CN217352526U - Slope reinforcement equipment for geotechnical engineering - Google Patents

Slope reinforcement equipment for geotechnical engineering Download PDF

Info

Publication number
CN217352526U
CN217352526U CN202220156026.5U CN202220156026U CN217352526U CN 217352526 U CN217352526 U CN 217352526U CN 202220156026 U CN202220156026 U CN 202220156026U CN 217352526 U CN217352526 U CN 217352526U
Authority
CN
China
Prior art keywords
slope
side slope
reinforcement
concrete
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220156026.5U
Other languages
Chinese (zh)
Inventor
郭永亮
王超然
张文卓
田晓昆
娄建全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220156026.5U priority Critical patent/CN217352526U/en
Application granted granted Critical
Publication of CN217352526U publication Critical patent/CN217352526U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a side slope reinforcement equipment for geotechnical engineering, including the side slope, be provided with the steel-pipe pile in the side slope, side slope one side is pre-buried has two stock, side slope one side is provided with the reinforcement mound, be provided with ten bored concrete piles on the side slope, be provided with the strengthening rib between the bored concrete pile, be provided with the concrete in the bored concrete pile, be provided with the waterproof layer on the concrete, be provided with the mounting bracket on the waterproof layer, be provided with the bank protection net on the mounting bracket, reinforcement mound one side is provided with the fixing base, be equipped with the mounting groove in the fixing base, be equipped with the collection piece in the mounting groove, the fixing base up end is provided with and keeps off the seat, fixing base one side is provided with the reinforcement. At first lay ten bored concrete piles on the side slope, then cooperate corresponding strengthening rib, make the bored concrete pile more fasten, pour the concrete afterwards, guaranteed the stability of side slope, wait after the concrete dries to lay the waterproof layer, the welding has the mounting bracket on the waterproof layer, installs detachable slope protection net on the mounting bracket, prevents that the rubble from rolling downwards.

Description

Slope reinforcement equipment for geotechnical engineering
Technical Field
The utility model belongs to the technical field of the building reinforcement, concretely relates to side slope reinforcement equipment for geotechnical engineering.
Background
Geotechnical engineering is a new technical system established in civil engineering practice, wherein the geotechnical engineering is to solve the problems of rock and soil engineering, including foundation and foundation, slope and underground engineering, etc., and as research objects thereof, along with the development of society, in order to improve the living standard of citizens, the country increasingly attaches importance to the construction of infrastructures, in the infrastructures, road construction is basic, but in China, the wideers are in a great position, road construction is extremely difficult in places with complex geographic environment, the construction of mountain roads and mountain roads cannot be avoided, at the moment, the protection and reinforcement of the slope is an important construction project, the factors of landslide, sideslip, collapse and the like of the slope are main disastrous factors for slope damage, the slope refers to ensure the stability of the roadbed, the slope surface with certain gradient is made on two sides of the roadbed, the slope surface with certain gradient and the like left after the opening of roads and railways along with the development of economy, the formed slopes generally have the phenomena of erosion, soil erosion and local shallow landslide, so that the geotechnical engineering slopes need to be reinforced, but the existing geotechnical engineering reinforcing devices cannot prevent rocks from rolling downwards, and the existing reinforcing devices cannot prevent the rocks from rolling downwards.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a side slope reinforcement equipment for geotechnical engineering to there is current reinforcing apparatus can not block the problem that the rock rolls downwards among the solution prior art.
In order to achieve the above object, the utility model provides a following technical scheme: including the side slope, be provided with the steel-pipe pile in the side slope, side slope one side is pre-buried has two stock, side slope one side is provided with the reinforcement mound, be provided with ten bored concrete piles on the side slope, be provided with the strengthening rib between the bored concrete pile, be provided with the concrete in the bored concrete pile, be provided with the waterproof layer on the concrete, be provided with the mounting bracket on the waterproof layer, be provided with the slope protection net on the mounting bracket, reinforcement mound one side is provided with the fixing base, be equipped with the mounting groove in the fixing base, be equipped with the collection piece in the mounting groove, the fixing base up end is provided with and keeps off the seat, fixing base one side is provided with the reinforcement.
Preferably, four mounting holes are formed in the mounting frame, fixing rods are inserted into the mounting holes, pushing springs are sleeved on the fixing rods, and one ends of the pushing springs are arranged on the mounting frame.
Preferably, both sides of the upper end face of the collecting block are provided with through holes, both sides of the upper end face of the fixing seat are provided with fixing grooves, and locking rods are inserted into the through holes and the fixing grooves.
Preferably, the upper end face of the side slope is provided with a guardrail.
1. The utility model discloses a pre-buried steel-pipe pile and two stocks of having in the side slope, then there is the reinforcement mound at side slope right side welding, lay ten bored concrete piles on the side slope afterwards, then cooperate corresponding strengthening rib, make the bored concrete pile fasten more, pour concrete afterwards, the stability of side slope has been guaranteed, wait to lay the waterproof layer after the concrete drying, the welding has the mounting bracket on the waterproof layer, install detachable slope protection net on the mounting bracket, slope protection net can strengthen by the stability on the domatic top layer of protection, form continuous support to whole side slope, prevent that the rubble from rolling downwards, and the rubble rolls to the collection piece on the side slope, the practicality of the device has been improved, it is favorable to preventing the rubble to roll off to keep off the seat, thereby solved current reinforcing apparatus and can not stop the problem that the rock rolls downwards.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an enlarged view of a portion a of FIG. 1;
fig. 3 is an enlarged schematic view of fig. 2 at b.
In the figure: 1 side slope, 2 steel-pipe piles, 3 stock, 4 reinforcement mounds, 5 bored concrete pile, 6 strengthening ribs, 7 concrete, 8 waterproof layers, 9 mounting brackets, 10 bank protection nets, 11 fixing bases, 12 mounting grooves, 13 collection blocks, 14 fender seats, 15 reinforcements, 16 mounting holes, 17 dead levers, 18 top push springs, 19 perforation, 20 fixed slots, 21 locking poles, 22 guardrails.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
As fig. 1, fig. 2 and fig. 3 show, the embodiment of the utility model provides a side slope reinforcement equipment for geotechnical engineering, including side slope 1, pre-buried steel-pipe pile 2 in the side slope 1, play the reinforcing effect to side slope 1, pre-buried two stock 3 that have in 1 right side of side slope, reinforcing mound 4 has been pour on 1 right side of side slope, reinforcing mound 4's setting, be favorable to consolidating the side of side slope 1, prevent that side slope 1 from collapsing to the right side, pre-buried ten bored concrete pile 5 that have on the side slope 1, the welding has strengthening rib 6 between the bored concrete pile 5, the intussuseption of bored concrete pile 5 is filled with concrete 7, the intussuseption of concrete 7 is filled with waterproof layer 8, insert on waterproof layer 8 and be equipped with mounting bracket 9, be equipped with slope protection net 10 on the mounting bracket 9.
As shown in fig. 1, fig. 2 and fig. 3, the right side welding of reinforcement pier 4 has fixing base 11, be equipped with mounting groove 12 in the fixing base 11, install collection piece 13 in the mounting groove 12, the rubble that drops falls into in collection piece 13 from side slope 1, the welding of fixing base 11 up end has fender seat 14, it is favorable to preventing the rubble from rolling off to keep off seat 14, fixing base 11 right side welding has reinforcement 15, be equipped with four mounting holes 16 on the mounting bracket 9, all insert in the mounting hole 16 and be equipped with dead lever 17, all overlap on the dead lever 17 and be equipped with top push spring 18, top push spring 18 initial state is compression state, top push spring 18 lower extreme all welds on mounting bracket 9, collection piece 13 up end both sides are equipped with perforation 19, fixing base 11 up end both sides are equipped with fixed slot 20, all insert in perforation 19 and the fixed slot 20 and be equipped with locking lever 21, side slope 1 up end welding has guardrail 22.
The working principle of the embodiment is as follows: when the geotechnical engineering slope reinforcement is carried out, firstly, a steel pipe pile 2 and two anchor rods 3 are pre-embedded in a slope 1, then the right side of the side slope 1 is welded with a reinforcing pier 4, then ten cast-in-place piles 5 are laid on the side slope 1, then, the cast-in-place pile 5 is more tightly matched with the corresponding reinforcing rib 6, then, the concrete 7 is poured, the stability of the side slope 1 is ensured, after the concrete 7 is dried, the waterproof layer 8 is laid, the waterproof layer 8 is welded with the mounting frame 9, the detachable slope protection net 10 is arranged on the mounting frame 9, the slope protection net 10 can enhance the stability of the surface layer of the protected slope, the whole side slope 1 is continuously supported, the broken stones are prevented from rolling downwards, the broken stones on the side slope 1 roll down to the collecting block 13, the practicability of the device is improved, the blocking seat 14 is favorable for preventing the broken stones from rolling down, and therefore the problem that the existing reinforcing device cannot prevent rocks from rolling down is solved.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the scope of the present invention.

Claims (4)

1. The utility model provides a slope reinforcement equipment for geotechnical engineering which characterized in that: the concrete pile reinforcement structure comprises a side slope (1), wherein a steel pipe pile (2) is arranged in the side slope (1), two anchor rods (3) are pre-buried on one side of the side slope (1), a reinforcement pier (4) is arranged on one side of the side slope (1), ten cast-in-place piles (5) are arranged on the side slope (1), reinforcing ribs (6) are arranged between the cast-in-place piles (5), concrete (7) is arranged in the cast-in-place piles (5), a waterproof layer (8) is arranged on the concrete (7), a mounting frame (9) is arranged on the waterproof layer (8), a slope protection net (10) is arranged on the mounting frame (9), a fixing seat (11) is arranged on one side of the reinforcement pier (4), a mounting groove (12) is arranged in the fixing seat (11), a collection block (13) is arranged in the mounting groove (12), and a blocking seat (14) is arranged on the upper end face of the fixing seat (11), and a reinforcing piece (15) is arranged on one side of the fixed seat (11).
2. The apparatus for slope reinforcement for geotechnical engineering according to claim 1, wherein: be equipped with four mounting holes (16) on mounting bracket (9), all insert in mounting hole (16) and be equipped with dead lever (17), all the cover is equipped with on dead lever (17) and pushes away spring (18), it all sets up on mounting bracket (9) to push away spring (18) one end.
3. The slope reinforcement equipment for geotechnical engineering according to claim 1, wherein: both sides of the upper end face of the collecting block (13) are provided with through holes (19), both sides of the upper end face of the fixing seat (11) are provided with fixing grooves (20), and locking rods (21) are inserted into the through holes (19) and the fixing grooves (20).
4. The slope reinforcement equipment for geotechnical engineering according to claim 1, wherein: and a guardrail (22) is arranged on the upper end surface of the side slope (1).
CN202220156026.5U 2022-01-20 2022-01-20 Slope reinforcement equipment for geotechnical engineering Active CN217352526U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220156026.5U CN217352526U (en) 2022-01-20 2022-01-20 Slope reinforcement equipment for geotechnical engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220156026.5U CN217352526U (en) 2022-01-20 2022-01-20 Slope reinforcement equipment for geotechnical engineering

Publications (1)

Publication Number Publication Date
CN217352526U true CN217352526U (en) 2022-09-02

Family

ID=83045015

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220156026.5U Active CN217352526U (en) 2022-01-20 2022-01-20 Slope reinforcement equipment for geotechnical engineering

Country Status (1)

Country Link
CN (1) CN217352526U (en)

Similar Documents

Publication Publication Date Title
CN102966119B (en) Geogrid reinforced wall and construction method thereof
CN109750571B (en) Road collapse emergency and permanent retaining integrated structure and construction method
CN110685286A (en) Deep foundation pit supporting construction process for adjacent road under complex geological condition
CN107119520A (en) The soft base combined type of coastal tidal, which is changed, fills out structure and Treatment Methods
Arulrajah et al. Geosynthetic applications in high-speed railways: a case study
CN111304988B (en) Light embankment structure built on steep hillside and construction method
CN113322731B (en) Construction method of foam concrete landscape restoration system
CN109306676A (en) The construction method of bank slump reparation structure
CN217352526U (en) Slope reinforcement equipment for geotechnical engineering
CN108360325A (en) Reinforcing road bed environment-friendly type widening road and construction method can be protected
CN203174626U (en) Geogrid reinforced wall
CN114351567B (en) Road bridge connection structure and construction method
CN210482328U (en) Retaining unit and retaining structure for landslide
CN210737555U (en) Underground pipeline in-situ protection mechanism for foundation pit supporting system
CN110219248B (en) Anti-overturning simple temporary bridge pier construction method and anti-overturning simple temporary bridge construction method
CN208668189U (en) Reinforcing road bed environment-friendly type widening road can be protected
CN209816577U (en) Coastal soft soil foundation riverside embankment widening structure
Mouratidis The “cut-and-cover” and “cover-and-cut” techniques in highway engineering
JP4700987B2 (en) Overhangway block and method for constructing overhangway using the block
Detert et al. High geogrid-reinforced slopes as flexible solution for problematic steep terrain: trieben-sunk project, Austria
Dean et al. P5/7 Embankment construction problems over deep variable soft deposits using a geocell mattress
CN110055981A (en) Supporting and retaining system unit, retaining structure and the construction method on landslide
CN217419689U (en) Soil body high slope outer buttress formula barricade anchor rope reinforced structure
JP2802909B2 (en) Roadway widening block and roadway widening method
JPH0692641B2 (en) Road widening method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant