Bagged concrete lifting frame device Download PDFInfo
- Publication number
- CN217264258U CN217264258U CN202220209358.5U CN202220209358U CN217264258U CN 217264258 U CN217264258 U CN 217264258U CN 202220209358 U CN202220209358 U CN 202220209358U CN 217264258 U CN217264258 U CN 217264258U
- Authority
- CN
- China
- Prior art keywords
- lifting
- bagged concrete
- lifting hook
- hook
- rack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 58
- 230000000149 penetrating effect Effects 0.000 abstract description 5
- 230000035515 penetration Effects 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000011178 precast concrete Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a bagged concrete lifting frame device, which comprises a rack which passes through a bagged concrete penetration hole, and bagged concrete with different specifications can adjust the position according to the rack; two ends of the rack respectively penetrate through the two slotted holes of the hanger connecting rod and are in supporting connection with the hanger connecting rod, and limiting blocks at two ends of the rack are limited on two sides of the hanger connecting rod; the lifting hook device lifts the bagged concrete lifting frame device through the lifting lugs, lifts the bagged concrete lifting frame device to a storage position and puts the bagged concrete lifting frame device down, then takes the rack down from the lifting frame connecting rod, and finally takes the rack out of the bagged concrete penetrating hole to store bagged concrete, and the bagged concrete lifting frame device is orderly arranged and saves time and labor; the lifting hook plate of the lifting hook device can be opened and closed through the two lifting ropes wound by the motor and the spring between the lifting hook plates. Can be with the motor reversal when needing to use bagged concrete to play the gallows device, the spring is closed with the hook board, and can be with motor corotation after the storage of bagged concrete is finished, loosens the lifting hook and will play the gallows and take off the saving.
Description
Technical Field
The utility model relates to a concrete transportation storage field, concretely relates to bagged concrete plays gallows device.
Background
At present, the bagged concrete warehouse storage does not consider the labor saving by using a machine mostly. Existing concrete lifting frame devices are also precast concrete blocks designed for use on construction sites. After the produced bagged concrete is transported to a warehouse, the bagged concrete is manually taken down and placed at a designated position of the warehouse. This process is time and labor consuming on the one hand, and also adds labor costs to the enterprise on the other hand. In the actual storage process, bagged concrete is difficult to store at a high position, so that the space utilization rate is reduced. At the same time, it becomes extremely difficult to remove the bagged concrete from the high place. The stacking of bagged concrete in an array is also a time-consuming and laborious activity for the staff.
The following technical problems mainly exist in the prior art: the existing concrete lifting frame device is designed for precast concrete blocks on a building site, most of the adopted modes utilize lifting hooks to lift objects, and the defect that bagged concrete cannot be stably lifted and cannot be adjusted and arranged according to specifications of different bagged concrete is overcome.
Disclosure of Invention
The utility model aims at solving the problem in the current storage, provide a bagged concrete plays gallows device, arrange through the tooth pitch that utilizes bagged concrete through hole and rack, make bagged concrete can arrange and stack to realize fixed position's storage.
In order to achieve the above purpose, the technical scheme of the utility model is that:
a bagged concrete lifting frame device comprises a lifting frame, lifting lugs arranged at the top of the lifting frame and a separable rack arranged at the lower end of the lifting frame; the hanger is characterized in that hanger connecting rods are arranged on two sides of the lower end of the hanger, slotted holes are formed in the hanger connecting rods, two ends of the rack penetrate through the two slotted holes respectively and are connected with the hanger connecting rods in a supporting mode, and limiting blocks extending downwards are arranged at two ends of the rack.
Preferably, the hanger is provided with a hollow part, and a support rod for connecting the upper inner wall and the lower inner wall of the hollow part is longitudinally arranged in the hollow part.
Preferably, the number of the lifting lugs is two, the lifting lugs are arranged at the top of the hanging bracket in parallel, a central circular hole is formed in each lifting lug, and the top of the hanging bracket is provided with a detachable lifting hook device through the lifting lugs.
Preferably, the lifting hook device comprises a lifting hook shell and two lifting hook plates which are connected to the lower side of the lifting hook shell in a sliding mode, springs are transversely connected between the two lifting hook plates, and connecting columns matched with the central circular holes of the lifting lugs are arranged on the opposite side faces of the two lifting hook plates; the lower side of the lifting hook shell is provided with a sliding groove communicated with the interior of the lifting hook shell, and the upper end of the lifting hook plate penetrates through the sliding groove to extend to the interior of the lifting hook shell and is movably clamped with the inner wall of the lifting hook shell through a limiting rod.
Preferably, a motor is fixedly arranged in the lifting hook shell, a left lifting rope and a right lifting rope are wound on a motor shaft of the motor, and a left pulley block for guiding the left lifting rope and a right pulley block for guiding the right lifting rope are further arranged in the lifting hook shell; and the two lifting hook plates positioned in the lifting hook shell are provided with lifting rings, and the two lifting rings are fixedly connected with one ends of the left lifting rope and the right lifting rope, which are far away from the motor shaft, respectively.
Preferably, a lifting hook lifting lug is arranged at the top of the lifting hook shell.
The utility model has the advantages that: the utility model discloses a bagged concrete lifting frame device, which comprises a rack which passes through a bagged concrete through hole, and bagged concrete with different specifications can be adjusted in position according to the rack; two ends of the rack respectively penetrate through the two slotted holes of the hanger connecting rod and are in supporting connection with the hanger connecting rod, and limiting blocks at two ends of the rack are limited on two sides of the hanger connecting rod; the bagged concrete hoisting device is hoisted to a storage position by a lifting hook device of the hoisting machine and then put down, then the rack is taken down from the hoisting frame connecting rod, and finally the rack is drawn out from the bagged concrete penetrating hole, so that the storage of the bagged concrete is realized, and the bagged concrete is orderly arranged, thereby saving time and labor; the lifting hook plate of the lifting hook device can be opened and closed through the two lifting ropes wound by the motor and the spring between the lifting hook plates. The motor can be reversely rotated when the bagged concrete lifting frame device is needed to be used, the spring closes the lifting hook plate, and the motor can be forwardly rotated after the storage of the bagged concrete is finished, the lifting hook is loosened, and the lifting frame is taken down for storage.
Drawings
Fig. 1 is a front view of embodiment 1 of the present invention;
fig. 2 is a schematic structural diagram of embodiment 1 of the present invention;
fig. 3 is a schematic structural view of the hook device of the present invention;
fig. 4 is a schematic structural diagram of embodiment 2 of the present invention;
FIG. 5 is a cross-sectional view taken along line A-A of FIG. 4;
fig. 6 is a partial sectional view taken along line B-B in fig. 5.
In the figure: the lifting eye, the supporting rod 2, the lifting frame 3, the connecting rod 4, the slotted hole 41, the rack 5, the penetrating hole 6 for bagged concrete, the bagged concrete 7, the hook device 8, the hook plate 9, the spring 10, the chute 11, the left lifting rope 12, the left pulley block 121, the right lifting rope 13, the right pulley block 131, the motor 14, the nut 16, the pulley shaft 17, the hook shell 18, the lifting eye 19, the lifting eye 20, the limiting rod 21, the limiting block 22, the hollow part 23, the central circular hole 24 and the connecting column 25.
Detailed Description
In order to make the technical field of the invention better understand, the invention is further described in detail with reference to the accompanying drawings and embodiments.
Example 1
1-2, the bagged concrete lifting frame device comprises a lifting frame 3, a lifting lug 1 arranged at the top of the lifting frame 3 and a separable rack 5 arranged at the lower end of the lifting frame 3; both sides of the lower end of the hanger 3 are provided with hanger connecting rods 4, slotted holes 41 are formed in the hanger connecting rods 4, the two ends of the rack 5 penetrate through the two slotted holes 41 respectively and are connected with the hanger connecting rods 4 in a supporting mode, the two ends of the rack 5 are provided with limiting blocks 22 extending downwards, and the two limiting blocks 22 are clamped on the left side and the right side of the two hanger connecting rods 4 respectively. The rack 5 penetrates through the bagged concrete penetrating hole 6, and bagged concrete 7 with different specifications can be adjusted in position according to the rack 5.
The hanger 3 is provided with a hollow part 23, so that the required cost and weight are reduced. In order to strengthen the structure, the hollow part 23 is internally and longitudinally provided with support rods 2 which are connected with the inner walls of the upper side and the lower side of the hollow part 23.
The number of the lifting lugs 1 is two, the two lifting lugs are arranged at the top of the hanging bracket 3 in parallel, and a central round hole 24 is formed in each lifting lug 1.
Example 2
As shown in fig. 3-6, in embodiment 2, on the basis of embodiment 1, a hook device 8 connected with a hanger 3 is added, and a detachable hook device 8 is installed on the top of the hanger 3 through a lifting lug 1.
The lifting hook device 8 comprises a lifting hook shell 18 and two lifting hook plates 9 connected to the lower side of the lifting hook shell 18 in a sliding mode, the number of the lifting hook plates 9 is two, springs 10 are transversely connected between the two lifting hook plates 9, and connecting columns 25 matched with central round holes 24 of the lifting lugs 1 are arranged on the opposite side faces of the two lifting hook plates 9; the downside of lifting hook shell 18 is seted up rather than the inside spout 11 that is linked together, two the upper end of lifting hook board 9 passes spout 11 and extends to the inside of lifting hook shell 18 and through gag lever post 21 and lifting hook shell 18's inner wall activity joint, two lifting hook boards 9 can slide on spout 11 through gag lever post 21.
A motor 14 is fixedly arranged inside the hook housing 18, a left lifting rope 12 and a right lifting rope 13 are wound on a motor shaft of the motor 14, and a left pulley block 121 for guiding the left lifting rope 12 and a right pulley block 131 for guiding the right lifting rope 13 are further arranged inside the hook housing 18; the inside fixed pulley shaft 17 that is provided with of lifting hook shell 18, there are two pulleys in the left side assembly pulley 121, and every pulley all rotates through pulley shaft 17 and sets up in lifting hook shell 18, and threaded connection has nut 16 still on the pulley shaft 17 of every pulley both sides, can adjust the position of pulley through nut 16, and the pulley is used for guiding left lifting rope 12 and removes. In addition, the structure of the right pulley block 131 is the same as that of the left pulley block 121; hanging rings 19 are arranged on the two hanging hook plates 9 in the hanging hook shell 18, and the two hanging rings 19 are respectively and fixedly connected with one ends, far away from the motor shaft, of the left hanging rope 12 and the right hanging rope 13. When the motor 14 rotates forwards, the left lifting rope 12 and the right lifting rope 13 respectively pull the left and right lifting hook plates 9, and the lifting hook device 8 is loosened. When the motor 14 is reversed, the spring 10 pulls the hook plate 9 back into position and the hook means is closed.
The top of the lifting hook shell 18 is provided with a lifting hook lifting lug 20, and the lifting hook lifting lug 20 is used for connecting a lifting rope of a crane.
The working principle is as follows: the utility model discloses mainly pass bagged concrete through hole with the rack, let the bagged concrete of different specifications again according to rack adjustment position, make bagged concrete arrange neatly. And then the two ends of the rack respectively pass through the two slotted holes of the hanger connecting rod and are in supporting connection with the hanger connecting rod. The lifting hook device of the crane lifts the bagged concrete lifting frame device through the lifting lugs to a storage position and then puts down the bagged concrete lifting frame device, then the rack is taken down from the lifting frame connecting rod, and finally the rack is taken out from the bagged concrete penetrating hole, so that storage of bagged concrete is realized. The hook plate of the hook device can be opened and closed. When the lifting hook is required to be closed, the motor is reversely rotated, and the spring enables the lifting hook plate to be closed. And after the storage of the bagged concrete is finished, the motor can rotate forwards, the lifting hook is loosened, and the lifting frame is taken down for storage.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides a bagged concrete plays gallows device which characterized in that: comprises a hanger (3), a lifting lug (1) arranged at the top of the hanger (3) and a separable rack (5) arranged at the lower end of the hanger (3); both sides of the lower end of the hanger (3) are provided with hanger connecting rods (4), slotted holes (41) are formed in the hanger connecting rods (4), two ends of the rack (5) penetrate through the two slotted holes (41) respectively and are connected with the hanger connecting rods (4) in a supporting mode, and limiting blocks (22) extending downwards are arranged at two ends of the rack (5).
2. The bagged concrete lifting frame device according to claim 1, characterized in that: the hanging bracket (3) is provided with a hollow part (23), and a support rod (2) connecting the upper inner wall and the lower inner wall of the hollow part (23) is longitudinally arranged in the hollow part (23).
3. The bagged concrete lifting frame device according to claim 1, characterized in that: the number of the lifting lugs (1) is two, the two lifting lugs are arranged at the top of the lifting frame (3) in parallel, a central round hole (24) is formed in the lifting lug (1), and the top of the lifting frame (3) is provided with a detachable lifting hook device (8) through the lifting lug (1).
4. The bagged concrete lifting frame device according to claim 3, characterized in that: the lifting hook device (8) comprises a lifting hook shell (18) and two lifting hook plates (9) connected to the lower side of the lifting hook shell (18) in a sliding mode, springs (10) are transversely connected between the two lifting hook plates (9), and connecting columns (25) matched with central round holes (24) of the lifting lugs (1) are mounted on the opposite side faces of the two lifting hook plates (9); the lower side of the lifting hook shell (18) is provided with a sliding groove (11) communicated with the interior of the lifting hook shell, and the upper end of the lifting hook plate (9) penetrates through the sliding groove (11) to extend to the interior of the lifting hook shell (18) and is movably clamped with the inner wall of the lifting hook shell (18) through a limiting rod (21).
5. The bagged concrete lifting frame device according to claim 4, characterized in that: a motor (14) is fixedly arranged in the hook shell (18), a left lifting rope (12) and a right lifting rope (13) are wound on a motor shaft of the motor (14), and a left pulley block (121) for guiding the left lifting rope (12) and a right pulley block (131) for guiding the right lifting rope (13) are further arranged in the hook shell (18); two lifting hook plates (9) positioned in the lifting hook shell (18) are respectively provided with a lifting ring (19), and the two lifting rings (19) are respectively fixedly connected with one ends of the left lifting rope (12) and the right lifting rope (13) far away from the motor shaft.
6. The bagged concrete lifting frame device according to claim 4, characterized in that: and a lifting hook lifting lug (20) is arranged at the top of the lifting hook shell (18).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220209358.5U CN217264258U (en) | 2022-01-25 | 2022-01-25 | Bagged concrete lifting frame device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220209358.5U CN217264258U (en) | 2022-01-25 | 2022-01-25 | Bagged concrete lifting frame device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217264258U true CN217264258U (en) | 2022-08-23 |
Family
ID=82903081
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220209358.5U Expired - Fee Related CN217264258U (en) | 2022-01-25 | 2022-01-25 | Bagged concrete lifting frame device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217264258U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116062607A (en) * | 2023-03-07 | 2023-05-05 | 菏泽市瑞祺医疗器械有限公司 | Special lifting appliance for lifting raw materials of traditional Chinese medicine decoction pieces |
-
2022
- 2022-01-25 CN CN202220209358.5U patent/CN217264258U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116062607A (en) * | 2023-03-07 | 2023-05-05 | 菏泽市瑞祺医疗器械有限公司 | Special lifting appliance for lifting raw materials of traditional Chinese medicine decoction pieces |
CN116062607B (en) * | 2023-03-07 | 2023-06-20 | 菏泽市瑞祺医疗器械有限公司 | Special lifting appliance for lifting raw materials of traditional Chinese medicine decoction pieces |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209957260U (en) | Hoisting frame for mechanical equipment | |
CN110077951B (en) | Plate hoisting device for building construction | |
CN209585580U (en) | Huge column modular is tilted from lifting operation platform | |
CN217264258U (en) | Bagged concrete lifting frame device | |
CN219238985U (en) | Double-hook set device | |
CN212174339U (en) | Lifting construction mechanical equipment | |
CN212450358U (en) | Mechanical equipment that lifts by crane that construction was used | |
CN110255394B (en) | Bridge pier crane for construction of cross-sea bridge | |
CN210759347U (en) | Mounting equipment | |
CN107244617B (en) | A kind of large-scale tree boom hoisting | |
CN219791022U (en) | Door frame moving frame | |
CN221543937U (en) | Electric folding lifting appliance for construction lifter | |
CN217350419U (en) | Hoisting device is used in machine parts production | |
CN221625669U (en) | Crane anti-rotation lifting hook group | |
CN214989686U (en) | Reinforcing bar bundle stone tongs | |
CN216918357U (en) | Hoisting device utilizing building internal structure | |
CN110626960A (en) | Mechanical equipment hoisting frame | |
CN216764107U (en) | Portable liquefied petroleum gas carrier hoisting accessory | |
CN221836555U (en) | Prefabricated plate hoist with adjustable | |
CN217417900U (en) | Simple multifunctional heavy crane | |
CN219601835U (en) | Vertical cylinder strorage device | |
CN217760105U (en) | Lifting chain and stirrup laying device | |
CN220518828U (en) | Detachable special storage and transportation frame for Chinese yam | |
CN212198281U (en) | Construction steel bar lifting device | |
CN210884947U (en) | Reinforcing bar net piece hoist device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220823 |