CN216839515U - Reinforced clay gunny bag cofferdam - Google Patents

Reinforced clay gunny bag cofferdam Download PDF

Info

Publication number
CN216839515U
CN216839515U CN202121501005.4U CN202121501005U CN216839515U CN 216839515 U CN216839515 U CN 216839515U CN 202121501005 U CN202121501005 U CN 202121501005U CN 216839515 U CN216839515 U CN 216839515U
Authority
CN
China
Prior art keywords
clay
sacks
filling
cofferdam
gunny bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121501005.4U
Other languages
Chinese (zh)
Inventor
蒋士基
彭高著
陆迎寿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Zhuang Autonomous Region Water Resources And Electric Power Survey Design And Research Institute Co ltd
Original Assignee
Guangxi Zhuang Autonomous Region Water Resources And Electric Power Survey Design And Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Zhuang Autonomous Region Water Resources And Electric Power Survey Design And Research Institute Co ltd filed Critical Guangxi Zhuang Autonomous Region Water Resources And Electric Power Survey Design And Research Institute Co ltd
Application granted granted Critical
Publication of CN216839515U publication Critical patent/CN216839515U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a muscle formula clay gunny bag cofferdam, including setting up in the clay gunny bag filling body of both sides and being located two the earth material filling body between the clay gunny bag filling body, the clay gunny bag filling body is piled by multilayer clay gunny bag and is built and form, and the lateral surface, the top surface and the bottom surface cladding of every layer of clay gunny bag have geogrid. The advantages of mechanical construction earthwork filling are fully utilized while the quantity of the clay sacks is reduced as much as possible, the purposes of reducing investment and accelerating construction progress are achieved, meanwhile, steep filling side slopes can be adopted due to the fact that the clay sacks are used on two sides for filling, and compared with a conventional earth-rock cofferdam, small filling sections can be adopted, and site space and engineering quantity can be greatly saved.

Description

Reinforced clay gunny bag cofferdam
Technical Field
The utility model relates to a clay gunny bag cofferdam, concretely relates to add muscle formula clay gunny bag cofferdam.
Background
The temporary cofferdam or flood bank heightening condition in flood control engineering in a flood season generally exists, the engineering generally adopts temporary filling of clay sacks, the clay sacks are small and easy to damage in mechanical construction, and manual bagging and manual piling are basically adopted during construction.
Because the clay sacks need to be manually bagged and piled, the advantages of mechanical construction are difficult to be exerted, and meanwhile, a large amount of manpower, material resources and financial resources are consumed in flood control and flood fighting projects, so that the effect of quick construction is difficult to achieve and the rescue opportunity is delayed.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model discloses a muscle formula clay gunny bag cofferdam adds.
The utility model discloses a realize that the technical scheme that above-mentioned purpose adopted is:
the reinforced clay gunny bag cofferdam comprises clay gunny bag filling bodies arranged on two sides and a soil material filling body positioned between the two clay gunny bag filling bodies, wherein the clay gunny bag filling bodies are formed by stacking multiple layers of clay gunny bags, and the outer side surface, the top surface and the bottom surface of each layer of clay gunny bag are coated with geogrids. The advantages of mechanical construction earthwork filling are fully utilized while the quantity of the clay sacks is reduced as much as possible, the purposes of reducing investment and accelerating construction progress are achieved, meanwhile, steep filling side slopes can be adopted due to the fact that the clay sacks are used on two sides for filling, and compared with a conventional earth-rock cofferdam, small filling sections can be adopted, and site space and engineering quantity can be greatly saved.
The geogrids on the adjacent top surface and the bottom surface are fixedly connected, so that the cofferdam structure is firmer and is not easy to loosen.
The geogrids on the adjacent top surface and bottom surface are tied up and fixedly connected through iron wires.
The geogrids coated on the outer side surface, the top surface and the bottom surface of each layer of the clay jute bag are integrally formed.
The inner side surface of the clay sacks filling body is coated with geogrids.
And the longitudinal/transverse tensile strength of the geogrid is more than or equal to 15 KN/m.
And a sub weir filled by clay sacks is also arranged at the top of the clay sacks.
The utility model has the advantages that: the utility model has the advantages of reasonable design it is ingenious, adopt the clay sack to fill in cofferdam both sides, the centre adopts the soil material, geogrid fills, in minimize clay sack quantity, the advantage of make full use of machinery construction earthwork filling reaches the purpose that reduces the investment and accelerate the construction progress, simultaneously because both sides use the clay sack to fill, can adopt steeper filling side slope, compare with conventional stone cofferdam, can adopt less filling section, can save place space and engineering volume greatly.
The present invention will be further described with reference to the accompanying drawings and the following detailed description.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is an enlarged schematic view of the structure of the geogrid.
Detailed Description
In the embodiment, referring to fig. 1 and fig. 2, the reinforced clay sack cofferdam provided in the embodiment includes clay sack filling bodies 1 arranged on both sides and a soil material filling body 2 located between the two clay sack filling bodies 1, wherein the clay sack filling body 1 is formed by stacking multiple layers of clay sacks, and the outer side surface, the top surface and the bottom surface of each layer of clay sack are coated with geogrids 3. The advantages of mechanical construction earthwork filling are fully utilized while the quantity of the clay sacks is reduced as much as possible, the purposes of reducing investment and accelerating construction progress are achieved, meanwhile, steep filling side slopes can be adopted due to the fact that the clay sacks are used on two sides for filling, and compared with a conventional earth-rock cofferdam, small filling sections can be adopted, and site space and engineering quantity can be greatly saved.
The geogrids 3 on the adjacent top surface and bottom surface are fixedly connected, so that the cofferdam structure is firmer and not easy to loosen.
The geogrids 3 on the adjacent top surface and bottom surface are tied up and fixedly connected through iron wires 4.
The geogrids 3 coated on the outer side surface, the top surface and the bottom surface of each layer of the clay jute bag are integrally formed.
The inner side surface of the clay sacks filling body 1 is coated with geogrids 3.
And the longitudinal/transverse tensile strength of the geogrid 3 is more than or equal to 15 KN/m.
The top of the clay sacks filling body 1 is also provided with a sub weir filled by clay sacks.
The utility model has the advantages of reasonable design ingenious, adopt the clay sack to fill in the cofferdam both sides, the centre adopts the soil material, geogrid 3 fills, in the quantity of minimize clay sack, the advantage of make full use of machinery construction earthwork filling reaches the purpose that reduces the investment and accelerate the construction progress, simultaneously because both sides use the clay sack to fill, can adopt steeper filling side slope, compare with conventional earth and rockfill cofferdam, can adopt less filling section, can save place space and engineering volume greatly.
The foregoing is illustrative of the preferred embodiments of the present invention and is not to be construed as limiting the invention in any way. The technical solution of the present invention can be used by anyone skilled in the art to make many possible variations and modifications, or to modify equivalent embodiments, using the technical means and contents disclosed above, without departing from the scope of the technical solution of the present invention. Therefore, the equivalent changes made according to the shape, structure and principle of the present invention should be covered in the protection scope of the present invention.

Claims (6)

1. A reinforced clay gunny bag cofferdam is characterized in that: the soil filling material comprises clay sacks filling bodies arranged on two sides and a soil filling body positioned between the two clay sacks filling bodies, wherein the clay sacks filling body is formed by stacking a plurality of layers of clay sacks, and geogrids are coated on the outer side surface, the top surface and the bottom surface of each layer of clay sack;
and the geogrids on the adjacent top surface and bottom surface are fixedly connected.
2. The reinforced clay sacks cofferdam of claim 1 wherein the geogrids of the adjacent top and bottom surfaces are tied up and fixed by wire.
3. The reinforced clay sacking cofferdam of claim 1, wherein the geogrids covered on the outer side, the top and the bottom of each layer of the clay sacks are integrally formed.
4. The reinforced clay sacks cofferdam of claim 1 wherein the inner side of the clay sacks fill is covered with geogrids.
5. The reinforced clay sacking cofferdam of claim 1, wherein the geogrid has a longitudinal/transverse tensile strength equal to or higher than 15 KN/m.
6. The reinforced clay sacks cofferdam of claim 1, wherein the top of the clay sacks filling body is further provided with a sub-weir formed by filling clay sacks.
CN202121501005.4U 2021-01-15 2021-07-02 Reinforced clay gunny bag cofferdam Active CN216839515U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202120113409X 2021-01-15
CN202120113409 2021-01-15

Publications (1)

Publication Number Publication Date
CN216839515U true CN216839515U (en) 2022-06-28

Family

ID=82082372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121501005.4U Active CN216839515U (en) 2021-01-15 2021-07-02 Reinforced clay gunny bag cofferdam

Country Status (1)

Country Link
CN (1) CN216839515U (en)

Similar Documents

Publication Publication Date Title
CN102168430B (en) Method for reducing soil pressure on retaining wall in expansive rock-soil area
CN203855974U (en) Three-dimensional-drainage flexible geocell eco-bag side slope
KR20110120627A (en) Method of construction for scour prevension and reinforcement of bridge pier, and structure of the same
CN208748665U (en) Wide ecological slope protection structure is spelled suitable for long and narrow space
CN101967830A (en) Ecological net cages and side slope retaining wall using same
CN205591237U (en) A make up and prevent and treat structure for mountain area height is filled
CN216839515U (en) Reinforced clay gunny bag cofferdam
CN202718131U (en) Novel geocell ecological retaining wall
CN211080132U (en) Prevent soil mass core wall dam of water conservancy splitting
CN218292029U (en) Full-flexible composite reinforced earth retaining wall structure
CN100593604C (en) Flexible explosion-proof dike and construction method thereof
CN206752408U (en) Land-based area soft damage dike structure
CN215441993U (en) Concrete panel rock-fill dam soft foundation reinforcing structure
CN211773854U (en) Soil retaining structure permeates water with soil nail
CN210238543U (en) Inclined slope surface layered backfill dynamic compaction leveling structure
CN111321700B (en) Overflowing energy dissipation type ecological bank protection method for anti-scouring and anti-landslide barrier plugs
CN104314046B (en) Adopt geo-grid structure to carry out river course and attack and occupy the method with spats construction
CN204530724U (en) Oil tank reinforced earth protection body
CN215290186U (en) One-way geogrid combines counterfort retaining wall side slope supporting construction
CN207633349U (en) The bank protection earthfill structure of anti-collapse
CN201158956Y (en) Flexible explosion-proof levee
CN104452667A (en) River channel reinforced retaining wall structure and construction method thereof
CN206173998U (en) Pile adds muscle retaining wall
CN201024416Y (en) Large area soft foundation soil bag field reinforced structure
CN217078846U (en) Geogrid reverse-wrapping ecological bag reinforced retaining wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant