CN217174387U - Hanging basket for bridge construction - Google Patents

Hanging basket for bridge construction Download PDF

Info

Publication number
CN217174387U
CN217174387U CN202220311683.2U CN202220311683U CN217174387U CN 217174387 U CN217174387 U CN 217174387U CN 202220311683 U CN202220311683 U CN 202220311683U CN 217174387 U CN217174387 U CN 217174387U
Authority
CN
China
Prior art keywords
plate
fixedly connected
hanging
watering
sprinkling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220311683.2U
Other languages
Chinese (zh)
Inventor
康晓凯
付普阳
刘刚
喻学武
张博
陈平
刘坤
李播雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
International Engineering Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
International Engineering Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by International Engineering Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical International Engineering Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority to CN202220311683.2U priority Critical patent/CN217174387U/en
Application granted granted Critical
Publication of CN217174387U publication Critical patent/CN217174387U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a bridge construction is with hanging basket, including two supports that set up side by side, the support is along the extending direction sliding connection of case roof beam the central axis in the side of going up of case roof beam, the upside of two supports is striden and is equipped with first hanger plate and second hanger plate, the downside of first hanger plate is provided with the inside mould, the cavity has been seted up to the inside of inside mould, the backup pad of the last lateral wall fixedly connected with shape of falling T of cavity, the first watering board of both ends fixedly connected with of backup pad horizontal part, the bottom surface of first watering board is spaced apart along the extending direction of first watering board and is equipped with the watering hole, the one end of first watering board is extended outside the inside mould and is connected with first hanger plate through the suspender, the downside of second hanger plate is connected with the chassis through the suspender, the both sides of inside mould are provided with the outside mould. The utility model discloses a set up first watering board and be connected the water pipe with first watering board, compare in the background art, use the utility model discloses the back need not to build the in-process at the bridge and installs repeatedly and demolish the water pipe.

Description

Hanging basket for bridge construction
Technical Field
The utility model relates to a bridge construction technical field, in particular to bridge construction is with hanging basket.
Background
The existing cradle is a main device in cantilever construction, and can be divided into 4 types of trusses, cable-stayed bridges, section steel bridges and hybrid bridges according to the structural form, and the cradle construction refers to that when a cantilever bridge with a larger span is poured, a cradle method is adopted for building the bridge in sections, a support does not need to be built, a large crane is not used, and compared with other methods, the cradle construction has the advantages of light structure, simplicity and convenience in splicing and the like.
The new bridge structure needs to be maintained by spraying water after being poured on the hanging basket, and in the prior art, when a cavity of the bridge is maintained, a water pipe needs to be installed into the cavity for spraying; with the gradual construction of the bridge, the water pipe in the maintenance method needs to be repeatedly installed and removed in the construction process, and manpower and material resources are extremely consumed.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a bridge construction is with hanging basket to need install repeatedly and demolish the problem of maintenance water pipe among the solution prior art in the bridge work progress.
In order to achieve the above object, the utility model relates to a bridge construction is with hanging basket's technical scheme is: the box girder comprises two supports arranged side by side, the supports are connected to the upper side face of a box girder in a sliding manner along the extending direction of the central axis of the box girder, a first hanging plate and a second hanging plate are arranged on the upper sides of the two supports in a spanning manner, an inner side mould is arranged on the lower side of the first hanging plate, a cavity is arranged in the inner side mould, an inverted T-shaped supporting plate is fixedly connected to the upper side wall of the cavity, first sprinkling plates are fixedly connected to the two ends of the transverse part of the supporting plate, the extending direction of the first sprinkling plates is the same as the sliding direction of the supports, sprinkling holes are arranged on the bottom surface of the first sprinkling plates at intervals along the extending direction of the first sprinkling plates, one end of each first sprinkling plate extends out of the inner side mould and is connected with the first hanging plate through a hanging strip, a first water inlet is formed in the end of each first sprinkling plate, the lower side of the second hanging plate is connected with an underframe through a hanging strip, the chassis is located the below of interior side mould, the both sides of interior side mould are provided with the outside mould, the outside mould with the chassis is connected.
Has the advantages that: after the bridge structure is poured, a first water inlet of the first sprinkling plate is connected with a water pipe, water flow in the water pipe can enter the first sprinkling plate and is sprayed out through a sprinkling hole formed in the first sprinkling plate, so that a cavity of the bridge is maintained, the connection between the water pipe and the first sprinkling plate is not required to be disconnected after the maintenance is finished, the water pipe is directly driven to move forwards through the control support after the anchoring connection between the support and the original bridge is disconnected, and when the maintenance is required after the next bridge is poured, the water flow is injected into the first sprinkling plate through the water pipe to be sprinkled by opening a water pump; the utility model discloses a set up first watering board and be connected the water pipe with first watering board, compare in the background art, use the utility model discloses the back need not to build the in-process at the bridge and installs repeatedly and demolish the water pipe, and the interval is seted up on first watering board in the hole that sprays water, has increased the utility model discloses maintenance effect to the bridge.
Furthermore, two fixedly connected with gusset plate between the support, the gusset plate orientation one side of inside form is provided with watering device.
Has the advantages that: be connected the water pipe with watering device, and then advance the maintenance to the outside of bridge, and need not to break off the connection between water pipe and the watering device after the maintenance is accomplished, directly drive the water pipe forward movement through the control support, when the bridge of lower section is pour and is accomplished the back and need the maintenance, only need open the water pump with rivers through water pipe pour into to watering device in spray can, further promoted the convenience of bridge maintenance through this design.
Furthermore, watering device includes fixed plate and second watering board, the fixed plate with the gusset plate orientation one side fixed connection of inner mould, one side fixedly connected with of fixed plate is the motor that just reverses, just reverse motor passes through controller control, just reverse motor with the controller electricity is connected, just reverse the output shaft of motor with second watering board fixed connection, the second watering board is located two between the support, be provided with second water inlet and watering shower nozzle on the second watering board.
Has the advantages that: after being connected water pipe and second watering board, constructor accessible controller control is just reversing motor corotation and reversal, and then adjusts the watering angle of second watering board for the second watering board can be more even maintain the bridge.
Furthermore, the upper sides of the two brackets are fixedly connected with first hydraulic cylinders, and the second hanging plate is connected with the brackets through the first hydraulic cylinders.
Has the advantages that: can drive the second hanger plate through first pneumatic cylinder and rise simultaneously and descend, and then can adjust the height of bottom plate, compare in the mode that electric block rolling suspender was used to the tradition, this kind of structure is simple and easy to assemble more.
Furthermore, the upper side surface of the box girder is fixedly connected with an inverted T-shaped fixing strip, the fixing strip is arranged at intervals along the extending direction of the central axis of the box girder, a sliding plate is spanned on the upper side surface of the fixing strip and fixedly connected with the fixing strip, an inverted U-shaped plate is fixedly connected to the lower side of the support and buckled on the sliding plate, the sliding plate is located between two side plates of the inverted U-shaped plate, one side, opposite to the two side plates, of each side plate is fixedly connected with a limiting plate, and the limiting plates are located between the sliding plate and the fixing strip.
Has the advantages that: through setting up the type plate that falls U for the support can not appear rolling when sliding, through setting up the limiting plate, make the support can not roll from beginning to end when sliding, make the support can be stable slide on the fixed plate through this structure, and then promoted the gliding stability of support and security.
Furthermore, the side of going up of case roof beam is provided with the second pneumatic cylinder, the support is located between the tip of second pneumatic cylinder and case roof beam, the through-hole has been seted up to the tip of second pneumatic cylinder piston rod, the thread groove has been seted up to the side of going up of the shape of falling U, it has high strength bolt to twist in the support, just high strength bolt's bottom passes the through-hole and twist in the thread groove.
Has the advantages that: through using the second pneumatic cylinder to push away the support, promoted the stability that the support removed, only need use during the connection moreover high strength bolt pass support and through-hole after and revolve twist in the thread groove can, and then made things convenient for constructor's dismouting greatly.
Drawings
Fig. 1 is a schematic structural view of a first visual angle of the hanging basket for bridge construction of the present invention;
FIG. 2 is a front view of the hanging basket for bridge construction;
fig. 3 is the utility model relates to a bridge construction is with structural schematic diagram at string basket second visual angle.
In the figure: 1. a support; 2. a box girder; 3. a first hanger plate; 4. a second hanger plate; 5. a first hydraulic cylinder; 6. an inner side mold; 7. a support plate; 8. a first sprinkler plate; 9. a sling; 10. a stabilizing plate; 11. a chassis; 12. an outer mold; 13. a reinforcing plate; 14. a first fixing plate; 15. a second fixing plate; 16. a positive and negative rotation motor; 17. a second sprinkler plate; 18. a sprinkler head; 19. a fixing strip; 20. a sliding plate; 21. an inverted U-shaped plate; 22. a limiting plate; 23. a second hydraulic cylinder; 24. high strength bolt.
Detailed Description
Embodiments of the present invention will be further described with reference to the accompanying drawings, wherein the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like refer to the same orientation or positional relationship as shown in the drawings, which is for convenience of description and simplicity of description, and does not indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present invention.
As shown in fig. 1 and 2, the hanging basket for bridge construction comprises two brackets 1 arranged side by side, wherein the brackets 1 are connected to the upper side surface of a box girder 2 in a sliding manner along the front-back direction; the upper sides of the two supports 1 are spanned with a first hanger plate 3 and a second hanger plate 4, specifically, the upper sides of the two supports 1 are fixedly connected with a first hydraulic cylinder 5, and the second hanger plate 4 is connected with the supports 1 through the first hydraulic cylinder 5. An inner side die 6 is arranged on the lower side of the first hanging plate 3, a cavity is formed in the inner side die 6, an inverted T-shaped supporting plate 7 is fixedly connected to the upper side wall of the cavity, first sprinkling plates 8 are fixedly connected to two ends of the transverse portion of the supporting plate 7, the first sprinkling plates 8 extend in the front-back direction, sprinkling holes (not shown in the figure) are formed in the bottom surfaces of the first sprinkling plates 8 at intervals along the extending direction of the first sprinkling plates 8, the front ends of the first sprinkling plates 8 extend out of the inner side die 6 and are connected with the first hanging plate 3 through hanging strips 9, first water inlets are formed in the front ends of the first sprinkling plates 8, and the rear ends of the first sprinkling plates 8 extend into the bridge and are connected with the bridge in an anchoring mode; one sides of the two brackets 1 far away from each other are fixedly connected with a stabilizing plate 10, the lower side of the inner side die 6 is provided with an underframe 11, and the underframe 11 is connected with the second hanging plate 4 and the stabilizing plate 10 through hanging strips 9; and outer side dies 12 are arranged on two sides of the inner side die 6, and the outer side dies 12 are connected with the bottom frame 11 through supporting frames.
Pour at bridge construction and accomplish the back, with first water inlet and the water piping connection of first watering board 8, rivers in the water pipe can get into to first watering board 8 in, and the outside blowout of watering hole through seting up on first watering board 8, and then maintain the cavity of bridge, and need not to break off the connection between water pipe and the first watering board 8 after the maintenance is accomplished, after the anchor between disconnect bracket 1 and the former bridge is connected, directly drive the water pipe forward movement through control bracket 1, when the bridge of lower section is pour and is accomplished the back and need the maintenance, only need open the water pump with rivers inject into through the water pipe to spray in first watering board 8 can.
As shown in fig. 1 and referring to the orientation in fig. 1, in this embodiment, a reinforcing plate 13 is fixedly connected between the two brackets 1, a first fixing plate 14 and a second fixing plate 15 are fixedly connected to one side of the reinforcing plate 13 facing the inner side mold 6, a forward and reverse motor 16 is fixedly connected to the left side of the first fixing plate 14, the forward and reverse motor 16 is controlled by a controller, the forward and reverse motor 16 is electrically connected to the controller, a second sprinkler plate 17 is fixedly connected to an output shaft of the forward and reverse motor 16, the left end of the second sprinkler plate 17 is rotatably connected to the second fixing plate 15, a second water inlet is opened on one side of the second sprinkler plate 17 away from the inner side mold 6, and sprinkler heads 18 are spaced from one side of the second sprinkler plate 17 facing the inner side mold 6 in the left-right direction.
The water pipe is connected with the second sprinkling plate 17 through the second water inlet, so that the second sprinkling plate 17 enters the outside of the bridge through the sprinkling nozzle 18 for maintenance, in the maintenance process, the constructor can control the forward and reverse rotation of the forward and reverse rotation motor 16 through the controller, further the sprinkling angle of the second sprinkling plate 17 is adjusted, and the second sprinkling plate 17 can be maintained on the bridge more uniformly. And need not to break off the connection between water pipe and the second watering board 17 after the maintenance is accomplished, directly drive the water pipe forward movement through control support 1, when the bridge of lower section pours and need the maintenance after accomplishing, only need open the water pump with rivers inject into the second watering board 17 through the water pipe spray can, and promoted the rotational stability of second watering board 17 through addding second fixed plate 15.
As shown in fig. 1 and 2, in the present embodiment, an inverted T-shaped fixing strip 19 is fixedly connected to the upper side surface of the box girder 2, and the fixing strips 19 are arranged at intervals in the front-rear direction; the upper side surface of the fixed strip 19 is spanned with a sliding plate 20, the sliding plate 20 is fixedly connected with the fixed strip 19, the lower side of the bracket 1 is fixedly connected with an inverted U-shaped plate 21, the inverted U-shaped plate 21 is buckled on the sliding plate 20, the fixed plate is positioned between two side plates of the inverted U-shaped plate 21, one opposite side of the two side plates is fixedly connected with a limiting plate 22, and the limiting plate 22 is positioned between the fixed plate and the fixed strip 19. Through setting up the U-shaped board 21 for left-right rocking can not appear when sliding in support 1, through setting up limiting plate 22, makes support 1 can not rock from beginning to end when sliding, makes through this structure that support 1 can be stable slide on the fixed plate, and then has promoted the gliding stability of support 1 and security.
As shown in fig. 3, in the present embodiment, a second hydraulic cylinder 23 is fixedly connected to an upper side surface of the box girder 2, the bracket 1 is located between the second hydraulic cylinder 23 and an end portion of the box girder 2, a through hole is formed at an end portion of a piston rod of the second hydraulic cylinder 23, a thread groove is formed on an upper side surface of the inverted U-shaped plate 21, a high-strength bolt 24 is screwed into a cross beam at the bottom of the bracket 1 along a vertical direction, and a bottom end of the high-strength bolt 24 passes through the through hole and is screwed into the thread groove. Support 1 has been promoted through using second pneumatic cylinder 23 top to push away support 1, has promoted the stability that support 1 removed, only need use during the connection moreover high strength bolt 24 pass support 1 and through-hole after and twist soon twist in the thread groove can, and then made things convenient for constructor's dismouting greatly.
In the above-mentioned embodiment, the gusset plate is towards one side fixedly connected with first fixed plate and second fixed plate of inside form, and the left side of first fixed plate is rotated through positive reverse motor and is connected with the second watering board, is provided with second water inlet and watering shower nozzle on the second watering board, in other embodiments, still can not be provided with the second watering board, and second water inlet and watering shower nozzle set up in the gusset plate towards one side of inside form.
In the above-mentioned embodiment, the gusset plate is connected with the second watering board towards one side fixedly connected with first fixed plate and the second fixed plate of inside mould, and the left side of first fixed plate is rotated through positive and negative motor and is connected with the second watering board, and the left end and the second fixed plate of second watering board rotate and are connected, in other embodiments, only fixedly connected with first fixed plate in one side of gusset plate towards the inside mould, the left side of first fixed plate is rotated through positive and negative motor and is connected with the second watering board.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and should not be construed as limiting the scope of the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the present invention.

Claims (6)

1. The utility model provides a bridge construction is with hanging basket which characterized in that: the box girder comprises two supports arranged side by side, the supports are connected to the upper side face of a box girder in a sliding manner along the extending direction of the central axis of the box girder, a first hanging plate and a second hanging plate are arranged on the upper sides of the two supports in a spanning manner, an inner side mould is arranged on the lower side of the first hanging plate, a cavity is arranged in the inner side mould, an inverted T-shaped supporting plate is fixedly connected to the upper side wall of the cavity, first sprinkling plates are fixedly connected to the two ends of the transverse part of the supporting plate, the extending direction of the first sprinkling plates is the same as the sliding direction of the supports, sprinkling holes are arranged on the bottom surface of the first sprinkling plates at intervals along the extending direction of the first sprinkling plates, one end of each first sprinkling plate extends out of the inner side mould and is connected with the first hanging plate through a hanging strip, a first water inlet is formed in the end of each first sprinkling plate, the lower side of the second hanging plate is connected with an underframe through a hanging strip, the chassis is located the below of interior side mould, the both sides of interior side mould are provided with the outside mould, the outside mould with the chassis is connected.
2. The hanging basket for bridge construction according to claim 1, wherein: two fixedly connected with gusset plate between the support, the gusset plate orientation one side of inside form is provided with watering device.
3. The hanging basket for bridge construction according to claim 2, wherein: watering device includes fixed plate and second watering board, the fixed plate with the gusset plate orientation one side fixed connection of inside form, one side fixedly connected with of fixed plate is just reversing the motor, just reversing the motor and passing through controller control, just reversing the motor with the controller electricity is connected, just reversing the output shaft of motor with second watering board fixed connection, the second watering board is located two between the support, be provided with second water inlet and watering shower nozzle on the second watering board.
4. The hanging basket for bridge construction according to claim 3, wherein: the upper sides of the two brackets are fixedly connected with first hydraulic cylinders, and the second hanging plate is connected with the brackets through the first hydraulic cylinders.
5. The hanging basket for bridge construction according to claim 4, wherein: the box beam comprises a box beam body and is characterized in that an inverted T-shaped fixing strip is fixedly connected to the upper side face of the box beam body, the fixing strip is arranged at intervals along the extending direction of the central axis of the box beam body, a sliding plate is arranged on the upper side face of the fixing strip in a crossing mode, the sliding plate is fixedly connected with the fixing strip, an inverted U-shaped plate is fixedly connected to the lower side of the support and buckled on the sliding plate, the sliding plate is located between two side plates of the inverted U-shaped plate, one side, opposite to the two side plates, of the two side plates is fixedly connected with a limiting plate respectively, and the limiting plate is located between the sliding plate and the fixing strip.
6. The hanging basket for bridge construction according to claim 5, wherein: the side of going up of case roof beam is provided with the second pneumatic cylinder, the support is located between the tip of second pneumatic cylinder and case roof beam, the through-hole has been seted up to the tip of second pneumatic cylinder piston rod, the thread groove has been seted up to the side of going up of the shape of falling U, it has high strength bolt to twist in the support, just high strength bolt's bottom is passed the through-hole and twist soon in the thread groove.
CN202220311683.2U 2022-02-16 2022-02-16 Hanging basket for bridge construction Active CN217174387U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220311683.2U CN217174387U (en) 2022-02-16 2022-02-16 Hanging basket for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220311683.2U CN217174387U (en) 2022-02-16 2022-02-16 Hanging basket for bridge construction

Publications (1)

Publication Number Publication Date
CN217174387U true CN217174387U (en) 2022-08-12

Family

ID=82738727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220311683.2U Active CN217174387U (en) 2022-02-16 2022-02-16 Hanging basket for bridge construction

Country Status (1)

Country Link
CN (1) CN217174387U (en)

Similar Documents

Publication Publication Date Title
CN101298839B (en) Tunnel concrete lining formwork apparatus
CN201943045U (en) Automatic-moving hydraulic cantilever gantry concrete placement device for wave wall
CN217174387U (en) Hanging basket for bridge construction
AU2021102863A4 (en) Maintenance Equipment for Anti-collision Wall of High-speed Railway Bridge and Vertical Wall of Cable Trough
CN216427858U (en) Linear adjusting template device for post-cast section of curved track beam
CN209619856U (en) Cast-in-place web and bottom plate maintenance of equipment
CN207092331U (en) Combined type reinforced truss floor support plate
CN213499889U (en) Novel box girder template
CN201228554Y (en) Tunnel concrete lining formwork apparatus
CN201669775U (en) Internal mold adjusting mechanism of prefabricated U-shaped concrete beam
CN111219197A (en) Die spraying equipment and die spraying process
CN106958233B (en) For pouring the hydraulic self-lifting formula cantilever form construction method of Arch Dam Concrete
CN110792038B (en) Self-propelled mold hanging tool and method for high-altitude cast-in-place of tie rod arch bridge beam
CN210651238U (en) Highway bridge precast beam sprays curing means
CN207700074U (en) The double limb triangle hanging baskets of continuous rigid frame bridge cantilever beam section construction
CN110076879A (en) A kind of concrete casting device for the production of prefabricated superimposed sheet
CN214993106U (en) Pier pouring die
CN209742366U (en) Supporting system for integral lifting in cylinder
CN109372553A (en) Tunnel mould spray belt template component
CN211314233U (en) Tunnel is a concrete spray curing means just
CN208563131U (en) A kind of ground line mobile formwork
CN209482165U (en) A kind of novel rhombus Hanging Basket
CN211488785U (en) Cleaning device for machining steel skeleton
CN210482086U (en) Concrete spraying and curing device for high-pier hanging basket construction
CN209195441U (en) A kind of template for the spray of tunnel mould

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant