CN217232613U - Civil engineering construction support - Google Patents

Civil engineering construction support Download PDF

Info

Publication number
CN217232613U
CN217232613U CN202220319389.6U CN202220319389U CN217232613U CN 217232613 U CN217232613 U CN 217232613U CN 202220319389 U CN202220319389 U CN 202220319389U CN 217232613 U CN217232613 U CN 217232613U
Authority
CN
China
Prior art keywords
support
bottom plate
fixedly connected
civil engineering
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220319389.6U
Other languages
Chinese (zh)
Inventor
刘龙勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220319389.6U priority Critical patent/CN217232613U/en
Application granted granted Critical
Publication of CN217232613U publication Critical patent/CN217232613U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model belongs to the technical field of construction support technique and specifically relates to a civil engineering building construction support, including the support main part, the support main part includes the bottom plate, the bottom plate is equipped with the removal structure that conveniently removes along length direction's both sides, the bottom plate bottom is equipped with the bearing structure that can guarantee support stability, the equal fixedly connected with riser in length direction's both sides is followed at the bottom plate top, the riser top is equipped with the safety cover, place the board through the regulation structural connection installation that can improve work efficiency between two risers, just bottom plate top center department is equipped with the buffer structure that can guarantee life, through setting up bearing structure for this support can be convenient remove, and also can effectual assurance support's stability in the course of the work as the support, thereby can effectively avoid the production of unexpected condition.

Description

Civil engineering construction support
Technical Field
The utility model relates to a construction support technical field specifically is a civil engineering building construction support.
Background
Civil engineering mainly studies basic knowledge and technologies of various land engineering facilities in the aspects of surveying, designing, building, maintaining and the like, newly building, rebuilding or expanding various engineering buildings and surveying, planning, designing, constructing and the like of related supporting facilities are carried out, main engineering facilities comprise houses, roads, railways, pipelines, tunnels, bridges, dams, mines and the like, and constructors often need to use supports to carry out operations at different heights in the construction process of civil engineering buildings.
However, the civil engineering construction support in the prior art still has a lot of defects, and the construction support in the prior art is convenient to move and difficult to ensure the stability of the support, so that the unexpected situation is easy to occur in the construction process; at present constructor often needs climb by oneself in the work progress, and the operation is comparatively inconvenient and makes work efficiency reduced.
There is therefore a need for a civil engineering construction support that ameliorates the above problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a civil engineering construction support to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a civil engineering construction support, includes support subject, support subject includes the bottom plate, the bottom plate is equipped with the convenient removal structure that removes along length direction's both sides, the bottom plate bottom is equipped with the bearing structure that can guarantee support stability, the equal fixedly connected with riser in length direction's both sides is followed at the bottom plate top, the riser top is equipped with the safety cover, through the board of placing of the regulation structural connection installation that can improve work efficiency between two risers, just bottom plate top center department is equipped with the buffer structure that can guarantee life.
As the utility model discloses preferred scheme, remove the structure and include to connect through the connecting axle and install the connecting plate along length direction both sides at the bottom plate, one side that the bottom plate was kept away from to the connecting plate and the equal fixedly connected with mounting bracket in both ends along width direction, and the inside connecting axle connection of installing of mounting bracket has the walking wheel.
As the utility model discloses preferred scheme, bearing structure is including seting up the fluting in the bottom plate bottom, the inside top fixedly connected with hydraulic stem of fluting, and hydraulic stem bottom fixedly connected with backup pad.
As the utility model discloses preferred scheme, adjust the structure including establishing in riser top one side and being located the inside driving motor of safety cover, the driving motor output just is located the inside first screw rod that is equipped with of riser, first screw rod outside top just is located the inside first belt pulley that is equipped with of safety cover, and first screw rod one side is equipped with the second screw rod, second screw rod outside top just is located the inside second belt pulley that is equipped with of safety cover, and be connected through driving belt between first belt pulley and the second belt pulley, the sliding sleeve is all installed through threaded connection in first screw rod and the second screw rod outside, and sliding sleeve one side fixedly connected with connecting rod.
As the utility model discloses preferred scheme, two risers are close to one side of placing the board and have all been seted up the spout, and the connecting rod keeps away from the one end of sliding sleeve and pass the spout and place board fixed connection, and driving motor's one end is kept away from to first screw rod is passed through the bearing and is connected the installation inside the riser, and the both ends of second screw rod are passed through the bearing and are connected respectively and install the top inside bottom of riser and safety cover.
As the utility model discloses preferred scheme, buffer structure is including seting up the dashpot at the bottom plate top, and the inside bottom array distribution of dashpot has a plurality of springs, and spring top fixedly connected with buffer board, buffer board top fixedly connected with blotter.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses in, through setting up bearing structure and moving structure, when this support is before using, the worker can remove this support through walking that the wheel is convenient, remove behind the workplace control hydraulic stem extension until the stable support of backup pad on ground, the accessible is broken the connecting plate off with the fingers and thumb afterwards and is accomodate the walking wheel for this support can be convenient remove, and also can effectual assurance support's stability in the course of the work when the support, thereby can effectively avoid the production of unexpected condition.
2. The utility model discloses in, adjust the structure through setting up, when this support is when using, the worker himself or place some construction articles for use in place the board on, can start two driving motor simultaneously through the switch afterwards, the first screw rod of driving motor drive rotates, at first screw rod, the second screw rod of control is rotated under first belt pulley and driving belt's combined action, thereby can make threaded connection's sliding sleeve reciprocate with it, realization lift work that can be convenient, make that this support can be convenient go up and down to personnel or goods, thereby do not need personnel to scramble, make the work degree of difficulty by effectual reduction simultaneously can effectual assurance work efficiency.
3. The utility model discloses in, through setting up buffer structure, when this support at the in-process that descends, after placing the board and descend to the bottom plate, the combined action of blotter, buffer board and spring down can effectually carry out effectual buffering to the impact force that the decline produced to can effectually protect the support, make the shock-absorbing capacity of this support can be by effectual improvement, thereby can the effectual life who guarantees the support.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the internal structure of one side of the present invention;
fig. 3 is a schematic view of the internal structure of one side of the protective cover of the present invention.
In the figure: 1. a stent body; 101. a base plate; 102. a vertical plate; 103. a protective cover; 104. placing the plate; 105. a chute; 2. a moving structure; 201. a connecting plate; 202. a mounting frame; 203. a traveling wheel; 3. a support structure; 301. grooving; 302. a hydraulic lever; 303. a support plate; 4. a buffer structure; 401. a buffer tank; 402. a spring; 403. a buffer plate; 404. a cushion pad; 5. an adjustment structure; 501. a drive motor; 502. a first screw; 503. a sliding sleeve; 504. a connecting rod; 505. a second screw; 506. a first pulley; 507. a drive belt; 508. a second pulley.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the scope of protection of the present invention.
In order to facilitate understanding of the present invention, the present invention will be described more fully hereinafter with reference to the accompanying drawings. Several embodiments of the present invention are presented. The invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Referring to fig. 1-3, the present invention provides a technical solution:
a civil engineering building construction support comprises a support body 1, the support body 1 comprises a bottom plate 101, two sides of the bottom plate 101 along the length direction are provided with moving structures 2 convenient to move, the bottom of the bottom plate 101 is provided with a supporting structure 3 capable of ensuring the supporting stability, two sides of the top of the bottom plate 101 along the length direction are fixedly connected with vertical plates 102, the top of each vertical plate 102 is provided with a protective cover 103, the two vertical plates 102 are connected with a placing plate 104 through adjusting structures 5 capable of improving the working efficiency, the center of the top of the bottom plate 101 is provided with a buffer structure 4 capable of ensuring the service life, the support can be conveniently moved by arranging the supporting structures 3 and the moving structures 2, the stability of the support can be effectively ensured in the working process, the occurrence of accidents can be effectively avoided, and the support can be conveniently lifted up and down by personnel or goods by arranging the adjusting structures 5, thereby do not need personnel to scramble for the work degree of difficulty by effectual reduction simultaneously can effectual assurance work efficiency, through setting up buffer structure 4, make the shock-absorbing capacity of this support can by effectual improvement, thereby can the effectual life who guarantees the support.
In the embodiment, referring to fig. 1 and 2, the moving structure 2 includes connecting plates 201 installed on two sides of the bottom plate 101 along the length direction through a connecting shaft, the connecting plates 201 are installed on one side of the bottom plate 101 away from the bottom plate, and both ends along the width direction are fixedly connected with mounting frames 202, and walking wheels 203 are installed inside the mounting frames 202 through a connecting shaft, the supporting structure 3 includes a slot 301 opened on the bottom of the bottom plate 101, a hydraulic rod 302 is fixedly connected to the top end inside the slot 301, and a supporting plate 303 is fixedly connected to the bottom of the hydraulic rod 302, by arranging the moving structure 2 and the supporting structure 3, the support can be moved conveniently, and the stability of the support can be effectively ensured in the working process, so that accidents can be effectively avoided, when the support is actually used, a worker can conveniently move the support through the walking wheels 203 before the support is used, move to work place back control hydraulic stem 302 extension until the stable support of backup pad 303 on ground, accessible break off with the fingers and thumb connecting plate 201 afterwards and accomodate walking wheel 203 for this support can be convenient remove, and also can be effectual when the support in the course of the work the stability of guaranteeing the support, thereby can effectively avoid accident's production.
In an embodiment, referring to fig. 1, fig. 2 and fig. 3, the adjusting structure 5 includes a driving motor 501 disposed at one side of the top of the vertical plate 102 and located inside the protecting cover 103, a first screw 502 is disposed at an output end of the driving motor 501 and located inside the vertical plate 102, a first belt pulley 506 is disposed at a top of an outer side of the first screw 502 and located inside the protecting cover 103, a second screw 505 is disposed at one side of the first screw 502, a second belt pulley 508 is disposed at a top of an outer side of the second screw 505 and located inside the protecting cover 103, the first belt pulley 506 is connected with the second belt pulley 508 through a transmission belt 507, sliding sleeves 503 are mounted at outer sides of the first screw 502 and the second screw 505 through threaded connections, a connecting rod 504 is fixedly connected to one side of the sliding sleeves 503, a sliding groove 105 is disposed at one side of the two vertical plates 102 close to the placing plate 104, and one end of the connecting rod 504 far from the sliding sleeve 503 is fixedly connected to the placing plate 104 through the sliding groove 105, one end of the first screw 502, which is far away from the driving motor 501, is connected and installed inside the vertical plate 102 through a bearing, and two ends of the second screw 505 are respectively connected and installed at the bottom end inside the vertical plate 102 and the top end inside the protective cover 103 through bearings, through the arrangement of the adjusting structure 5, the bracket can conveniently lift and lower people or goods, so that people do not need to climb, the working difficulty is effectively reduced, and the working efficiency can be effectively ensured at the same time, when the bracket is used in actual use, a worker or some construction articles are placed on the placing plate 104, then two driving motors 501 can be simultaneously started through a switch, the driving motors 501 drive the first screw 502 to rotate, the second screw 505 is controlled to rotate under the combined action of the first screw 502, the first belt pulley 506 and the driving belt 507, and the sliding sleeve 503 in threaded connection with the first screw can move up and down, can be convenient realization lift work for this support can be convenient go up and down to personnel or goods, thereby does not need personnel to scramble, makes the work degree of difficulty by effectual reduction simultaneously can effectual assurance work efficiency.
In an embodiment, referring to fig. 1 and fig. 2, the buffer structure 4 includes a buffer slot 401 opened at the top of the bottom plate 101, a plurality of springs 402 are distributed in an array at the bottom end inside the buffer slot 401, and the top of the spring 402 is fixedly connected with a buffer plate 403, the top of the buffer plate 403 is fixedly connected with a buffer pad 404, by arranging the buffer structure 4, the buffer performance of the bracket can be effectively improved, thereby effectively ensuring the service life of the bracket, in actual use, when the rack is lowered, after the placing plate 104 is lowered to the bottom plate 101, the combined action of the buffer pad 404, the buffer plate 403 and the spring 402 can effectively buffer the impact force generated by the descent, thereby can effectually protect the support for the shock-absorbing capacity of this support can be by effectual improvement, thereby can the effectual life who guarantees the support.
The working principle is as follows: when the support is used, a worker can conveniently move the support through the walking wheels 203 and control the hydraulic rod 302 to extend until the support plate 303 is stably supported on the ground after moving to a working place, then the walking wheels 203 can be stored by pulling the connecting plate 201 off, so that the support can be conveniently moved, and the stability of the support can be effectively ensured in the working process of the support, thereby effectively avoiding the occurrence of accidents, when the support is used, the worker himself or places some construction articles on the placing plate 104, then two driving motors 501 can be simultaneously started through a switch, the driving motors 501 drive the first screw rod 502 to rotate, the second screw rod 505 is controlled to rotate under the combined action of the first screw rod 502, the first belt pulley 506 and the driving belt 507, so that the sliding sleeve 503 in threaded connection with the support can move up and down, can be convenient realization lift work, make this support can be convenient go up and down to personnel or goods, thereby do not need personnel to scramble, make the work degree of difficulty by effectual reduction simultaneously can effectual assurance work efficiency, at the in-process that falls when this support, after placing board 104 and descend to bottom plate 101, blotter 404, can effectually carry out effectual buffering to the impact force that the decline produced under buffer board 403 and spring 402's the combined action, thereby can effectually protect the support, make the shock-absorbing capacity of this support can be by effectual improvement, thereby can be effectual life who guarantees the support.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a civil engineering construction support, includes support main part (1), its characterized in that: support main part (1) includes bottom plate (101), bottom plate (101) are equipped with convenient removal's removal structure (2) along length direction's both sides, bottom plate (101) bottom is equipped with bearing structure (3) that can guarantee support stability, the equal fixedly connected with riser (102) in length direction's both sides is followed at bottom plate (101) top, riser (102) top is equipped with safety cover (103), place board (104) of installing is connected through regulation structure (5) that can improve work efficiency between two riser (102), just bottom plate (101) top center department is equipped with buffer structure (4) that can guarantee life.
2. The civil engineering construction support of claim 1, characterized in that: remove structure (2) and include connecting plate (201) of installing along length direction both sides at bottom plate (101) through the connecting axle, one side of bottom plate (101) and along the equal fixedly connected with mounting bracket (202) in width direction's both ends are kept away from in connecting plate (201), and inside connecting axle through the connecting axle of mounting bracket (202) installs walking wheel (203).
3. The civil engineering construction support of claim 1, wherein: the supporting structure (3) comprises a groove (301) formed in the bottom of the bottom plate (101), a hydraulic rod (302) is fixedly connected to the top end of the interior of the groove (301), and a supporting plate (303) is fixedly connected to the bottom of the hydraulic rod (302).
4. The civil engineering construction support of claim 1, characterized in that: adjusting structure (5) is including establishing in riser (102) top one side and being located inside driving motor (501) of safety cover (103), driving motor (501) output end just is located riser (102) inside and is equipped with first screw rod (502), first screw rod (502) outside top just is located safety cover (103) inside and is equipped with first belt pulley (506), and first screw rod (502) one side is equipped with second screw rod (505), second screw rod (505) outside top just is located safety cover (103) inside and is equipped with second belt pulley (508), and be connected through drive belt (507) between first belt pulley (506) and second belt pulley (508), sliding sleeve (503) are all installed through threaded connection in first screw rod (502) and second screw rod (505) outside, and sliding sleeve (503) one side fixedly connected with connecting rod (504).
5. The civil engineering construction support of claim 1 or 4, wherein: the two vertical plates (102) are provided with sliding grooves (105) on one sides close to the placing plate (104), one ends, far away from the sliding sleeve (503), of the connecting rods (504) penetrate through the sliding grooves (105) to be fixedly connected with the placing plate (104), one ends, far away from the driving motor (501), of the first screw rods (502) are connected through bearings and installed inside the vertical plates (102), and two ends of the second screw rods (505) are connected through bearings and installed at the bottom ends inside the vertical plates (102) and the top ends inside the protective covers (103).
6. The civil engineering construction support of claim 1, wherein: buffer structure (4) are including seting up buffer slot (401) at bottom plate (101) top, and the inside bottom array distribution of buffer slot (401) has a plurality of springs (402), and spring (402) top fixedly connected with buffer board (403), buffer board (403) top fixedly connected with blotter (404).
CN202220319389.6U 2022-02-17 2022-02-17 Civil engineering construction support Expired - Fee Related CN217232613U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220319389.6U CN217232613U (en) 2022-02-17 2022-02-17 Civil engineering construction support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220319389.6U CN217232613U (en) 2022-02-17 2022-02-17 Civil engineering construction support

Publications (1)

Publication Number Publication Date
CN217232613U true CN217232613U (en) 2022-08-19

Family

ID=82836714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220319389.6U Expired - Fee Related CN217232613U (en) 2022-02-17 2022-02-17 Civil engineering construction support

Country Status (1)

Country Link
CN (1) CN217232613U (en)

Similar Documents

Publication Publication Date Title
CN110034506B (en) Power equipment overhauls auxiliary device
CN209891212U (en) Geotechnical engineering uses multi-functional supporting device
CN111517205A (en) Steel plate hoisting equipment for building
CN217232613U (en) Civil engineering construction support
CN215252388U (en) High-altitude falling object protection device for road and bridge engineering
CN108999570A (en) Tunnel drill carriage
CN210341600U (en) Bow-back type overhead inverted arch trestle
CN213509495U (en) Civil engineering construction support
CN105239515A (en) Device and method for bracket installation of railway protective scaffolding in combined highway and railway bridge
CN213683135U (en) Construction platform for steel structure engineering
CN212450523U (en) Protection type lift platform that user's electric power was maintained
CN213204900U (en) Lifting device for be used for fitment
CN103735224B (en) Wall rail mounted window cleaning equipment
CN208907347U (en) Tunnel drill carriage
CN218205552U (en) Civil engineering construction is with construction support
CN214834545U (en) Reinforced building construction working platform
CN111287436A (en) Bearing structure is used in building engineering construction
CN217175583U (en) Stable form civil engineering construction support
CN217106319U (en) Shoring device is used in building engineering construction
CN220909064U (en) Supporting device
CN115434495A (en) A equipment is demolishd to protection canopy for electric power communication moves changes
CN216196431U (en) Low-rise building outer wall repairing platform
CN218815088U (en) Lifting device for building engineering
CN110054095A (en) Movable curtain wall is sat on the fence hanging device
CN218092212U (en) Combined type support frame for Shimu engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220819