CN202718131U - Novel geocell ecological retaining wall - Google Patents

Novel geocell ecological retaining wall Download PDF

Info

Publication number
CN202718131U
CN202718131U CN 201220421427 CN201220421427U CN202718131U CN 202718131 U CN202718131 U CN 202718131U CN 201220421427 CN201220421427 CN 201220421427 CN 201220421427 U CN201220421427 U CN 201220421427U CN 202718131 U CN202718131 U CN 202718131U
Authority
CN
China
Prior art keywords
geotechnical grid
retaining wall
reinforcement layer
novel
ecological retaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220421427
Other languages
Chinese (zh)
Inventor
章飚
倪跃华
傅永忠
章泽
靳建祥
毛斌峰
章蓝天
詹士燕
傅列平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YONGYE CONSTRUCTION ENGINEERING GROUP Co Ltd
ZHEJIANG ZHONGJIN GARDEN CONSTRUCTION GROUP CO Ltd
ZHEJIANG HENGLIANG CONSTRUCTION CO Ltd
Original Assignee
YONGYE CONSTRUCTION ENGINEERING GROUP Co Ltd
ZHEJIANG ZHONGJIN GARDEN CONSTRUCTION GROUP CO Ltd
ZHEJIANG HENGLIANG CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YONGYE CONSTRUCTION ENGINEERING GROUP Co Ltd, ZHEJIANG ZHONGJIN GARDEN CONSTRUCTION GROUP CO Ltd, ZHEJIANG HENGLIANG CONSTRUCTION CO Ltd filed Critical YONGYE CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN 201220421427 priority Critical patent/CN202718131U/en
Application granted granted Critical
Publication of CN202718131U publication Critical patent/CN202718131U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a novel geocell ecological retaining wall which is composed of a reinforced layer in a roadbed and a wall body. The reinforced layer is composed of a plurality of geocells I which are arranged in plane mode and padding filled in grids of the geocells I. The wall body is formed by piling up multiple layers of geocells II. Backfill is filled into grids of the geocells II. The bottom of the wall body stretches into a foundation and is connected with rivets of the foundation. Multiple geocell reinforced layers are arranged in the roadbed so that characteristics of high modulus and high strength of the geocells can be fully used of. Net-shaped sand chambers formed in the roadbed provide large side direction constraint force, and tensile strength, shearing strength and overall stability are all greatly improved. And when the flexible wall body bears too much pressure from the backfill, the flexible wall body can transform in bending and shearing mode so as to reduce a backfill pressure load and improve bearing capacity of the entire retaining wall structure.

Description

A kind of Novel geotechnical grid Ecological Retaining Wall
Technical field
The utility model relates to a kind of barricade, refers more particularly to a kind of Novel geotechnical grid Ecological Retaining Wall with larger tensile strength and shear strength.
Background technology
Geotechnical grid has Anti-erosion, and is corrosion-resistant; Packing material can be gathered materials on the spot; Ageing-resistant; Rigidity is large: the characteristics such as Tensile strength height, in the every field of civil engineering (such as slope project, retaining wall, slope protection, shallow layer foundation processing etc.) be widely used in, obtained good effect, be ZL03219002.6 such as China Patent No., name is called the utility model patent of geotechnical grid vegetation barricade, a kind of geotechnical grid barricade is disclosed, in being provided with it, roadbed fills Packed reinforcing rib, be filled with native geotechnical grid in its lattice having of the side of roadbed reinforcing rib, one deck geotechnical grid connects with holdfast with neighbouring one deck geotechnical grid, this vegetation barricade belongs to the flexible shoring structure, have the characteristics of concrete or stone-laying barricade and reinforced earth bulkhead concurrently, although this utility model can be coordinated the stressed of body of wall and distortion preferably, effectively disperse base stress, sedimentation is less, but because the method for designing of Gravity Retaining Wall is still continued to use in design, can cause undoubtedly the waste of material, and the displacement of the soil body behind occurs in the wall back of the body easily, cause the subrange internal stress to increase and cause that comparatively fast barricade topples, this has greatly limited this geosynthetics the promoting the use of in engineering practice that fabulous economic benefit and social benefit are arranged of geotechnical grid.
The utility model content
The wall back of the body soil body that the utility model mainly solves conventional geotechnical grid barricade is subjected to displacement easily and causes the subrange internal stress to increase very fast and cause the technical problem that barricade topples; A kind of have larger tensile strength and shear strength, constitutionally stable Novel geotechnical grid Ecological Retaining Wall are provided.
In order to solve the technical problem of above-mentioned existence, the utility model mainly is to adopt following technical proposals:
A kind of Novel geotechnical grid Ecological Retaining Wall of the present utility model, be arranged on the ground, formed with the body of wall that is connected the roadbed side and be connected with the reinforcement layer by the some reinforcement layers that are located in the roadbed, described reinforcement layer is by the geotechnical grid I and the media assemblage that is filled in the geotechnical grid I grid of a plurality of layout, the geotechnical grid reinforcement floor is given full play to the high-modulus of lattice chamber, high-intensity characteristic, structure webbed sandstone chamber and larger lateral restriction is provided in roadbed, limited the displacement of body of wall towards rolling earth behind retaining wall, its tension, shear strength and resistance to overturning all are greatly improved, and are combined with body of wall jointly to have consisted of whole Ecological Retaining Wall.
As preferably, described filler is sand material, and reinforcement layer intensity is high, Equalsettlement.
As preferably, described reinforcement layer is horizontal, evenly distribute up and down, end face and the load of top reinforcement layer join, and bottom surface and the ground of bottom reinforcement layer join, the upper strata reinforcement layer depth of adjacent reinforcement layer is greater than lower floor's reinforcement layer depth, the muscle face of reinforcement layer overlaps with the main stress bar action direction, and the reinforcement layer has obvious anti-bending strength, for the concrete distribution of load, optimal design the reinforcement layer of different depth, different spacing, saved construction costs.
As preferably, be hinge type latch integrated connection between the described geotechnical grid I adjacent plate, a plurality of geotechnical grid I are connected to each other and form whole " net adds stone " structure, make the reinforcement layer have larger adhesion strength and frictional force, have improved the tensile strength of reinforcement layer.
As preferably, described body of wall is made of the stack of multilayer geotechnical grid II, is filled with backfill in the grid of described geotechnical grid II, and the bottom of body of wall is stretched in the ground and with the ground holdfast and is connected, by the stacking flexible body of wall that forms of geotechnical grid, when soil pressure is larger, deflection deformation and shear strain can occur, reduced its soil pressure load of bearing, the corresponding bearing capacity that improves total, simultaneously, also can be on body of wall grass planting, satisfy the requirement of ecological and view.
As preferably, be hinge type latch integrated connection between the geotechnical grid II of respective layer in described geotechnical grid I and the body of wall, make body of wall and roadbed form complete structure by the reinforcement layer, the three is acting in conjunction as a whole.
As preferably, be hinge type latch integrated connection between the described geotechnical grid II adjacent plate, holdfast is connected between the upper strata of multilayer geotechnical grid II and the lower floor, guarantees the resistance to overturning of body of wall, and the bearing capacity that improves body of wall also provides larger lateral restriction.
As preferably, the mesh walls of described geotechnical grid II is provided with spilled water hole, and spilled water hole provides drainage channel; can protect surface of wall to avoid rainwash; safeguard the resistance to overturning of body of wall, also can promote the plant growth in the body of wall geotechnical grid, satisfy ecological and view requirement.
The beneficial effects of the utility model are: multilayer geotechnical grid reinforcement layer is set in roadbed, give full play to the high-modulus of geotechnical grid, high-intensity characteristic, structure webbed sandstone chamber and larger lateral restriction is provided in roadbed, limited the displacement of body of wall towards rolling earth behind retaining wall, its tension, shear strength and resistance to overturning all are greatly improved, and the flexible body of wall that the geotechnical grid stack consists of, when the pressure that bankets is larger, deflection deformation and shear strain can occur voluntarily, reduced its soil pressure load of bearing, the corresponding bearing capacity that improves whole wall-retaining structure, simultaneously, grass planting on body of wall has also satisfied the ecology of roadbed and the requirement of view.
Description of drawings
Fig. 1 is structural representation of the present utility model.
1. roadbeds among the figure, 2. reinforcement layer, 3. body of wall, 4. geotechnical grid I, 5. load, 6. ground, 7. geotechnical grid II.
The specific embodiment
Below by embodiment, and by reference to the accompanying drawings, the technical solution of the utility model is described in further detail.
Embodiment: a kind of Novel geotechnical grid Ecological Retaining Wall of present embodiment, be arranged on the ground, as shown in Figure 1, formed with the body of wall 3 that is connected the roadbed side and be connected with the reinforcement layer by four reinforcement layers 2 of design in roadbed 1, the reinforcement layer is horizontal, evenly distribute up and down, end face and the load 5 of top reinforcement layer join, bottom surface and the ground 6 of bottom reinforcement layer join, the upper strata reinforcement layer depth of adjacent reinforcement layer is greater than lower floor's reinforcement layer depth, every layer of reinforcement layer passes through hinge type latch integrated connection by the geotechnical grid I 4 of a plurality of layout, is filled with metaling in the grid of geotechnical grid I; Body of wall is made of 7 stacks of multilayer geotechnical grid II, be filled with backfill in the grid of geotechnical grid II, the bottom of body of wall is stretched in the ground and with the ground holdfast and is connected, holdfast is connected between the upper strata of multilayer geotechnical grid II and the lower floor, by hinge type latch integrated connection, have spilled water hole in the mesh walls of geotechnical grid II between the geotechnical grid II adjacent plate; Be connected to form an overall structure body by the hinge type latch between the geotechnical grid II of respective layer in geotechnical grid I and the body of wall.
During construction, at first with roadbed leveling and compaction in layers, degree of compaction index request K 〉=0.9, reinforcement layer in the roadbed is four layers, depth of placement is followed successively by 10M from top to bottom, 8M, 6.7M and 5M, to weld apart from 80cm, the high 20cm of grid, thick 1. 20mm of sheet material, hot strength 〉=20MPa, stretch modulus 〉=650MPa, the geotechnical grid of weld tensile strength 〉=100N/cm open fully and fixing around, be tiled on the roadbed, every layer of geotechnical grid connects into integral body by the hinge type latch each other, and fills the rubble filler in the grid of geotechnical grid, filler requires even particle size, maximum particle diameter must not be greater than 5cm, and every layer of filler void is filled out thickness and is not more than 30cm and is not less than 25cm, passes through the road roller compacting after the leveling; Body of wall and roadbed synchronous construction, along the roadbed edge, the geotechnical grid II superposes up and down and forms flexible body of wall, slope, roadbed edge scrapes out step, along vertical separation 2M, the geotechnical grid layer stretches into slope step 2M and roadbed edge overlap joint, between every two-layer geotechnical grid II with ф 10 holdfasts of long 50cm interval 2M longitudinally, lateral separation lM is fixed, in the grid of geotechnical grid II, fill backfill and flatten compacting, planeness requires the same structure layer height to differ and is no more than 2cm, and the geotechnical grid II of corresponding height and the geotechnical grid in the reinforcement layer are connected firmly by the hinge type latch in the body of wall; In the outermost geotechnical grid II of body of wall grid, plant grass-seed, finish the construction of Ecological Retaining Wall.
More than explanation is not that the utility model has been done restriction; the utility model also is not limited only to giving an example of above-mentioned explanation; the variation that those skilled in the art make in essential scope of the present utility model, retrofit, increase or replace, all should be considered as protection domain of the present utility model.

Claims (8)

1. Novel geotechnical grid Ecological Retaining Wall, be arranged on the roadbed (1), it is characterized in that: described Ecological Retaining Wall is comprised of with the body of wall that is connected the roadbed side and be connected with the reinforcement layer (3) the some reinforcement layers (2) that are located in the roadbed, and described reinforcement layer is by the geotechnical grid I (4) of a plurality of layout and be filled in media assemblage in the geotechnical grid I grid.
2. a kind of Novel geotechnical grid Ecological Retaining Wall according to claim 1, it is characterized in that: described filler is sand material.
3. a kind of Novel geotechnical grid Ecological Retaining Wall according to claim 1 and 2, it is characterized in that: described reinforcement layer (2) is horizontal, evenly distribute up and down, the end face of top reinforcement layer and load (5) join, bottom surface and the ground (6) of bottom reinforcement layer join, and the upper strata reinforcement layer depth of adjacent reinforcement layer is greater than lower floor's reinforcement layer depth.
4. a kind of Novel geotechnical grid Ecological Retaining Wall according to claim 1 and 2 is characterized in that: be hinge type latch integrated connection between described geotechnical grid I (4) adjacent plate.
5. a kind of Novel geotechnical grid Ecological Retaining Wall according to claim 1, it is characterized in that: described body of wall is made of multilayer geotechnical grid II (7) stack, be filled with backfill in the grid of described geotechnical grid II, the bottom of body of wall is stretched in the ground (6) and with the ground holdfast and is connected.
6. a kind of Novel geotechnical grid Ecological Retaining Wall according to claim 5 is characterized in that: be hinge type latch integrated connection in described geotechnical grid I (4) and the body of wall between the geotechnical grid II (7) of respective layer.
7. a kind of Novel geotechnical grid Ecological Retaining Wall according to claim 5 is characterized in that: be hinge type latch integrated connection between described geotechnical grid II (7) adjacent plate, holdfast is connected between the upper strata of multilayer geotechnical grid II and the lower floor.
8. according to claim 6 or 7 described a kind of Novel geotechnical grid Ecological Retaining Walls, it is characterized in that: the mesh walls of described geotechnical grid II (7) is provided with spilled water hole.
CN 201220421427 2012-08-23 2012-08-23 Novel geocell ecological retaining wall Expired - Fee Related CN202718131U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220421427 CN202718131U (en) 2012-08-23 2012-08-23 Novel geocell ecological retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220421427 CN202718131U (en) 2012-08-23 2012-08-23 Novel geocell ecological retaining wall

Publications (1)

Publication Number Publication Date
CN202718131U true CN202718131U (en) 2013-02-06

Family

ID=47619957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220421427 Expired - Fee Related CN202718131U (en) 2012-08-23 2012-08-23 Novel geocell ecological retaining wall

Country Status (1)

Country Link
CN (1) CN202718131U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821058A (en) * 2014-03-04 2014-05-28 河海大学 Reinforced road embankment structure device and construction method thereof
CN107165013A (en) * 2017-06-02 2017-09-15 东南大学 Geotechnical grid reinforcement foam concrete light road foundation fills structure and its method
CN107386255A (en) * 2017-09-21 2017-11-24 安徽徽风新型合成材料有限公司 A kind of stepped geotechnical grid and its laying method
CN108035378A (en) * 2017-12-20 2018-05-15 石家庄铁道大学 The compound reinforcing rib Ecological Retaining Wall of geotechnical grid and its construction method
CN109056654A (en) * 2018-09-17 2018-12-21 天津市北洋水运水利勘察设计研究院有限公司 A kind of geotechnical grid encloses low bank between fields and its construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821058A (en) * 2014-03-04 2014-05-28 河海大学 Reinforced road embankment structure device and construction method thereof
CN103821058B (en) * 2014-03-04 2015-11-18 河海大学 The constructional device of Study on Reinforced Embankments Using and construction method thereof
CN107165013A (en) * 2017-06-02 2017-09-15 东南大学 Geotechnical grid reinforcement foam concrete light road foundation fills structure and its method
CN107386255A (en) * 2017-09-21 2017-11-24 安徽徽风新型合成材料有限公司 A kind of stepped geotechnical grid and its laying method
CN108035378A (en) * 2017-12-20 2018-05-15 石家庄铁道大学 The compound reinforcing rib Ecological Retaining Wall of geotechnical grid and its construction method
CN109056654A (en) * 2018-09-17 2018-12-21 天津市北洋水运水利勘察设计研究院有限公司 A kind of geotechnical grid encloses low bank between fields and its construction method

Similar Documents

Publication Publication Date Title
CN202718131U (en) Novel geocell ecological retaining wall
CN201952698U (en) Roadbed structure reinforced by geotextile discrete material piles
CN108442200B (en) Domestic garbage incineration ash mixed soil composite reinforced roadbed and construction method thereof
CN204530620U (en) A kind of novel combination type Ecological Retaining Wall
CN103952986B (en) A kind of off-load formula rigid culvert structure
CN202969393U (en) Ribbing load reduction structure of road high hill culvert
CN101654899A (en) Liquified soil foundation-bed shock-resistant strengthening structure of high-speed railway
CN108978623B (en) Composite reinforced gravel cushion layer doped with construction waste and waste tires and construction method
CN202809501U (en) Reinforced load reducing structure of motorway high filling culvert in mountainous area
CN106758629A (en) A kind of the geotechnical grid reinforcement sand bedding course and construction method of the building waste that adulterates
CN203855974U (en) Three-dimensional-drainage flexible geocell eco-bag side slope
CN108035378A (en) The compound reinforcing rib Ecological Retaining Wall of geotechnical grid and its construction method
CN201530968U (en) High-speed railway liquefying soil foundation-roadbed seismic strengthening structure
CN209227507U (en) Punish the Rigid Flexible Piled Composite Foundation of superelevation embankment soft foundation
CN102174810B (en) Foundation reinforcement structure of construction refuse dump on soft soil
CN209260466U (en) A kind of high-fill roadbed structure
CN209723024U (en) Composite foundation reinforcement counterfort wall structure
CN206521949U (en) Frame module formula Polymer Geogrids Reinforced Earth safeguard structure
CN207452938U (en) Composite foundation reinforced cantilever retaining wall structure
CN108677999A (en) A kind of Muddy Bottoms packeted soil barrier wall structure and construction method
CN214993514U (en) Landscape river levee reinforced retaining wall
CN216107863U (en) Can reduce uneven indisputable tailing of subsiding and add muscle embankment structure
CN205420939U (en) Roadbed structure of crowded native bored concrete pile stake net of bidirectional screw
CN100593604C (en) Flexible explosion-proof dike and construction method thereof
CN203960759U (en) A kind of off-load formula rigidity culvert structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130206

Termination date: 20170823