CN216892429U - Foundation pit fender pile plugging device - Google Patents

Foundation pit fender pile plugging device Download PDF

Info

Publication number
CN216892429U
CN216892429U CN202122886637.3U CN202122886637U CN216892429U CN 216892429 U CN216892429 U CN 216892429U CN 202122886637 U CN202122886637 U CN 202122886637U CN 216892429 U CN216892429 U CN 216892429U
Authority
CN
China
Prior art keywords
plugging
grouting
foundation pit
control device
fender pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122886637.3U
Other languages
Chinese (zh)
Inventor
黄夏宸
陆家祺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN202122886637.3U priority Critical patent/CN216892429U/en
Application granted granted Critical
Publication of CN216892429U publication Critical patent/CN216892429U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model relates to a foundation pit fender pile plugging device. The foundation pit fender pile plugging device comprises a track and plugging equipment, wherein the plugging equipment is arranged on the track and can move along the track; the plugging device comprises a grouting assembly, a moving part and a control device, wherein the grouting assembly and the moving part are electrically connected with the control device; the grouting assembly is arranged on the moving portion, the control device controls the moving portion to move so as to drive the grouting assembly to move to a plugging point, and the control device controls the grouting assembly to perform grouting plugging. Above-mentioned foundation ditch fender pile plugging device is at the orbiting through leaking stoppage equipment to and the motion of removal portion, make slip casting move gradually to leaking stoppage point, and then carry out the leaking stoppage, reduce the manual work, and need not to set up interim scaffold frame, be convenient for carry out the leaking stoppage, and can eliminate the potential safety hazard, improve the security.

Description

Foundation pit fender pile plugging device
Technical Field
The utility model relates to the technical field of foundation pit engineering, in particular to a foundation pit fender pile plugging device.
Background
In order to ensure that the deformation of the periphery protection object is controllable in the foundation pit construction process, the deformation of a foundation pit support system must be strictly limited. The conventional support system adopts the following two modes for plugging: 1) plugging in the pit: the rapid cement is matched with a drainage tube for leaking stoppage and drainage, and polyurethane grouting is used for leaking stoppage; 2) plugging outside the pit: and (4) single/double-liquid grouting outside the foundation pit fender pile. By adopting the means, a large amount of labor cost and mechanical cost are generated when the foundation pit enclosure system is prevented from leaking, individual project sites are narrow according to actual conditions on site, large-scale mechanical out-of-pit grouting leakage stoppage work cannot be carried out, and a mode of stopping leakage in pits is adopted along with exposure of the excavation surface of the foundation pit more often.
SUMMERY OF THE UTILITY MODEL
Based on this, it is necessary to provide a foundation pit fender pile plugging device aiming at the problem of how to facilitate the plugging of the foundation pit fender pile and improve the safety.
A foundation pit fender pile leakage stopping device comprises a track and leakage stopping equipment, wherein the leakage stopping equipment is arranged on the track and can move along the track; the plugging device comprises a grouting assembly, a moving part and a control device, wherein the grouting assembly and the moving part are electrically connected with the control device; the grouting assembly is arranged on the moving portion, the control device controls the moving portion to move so as to drive the grouting assembly to move to a plugging point, and the control device controls the grouting assembly to perform grouting plugging.
Above-mentioned foundation pit fender pile plugging device, including track and leaking stoppage equipment, leaking stoppage equipment is located on the track, can be along orbital motion, leaking stoppage equipment includes the slip casting subassembly, removal portion and controlling means, slip casting subassembly and removal portion all are connected with the controlling means electricity, the slip casting subassembly is located on the removal portion, the motion of controlling means control removal portion, so that drive slip casting subassembly motion to leaking stoppage point, controlling means control slip casting subassembly carries out the slip casting leaking stoppage, through leaking stoppage equipment at orbital motion, and the motion of removal portion, make slip casting move gradually to leaking stoppage point, and then leak stoppage, reduce the manual work, and need not to set up interim scaffold, be convenient for leak stoppage, and can eliminate the potential safety hazard, the safety is improved.
In one embodiment, the number of the tracks is multiple, and the multiple tracks are arranged according to row-column intervals.
In one embodiment, the distance between adjacent tracks in the row and column direction is 6-8 m.
In one embodiment, the grouting assembly comprises a pump and a grouting machine, the grouting machine is arranged on the moving part, and the grouting machine is electrically connected with the pump.
In one embodiment, the plugging device further comprises a slurry table, wherein the slurry table is connected with the grouting machine and provides slurry for the grouting machine.
In one embodiment, the leakage stoppage device further comprises a power supply device, wherein the power supply device is electrically connected with the leakage stoppage device and supplies power to the leakage stoppage device.
In one embodiment, the device further comprises an operating device, and the operating device is in wireless communication connection with the control device.
In one embodiment, the plugging device further comprises a detection device electrically connected with the control device, and the detection device is used for identifying a plugging point.
In one embodiment, the moving part is a robot arm.
In one embodiment, the plugging device further comprises a platform and a roller, the roller is arranged on the platform, the grouting assembly, the moving part and the control device are arranged on the platform, and the roller is arranged on the track.
Drawings
FIG. 1 is a top view of an embodiment of a foundation pit fender pile plugging device;
fig. 2 is a cross-sectional view of an embodiment of the foundation pit fender pile plugging device.
Detailed Description
In order to make the technical problems solved, the technical solutions adopted and the technical effects achieved by the present invention clearer, the technical solutions of the present invention are further described below by way of specific embodiments with reference to the accompanying drawings.
In the description of the present invention, unless expressly stated or limited otherwise, the terms "connected," "connected," and "fixed" are to be construed broadly, e.g., as meaning permanently connected, removably connected, or integral to one another; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
In the present invention, unless otherwise expressly stated or limited, "above" or "below" a first feature means that the first and second features are in direct contact, or that the first and second features are not in direct contact but are in contact with each other via another feature therebetween. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly under and obliquely below the second feature, or simply meaning that the first feature is at a lesser elevation than the second feature.
In the description of the present embodiment, the terms "upper", "lower", "right", and the like are used in the orientation or positional relationship shown in the drawings only for convenience of description and simplicity of operation, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used only for descriptive purposes and are not intended to have a special meaning.
Referring to fig. 1 and 2 in combination, an embodiment of the plugging device for the foundation pit fender post includes a rail 110 and plugging equipment 120, wherein the plugging equipment 120 is disposed on the rail 110, and the plugging equipment 120 can move along the rail 110. Wherein the rail 110 is arranged on the enclosure system. The foundation pit fender pile plugging device is used for a traditional horizontal supporting system of foundation pit support, plugging equipment can move on a track and can be adjusted through a moving part, so that the plugging efficiency is accelerated, the labor and time waste of the existing plugging are overcome, and the potential safety hazard is also solved.
Further, the plugging device 120 includes a grouting assembly (not shown), a moving portion 121, and a control device (not shown), where the grouting assembly and the moving portion 121 are electrically connected to the control device, the grouting assembly is disposed on the moving portion 121, and the control device controls the moving portion 121 to move, so as to drive the grouting assembly to move to a plugging point, and the control device controls the grouting assembly to perform grouting plugging. Specifically, the plugging device 120 slides on the rail 110, and then the control device controls the moving part 121 to move, so as to drive the grouting assembly to move to the plugging point, and then the control device controls the grouting assembly to perform grouting plugging, so as to plug the plugging point. Wherein, the leaking stoppage point refers to the point needing leaking stoppage. Furthermore, the control device is electrically connected with the grouting assembly and the moving part, and the control device receives the electric signal to control. The control device may be a CPU or the like.
Above-mentioned foundation ditch fender pile plugging device, including track 110 and leaking stoppage equipment 120, leaking stoppage equipment 120 is located on track 110, can move along track 110, leaking stoppage equipment 120 includes the slip casting subassembly, removal portion 121 and controlling means, slip casting subassembly and removal portion 121 all are connected with controlling means electricity, the slip casting subassembly is located on removal portion 121, controlling means control removal portion 121 moves, so that drive slip casting subassembly motion to leaking stoppage point, controlling means control slip casting subassembly carries out the slip casting leaking stoppage, move at track 110 through leaking stoppage equipment 120, and the motion of removal portion 121, make the slip casting move gradually to leaking stoppage point, and then carry out the leaking stoppage, reduce the manual work, and need not to set up interim scaffold, be convenient for leak stoppage, and can eliminate the potential safety hazard, and the security is improved.
In one embodiment, the number of the tracks 110 is multiple, and the multiple tracks 110 are arranged in rows and columns. The tracks 110 are arranged at the top and the bottom of the support of the enclosure system, namely, the tracks 110 are arranged at intervals in the horizontal and vertical directions, and a latticed track is formed on the excavated surface of the foundation pit enclosure pile, so that multi-layer construction can be realized, namely, the leakage stoppage equipment 120 can perform leakage stoppage construction on the upper layer of the excavated lower layer of the foundation pit, and the construction efficiency is improved. Further, in one embodiment, the distance between the adjacent rails 110 in the row direction is 6 to 8 meters, which is disadvantageous for foundation pit construction if the distance between the adjacent rails 110 is too small, and is difficult to block the plugging points between the rails 110 if the distance between the adjacent rails 110 is too large. The distance between the adjacent rails 110 is 6-8m, and the adjacent rails can just cover all construction areas according to the space range of the movement of the moving part 121.
Specifically, in an embodiment, the plugging device 120 further includes a platform 122 and a roller, the roller is disposed on the platform 122, the grouting assembly, the moving portion 121 and the control device are disposed on the platform, and the roller is disposed on the track. That is, the leakage blocking apparatus 120 performs movement on the rail 110 by means of the roller. Therefore, after the plugging device 120 moves to the nearest plugging point on the track 110, the plugging device 120 performs positioning and fixed-point plugging through the moving part 121 of the plugging device 120, wherein the coverage diameter of the moving part 121 is 6-8m, namely the coverage diameter of the moving part 121 is the distance between the adjacent tracks 110. The moving part 121 may be a mechanical arm, i.e., a telescopic arm. The grouting member may be coupled to the moving part 121 by means of a bolt or the like.
In one embodiment, the grouting assembly includes a pump and a grouting machine disposed on the moving part 121, the grouting machine being electrically connected to the pump. That is, after the plugging device moves to a predetermined position, the grouting machine sends a signal to the pump through the control device, and the pump performs grouting pressurization on the grouting machine, so that the grouting machine performs pushing fixed-point grouting. It should be noted that the pump may be an air pump. The grouting machine moves to the plugging point by the moving portion 121.
Further, in an embodiment, the plugging device further comprises a slurry table, wherein the slurry table is connected with the grouting machine and provides slurry for the grouting machine. Wherein, the slurry is a plugging material. The slurry platform is used for placing different plugging materials according to different leakage conditions and enclosure forms and providing the plugging materials for the grouting machine. Wherein, the plugging material can be single-component polyurethane solution or similar plugging material. The plugging material can be used in combination with cement, injected into a grouting machine, and subjected to plugging and drainage through a drainage tube of the grouting machine.
In one embodiment, the foundation pit fender pile plugging device further comprises a power supply device, and the power supply device is electrically connected with the plugging equipment so as to supply power to the plugging equipment. Wherein, power supply unit can be equipped with the switch to can control the power supply and the outage of leaking stoppage equipment through the switch, and then whether control leaking stoppage equipment is worked. Specifically, the power supply device may include a leakage stoppage power supply (a power supply for the moving part and the grouting machine) and a mobile power supply (power for running of the roller). The power supply device may be a lithium battery.
Further, in an embodiment, the plugging device further comprises a detection device, the detection device is electrically connected with the control device, and the detection device is used for identifying a plugging point. In other words, the detection device can survey the leakage point condition on the construction site, namely, the leakage point is determined, the position information of the leakage point is sent to the control device, the control device can control the leakage stopping equipment to move along the track, and the moving part is controlled to move the grouting machine to the leakage stopping point. At this time, the power supply device further comprises a survey power supply, namely, the power supply device also supplies power to the detection device. It should be noted that the power supply device may be integrated with the plugging device 120 or may be separately provided on the platform.
It should be noted that, the foundation pit fender pile leaking stoppage device can determine a leaking stoppage point by surveying the condition of the leaking stoppage point on a construction site through the detection device, and send the position information of the leaking stoppage point to the control device, the control device can control the leaking stoppage equipment to move along a track, and the moving part is controlled to move the grouting machine to the leaking stoppage point for automatic fixed-point leaking stoppage.
Further, this foundation ditch fender pile plugging device can also adopt semi-automatization formula to work. In this embodiment, the foundation pit support device plugging device further comprises an operation device, and the operation device is in wireless communication connection with the control device, so that the plugging equipment is remotely controlled to move through the operation device, and fixed-point plugging is performed on a plugging point. Wherein, the control device can be a remote control machine.
Above-mentioned foundation ditch fender pile plugging device, leaking stoppage equipment lay on the track, carry out remote control or automatic leaking stoppage according to on-the-spot actual position, when reducing the manual work, need not to set up interim scaffold, when excavating the lower floor, also can the remote control upper story leaking stoppage equipment be under construction, improve the efficiency of construction.
The technical features of the embodiments described above may be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the embodiments described above are not described, but should be considered as being within the scope of the present specification as long as there is no contradiction between the combinations of the technical features.
The above-mentioned embodiments only express several embodiments of the present invention, and the description thereof is more specific and detailed, but not construed as limiting the scope of the utility model. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the inventive concept, which falls within the scope of the present invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.

Claims (10)

1. The foundation pit fender pile leakage stopping device is characterized by comprising a track and leakage stopping equipment, wherein the leakage stopping equipment is arranged on the track and can move along the track; the plugging device comprises a grouting assembly, a moving part and a control device, wherein the grouting assembly and the moving part are electrically connected with the control device; the grouting assembly is arranged on the moving portion, the control device controls the moving portion to move so as to drive the grouting assembly to move to a plugging point, and the control device controls the grouting assembly to perform grouting plugging.
2. The foundation pit fender pile leakage stopping device of claim 1, wherein the number of the rails is multiple, and the rails are arranged at intervals in rows and columns.
3. The foundation pit fender post plugging device of claim 2, wherein the spacing between adjacent rails in the row direction is 6-8 m.
4. The foundation pit fender post plugging device of any one of claims 1-3, wherein the grouting assembly comprises a pump and a grouting machine, the grouting machine is arranged on the moving part, and the grouting machine is electrically connected with the pump.
5. The foundation pit fender pile plugging device of claim 4, wherein the plugging equipment further comprises a slurry table, the slurry table is connected with the grouting machine, and the slurry table provides slurry for the grouting machine.
6. The foundation pit fender pile plugging device of claim 1, further comprising a power supply device, wherein the power supply device is electrically connected with the plugging equipment, and the power supply device supplies power to the plugging equipment.
7. The foundation pit fender pile plugging device of claim 1, further comprising an operating device, wherein the operating device is in wireless communication connection with the control device.
8. The foundation pit fender pile plugging device of claim 1, wherein the plugging equipment further comprises a detection device, the detection device is electrically connected with the control device, and the detection device is used for identifying a plugging point.
9. The foundation pit fender plugging device of claim 1, wherein the moving portion is a mechanical arm.
10. The foundation pit fender pile plugging device of claim 1, wherein the plugging equipment further comprises a platform and rollers, the rollers are arranged on the platform, the grouting assembly, the moving part and the control device are arranged on the platform, and the rollers are arranged on the rails.
CN202122886637.3U 2021-11-24 2021-11-24 Foundation pit fender pile plugging device Active CN216892429U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122886637.3U CN216892429U (en) 2021-11-24 2021-11-24 Foundation pit fender pile plugging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122886637.3U CN216892429U (en) 2021-11-24 2021-11-24 Foundation pit fender pile plugging device

Publications (1)

Publication Number Publication Date
CN216892429U true CN216892429U (en) 2022-07-05

Family

ID=82202708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122886637.3U Active CN216892429U (en) 2021-11-24 2021-11-24 Foundation pit fender pile plugging device

Country Status (1)

Country Link
CN (1) CN216892429U (en)

Similar Documents

Publication Publication Date Title
CN213233477U (en) Foundation pit supporting structure and foundation pit slope supporting system
CN111962504A (en) Construction method for covering and digging top-down permanent steel pipe column
CN113235601A (en) Deep foundation pit construction risk control structure and method for collapsible loess adjacent building
CN108999225B (en) Inclination correcting method for rotary shifting brick-concrete structure building
CN112942398A (en) Assembled open caisson construction system and process
CN105714829A (en) Construction device for deep foundation pit excavation and underground station construction and construction method adopting same
CN216892429U (en) Foundation pit fender pile plugging device
CN115263315A (en) Downward shield construction method and device for vertical shaft
JP6043006B1 (en) Construction method of underground structure
CN105804115B (en) Assembled ground-connecting-wall or prefabricated pile and assembled underground station integrative construction device and construction method
CN101381995A (en) Fast excavation system and excavation method
CN219348093U (en) Landfill leak source location detection device
CN105714851B (en) Assembled ground-connecting-wall or prefabricated pile are with cast-in-place underground station integrative construction device and using its construction method
CN110578833A (en) Underground rigid pipeline supporting structure and method
CN114277803B (en) Post-insertion method positioning construction method for reverse construction method steel pipe structural column
CN115627788A (en) TRD (blast furnace pressure recovery device) reinforcement construction method for metro section connection channel
CN115387847A (en) Subway tunnel separated pump room structure and construction method based on full-convolution full casing pipe
CN203891045U (en) Leakage blocking and grouting device between deep foundation pit fender posts
CN114542092A (en) Shield receiving construction method without bottom plate structure
CN103352704A (en) Construction method for enabling tunnel shield to pass through vertical shaft structure
CN116348643A (en) Civil engineering machine and civil engineering method for shoveling
CN113309108A (en) Isolation pile with servo grouting function and construction method thereof
JP3303115B2 (en) Underground shaft construction equipment
CN114396073B (en) Coal yard foundation structure, construction method thereof and coal yard structure
CN220285804U (en) Tunnel engineering construction dust device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant