CN213329058U - Seepage-proofing structure of geotechnical engineering side slope - Google Patents

Seepage-proofing structure of geotechnical engineering side slope Download PDF

Info

Publication number
CN213329058U
CN213329058U CN202021603248.4U CN202021603248U CN213329058U CN 213329058 U CN213329058 U CN 213329058U CN 202021603248 U CN202021603248 U CN 202021603248U CN 213329058 U CN213329058 U CN 213329058U
Authority
CN
China
Prior art keywords
layer
slope
planting soil
water
baffle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021603248.4U
Other languages
Chinese (zh)
Inventor
何文社
杨喜莲
刘尚昆
赵倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou Jiaotong University
Original Assignee
Lanzhou Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou Jiaotong University filed Critical Lanzhou Jiaotong University
Priority to CN202021603248.4U priority Critical patent/CN213329058U/en
Application granted granted Critical
Publication of CN213329058U publication Critical patent/CN213329058U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The utility model discloses a prevention of seepage water structure of geotechnical engineering side slope, including the slope body, the domatic gravel layer of having installed of the slope body, the geotechnological cloth layer has been installed on the gravel layer, and geotechnological cloth layer facial make-up is equipped with the waterproof layer, and the waterproof layer facial make-up is equipped with planting soil layer, and the cover is equipped with the connecting strip between plug bush and the plug bush on the baffle. Fix the geotechnological cloth layer through tying the anchor for the geotechnological cloth layer covers the gravel layer, through the setting on gravel layer and geotechnological cloth layer, can slow down the inside water of slope to planting soil layer infiltration speed, through blockking of waterproof layer, can effectively reduce the slope to planting soil layer water permeability, because all adopt the connecting strip to connect between the plug bush, consequently, through the support of first fender platform and second baffle, it is more stable at planting soil layer to make the baffle erect, and partly see through the water of planting soil layer, can be kept off by the baffle check, supply vegetation to use, thereby can prevent that the water from seeing through side slope to highway, prevention of seepage water nature is good.

Description

Seepage-proofing structure of geotechnical engineering side slope
Technical Field
The utility model belongs to the technical field of geotechnical engineering, concretely relates to prevention of seepage water structure of geotechnical engineering side slope.
Background
The above-ground, underground and underwater engineering are collectively called civil engineering, and the part of civil engineering involving rocks, soil, underground and water is called geotechnical engineering.
The side slope of public roadside is geotechnical engineering's, and its main part adopts the stone to pile to lay planting soil on domatic, plant the vegetation in the planting soil, through the root of vegetation to the taking off of planting soil attach, can settle planting soil stably domatic, the weak point that exists is: according to the slope structure, when the water body on the other side of the slope rises, the water body can permeate the planting soil and the stones to seep to the road.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a prevention of seepage water structure of geotechnical engineering side slope to solve among the prior art problem that prevention of seepage water ability is not good enough.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a prevention of seepage water structure of geotechnical engineering side slope, includes the slope body, the gravel layer has been installed on the domatic of slope body, the geotechnological cloth layer has been installed on the gravel layer, geotechnological cloth layer facial make-up is equipped with the waterproof layer, the waterproof layer facial make-up is equipped with plants the soil layer, the built-in baffle that is equipped with in planting soil layer, the cover is equipped with the connecting strip between plug bush and the plug bush on the baffle.
Preferably, the thickness of the sandstone layer is at least 5 cm.
Preferably, the geotechnical cloth layer is inserted with a bolt anchor which penetrates into the slope body
Preferably, the top of the slope body is provided with a first blocking platform which is of a right-angle plate structure, the bottom of the slope body is provided with a second blocking platform, and the side of the second blocking platform is provided with a water storage ditch.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model provides a geotechnical engineering side slope's prevention of seepage water structure, fix geotechnological cloth layer through tying the anchor, make geotechnological cloth layer cover the gravel layer, through the setting on gravel layer and geotechnological cloth layer, can slow down the water of slope internal portion to planting soil layer infiltration speed, stop through the waterproof layer, can effectively reduce the slope body to planting soil layer water permeability, because all adopt the connecting strip to connect between the plug bush, consequently, through the support of first fender platform and second baffle, make the baffle erect and plant the soil layer more stable, and some sees through the water of planting soil layer, can be kept off by the baffle check, supply vegetation to use, thereby can prevent that the water from seeing through side slope to highway, the prevention of seepage water nature is good.
Drawings
FIG. 1 is a partial schematic front view of the present invention;
fig. 2 is a partially cut-away right view of fig. 1.
In the figure: 1 slope body, 2 gravel layers, 3 geotechnical cloth layers, 4 bolt anchors, 5 waterproof layers, 6 planting soil layers, 7 baffles, 8 plug bushes, 9 connecting strips, 10 first blocking platforms, 11 second blocking platforms and 12 water storage ditches.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Referring to fig. 2, a seepage-proofing structure for a geotechnical engineering slope comprises a slope body 1, a sandstone layer 2 is laid on the slope surface of the slope body 1, the grading particle size of the sandstone layer 2 is 2 mm, the laying thickness of the sandstone layer 2 is 5 cm, a geotextile layer 3 is laid on the sandstone layer 2, bolt anchors 4 are uniformly inserted into the geotextile layer 3, the bolt anchors 4 penetrate into the slope body 1, the geotextile layer 3 is fixed through the bolt anchors 4, the geotextile layer 3 covers the sandstone layer 2, the permeation speed of water in the slope body 1 to a planting soil layer 6 can be reduced through the arrangement of the sandstone layer 2 and the geotextile layer 3, the geotextile layer 3 is coated with a waterproof layer 5, the waterproof layer 5 is a pure cement slurry layer, the thickness of the waterproof layer 5 is 2 cm, and the permeation rate of the slope body 1 to the planting soil layer 6 can be effectively reduced through the blocking of the waterproof layer 5.
Referring to fig. 1 and 2, a planting soil layer 6 is installed on a waterproof layer 5, the planting soil layer 6 is 40 cm thick, vegetation can be planted in the planting soil layer 6, baffles 7 are uniformly embedded in the planting soil layer 6 along the vertical direction, the baffles 7 are square plates with the side length of 1 meter, the height of the baffles 7 embedded in the planting soil layer 6 is 30 cm, pure cement slurry is uniformly coated on the front and rear adjacent baffles 7, after the pure cement slurry is solidified, the front and rear baffles 7 can be bonded together, the bonding part has good waterproofness, an inserting sleeve 8 is uniformly sleeved on the baffles 7 connected in the front and rear direction in an interference fit mode by taking five meters as a distance, the inserting sleeve 8 is of a U-shaped plate structure, connecting strips 9 are welded between the inserting sleeves 8, a first blocking platform 10 is placed at the top of a slope body 1, the first blocking platform 10 is of a right-angle plate structure, a second blocking platform 11 is installed at the bottom of the slope body 1, and the first blocking platform, downside baffle 7 contact second fender platform 11, the first fender platform 10 of plug bush 8 contact of the top, because all adopt connecting strip 9 to connect between the plug bush 8, consequently, support through first fender platform 10 and second baffle 11, it is more stable at planting soil layer 6 to make baffle 7 erect, and partly see through the water of planting soil layer 6, can be kept off by baffle 7 check, supply vegetation to use, retaining ditch 12 has been installed to the avris of second fender platform 11, retaining ditch 12 adopts the concrete prefabrication to form, the setting of retaining ditch 12, can collect and discharge the rainwater of whereabouts to other positions from the side slope in the rainy day.
Fix geotechnological cloth layer 3 through bolt anchor 4, make geotechnological cloth layer 3 cover gravel layer 2, through gravel layer 2 and geotechnological cloth layer 3's setting, can slow down the inside water of slope 1 to planting soil layer 6 permeation rate, block through waterproof layer 5, can effectively reduce slope 1 to planting soil layer 6 water permeability, because all adopt connecting strip 9 to connect between the plug bush 8, consequently, support through first fender platform 10 and second baffle 11, make baffle 7 erect and plant soil layer 6 more stable, and partly see through the water of planting soil layer 6, can be kept off by baffle 7 check, supply vegetation to use, thereby can prevent that the water from seeing through on side slope to the highway, prevention of seepage water nature is good.

Claims (4)

1. The utility model provides a seepage prevention water structure of geotechnical engineering side slope, includes slope body (1), its characterized in that: the slope surface of the slope body (1) is provided with a sandstone layer (2), a geotechnical cloth layer (3) is arranged on the sandstone layer (2), a waterproof layer (5) is arranged on the geotechnical cloth layer (3), a planting soil layer (6) is arranged on the waterproof layer (5), a baffle (7) is arranged in the planting soil layer (6), and a connecting strip (9) is connected between the inserting sleeves (8) and the inserting sleeves (8) in a sleeved mode on the baffle (7).
2. The seepage-proofing structure of the geotechnical engineering slope according to claim 1, characterized in that: the thickness of the sand stone layer (2) is at least 5 cm.
3. The seepage-proofing structure of the geotechnical engineering slope according to claim 1, characterized in that: the geotechnical cloth layer (3) is inserted with the bolt anchor (4) and the bolt anchor (4) penetrates into the slope body (1).
4. The seepage-proofing structure of the geotechnical engineering slope according to claim 3, characterized in that: the water storage slope is characterized in that a first blocking platform (10) is arranged at the top of the slope body (1), the first blocking platform (10) is of a right-angle plate structure, a second blocking platform (11) is arranged at the bottom of the slope body (1), and a water storage ditch (12) is arranged on the side of the second blocking platform (11).
CN202021603248.4U 2020-08-05 2020-08-05 Seepage-proofing structure of geotechnical engineering side slope Expired - Fee Related CN213329058U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021603248.4U CN213329058U (en) 2020-08-05 2020-08-05 Seepage-proofing structure of geotechnical engineering side slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021603248.4U CN213329058U (en) 2020-08-05 2020-08-05 Seepage-proofing structure of geotechnical engineering side slope

Publications (1)

Publication Number Publication Date
CN213329058U true CN213329058U (en) 2021-06-01

Family

ID=76094136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021603248.4U Expired - Fee Related CN213329058U (en) 2020-08-05 2020-08-05 Seepage-proofing structure of geotechnical engineering side slope

Country Status (1)

Country Link
CN (1) CN213329058U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114150680A (en) * 2021-12-24 2022-03-08 江西师范高等专科学校 Seepage-proofing structure of geotechnical engineering side slope

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114150680A (en) * 2021-12-24 2022-03-08 江西师范高等专科学校 Seepage-proofing structure of geotechnical engineering side slope

Similar Documents

Publication Publication Date Title
CN106759825B (en) Construction method of sponge urban green land water storage system
CN111335100A (en) Embankment structure suitable for coastal region and construction method thereof
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN112392127B (en) Dendritic embedded type flexible ecological slope drainage ditch and construction method
CN106703044A (en) Flow-plastic-shaped flushing and filling soil weak stratum sloping combination support method
CN210216254U (en) Concrete guardrail structure
CN216339667U (en) Novel retaining wall drains, drainage structures
CN102383408B (en) Greening method for high water level impermeable saline and alkaline lands and greening system
CN209760147U (en) A ecological bank protection for hydraulic engineering
CN213329058U (en) Seepage-proofing structure of geotechnical engineering side slope
CN113152354B (en) Structure and method for pre-positioned in-situ water ecological restoration of tidal river reach
CN102704437A (en) Coal mining subsidence area cultivation water source reconstruction method suitable for complex mountain area
CN214574037U (en) Comprehensive treatment system for up-down landslides of highway
CN214301528U (en) Sponge transformation system for urban river retaining wall
CN215593889U (en) Ecological revetment structure suitable for urban river
CN210315599U (en) Slope greening water and soil protection structure
CN208934005U (en) A kind of vertical curved baffle landscape pile plate wall
CN208152189U (en) A kind of rainwater ecological exhaust system
CN111926766A (en) Soil erosion and water loss prevention type revetment structure
CN110616619A (en) Lawn field convenient for water seepage and construction method
CN205529733U (en) Processing structure of soft base in coast
CN216640132U (en) Ecological side ditch of urban road design
CN217174849U (en) Slope ecological restoration structure of damaged mountain
CN212052161U (en) Dyke structure suitable for coastal region
CN219280851U (en) Ecological protection structure based on pipeline trench recovery

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210601