plug connector, the stone plate is provided with a second adapter, and the second adapter is provided with a second clamping groove matched with the second plug connector, so that the second adapter is connected and fixed with the stone plate and the second pendant through the second clamping groove and the second plug connector.
Further, the anchor plate is fixedly connected to the wall of the concrete structure through anchor bolts and/or expansion bolts.
Furthermore, the first hanging piece is connected and fixed on the anchor plate through an anchor bolt.
Furthermore, structural adhesive is filled between the anchor bolt and the concrete structure wall.
Compared with the prior art, the anchor plate is arranged on the concrete structure wall and used for fixing the first hanging piece, so that the upper end of the stone plate is fixed, and the lower end of the stone plate is inserted into the first hanging piece through the second hanging piece, so that the stone plate is hung on the wall in a dry mode on the premise of not using steel, the use of steel is reduced, the construction period is shortened, and the structure is simple.
Drawings
Fig. 1 is a cross-sectional view of the present invention.
Fig. 2 is a partially enlarged view of the reference mark a in fig. 1.
Fig. 3 is a partially enlarged view of the reference B in fig. 1.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples.
As shown in fig. 1 and 2, the utility model discloses a dry hanging stone system, which comprises a stone plate 1 and a dry hanging system 2, wherein the dry hanging system 2 comprises an anchor plate 3 anchored on a concrete structure wall, a first hanging piece 4 and a second hanging piece 5, the first hanging piece 4 and the second hanging piece 5 are respectively fixed on the upper side and the lower side of the stone plate 1, the first hanging piece 4 is also fixed on the anchor plate 3, a support slot 41 is arranged on the first hanging piece 4, and the second hanging piece 5 is inserted into the support slot 41.
As shown in fig. 2, the first hanging member 4 includes a first connection end 42 and a second connection end 43, a first inclined portion 44 extending toward the direction of the anchor plate 3 is disposed between the first connection end 42 and the second connection end 43, the support bracket 41 is disposed on one end of the second connection end 43 away from the first inclined portion 44, the first connection end 42 is adjacent to the stone plate 1, the second connection end 43 is adjacent to the concrete structure wall, a first plug connector 45 is disposed on one end face of the first connection end 42 opposite to the stone plate 1, a first adaptor 6 is disposed on the stone plate 1, a first clamping groove 61 adapted to the first plug connector 45 is disposed on the first adaptor 6, so that the first adaptor 6 is clamped to the first plug connector 45 through the first clamping groove 61, the stone plate 1 and the first hanging member 4 are connected and fixed, and the first hanging member 4 is connected and fixed to the anchor plate 3 through the second connection end 43.
As shown in fig. 3, the first plug 45 is integrally connected to the first connection end 42, but as shown in fig. 2, a screw 451 is provided on the first plug 45, a through hole is provided on the first connection end 42, and after the screw 451 of the first plug 45 is inserted into the through hole of the first connection end 42 and is screwed down by a nut, the first plug 45 is fixed to the first connection end 42.
As shown in fig. 2, the second hanger 5 includes a third connecting end 51 and an inserting portion 52, a second inclined portion 53 extending toward the anchor plate 3 is provided between the third connecting end 51 and the inserting portion 52, the second hanger 5 is inserted into the receiving groove 41 through the inserting portion 52 to fix the lower side of the stone plate 1 to the corresponding first hanger 4, the third connecting end 51 is adjacent to the stone plate 1, and the inserting portion 52 is adjacent to the concrete structure wall; the third connecting end 51 is provided with a second plug connector 54, the stone plate 1 is provided with a second adaptor 7, and the second adaptor 7 is provided with a second clamping groove 71 matched with the second plug connector 54, so that the second adaptor 7 is clamped with the second plug connector 54 through the second clamping groove 71, and the stone plate 1 and the second pendant 5 are connected and fixed.
As shown in fig. 3, the second connector 54 is integrally connected to the third connection end 51, but as shown in fig. 2, a screw 541 may be provided in the second connector 54, a through hole may be provided in the third connection end 51, and after the screw 541 of the second connector 54 is inserted into the through hole of the third connection end 51 and is screwed down by a nut, the second connector 54 may be fixed to the third connection end 51.
In one embodiment, the length of the second connection end 43 is less than the length of the first connection end 42; the length of the third connecting end 51 is greater than the length of the mating part 52.
As shown in fig. 1 and 2, the anchor plate 3 is fixedly connected to the wall of the concrete structure by the anchor bolt 8 and/or the expansion bolt 9; preferably, the anchor plate 3 is fixed on the concrete structure wall by an anchor bolt 8 arranged at the center of the anchor plate 3 and expansion bolts 9 arranged at the periphery of the anchor plate 3.
As shown in fig. 1 and 2, the first hanging member 4 is connected and fixed on the anchor plate 3 through the anchor bolt 8, so that common accessories are realized, the use of the accessories is reduced, and the construction difficulty is reduced.
As shown in fig. 1, structural adhesive is filled between the anchor bolt 8 and the concrete structure wall, that is, in the hole of the concrete structure wall for installing the anchor bolt 8, structural adhesive is filled between the anchor bolt 8 and the hole, thereby improving the degree of stability.
In the utility model, the anchor plate 3, the first hanging piece 4, the second hanging piece 5, the first adapter 6 and the second adapter 7 are all made of steel.
As shown in fig. 2, the axis of the anchor bolt 8 is located at the gap between the two stone plates 1, and when the second hanger 5 is connected to the first hanger 4, the surfaces of the first connection end 42 and the third connection end 51 are on the same plane.
The stone plate dry hanging device realizes dry hanging of stone plates on the premise of not using steel, reduces the use of steel, reduces the distance between a veneer layer and a wall surface, improves the utilization rate of building space, shortens the construction period and has a simple structure.
Claims (7)
1. The utility model provides a hang stone material system futilely, includes stone material board (1), hangs system (2) futilely, its characterized in that: the dry hanging system (2) comprises an anchor plate (3) anchored on a concrete structure wall, a first hanging piece (4) and a second hanging piece (5), the first hanging piece (4) and the second hanging piece (5) are respectively fixed on the upper side and the lower side of the stone plate (1), the first hanging piece (4) is further fixed on the anchor plate (3), a bearing groove (41) is arranged on the first hanging piece (4), and the second hanging piece (5) is inserted into the bearing groove (41).
2. The dry hang stone system of claim 1, wherein: the first hanging piece (4) comprises a first connecting end (42) and a second connecting end (43), a first inclined portion (44) extending towards the direction of the anchor plate (3) is arranged between the first connecting end (42) and the second connecting end (43), a supporting groove (41) is arranged on the second connecting end (43), a first plug connector (45) is arranged on one end face, opposite to the stone plate (1), of the first connecting end (42), a first connecting piece (6) is arranged on the stone plate (1), a first clamping groove (61) matched with the first plug connector (45) is formed in the first connecting piece (6), so that the first connecting piece (6) is connected and fixed with the first plug connector (45) through the first clamping groove (61), connection and fixation of the stone plate (1) and the first hanging piece (4) are achieved, and the first hanging piece (4) is connected and fixed with the anchor plate (3) through the second connecting end (43).
3. The dry hang stone system of claim 2, wherein: the length of the second connecting end (43) is smaller than that of the first connecting end (42).
4. A dry hang stone system as claimed in any one of claims 1 to 3, wherein: the second hanging piece (5) comprises a third connecting end (51) and an inserting part (52), a second inclined part (53) extending towards the direction of the anchor plate (3) is arranged between the third connecting end (51) and the inserting part (52), and the second hanging piece (5) is inserted into the supporting groove (41) through the inserting part (52) so as to fix the lower side of the stone plate (1) on the corresponding first hanging piece (4); be equipped with second plug connector (54) on third link (51), be equipped with second adaptor (7) on stone material board (1), be equipped with on second adaptor (7) with second plug connector (54) looks adaptation second draw-in groove (71) to make second adaptor (7) through second draw-in groove (71) and second plug connector (54) joint, realize being connected stone material board (1) and second pendant (5) fixedly.
5. The dry hang stone system of claim 4, wherein: the anchor plate (3) is fixedly connected with a concrete structure wall through an anchor bolt (8) and/or an expansion bolt (9).
6. The dry hang stone system of claim 5, wherein: the first hanging piece (4) is connected and fixed on the anchor plate (3) through an anchor bolt (8).
7. The dry hang stone system of claim 6, wherein: and structural glue is filled between the anchor bolt (8) and the concrete structure wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123214389.4U CN216949254U (en) | 2021-12-20 | 2021-12-20 | Dry-hanging stone system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123214389.4U CN216949254U (en) | 2021-12-20 | 2021-12-20 | Dry-hanging stone system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216949254U true CN216949254U (en) | 2022-07-12 |
Family
ID=82311519
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202123214389.4U Active CN216949254U (en) | 2021-12-20 | 2021-12-20 | Dry-hanging stone system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216949254U (en) |
-
2021
- 2021-12-20 CN CN202123214389.4U patent/CN216949254U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110424664A (en) | A kind of wall decorating veneer component and wall body decoration method of plate installation | |
CN216949254U (en) | Dry-hanging stone system | |
CN214696609U (en) | Wallboard connecting buckle | |
CN213508987U (en) | Window edge sealing fixing piece of assembled building external wall heat insulation integrated plate | |
CN201334739Y (en) | Internal partition wall board system | |
CN113309329A (en) | Wall and floor ceramic tile dry-process paving system | |
CN104895204A (en) | Connecting structure of insertion connection type thermal insulation plate | |
CN114635536A (en) | Internal corner connecting structure of decorative wallboard | |
CN218562723U (en) | Decoration engineering is with preventing fossil fragments that ftractures | |
CN112144807A (en) | Wallboard mounting structure and mounting method thereof | |
CN215167516U (en) | Ceramic tile external corner location mounting structure is mated formation to wall dry process | |
CN217998552U (en) | Aluminum alloy curtain wall structure | |
CN217580969U (en) | Transverse connecting structure of decorative wallboard | |
CN217580968U (en) | External corner connecting structure of decorative wallboard | |
CN210032443U (en) | Heat-insulation decorative plate outer wall external heat-insulation system installation structure with transverse keel | |
CN218323605U (en) | Formaldehyde-free environment-friendly decorative plate for building interior decoration | |
CN213773974U (en) | Assembled bathroom wallboard system | |
CN214658453U (en) | Wallboard mounting structure | |
CN218234150U (en) | Adjustable bearing pendant structure | |
CN219080655U (en) | Assembly type reinforcing component | |
CN112523458B (en) | Building external wall board dry hanging component | |
CN217353340U (en) | Dry hanging structure | |
CN217175301U (en) | Assembly structure of super high-rise building outer wall | |
CN217580970U (en) | Internal corner connecting structure of decorative wallboard | |
CN219548089U (en) | Novel metal surface composite partition plate keel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |