CN204530724U - Oil tank reinforced earth protection body - Google Patents

Oil tank reinforced earth protection body Download PDF

Info

Publication number
CN204530724U
CN204530724U CN201420718506.1U CN201420718506U CN204530724U CN 204530724 U CN204530724 U CN 204530724U CN 201420718506 U CN201420718506 U CN 201420718506U CN 204530724 U CN204530724 U CN 204530724U
Authority
CN
China
Prior art keywords
protection body
oil tank
reinforced earth
grid
earth protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420718506.1U
Other languages
Chinese (zh)
Inventor
于宗彬
李义唐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG WEIFENGDA CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
SHANDONG WEIFENGDA CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG WEIFENGDA CONSTRUCTION ENGINEERING Co Ltd filed Critical SHANDONG WEIFENGDA CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201420718506.1U priority Critical patent/CN204530724U/en
Application granted granted Critical
Publication of CN204530724U publication Critical patent/CN204530724U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of oil tank reinforced earth protection body.This oil tank reinforced earth protection body, comprise ground and reinforced earth protection body, reinforced earth protection body adopts geogrids layer and packing layer to replace pressing and forms, oil tank surrounding adopts unidirectional geo-grid, lower one deck unidirectional geo-grid employing pitman carries out tension with last layer and is connected, mount compacting is piled up inside the unidirectional geo-grid of lower one deck, and compress the unidirectional geo-grid of last layer, outside reinforced earth protection body, mount is enclosed with turf to side outside wall, roof adopts one to two layer of direction earthwork grille, in direction earthwork grille, layering is filled with filler, the superiors are paved with turf or grass-seed.The utility model adopts Fill Reinforced With Geogrids flexible structure, solves traditional earthing oil tank large volume earthwork evacuation, transport, occupation of land and cannot the difficult problem of earthing, meanwhile, also has greening and environmental protection, hidden, camouflage, not easily to give away one's position and the advantage such as cost is low.

Description

Oil tank reinforced earth protection body
Technical field
The utility model relates to a kind of oil tank soil protection body, is specifically related to a kind of oil tank reinforced earth protection body and construction method thereof.
Background technology
The oil storage of earthing oil tank is one of important way of world front oil strategic reserves.The construction program of earthing oil tank, normally first excavates out certain space downwards on level land or hillside, builds up oil tank, and then build tank room revetment by laying bricks or stones, and cast watch box vault, waits and assemble tank accessories, finally remake earthing process.
China's earthing construction requirement tank room vault thickness of earth covering should be no less than 0.5m, and the earthing width on enclosure wall top is generally not less than 1.5m, and the earthing gradient is not less than 1:1.5.Tradition earthing directly piles up the earthwork around oil tank, and the capacity of earthing oil tank is generally 1000-10000m 3, bulky, be difficult to after earthing to certain altitude continue upper soil and machinery compacting cannot be adopted, structural instability.This earthing method exists takes up an area greatly, and earth volume is large, does not cover the problems such as soil, be difficult to meet earthing standard-required, and earthing is easily washed away by rainwater, needs every year to drop into a large amount of maintenance costs, wastes time and energy.
Utility model content
For making up the deficiencies in the prior art, the utility model provides one to save the area, and reduces earth volume, can greening and environmental protection, camouflage, cost low and there is oil tank reinforced earth protection body and the construction method thereof of stronger anti-seismic performance.
The utility model is achieved by the following technical solution:
A kind of oil tank reinforced earth protection body, comprise ground and reinforced earth protection body, its special character is: described reinforced earth protection body adopts geogrids layer and packing layer to replace pressing and forms, oil tank surrounding adopts unidirectional geo-grid, adopt pitman and last layer to carry out tension outside the unidirectional geo-grid of lower one deck to be connected, pile up mount compacting inside the unidirectional geo-grid of lower one deck, and compress the unidirectional geo-grid of last layer.
Oil tank reinforced earth protection body of the present utility model, Qiang Wai side, described reinforced earth protection body lateral is enclosed with turf.
Oil tank reinforced earth protection body of the present utility model, roof adopts one to two layer of direction earthwork grille, and in direction earthwork grille, layering is filled with filler, and the superiors are paved with turf or grass-seed.
Oil tank reinforced earth protection body of the present utility model, described ground comprises some layers of direction earthwork grille, and in direction earthwork grille, layering is filled with filler, and the direction earthwork grille number of plies is determined according to original soil bearing stratum depth.
Oil tank reinforced earth protection body of the present utility model, the material of described unidirectional geo-grid and pitman is high density polyethylene (HDPE), and the material of direction earthwork grille is polypropylene, and filler is soil or chip ballast; Geo-grid carbon black content is no less than 2%, and Granular composite is even, lustrous surface.
The construction method of oil tank reinforced earth protection body of the present utility model, its special character is: comprise the following steps: (1) lays ground; (2) main body bottom completely spreads unidirectional geo-grid, metope parcel planting soil, and outer side slope lays turf, and inner vertical metope code bag makes real, and filler divides two-layer backfill, and after compacting, every layer thickness is 60 centimetres, adopts machinery or hand compaction; (3) unidirectional geo-grid outside interlayer from the second layer adopts pitman to carry out being connected with last layer and reserve geo-grid with inner side and strain, and mount, laying turf are planted, inner side code bag in outside again code, and filling compaction, until design elevation; (4) the unidirectional geo-grid anti-package of the last one deck in top; (5) tank body top completely spreads filler, manually makes real, and direction earthwork grille laid by filler, continues filler, manually flattens, makes real; (6) second layer direction earthwork grille laid by tank body vault, backfill compacting after last one deck unidirectional geo-grid connection tank body top direction earthwork grille entirety of reinforced earth protection body top anti-package also expires turfing or grass-seed, tank body vault continues upper soil to design elevation, manually flattens, makes real and expire turfing or grass-seed.
The beneficial effects of the utility model are: this oil tank reinforced earth protection body adopts Fill Reinforced With Geogrids flexible structure, because the unidirectional geo-grid of high density has unique durability, high strength, invasion and attack not by strong wind, rainwater destroy, extend its application life, solve traditional earthing oil tank large volume earthwork evacuation, transport, occupation of land and cannot the difficult problem of earthing.Meanwhile, also have greening and environmental protection, hidden, camouflage, not easily to give away one's position and the advantage such as cost is low, both protected the permanent of tank body, and additionally reduced land used and earth volume, easy construction, speed are fast, and have good adaptive capacity to ground.For 10 meters of high oil tanks: adopt the utility model oil tank reinforced earth protection body can save earth volume about 50% than traditional oil tank earthing, save land area about 60%.This project Fill Reinforced With Geogrids be propose in current domestic the first national standard use new technology, new technology, new construction, new material typical case, there is domestically leading level, also the beginning of national defence and front oil strategic reserves engineering use flexible structure scheme has been started, the basis making oil tank reinforced earth protection body engineering be difficult to carry out scheme in tradition steps a significant step, further extensive use will have been obtained gradually in similar or Other Engineering from now on.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail.
Accompanying drawing 1 is overall profile of the present utility model.
Accompanying drawing 2 is the utility model oil tank surrounding reinforced earth protection body profiles.
Accompanying drawing 3 is partial enlarged drawings shown in A in accompanying drawing 1.
Accompanying drawing 4 is partial enlarged drawings shown in B in accompanying drawing 1.
Accompanying drawing 5 is partial enlarged drawings shown in C in accompanying drawing 3.
Accompanying drawing 6 is the utility model oil tank vault reinforced earth protection body profiles.
In figure, 1 unidirectional geo-grid, 2 direction earthwork grilles, 3 fillers, 4 turfs or grass-seed, 5 pitmans, 6 mounts.
Detailed description of the invention
Embodiment 1:
Accompanying drawing is a kind of detailed description of the invention of the present utility model.This embodiment comprises ground and oil tank reinforced earth protection body, and ground comprises three layers of direction earthwork grille 2 on original soil bearing stratum, is filled with filler 3 in direction earthwork grille 2; Oil tank reinforced earth protection body adopts geogrids layer and packing layer to replace pressing and forms; Oil tank surrounding adopts unidirectional high density geo-grid 1, pitman 5 is adopted to be connected with last layer outside the unidirectional geo-grid 1 of lower one deck, inner side directly and last layer compacting, the each reserved 1.5 meters of length in unidirectional geo-grid 1 two ends, mount 6 compacting is piled up at two ends, and outside oil tank surrounding reinforced earth protection body, mount 6 is enclosed with turf 4 to side outside wall; Oil tank vault adopts two layers of direction earthwork grille 2, and in direction earthwork grille 2, layering is filled with filler 3, and the superiors are paved with turf or grass-seed 4; It is that an entirety is domatic that the unidirectional geo-grid of oil tank surrounding reinforced earth protection body top layer 1 and tank body vault top layer direction earthwork grille 2 connect Soil covering after grafting.The material of unidirectional geo-grid 1 and pitman 5 is high density polyethylene (HDPE) (HDPE), direction earthwork grille 2 be polypropylene (PP), main body filler 3 is soil or chip ballast, and vault filler be native.
Embodiment 2:
For Shandong portion oil tank reinforced earth protection body engineering: adopt Fill Reinforced With Geogrids anti-package flexible structure.After design software calculates, when meeting the requirement of national standard safety and stability, determine reinforcement material model, drawing rib length.Oil tank reinforced earth protection body bottom part body completely spreads unidirectional grid, the domatic parcel planting soil of exterior wall, lays turf and carries out wall greening, and inner side is real along the vertical code bag pressure of tank body enclosure wall, integral layer filler flattens, and point two-layer (every layer of 30cm) backfill adopts machinery or hand compaction.From outside between second layer start layers adopt pitman to carry out being connected with last layer and with same layer inside (near enclosure wall) grid strain, then wrap up planting soil, laying turf, filling compaction, until design elevation.Be connected with dome top one deck two-way grille after the unidirectional geo-grid anti-package of last one deck and fill compaction grass planting.
Oil tank reinforced earth protection body Specific construction step is as follows:
(1) foundation excavation edge line is released on the ground according to design drawing.
(2) the foundation trench leveling compacting of will excavate.
(3) by designing requirement cutting direction earthwork grille, grid cutting length is the 2 meters of anti-package length in the additional every side of slot bottom width.
(4) when laying first floor two-way grille, grid is placed on the good ground basal plane of compacting.
(5) by the mode of vertically toppling over, filler is poured on the grid laid.Adopt machinery by smooth for the filler of toppling over, every layer of backfill thickness controls by the designing requirement after compacting.
(6) the fixing rear laying second layer direction earthwork grille of grid anti-package anchoring rods will be reserved on the first floor foundation pad that compacting is good, repeat above-mentioned steps.
(7) after basis is carried out, carry out the surveying and locating of wall surface line, and oil tank reinforced earth protection body metope bottom line is hung up properly.
(8) by the unidirectional geo-grid of designing requirement cutting, unidirectional geo-grid cutting length is anchor Design length, outside anti-package length and inner side (near enclosure wall) reserved back-pressure length sum.
(9) to completely spread when laying the unidirectional geo-grid of first floor, grid is placed on the good ground of compacting, reserved outside anti-package length thereof perpendicular to tank body metope, and is placed in beyond wall line by grid length direction, and inner side back-pressure length thereof is sling by wall hook.
(10) by the mode of vertically toppling over, filler is poured on the grid laid.Machinery is by smooth for the filler of toppling over, and every layer of backfill thickness controls (at twice backfill compacting) by the designing requirement after compacting.
(11) set level whole by plantation mount by body of wall line code, and carry out manual amendment by design grade, inner vertical code bag pressure is real.
(12) machinery or manually flatten and backfill the second layer (about 30cm) filler and flatten after carrying out compacting and be densified to design height.
(13) lay the unidirectional geo-grid of the second layer on the first floor backfill face of leveling compacting before, the plantation mount piled up part outside wall is cut after exposing planting soil and lay turf, be connected with first floor geo-grid with pitman outside the second layer geo-grid that is about to cut of existing side by side, tension, carry out two ends by anchoring rods to fix simultaneously, make the grid of tension keep tightening fixing state, after construction every day, externally the turf of metope carries out maintenance in time.
(14) continue lower one deck, repeat above operational procedure until top, slope.
(15) grid that top layer anti-package is come is waited for and being connected with dome top one deck two-way grille.
(16) planting soil is transported to tank body TOC to make real (thickness 15cm) with manually having bad luck leveling, employing machine is forbidden to ram and heavily ram, by design, the direction earthwork grille of cutting is laid on the soil layer after making real, fill out the thick planting soil of 20cm again after fixing, manually continue to have bad luck leveling, make real.
(17) by tank body vault lay second layer two-way grille be connected with reinforced earth protection body top unidirectional grid as a whole after, upper soil carries out manually again having bad luck to design elevation, carry out flattening, make real, full turfing or grass-seed, and start to carry out overall maintenance.

Claims (5)

1. an oil tank reinforced earth protection body, comprises ground and reinforced earth protection body, it is characterized in that: described reinforced earth protection body adopts geogrids layer and packing layer to replace pressing and forms; Oil tank surrounding adopts unidirectional geo-grid, adopts pitman and last layer to carry out tension and be connected outside the unidirectional geo-grid of lower one deck, piles up mount compacting, and compress the unidirectional geo-grid of last layer inside the unidirectional geo-grid of lower one deck.
2. oil tank reinforced earth protection body according to claim 1, is characterized in that: Qiang Wai side, described reinforced earth protection body lateral is enclosed with turf.
3. oil tank reinforced earth protection body according to claim 1, is characterized in that: roof adopts one to two layer of direction earthwork grille, and in direction earthwork grille, layering is filled with filler, and the superiors are paved with turf or grass-seed.
4. oil tank reinforced earth protection body according to claim 1, it is characterized in that: described ground comprises some layers of direction earthwork grille, in direction earthwork grille, layering is filled with filler, and the direction earthwork grille number of plies is as the criterion with original soil bearing stratum depth.
5. oil tank reinforced earth protection body according to claim 1, is characterized in that: the material of described unidirectional geo-grid and pitman is high density polyethylene (HDPE), and the material of direction earthwork grille is polypropylene, and filler is soil or chip ballast.
CN201420718506.1U 2014-11-26 2014-11-26 Oil tank reinforced earth protection body Expired - Fee Related CN204530724U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420718506.1U CN204530724U (en) 2014-11-26 2014-11-26 Oil tank reinforced earth protection body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420718506.1U CN204530724U (en) 2014-11-26 2014-11-26 Oil tank reinforced earth protection body

Publications (1)

Publication Number Publication Date
CN204530724U true CN204530724U (en) 2015-08-05

Family

ID=53744748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420718506.1U Expired - Fee Related CN204530724U (en) 2014-11-26 2014-11-26 Oil tank reinforced earth protection body

Country Status (1)

Country Link
CN (1) CN204530724U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612167A (en) * 2014-11-26 2015-05-13 山东玮丰达建筑工程有限公司 Oil tank reinforced earth protective body and construction method thereof
WO2022141932A1 (en) * 2020-12-31 2022-07-07 山东京博控股集团有限公司 Integral side slope structure of soil covering tank

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612167A (en) * 2014-11-26 2015-05-13 山东玮丰达建筑工程有限公司 Oil tank reinforced earth protective body and construction method thereof
WO2022141932A1 (en) * 2020-12-31 2022-07-07 山东京博控股集团有限公司 Integral side slope structure of soil covering tank
AU2021414579B2 (en) * 2020-12-31 2023-04-20 Shandong Chambroad Equipment Manufacture Installation Co., Ltd. Integral side slope structure of soil covering tank
US11774041B2 (en) 2020-12-31 2023-10-03 Shandong Chambroad Holding Group Co., Ltd. Integral side slope structure of soil covering tank

Similar Documents

Publication Publication Date Title
CN103882884B (en) A kind of anchor cable geo-grid retaining structure and construction method thereof
CN101580305B (en) Wetland governance method for improving ecological environmental in reservoir falling zone
CN204849509U (en) Highway roadbed structure of antidetonation sand prevention
KR101079737B1 (en) Retaing wall for planting having water tank and construction method thereof
CN103643672A (en) Vacuum preloading foundation treatment construction method
CN109083161A (en) Wide ecological slope protection structure and its construction method are spelled suitable for long and narrow space
CN208748665U (en) Wide ecological slope protection structure is spelled suitable for long and narrow space
CN204530724U (en) Oil tank reinforced earth protection body
CN201991010U (en) Ecological environmental protection type one-way geogrid reinforced soil side slope device
CN205591237U (en) A make up and prevent and treat structure for mountain area height is filled
CN104612167A (en) Oil tank reinforced earth protective body and construction method thereof
CN203602980U (en) Flake rubble stack reinforced soil composite embankment structure
CN101182708B (en) Covering type composite vacuum electroosmosis, method for forced ramming reinforcing foundation and device thereof
CN206157760U (en) Honeycomb geotechnique check room retaining wall with ecological recovery function
CN212223948U (en) Multi-stage reinforced retaining wall comprehensive protection system suitable for large-scale abandoned slag yard
CN210507392U (en) Structural layer formed rapidly in soft foundation field
CN218292029U (en) Full-flexible composite reinforced earth retaining wall structure
CN100593604C (en) Flexible explosion-proof dike and construction method thereof
CN202073069U (en) Waterproof revetment of artificial lake
CN106760577B (en) Frame module type plastic geogrid reinforced soil protection structure and construction method thereof
CN201158956Y (en) Flexible explosion-proof levee
CN206521949U (en) Frame module formula Polymer Geogrids Reinforced Earth safeguard structure
CN107882062A (en) Massif hillside fields is based on gravity type and the compound Retaining wall method of Fill Reinforced With Geogrids
CN213329058U (en) Seepage-proofing structure of geotechnical engineering side slope
CN206352302U (en) A kind of protective slope structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150805

Termination date: 20191126