CN214993106U - Pier pouring die - Google Patents

Pier pouring die Download PDF

Info

Publication number
CN214993106U
CN214993106U CN202120011638.0U CN202120011638U CN214993106U CN 214993106 U CN214993106 U CN 214993106U CN 202120011638 U CN202120011638 U CN 202120011638U CN 214993106 U CN214993106 U CN 214993106U
Authority
CN
China
Prior art keywords
template
water
base
pier
water inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120011638.0U
Other languages
Chinese (zh)
Inventor
何杨闽
邵龙
陆中旭
马雷鸣
姜岳阳
娄俞民
李翔
朱张涛
范春明
黄继东
熊勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jinzhu Transportation Construction Co Ltd
Original Assignee
Zhejiang Jinzhu Transportation Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jinzhu Transportation Construction Co Ltd filed Critical Zhejiang Jinzhu Transportation Construction Co Ltd
Priority to CN202120011638.0U priority Critical patent/CN214993106U/en
Application granted granted Critical
Publication of CN214993106U publication Critical patent/CN214993106U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a pier pouring mold, including setting up the template on the base, the intermediate position of base is offered and is established the discharge opening of supporting seat in, the intermediate position fixedly connected with mounting panel of four sides of base, fixedly mounted with the cylinder on the mounting panel, the upper surface avris of base and mounting panel correspond the position and have offered the slide, sliding connection has the slider in the slide, fixedly connected with fixed plate on the slider, be connected with the bracing piece on the fixed plate, the other end and the template outside of bracing piece are fixed; the runner of vertical setting is seted up to the inside intermediate position of template, and the water jet that communicates with the runner is seted up to the inboard upper end of template, and the water inlet that communicates with the runner is seted up to the outside lower extreme of template, and fixed mounting has the water injection piece that corresponds with the water inlet on the base, and the intercommunication has the raceway between the water injection piece, and the other end and the outside water pump intercommunication of raceway. The utility model provides a current pier casting die install and remove hard problem through the manual work.

Description

Pier pouring die
Technical Field
The utility model relates to a building technical field specifically is a pier casting mold.
Background
The existing bridge construction is generally completed after pouring construction of bridge piers is carried out at a construction site and then box girder pouring is carried out or prefabricated and formed box girders are subjected to composite construction, and the construction process needs large-scale cast-in-place construction. With the continuous progress of bridge construction technology, the construction process for prefabricating and pouring the pier in a large-scale prefabrication factory is adopted, the factory prefabrication and pouring can greatly save time, guarantee the construction period, and simultaneously can better guarantee the quality, save the cost and reduce the safety risk.
Along with the standardization of bridge construction, the piers used by a plurality of bridges are designed according to regulations, a template of one pier can be repeatedly used, the existing prefabricated piers need to be erected and fixed before pouring, manual template removal is needed after concrete pouring and forming, the existing prefabricated piers are troublesome, the formed concrete needs to be watered regularly after the concrete piers are poured and formed to ensure the quality of the piers, manual watering is generally adopted at present, and the labor intensity of processing workers is high.
SUMMERY OF THE UTILITY MODEL
The utility model provides a pier casting mold that opens and shuts through cylinder has solved current pier casting mold and has installed and removed hard problem through the manual work.
The technical problem is solved by the following technical scheme: a pier pouring mold comprises a base and a template, wherein the template is arranged on the base, a discharge opening is formed in the middle of the base, a supporting seat is arranged in the discharge opening, an installation plate is fixedly connected to the middle of the four sides of the base, an air cylinder is fixedly arranged on the installation plate, a slide way is formed in the side of the upper surface of the base corresponding to the installation plate, a slide block is connected in the slide way in a sliding mode, a fixed plate is fixedly connected to the slide block, a supporting rod is connected to the fixed plate, and the other end of the supporting rod is fixed to the outer side of the template;
the water injection device is characterized in that a vertically arranged flow channel is formed in the middle of the inside of the template, a water spray nozzle communicated with the flow channel is formed in the upper end of the inner side of the template, a water inlet communicated with the flow channel is formed in the lower end of the outer side of the template, water injection blocks corresponding to the water inlet are fixedly mounted on the base, a water conveying pipe is communicated among the water injection blocks, and the other end of the water conveying pipe is communicated with an external water pump.
Preferably, a water cavity is formed in the water injection block, a water inlet nozzle communicated with the water cavity is arranged on one side of the water cavity, and the water inlet nozzle is matched with the water inlet.
Preferably, the surface of the water inlet nozzle is provided with a sealing ring, and the sealing ring is connected with the water inlet nozzle in a vulcanization mode.
Preferably, the outer side of the upper end of the template is provided with a hanging block.
Preferably, two support rods are mounted on the same fixing plate, and the upper ends of the two support rods are respectively fixed with the upper end and the lower end of the template.
Preferably, the size of the supporting seat is consistent with that of a prefabricated pier.
Compared with the prior art, the utility model discloses possess following beneficial effect:
1. through setting up cylinder, slider, fixed plate and bracing piece, can realize that the cylinder promotes the antedisplacement of template and retreats, realize the combination of template when the antedisplacement, retreat then realize the drawing of patterns, avoid traditional needs manual work to make up the template and the drawing of patterns, improve work efficiency, reduce workman's working strength.
2. Through set up runner and water jet in the template, set up the water injection piece through the raceway intercommunication on the base, when the drawing of patterns is retreated to the template, the water injection piece can water the water injection in the runner and spout from the water jet, realizes watering the shaping concrete, guarantees the quality of concrete, avoids traditional manual watering.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic top view of the present invention;
fig. 3 is an enlarged schematic view of a in fig. 1.
In the figure: the device comprises a base 1, a template 2, a support rod 3, a mounting plate 4, a cylinder 5, a slideway 6, a sliding block 7, a fixing plate 8, a water jet 9, a runner 10, a hanging block 11, a water injection block 12, a support seat 13, a water inlet 14, a water inlet nozzle 15, a water cavity 16 and a water delivery pipe 17.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, the pier pouring mold comprises a base 1 and a template 2, wherein a hanging block 11 is arranged on the outer side of the upper end of the template 2 to facilitate the hanging of a hoisting device, the template 2 is arranged on the base 1, a discharge opening is formed in the middle of the base 1, a supporting seat 13 is arranged in the discharge opening, the size of the supporting seat 13 is consistent with that of a prefabricated pier, demolding of the pier is facilitated, mounting plates 4 are fixedly connected to the middle positions of four sides of a base 1, air cylinders 5 are fixedly mounted on the mounting plates 4, slide ways 6 are arranged on the side of the upper surface of the base 1 corresponding to the mounting plates 4, slide blocks 7 are connected in the slide ways 6 in a sliding mode, fixing plates 8 are fixedly connected to the slide blocks 7, two supporting rods 3 are mounted on the same fixing plate 8, the upper ends of the two supporting rods 3 are fixed to the upper end and the lower end of a formwork 2 respectively, supporting rods 3 are connected to the fixing plates 8, and the other ends of the supporting rods 3 are fixed to the outer side of the formwork 2;
runner 10 of vertical setting is seted up to template 2's inside intermediate position, water jet 9 with runner 10 intercommunication is seted up to template 2's inboard upper end, water inlet 14 with runner 10 intercommunication is seted up to template 2's outside lower extreme, fixed mounting has the water injection piece 12 that corresponds with water inlet 14 on the base 1, water cavity 16 has been seted up to the inside of water injection piece 12, one side of water cavity 16 is provided with the inlet tap 15 with water cavity 16 intercommunication, the surface of inlet tap 15 is provided with the sealing washer, this sealing washer is connected with the vulcanization of inlet tap 15, the setting of sealing washer improves sealed effect, inlet tap 15 matches with water inlet 14, be convenient for inlet tap 15 to insert the water inlet, the intercommunication has raceway 17 between a plurality of water injection pieces 12, raceway 17's the other end and outside water pump intercommunication.
The working principle is as follows: when the device is used, before the pier needs to be poured, the cylinder 5 is started, the cylinder 5 pushes the slide block 7 to move forwards, the slide block 7 drives the fixing plate 8 to move forwards, the support rod 3 drives the template 2 to move to a specified position, the combination between the templates 2 realizes the erection of the pier templates, after the concrete is poured from the upper part of the template 2, after the concrete pier is formed, the cylinder 5 is started again, the cylinder 5 drives the template 2 to move backwards to realize the demoulding, in the process of the backward movement of the template 2, the water inlet nozzle 15 is inserted into the water inlet 14, at the moment, the water suction pump is started, the water suction pump pumps water into the water conveying pipe 17, the water conveying pipe 17 conveys water into the water injection block 12 and sprays out from the water spray opening 9 through the flow passage 10 to realize the watering of the concrete pier, the quality of the concrete is ensured, and after the pier is prepared, the hanging block 11 on the template 2 is hung through the hanging mechanism, and (3) the template 2 is communicated with the base 1 and is drawn out, so that the concrete pier is completely separated from the template 2.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A pier pouring mold comprises a base (1) and a template (2), and is characterized in that the template (2) is arranged on the base (1), a discharge opening is formed in the middle of the base (1), a supporting seat (13) is arranged in the discharge opening, mounting plates (4) are fixedly connected to the middle of four sides of the base (1), an air cylinder (5) is fixedly mounted on each mounting plate (4), a slide way (6) is formed in the side of the upper surface of the base (1) and corresponds to the mounting plates (4), a slide block (7) is connected in the slide way (6) in a sliding mode, a fixing plate (8) is fixedly connected to each slide block (7), a supporting rod (3) is connected to each fixing plate (8), and the other end of each supporting rod (3) is fixed to the outer side of the template (2);
the water injection device is characterized in that a vertically arranged flow channel (10) is formed in the middle of the inside of the template (2), a water spray opening (9) communicated with the flow channel (10) is formed in the upper end of the inner side of the template (2), a water inlet (14) communicated with the flow channel (10) is formed in the lower end of the outer side of the template (2), water injection blocks (12) corresponding to the water inlet (14) are fixedly mounted on the base (1), a plurality of water conveying pipes (17) are communicated among the water injection blocks (12), and the other ends of the water conveying pipes (17) are communicated with an external water pump.
2. The pier pouring mold according to claim 1, wherein a water cavity (16) is formed in the water injection block (12), a water inlet nozzle (15) communicated with the water cavity (16) is arranged on one side of the water cavity (16), and the water inlet nozzle (15) is matched with the water inlet (14).
3. The pier casting mold according to claim 2, wherein a sealing ring is arranged on the surface of the water inlet nozzle (15), and the sealing ring is connected with the water inlet nozzle (15) in a vulcanization mode.
4. The pier casting mold according to claim 1, wherein a hanging block (11) is arranged on the outer side of the upper end of the template (2).
5. The pier pouring mold according to claim 1, wherein two support rods (3) are mounted on the same fixing plate (8), and the upper ends of the two support rods (3) are fixed to the upper end and the lower end of the template (2) respectively.
6. The pier casting mold according to claim 1, wherein the size of the supporting seat (13) is consistent with that of a prefabricated pier.
CN202120011638.0U 2021-01-05 2021-01-05 Pier pouring die Active CN214993106U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120011638.0U CN214993106U (en) 2021-01-05 2021-01-05 Pier pouring die

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120011638.0U CN214993106U (en) 2021-01-05 2021-01-05 Pier pouring die

Publications (1)

Publication Number Publication Date
CN214993106U true CN214993106U (en) 2021-12-03

Family

ID=79142927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120011638.0U Active CN214993106U (en) 2021-01-05 2021-01-05 Pier pouring die

Country Status (1)

Country Link
CN (1) CN214993106U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114808742A (en) * 2022-05-26 2022-07-29 重庆宝坤建筑工程有限公司 Modularization support device of steel form is pour to pier

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114808742A (en) * 2022-05-26 2022-07-29 重庆宝坤建筑工程有限公司 Modularization support device of steel form is pour to pier
CN114808742B (en) * 2022-05-26 2024-01-12 沧州晟实伟业机械设备制造有限公司 Modularized supporting equipment for pouring steel templates of bridge piers

Similar Documents

Publication Publication Date Title
CN203022024U (en) Integrally-movable formwork for pipe gallery cast-in-situ construction
CN111749714B (en) Window-by-window layered pouring system for circular water delivery tunnel wall and construction method
CN214993106U (en) Pier pouring die
CN110682416A (en) Template system for prefabricating comprehensive pipe gallery and construction method thereof
CN111113628B (en) Construction method for spraying prefabricated T-shaped beam
CN111608662A (en) Shaft oversized-diameter integral moving metal template
CN208563380U (en) A kind of self-propelled pipe gallery plate device
CN208950298U (en) A kind of new structure circular cross section cylinder mould
CN201972715U (en) Integrated ditch cable trough mould frame
CN218255834U (en) Component formwork for casting concrete structure prefabricated plate
CN208293613U (en) A kind of city integrated piping lane Quick Release die set device of running type
CN110714785A (en) Pipe gallery top plate construction trolley, trolley set and construction method
CN215618854U (en) Prefabricated box culvert mould
CN114657905A (en) Integral box culvert vertical combined prefabricated rack and preparation method thereof
CN214883863U (en) Template system is pour to utility tunnel
CN211053992U (en) Prefabricated case roof beam side form
CN213034888U (en) Prefabricated mould of pouring of stair convenient to drawing of patterns
CN114875969A (en) Integrated construction method for open-cut cast-in-place underground comprehensive pipe gallery movable bench formwork
CN213412368U (en) Horizontal adjustable prefabricated building body mould
CN113997391A (en) A no inside and outside support integral formwork for prefabricating assembled box culvert
CN209779452U (en) Pier shaft bulky concrete control by temperature change construction equipment
CN210551989U (en) A mould for making roofing parapet flashing prefab
CN113246285A (en) Automatic assembly line prefabrication construction method for concrete revetment hooking block
CN221001294U (en) Assembled formwork-free channel structure
CN110761323A (en) Underground comprehensive pipe gallery sliding formwork construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant