CN217106319U - Shoring device is used in building engineering construction - Google Patents

Shoring device is used in building engineering construction Download PDF

Info

Publication number
CN217106319U
CN217106319U CN202220975852.2U CN202220975852U CN217106319U CN 217106319 U CN217106319 U CN 217106319U CN 202220975852 U CN202220975852 U CN 202220975852U CN 217106319 U CN217106319 U CN 217106319U
Authority
CN
China
Prior art keywords
base
fixedly connected
engineering construction
shoring device
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220975852.2U
Other languages
Chinese (zh)
Inventor
张军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220975852.2U priority Critical patent/CN217106319U/en
Application granted granted Critical
Publication of CN217106319U publication Critical patent/CN217106319U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a jacking device for building engineering construction, including the base, the last fixed surface of base is connected with the fixing base, and the pneumatic cylinder is installed at the top of fixing base, and the one end fixedly connected with of the inside hydraulic stem of pneumatic cylinder extends the post, extends the first backup pad of top fixedly connected with of post, and the notch has all been seted up to the both sides at the top of first backup pad, is equipped with adjustment mechanism on the inner wall of notch, and the both sides at fixing base top are equipped with the accent heavy subassembly. The utility model discloses beneficial effect: the electric push rod drives the slider of second backup pad bottom through being equipped with and removes in the spout, enlarges the scope of first backup pad to building roof, and the first slipmat of cooperation and second slipmat support the building, improve the device practicality, through loop bar and the part that increases weight, can adjust the regional weight of base through the quantity that increases the part to ensure the stability of base, thereby guarantee that the shoring device support in-process can not take place to remove.

Description

Shoring device is used in building engineering construction
Technical Field
The utility model belongs to the technical field of the construction, concretely relates to shoring device is used in building engineering construction.
Background
Along with the gradual development of the economy of China, the construction range is more and more extensive, the building is usually of a reinforced concrete structure, the concrete can be completely solidified only by consuming time in the construction process, and in order to prevent the deformation of the concrete from influencing the stability of the building structure in the solidification process, a special jacking device is often required to be used for supporting the roof of the building so as to protect the stability of the building, so that the existing jacking device on the construction site is continuously developed;
wherein the utility model discloses a "jacking device for housing construction" that application number is "CN 202121202422.9" also is the structure of adopting, and it "includes the branch, branch lower extreme fixedly connected with inserted bar, the branch lower extreme outside is equipped with a set of semi-circular barrel, set up the interpolation mouth of inside and outside intercommunication on the semi-circular barrel up end, seted up on the branch up end and accomodate the groove, it is equipped with the extension rod that is used for extending to the support height to accomodate the inslot, be equipped with the adjustment mechanism who is used for adjusting it between extension rod and the accomodation groove inner chamber, extension rod upper end rotation is connected with a set of backup pad, a set of the adjacent one end lateral wall surface of backup pad covers the friction course, the utility model discloses an effect through adding the mouth can add sand and soil and building stones etc. to in to increase the holistic weight of cask to in order to provide more stable holding power for branch, move up to accomodating the groove outside through the extension rod, and then extend the holistic support height of device and enlarge application scope to the backup pad is expanded to the outside through the cooperation between rotary drum and the roof, thereby makes the device have the better supporting role that provides of bigger support range ", but this kind of bearing structure in the in-service use process, still has following defect:
(1) the whole structure of the top bracing device is relatively fixed, the rotary drum is matched with a building roof in a rolling manner and is unfolded outwards, but the supporting area after the unfolding is fixed and cannot be adjusted again, so that the top bracing device is limited in use;
(2) the bottom connecting structure in the top bracing device adds sand and stone into the barrel from the adding port, so as to increase the weight of the bottom of the device, and the method is difficult to ensure the stability of the device;
therefore, it is necessary to design a top bracing device which is practical and reliable and has higher stability.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a shoring device is used in building engineering construction aims at solving current shoring device structure for construction among the prior art for receive the lower problem of limitation and stability.
In order to achieve the above object, the utility model provides a following technical scheme: a supporting device for constructional engineering construction comprises a base, wherein a fixed seat is fixedly connected to the upper surface of the base, a hydraulic cylinder is mounted at the top of the fixed seat, an extension column is fixedly connected to one end of a hydraulic rod inside the hydraulic cylinder, a first supporting plate is fixedly connected to the top of the extension column, notches are formed in two sides of the top of the first supporting plate, an adjusting mechanism is arranged on the inner wall of each notch, and weight adjusting assemblies are arranged on two sides of the top of the fixed seat;
the adjusting mechanism comprises an electric push rod arranged on the inner wall of the notch, a second supporting plate is fixedly connected with the telescopic end of the electric push rod, a sliding block is arranged at the bottom of the second supporting plate, and a second anti-skid pad is fixedly connected to the upper surface of the second supporting plate.
In order to make and protect the extension post, conduct the utility model relates to an it is preferred, the top fixed mounting of fixing base has the support sleeve post, the rubber pad is installed at the top of support sleeve post.
In order to make the stability that keeps first backup pad, as the utility model relates to a preferred, the first slipmat of top fixedly connected with of first backup pad, the both sides of first backup pad bottom all through the bracing piece that appears to one side and extend the both sides fixed connection on capital end.
In order to make and adjust the regional weight of base, as the utility model relates to an it is preferred, transfer heavy subassembly including installing two loop bars in base top both sides, the surface cover of loop bar is equipped with a plurality of and increases heavy piece.
In order to make it be convenient for promote the second backup pad, as the utility model relates to an it is preferred, the spout has been seted up at the top of notch, the inner wall and the slider sliding connection of spout.
In order to make and cushion the bearing capacity, as the utility model relates to an it is preferred, four edges of base bottom all are equipped with the cushion socket.
In order to make to inside control with electrical apparatus, conduct the utility model relates to an it is preferred, control panel is installed at the top of base, electric putter passes through control panel and external power supply electric connection.
In order to make when supporting the special system, be convenient for remove, as the utility model relates to a preferred, four edges of base bottom all are equipped with the removal subassembly, remove the subassembly including installing the cylinder on the standing groove inner wall has been seted up to the base bottom, the delivery rod fixedly connected with mounting panel of cylinder, the bottom of mounting panel is equipped with a plurality of universal wheel.
Compared with the prior art, the beneficial effects of the utility model are that:
1) the sliding block at the bottom of the second supporting plate is driven to move in the sliding groove through the arranged electric push rod, so that the range of the original first supporting plate to the roof of the building is enlarged, and the building is supported by matching the first anti-skid pad on the first supporting plate and the second anti-skid pad on the second supporting plate, so that the practicability of the top supporting device is improved;
2) through the loop bar in the accent heavy subassembly that is equipped with the piece that increases, can adjust the regional weight of base through the quantity that increases the piece to ensure the stability of base, thereby guarantee that the shoring device support in-process can not take place to remove.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural diagram of embodiment 1 of the present invention;
fig. 2 is a schematic view of a fixing base structure according to embodiment 1 of the present invention;
fig. 3 is a schematic structural view of an adjusting mechanism in embodiment 1 of the present invention;
fig. 4 is a schematic structural view of a weight adjusting assembly in embodiment 1 of the present invention;
fig. 5 is a schematic structural diagram of embodiment 2 of the present invention.
In the figure: 1. a base; 11. a shock absorbing seat; 12. a control panel; 13. a placement groove; 2. a fixed seat; 21. a hydraulic cylinder; 22. a hydraulic lever; 23. an extension column; 24. a first support plate; 241. a notch; 242. a first non-slip mat; 243. a diagonal support bar; 244. a chute; 25. supporting a sleeve column; 251. a rubber pad; 3. an adjustment mechanism; 31. an electric push rod; 32. a second support plate; 33. a slider; 34. a second non-slip mat; 4. a weight adjusting component; 41. a loop bar; 42. a weight increasing member; 5. a moving assembly; 51. a cylinder; 52. mounting a plate; 53. a universal wheel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
Referring to fig. 1-4, the present invention provides the following technical solutions: a jacking device for construction of constructional engineering comprises a base 1, wherein a fixed seat 2 is fixedly connected to the upper surface of the base 1, a hydraulic cylinder 21 is installed at the top of the fixed seat 2, an extension column 23 is fixedly connected to one end of a hydraulic rod 22 inside the hydraulic cylinder 21, a first support plate 24 is fixedly connected to the top of the extension column 23, notches 241 are formed in two sides of the top of the first support plate 24, an adjusting mechanism 3 is arranged on the inner wall of each notch 241, and weight adjusting assemblies 4 are arranged on two sides of the top of the fixed seat 2;
the adjusting mechanism 3 comprises an electric push rod 31 installed on the inner wall of the notch 241, a second supporting plate 32 is fixedly connected to the telescopic end of the electric push rod 31, a sliding block 33 is installed at the bottom of the second supporting plate 32, and a second anti-skid pad 34 is fixedly connected to the upper surface of the second supporting plate 32.
During the specific use, utilize electric putter 31 to drive the slider 33 of second backup pad 32 bottom and slide in the inside of spout 244 to enlarge the support scope of first backup pad 24 to the building, cooperate second slipmat 34 to support the building, improve the practicality of device.
In this embodiment, the top of the fixing base 2 is fixedly installed with a supporting sleeve column 25, and the top of the supporting sleeve column 25 is installed with a rubber pad 251.
When the extension column 23 is used in a specific mode, the support sleeve column 25 and the rubber pad 251 are used for protecting the extension column 23 conveniently.
In this embodiment, the top of the first supporting plate 24 is fixedly connected with a first non-slip mat 242, and both sides of the bottom of the first supporting plate 24 are fixedly connected with both sides of the top end of the extending column 23 through an inclined supporting rod 243.
In particular use, the two diagonal support bars 243 are used to facilitate the support of the first support plate 24.
In this embodiment, the weight adjusting assembly 4 includes two loop bars 41 installed on two sides of the top of the base 1, and a plurality of weight increasing members 42 are sleeved on the surface of the loop bars 41.
When the device is used in a specific mode, the weight of the area of the base 1 is adjusted by adjusting the number of the weight increasing pieces 42 on the sleeve rod 41, so that the stability of the bottom of the device is improved.
In this embodiment, the top of the notch 241 is provided with a sliding slot 244, and the inner wall of the sliding slot 244 is slidably connected with the sliding block 33.
In particular use, the slider 33 slides on the inner wall of the chute 244.
In this embodiment, four corners of the bottom of the base 1 are provided with shock absorbing seats 11.
When the damping seat is used specifically, the bearing force applied to a building is buffered by the damping seat 11.
In this embodiment, the top of the base 1 is provided with a control panel 12, and the electric push rod 31 is electrically connected to the external power source through the control panel 12.
Specifically, the control panel 12 controls the electric push rod 31.
The working principle is as follows: connect it with external power source when using this equipment, at first, according to the needs that the building supported, cooperation electric putter 31 drives the slider 33 of second backup pad 32 bottom and slides in spout 244, thereby enlarge the support range of first backup pad 24, the practicality of high-speed device, the second slipmat 34 at cooperation second backup pad 32 top supports the building, avoid taking place to remove among the support process, drive hydraulic stem 22 through pneumatic cylinder 21 and remove, hydraulic stem 22 drives extension column 23 and upwards removes inside support sleeve post 25, thereby drive first backup pad 24 and upwards remove, cooperation second backup pad 32 and first slipmat 242 support the building, the weight of base 1 is adjusted through adjusting the quantity of increase piece 42 on two loop bars 41, thereby ensure the stability of device, improve the effect to the building support.
Example 2
Referring to fig. 5, in order to support the device and move the device conveniently, the present embodiment is characterized by the following features: in this embodiment, four edges of base 1 bottom all are equipped with removal subassembly 5, remove subassembly 5 including installing cylinder 51 on the standing groove 13 inner wall is seted up to base 1 bottom, cylinder 51's output pole fixedly connected with mounting panel 52, and the bottom of mounting panel 52 is equipped with a plurality of universal wheel 53.
When the device is used specifically, the output rod of the air cylinder 51 is utilized to drive the mounting plate 52 to move downwards, and the device is moved to a proper position by matching with the plurality of universal wheels 53, so that the flexibility of the device is improved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a shoring device for building engineering construction, includes base (1), its characterized in that: the upper surface of the base (1) is fixedly connected with a fixed seat (2), the top of the fixed seat (2) is provided with a hydraulic cylinder (21), one end of a hydraulic rod (22) inside the hydraulic cylinder (21) is fixedly connected with an extension column (23), the top of the extension column (23) is fixedly connected with a first support plate (24), two sides of the top of the first support plate (24) are both provided with a notch (241), the inner wall of the notch (241) is provided with an adjusting mechanism (3), and two sides of the top of the fixed seat (2) are provided with weight adjusting components (4);
the adjusting mechanism (3) comprises an electric push rod (31) installed on the inner wall of the notch (241), a second supporting plate (32) is fixedly connected with the telescopic end of the electric push rod (31), a sliding block (33) is installed at the bottom of the second supporting plate (32), and a second anti-skid pad (34) is fixedly connected to the upper surface of the second supporting plate (32).
2. The shoring device for constructional engineering construction as claimed in claim 1, wherein: the top of fixing base (2) is fixed mounting has support sleeve post (25), rubber pad (251) is installed at the top of support sleeve post (25).
3. The shoring device for constructional engineering construction as claimed in claim 1, wherein: the top of the first supporting plate (24) is fixedly connected with a first non-slip mat (242), and two sides of the bottom of the first supporting plate (24) are fixedly connected with two sides of the top end of the extending column (23) through oblique supporting rods (243).
4. The shoring device for constructional engineering construction as claimed in claim 1, wherein: transfer heavy subassembly (4) including installing two loop bars (41) in base (1) top both sides, the surface cover of loop bar (41) is equipped with a plurality of and increases heavy piece (42).
5. The shoring device for constructional engineering construction as claimed in claim 1, wherein: the top of the notch (241) is provided with a sliding groove (244), and the inner wall of the sliding groove (244) is in sliding connection with the sliding block (33).
6. The shoring device for constructional engineering construction as claimed in claim 1, wherein: four corners of base (1) bottom all are equipped with shock attenuation seat (11).
7. The shoring device for constructional engineering construction as claimed in claim 1, wherein: control panel (12) are installed at the top of base (1), electric putter (31) pass through control panel (12) and external power source electric connection.
8. The shoring device for constructional engineering construction as claimed in claim 1, wherein: four edges of base (1) bottom all are equipped with removal subassembly (5), remove subassembly (5) including installing cylinder (51) on base (1) bottom is seted up standing groove (13) inner wall, the output pole fixedly connected with mounting panel (52) of cylinder (51), the bottom of mounting panel (52) is equipped with a plurality of universal wheel (53).
CN202220975852.2U 2022-04-26 2022-04-26 Shoring device is used in building engineering construction Active CN217106319U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220975852.2U CN217106319U (en) 2022-04-26 2022-04-26 Shoring device is used in building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220975852.2U CN217106319U (en) 2022-04-26 2022-04-26 Shoring device is used in building engineering construction

Publications (1)

Publication Number Publication Date
CN217106319U true CN217106319U (en) 2022-08-02

Family

ID=82584492

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220975852.2U Active CN217106319U (en) 2022-04-26 2022-04-26 Shoring device is used in building engineering construction

Country Status (1)

Country Link
CN (1) CN217106319U (en)

Similar Documents

Publication Publication Date Title
CN217106319U (en) Shoring device is used in building engineering construction
CN210004994U (en) auxiliary tool for photography for digital building surveying and mapping
CN217928086U (en) Support for pipe jacking laser theodolite
CN213927549U (en) Supporting mechanism for prefabricated concrete slab
CN212997086U (en) Lifting device and wheelchair
CN211178552U (en) Supporting and adjusting device for land survey
CN210563430U (en) Building templates surface building prosthetic devices
CN220954502U (en) A travelling bogie device for subway open cut station
CN215672295U (en) Temporary supporting equipment for tunnel bridge construction
CN215441901U (en) Pile hole soil cleaning device for building engineering
CN218174411U (en) High-stability pedestal crane
CN110939471A (en) Net supporting machine for roadway support and using method thereof
CN218711869U (en) Safety device is used in road bed construction
CN214456550U (en) Equipment installation device of equipment cabinet
CN217758212U (en) Road surface compaction device for highway construction
CN217232613U (en) Civil engineering construction support
CN214999105U (en) Damping device of electric power engineering foundation treatment equipment
CN211900638U (en) Safety support is laid to anchor net
CN219788402U (en) Six-axis robot operation table with lifting mechanism
CN220790502U (en) Adjustable building construction platform
CN218175550U (en) Movable road crusher
CN217712397U (en) Construction ladder is used in road bridge construction of conveniently extending
CN215706525U (en) Pile foundation handling device for hydraulic engineering
CN219755210U (en) Movable vibration reduction platform
CN212000645U (en) Bridge construction supporting equipment in field of bridge engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant