CN217153260U CN202123392166.7U CN202123392166U CN217153260U CN 217153260 U CN217153260 U CN 217153260U CN 202123392166 U CN202123392166 U CN 202123392166U CN 217153260 U CN217153260 U CN 217153260U
Authority
CN
China
Prior art keywords
bolt
plate
fixing device
vertical plate
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123392166.7U
Other languages
Chinese (zh)
Inventor
马萧
高乔超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN202123392166.7U priority Critical patent/CN217153260U/en
Application granted granted Critical
Publication of CN217153260U publication Critical patent/CN217153260U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

A fixing device for a fire fighting pipe belongs to the technical field of concrete frame structure construction. Comprises a vertical plate (1), a ribbed plate (2), a fixing plate (3), an anchor bolt (4), a bolt (5) and a clamping groove (6); the vertical plate (1) and the fixing plate (3) are vertically welded; the two triangular rib plates (2) are welded at two ends between the vertical plate (1) and the fixed plate (3); the anchor bolt (4) vertically penetrates through the middle position of the fixing plate (3); the bolt (5) vertically penetrates through the middle position of the vertical plate (1); the end of the bolt (5) is welded with the clamping groove (6). The advantage lies in, the equipment is simple, convenient and practical, has avoided construction machinery's pressure loss to destroy, has also avoided the route change of interim fire control pipe when the terrace is under construction, has saved the manual work, has reduced construction cost.

Description

Fixing device of fire control pipe
Technical Field
The utility model belongs to concrete frame structure construction field especially provides a fixing device of fire control pipe.
Background
When the concrete frame structure is constructed, an underground mode is generally adopted for the entry of a temporary fire fighting pipe, and the defects of the mode include that firstly, the pressure loss and the damage of the underground fire fighting pipe are easily caused by the walking of construction machinery on the ground, and the water leakage is caused; secondly, when the ground terrace is formally constructed, temporary fire-fighting pipelines need to be changed at any time, which is labor-consuming and time-consuming and increases the investment of construction cost.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a fixing device of a fire fighting pipe, which solves the problems that the pressure loss and the damage of the underground fire fighting pipe are easily caused by the walking of the construction machinery on the ground, and the water leakage is caused; when the ground terrace is formally constructed, temporary fire-fighting pipelines need to be changed at any time, which wastes labor and time and increases the construction cost and the like.
The utility model discloses with two sets of fixing device through crab-bolt relatively fixed on the concrete frame wall body, every 3m sets up one on a central line, then put the fire control pipe between two sets of fixing device to twist the bolt on the fixing device simultaneously, until the tight fire control pipeline in draw-in groove top of two bolt tip, when the fire control pipeline changes the position, only need not hard up the bolt can protectively demolish the fire control pipeline, fixing device and can used repeatedly.
The utility model comprises a vertical plate 1, a rib plate 2, a fixing plate 3, an anchor bolt 4, a bolt 5 and a clamping groove 6 which are combined for use, and the vertical plate 1 and the fixing plate 3 are vertically welded; the two triangular rib plates 2 are welded at two ends between the vertical plate 1 and the fixed plate 3; the anchor bolt 4 vertically penetrates through the middle position of the fixing plate 3; the bolt 5 vertically penetrates through the middle position of the vertical plate 1; the end of the bolt 5 is welded with the clamping groove 6 (see fig. 1, 2 and 3).
During the use, with two sets of fixing device through crab-bolt 4 relatively fixed on concrete frame wall body 7, set up one per 3m on a central line, then put fire-fighting pipeline 8 between two sets of fixing device to twist simultaneously and move bolt 5 on the fixing device, until 6 tops of draw-in groove 6 of two bolt 5 tip tightly fire-fighting pipeline, when fire-fighting pipeline 8 changes the position, only need not hard up bolt 5 can protectively demolish fire-fighting pipeline 8, fixing device and used repeatedly (fig. 4, fig. 5, fig. 6).
The utility model has the advantages of, the equipment is simple, and convenient and practical has avoided construction machinery's pressure loss to destroy, and the route change of interim fire control pipe when also having avoided the terrace construction has saved the manual work, has reduced construction cost.
Drawings
Fig. 1 is a front view of the fixture.
Fig. 2 is a side view of the fixture.
Fig. 3 is a top view of the fixture.
Fig. 4 is a front view of the fixture in use.
Fig. 5 is a side view of the fixture in use.
Fig. 6 is a top view of the fixture in use.
In the figure, a vertical plate 1, a ribbed slab 2, a fixing plate 3, an anchor bolt 4, a bolt 5, a clamping groove 6, a concrete frame wall 7 and a fire fighting pipeline 8.
Detailed Description
Fig. 1-6 show a specific embodiment of the present invention. The present invention will be further explained with reference to the accompanying drawings.
The fixing device of the utility model comprises a vertical plate 1, a ribbed plate 2, a fixing plate 3, an anchor bolt 4, a bolt 5 and a clamping groove 6, which are combined for use, and the vertical plate 1 and the fixing plate 3 are vertically welded; the two triangular rib plates 2 are welded at two ends between the vertical plate 1 and the fixed plate 3; the anchor bolt 4 vertically penetrates through the middle position of the fixing plate 3; the bolt 5 vertically penetrates through the middle position of the vertical plate 1; the end of the bolt 5 is welded with the clamping groove 6.
Wherein the vertical plate 1 is processed by a steel plate with the thickness of 16mm, and the size (length and width) is 200 x 200 mm; the rib plate 2 is formed by processing a steel plate with the thickness of 14mm and is an isosceles right-angle triangle, and the side length of the right angle is 120 mm; the fixed plate 3 is machined from a steel plate 16mm thick and has a dimension (length and width) of 180mm and 180 mm; the diameter of the anchor bolt 4 is 16mm, and the length of the anchor bolt is 50 mm; the diameter of the bolt 5 is 20mm, and the length of the bolt is 100 mm; the clamping groove 6 is formed by processing channel steel with the section width of 120mm and the length of 100 mm.
During the use, with two sets of fixing device through crab-bolt 4 relatively fixed on concrete frame wall body 7, set up one per 3m on a central line, then put fire control pipeline 8 between two sets of fixing device to twist simultaneously and move bolt 5 on the fixing device, until 6 tops of draw-in groove 6 top tight fire control pipelines of two 5 tip bolts, when the 8 change positions of fire control pipeline, only need not hard up bolt 5 can protectively demolish fire control pipeline 8, fixing device and can used repeatedly.
When the concrete frame structure of the comprehensive office building is constructed, a fixing device on a concrete frame wall body is adopted for fixing the fire fighting pipe, and a good effect is achieved. The fixing device comprises a vertical plate, a rib plate, a fixing plate, an anchor bolt, a bolt and a clamping groove 6, and the vertical plate and the fixing plate are vertically welded in a combined mode; the two triangular rib plates are welded at two ends between the vertical plate and the fixed plate; the anchor bolt vertically penetrates through the middle position of the fixing plate; the bolt vertically penetrates through the middle position of the vertical plate; the end of the bolt is welded with the clamping groove. During the use, with two sets of fixing device through crab-bolt relatively fixed on concrete frame wall body, every 3m sets up one on a central line, then put the fire control pipe between two sets of fixing device to twist simultaneously and move the bolt on the fixing device, until the draw-in groove top tight fire control pipeline of two bolt tip, when the fire control pipeline changes the position, only need not hard up the bolt can protectively demolish the fire control pipeline, fixing device and used repeatedly. This fixing device equipment is simple, and convenient and practical has avoided construction machinery's pressure loss to destroy, has also avoided the route change of interim fire control pipe when the terrace is under construction, has saved the manual work, has reduced construction cost.

Claims (2)

1. A fixing device for a fire fighting pipe is characterized by comprising a vertical plate (1), a ribbed plate (2), a fixing plate (3), an anchor bolt (4), a bolt (5) and a clamping groove (6); the vertical plate (1) and the fixing plate (3) are vertically welded; the two triangular rib plates (2) are welded at two ends between the vertical plate (1) and the fixed plate (3); the anchor bolt (4) vertically penetrates through the middle position of the fixing plate (3); the bolt (5) vertically penetrates through the middle position of the vertical plate (1); the end of the bolt (5) is welded with the clamping groove (6).
2. A fire hose fixing device according to claim 1, characterised in that the riser (1) is machined from a steel plate 16mm thick and has dimensions 200 x 200mm in length and width; the rib plate (2) is formed by processing a steel plate with the thickness of 14mm and is an isosceles right-angle triangle with the right-angle side length of 120 mm; the fixing plate (3) is processed by a steel plate with the thickness of 16mm, and the length and the width of the fixing plate are 180mm and 180 mm; the diameter of the anchor bolt (4) is 16mm, and the length of the anchor bolt is 50 mm; the diameter of the bolt (5) is 20mm, and the length of the bolt is 100 mm; the clamping groove (6) is formed by processing channel steel with the section width of 120mm and the length of 100 mm.
CN202123392166.7U 2021-12-29 2021-12-29 Fixing device of fire control pipe Active CN217153260U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123392166.7U CN217153260U (en) 2021-12-29 2021-12-29 Fixing device of fire control pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123392166.7U CN217153260U (en) 2021-12-29 2021-12-29 Fixing device of fire control pipe

Publications (1)

Publication Number Publication Date
CN217153260U true CN217153260U (en) 2022-08-09

Family

ID=82686619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123392166.7U Active CN217153260U (en) 2021-12-29 2021-12-29 Fixing device of fire control pipe

Country Status (1)

Country Link
CN (1) CN217153260U (en)

Similar Documents

Publication Publication Date Title
CN217153260U (en) Fixing device of fire control pipe
CN104047419A (en) Wall linking method of scaffold and wall-linking member used by scaffold
CN111593741A (en) Pipeline groove supporting device and construction method
CN202039590U (en) Steel pipe type scaffold wall connecting device
CN106013763A (en) Flat iron fastener type external scaffold wall connecting piece
CN206448166U (en) A kind of vertical prestressing mud jacking pipeline docking facilities
CN210151883U (en) Inner lining repairing mechanism for rain sewage pipeline
CN212427430U (en) Heavy-calibre pipeline mouth of pipe socket joint auxiliary device
CN210092836U (en) Prefabricated steel cylinder concrete circular power pipe gallery with pipe seat
CN209881341U (en) Pre-buried positioner of water and electricity pipeline
CN203603444U (en) Steel pipe scaffold wall connecting piece
CN111851703A (en) Large-diameter pipeline outdoor construction butt joint assembly and construction method
CN210976098U (en) Underground pipe gallery pre-buried support
CN210369915U (en) Steel casing sliding positioning device
CN205956562U (en) Wall pipe with sleeve pipe
CN216306932U (en) Interim fire hose fixed gallows on roof
CN107035916B (en) Miniature pipe jacking mud loosening device
CN211331984U (en) Building engineering ladder muscle welding auxiliary device
CN211057871U (en) Stagnant water wall screw rod stagnant water steel sheet welded fastening device is worn to stagnant water
CN217735549U (en) Dust falling device for coal mining operation
CN207514380U (en) Poling resistance absorber
CN212616824U (en) Durable cement pipe structure
CN217268780U (en) Built-in bolt type finalized wall connecting device
CN211286739U (en) Device for temporarily protecting indoor elevator door opening
CN208915828U (en) A kind of tubing fixing device for transport

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant