CN216811718U - A template platform truck for ditch cable duct pouring construction - Google Patents

A template platform truck for ditch cable duct pouring construction Download PDF

Info

Publication number
CN216811718U
CN216811718U CN202220406817.9U CN202220406817U CN216811718U CN 216811718 U CN216811718 U CN 216811718U CN 202220406817 U CN202220406817 U CN 202220406817U CN 216811718 U CN216811718 U CN 216811718U
Authority
CN
China
Prior art keywords
trolley
construction
hoisting
standard
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220406817.9U
Other languages
Chinese (zh)
Inventor
黄宜伟
陈林
谢三镇
谭壮士
伍彦斌
石志杰
吴继
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Mechanisation Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Mechanisation Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Mechanisation Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN202220406817.9U priority Critical patent/CN216811718U/en
Application granted granted Critical
Publication of CN216811718U publication Critical patent/CN216811718U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the technical field of casting construction of a ditch cable trough, and particularly relates to a template trolley for casting construction of the ditch cable trough, which comprises a template, a hoisting assembly and a mould frame trolley, wherein the hoisting assembly is connected to the upper end of the mould frame trolley, and the bottom of the mould frame trolley is provided with a traveling system; the template comprises a plurality of standard knots, and the standard knots are detachably connected with the hoisting assembly; and after the standard knots are hoisted in place, connecting the adjacent standard knots with each other. Through the formwork trolley, the standard knot is hoisted in place, a plurality of standard knots are quickly arranged and connected into the formwork, the construction length is increased, the integrated forming and pouring construction of the ditch cable trough is realized, the construction efficiency is high, and the integrity of the poured ditch cable trough is good.

Description

A template platform truck for ditch cable duct pouring construction
Technical Field
The utility model belongs to the technical field of casting construction of a cable trough of a ditch, and particularly relates to a template trolley for casting construction of the cable trough of the ditch.
Background
The ditch cable groove is an important component of a modern tunnel as a tunnel auxiliary project, the construction quality of the ditch cable groove directly influences the integral construction and forming image of the tunnel, and in the prior art, a template trolley is generally adopted for pouring construction of the ditch cable groove.
Chinese utility model with publication number CN207363676U discloses a self-propelled ditch cable trough trolley, which mainly solves the problems of many operation procedures, long construction time consumption, many reinforcing supports, large construction difficulty and the like existing in the traditional manual operation. It is mainly characterized in that: the device comprises a die frame door mechanism, a die plate transverse hydraulic oil cylinder, a die frame lifting hydraulic oil cylinder, a die removing and erecting hydraulic oil cylinder, a die plate assembly, a front traveling mechanism, a rear traveling mechanism and the like; the die carrier door mechanism is provided with a door frame lifting hydraulic oil cylinder and a door frame bottom beam jack; the front travelling mechanism and the rear travelling mechanism are respectively arranged at the front side and the rear side of the die carrier door mechanism; the template assembly comprises a cable mold, a ditch mold, side molds, a telescopic beam, a telescopic outer sleeve and a telescopic slide rod, and the side molds are respectively arranged on the left side and the right side of the mold frame door mechanism. The construction method has the advantages of being fast in construction progress, high in automation degree, high in construction quality, capable of saving construction cost, energy-saving, environment-friendly and the like.
By adopting the trolley, because the templates are fixedly connected with the die carrier, only one section of template at two sides can be installed and poured at a time, the construction length is limited, and therefore, the length of pouring in a one-step die filling mode is shorter, and the requirement of high-efficiency pouring construction of a cable duct of a ditch cannot be met.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that in the prior art, because the templates are fixedly connected with the die carrier, only one section of template at two sides can be installed and poured each time, and the construction length is limited, the length of one-time die-filling pouring is short, and the requirement of high-efficiency pouring construction of a cable trough of a ditch cannot be met, so that the template trolley for pouring construction of the cable trough of the ditch is provided.
A formwork trolley for casting construction of a ditch cable duct comprises a formwork, a hoisting assembly and a formwork trolley, wherein the hoisting assembly is connected to the upper end of the formwork trolley, and a traveling system is installed at the bottom of the formwork trolley; the template comprises a plurality of standard knots, and the standard knots are detachably connected with the hoisting assembly; and after the standard knots are hoisted in place, connecting the adjacent standard knots with each other. Through the die carrier platform truck will standard festival hoist and mount in place, set up a plurality ofly fast the standard festival is connected into the template has increased construction length, has realized ditch cable duct integrated into one piece and has pour the construction, and the efficiency of construction is high, and the ditch cable duct's of pouring wholeness is good, linear following straight.
Furthermore, the adjacent standard knots are connected by bolts. Through bolted connection the standard festival, install when connecting firm and dismantle convenient and fast, ensured the wholeness of pouring ditch cable duct.
Furthermore, the die carrier trolley comprises four stand columns, two cross beams and two side beams, the front cross beam and the rear cross beam are connected with the left side beam and the right side beam, and the four stand columns are arranged at the lower ends of the joints of the cross beams and the side beams.
Furthermore, the left end and the right end of the cross beam extend out and are connected with the hoisting assembly; the hoisting components on the left side and the right side are respectively connected with one standard knot. The left end and the right end are hoisted simultaneously, the standard knot ensures that the formwork trolley is balanced and stable, and meanwhile, the construction efficiency is also improved.
Furthermore, the hoisting component is an electric hoist and comprises a hoisting rope with a hoisting hook, and the hoisting hook is connected with the standard knot. The electric hoist can hoist the standard knot, so that the standard knot can be effectively hoisted and installed in place.
Further, the device also comprises an inclined strut, wherein the inclined strut comprises a first inclined strut, a second inclined strut and a third inclined strut; the first inclined strut is connected with the upright post and the cross beam; the second inclined strut is connected with the upright post and the side beam; the third diagonal brace connects the cross beam and the side beam. The stand column, the cross beam and the side beams are reinforced by the inclined struts, so that the stability and reliability of the integral structure of the formwork trolley are further ensured, and the stability of a template and other devices installed on the formwork trolley is ensured.
Further, the walking system comprises a plurality of steerable rollers. Through the gyro wheel, the die carrier platform truck can freely turn to the walking, will the accurate fortune of standard festival reaches mounted position, and is nimble convenient.
Furthermore, the lifting device further comprises a remote control device, and the remote control device is connected with the lifting assembly and the walking system. Through remote control unit, operating personnel can be right template trolley remote control controls template trolley's the operation of lifting by crane and removing, has ensured operating personnel's safety, has further promoted the efficiency of construction simultaneously.
Has the advantages that:
1. according to the utility model, the standard joints are hoisted in place through the formwork trolley, a plurality of standard joints are quickly arranged and connected into the formwork, the construction length is increased, the integral forming and pouring construction of the ditch cable trough is realized, the construction efficiency is high, and the integrity of the poured ditch cable trough is good.
2. The standard knot is connected through bolting, so that the standard knot is stably connected and is convenient and quick to mount and dismount, and the integrity of the cable trough for pouring the ditch is ensured. The stand column, the cross beam and the side beams are reinforced by the inclined struts, so that the stability and reliability of the whole structure of the formwork trolley are further ensured, and the stability of a template and other devices installed on the formwork trolley is ensured.
3. The electric hoist is used for hoisting the standard knot, so that the standard knot can be effectively hoisted and installed in place. Through the gyro wheel, the die carrier platform truck can freely turn to the walking, will the accurate transport of standard festival reaches the mounted position, and is nimble convenient. Through remote control unit, operating personnel can be right template platform truck remote control controls the operation of lifting by crane and removing of template platform truck has ensured operating personnel's safety, has further promoted the efficiency of construction simultaneously.
Drawings
FIG. 1 is a schematic illustration of the practice of the present invention;
fig. 2 is a schematic view of the main structure of the present invention.
Description of the drawings: 1. a standard section; 2. a column; 3. a cross beam; 4. a side beam; 5. bracing; 51. a first diagonal brace; 52. a second diagonal brace; 53. a third diagonal brace; 6. an electric hoist; 7. and (4) a roller.
Detailed Description
In order to make those skilled in the art better understand the technical solutions in the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance; furthermore, unless expressly stated or limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, as they may be fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example 1
Referring to fig. 1 and 2, the embodiment provides a formwork trolley for casting construction of a ditch cable duct, which comprises a formwork, a hoisting assembly and a formwork trolley, wherein the hoisting assembly is connected to the upper end of the formwork trolley, and a traveling system is installed at the bottom of the formwork trolley; the template comprises a plurality of standard joints 1, and the standard joints 1 are detachably connected with the hoisting assembly; and after the standard joints 1 are hoisted in place, connecting the adjacent standard joints 1 with each other. Through the die carrier platform truck will standard festival 1 hoist and mount to target in place, set up a plurality ofly fast standard festival 1 is connected into the template has increased construction length, has realized ditch cable duct integrated into one piece and has pour the construction, and the efficiency of construction is high, and the ditch cable duct's of pouring wholeness is good, linear in the same direction as straight.
Specifically, adjacent standard knots 1 are connected by bolts. Through bolted connection standard festival 1, install when connecting firm and dismantle convenient and fast, ensured the wholeness of pouring ditch cable duct.
Referring to fig. 2, the formwork trolley comprises four upright posts 2, two cross beams 3 and two side beams 4, the front cross beam 3 and the rear cross beam 3 are connected with the left side beam 4 and the right side beam 4, and the four upright posts 2 are arranged at the lower ends of the joints of the cross beams 3 and the side beams 4.
Referring to fig. 2, the walking system includes a plurality of steerable rollers 7. Through gyro wheel 7, the die carrier platform truck can freely turn to the walking, will the accurate transport of standard festival 1 is to the mounted position, and is nimble convenient.
As a further improvement of this embodiment, referring to fig. 2, the left and right ends of the cross beam 3 extend out and are connected with the hoisting assembly; the hoisting components on the left side and the right side are respectively connected with one standard knot 1. The left end and the right end are hoisted simultaneously, the standard knot 1 ensures that the formwork trolley is balanced and stable, and meanwhile, the construction efficiency is also improved.
Hoisting assembly is electric block 6, including the lifting rope that has the lifting hook, the lifting hook is connected standard festival 1. The standard knot 1 is hoisted through the electric hoist 6, so that hoisting and installation of the standard knot 1 can be effectively realized.
As a further improvement of the present embodiment, referring to fig. 2, the present invention further includes a diagonal brace 5, where the diagonal brace 5 includes a first diagonal brace 51, a second diagonal brace 52, and a third diagonal brace 53; the first inclined strut 51 connects the upright 2 and the cross beam 3; the second inclined strut 52 connects the upright 2 and the side beam 4; the third diagonal brace 53 connects the cross member 3 and the side member 4. Through the bracing 5 right stand 2 crossbeam 3 with the reinforcement of curb girder 4 has further ensured the firm reliable of die carrier platform truck overall structure to the stability of template and other devices of installing on the die carrier platform truck has been ensured.
As a further improvement of this embodiment, the lifting device further comprises a remote control device, and the remote control device is connected with the lifting assembly and the traveling system. Through remote control unit, operating personnel can be right template trolley remote control controls template trolley's the operation of lifting by crane and removing, has ensured operating personnel's safety, has further promoted the efficiency of construction simultaneously.
The using method comprises the following steps: through remote control unit controls electric block 6 with traveling system, accurate hoist and mount are all 1 to predetermined construction position of standard festival, control both ends and go on in step, through bolted connection 1 forms the template of standard festival, begins to pour after accomplishing the connection, passes through again behind the concrete shaping remote control unit demolishs the mould to the dress mould work of beginning next stage, according to this circulation, accomplish the integral pouring construction of ditch cable duct. The standard sections 1 are completely the same in structure, the number of the standard sections 1 can be flexibly selected according to construction requirements, and the length of one-time pouring construction is controlled.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications therefrom are within the scope of the utility model.

Claims (8)

1. A formwork trolley for casting construction of a cable duct of a ditch comprises a formwork, a hoisting assembly and a formwork trolley, wherein the hoisting assembly is connected to the upper end of the formwork trolley; the template comprises a plurality of standard knots (1), and the standard knots (1) are detachably connected with the hoisting assembly; and after the standard sections (1) are hoisted in place, connecting the adjacent standard sections (1) with each other.
2. The formwork trolley for casting construction of the cable duct of the ditch according to claim 1, wherein adjacent standard knots (1) are connected by bolts.
3. The formwork trolley for casting construction of the cable duct of the ditch according to claim 1, wherein the formwork trolley comprises four stand columns (2), two cross beams (3) and two side beams (4), the front cross beam (3) and the rear cross beam (3) are connected with the left side beam (4) and the right side beam (4), and the four stand columns (2) are arranged at the lower ends of the joints of the cross beams (3) and the side beams (4).
4. The formwork trolley for casting construction of the cable duct of the ditch according to claim 3, wherein the left end and the right end of the cross beam (3) extend out and are connected with the hoisting assembly; the hoisting components on the left side and the right side are respectively connected with one standard knot (1).
5. The formwork trolley for casting construction of a cable trench of a ditch according to claim 1, wherein the hoisting component is an electric hoist (6) comprising a hoisting rope with a hoisting hook, and the hoisting hook is connected with the standard knot (1).
6. The formwork trolley for casting construction of a cable trench of a ditch according to claim 3, further comprising a diagonal brace (5), wherein the diagonal brace (5) comprises a first diagonal brace (51), a second diagonal brace (52) and a third diagonal brace (53); the first inclined strut (51) is connected with the upright post (2) and the cross beam (3); the second inclined strut (52) is used for connecting the upright post (2) and the side beam (4); the third inclined strut (53) connects the cross beam (3) and the side beam (4).
7. A form-work trolley for trench cable pit casting according to claim 1, characterized in that the travelling system comprises a plurality of steerable rollers (7).
8. The form jumbo for trench cable trough casting construction of claim 1, further comprising a remote control device, wherein the remote control device connects the hoisting assembly and the traveling system.
CN202220406817.9U 2022-02-24 2022-02-24 A template platform truck for ditch cable duct pouring construction Expired - Fee Related CN216811718U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220406817.9U CN216811718U (en) 2022-02-24 2022-02-24 A template platform truck for ditch cable duct pouring construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220406817.9U CN216811718U (en) 2022-02-24 2022-02-24 A template platform truck for ditch cable duct pouring construction

Publications (1)

Publication Number Publication Date
CN216811718U true CN216811718U (en) 2022-06-24

Family

ID=82044372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220406817.9U Expired - Fee Related CN216811718U (en) 2022-02-24 2022-02-24 A template platform truck for ditch cable duct pouring construction

Country Status (1)

Country Link
CN (1) CN216811718U (en)

Similar Documents

Publication Publication Date Title
CN106401173A (en) Sliding reverse formwork device and construction method thereof
CN108360380A (en) A kind of bridge pier column construction operation platform and its construction method
CN108915730A (en) A kind of open trench tunnel rectangular configuration lining template trolley for baffle system
CN111926998B (en) Super high-rise structure outer frame steel pipe column construction method
CN208950298U (en) A kind of new structure circular cross section cylinder mould
CN216811718U (en) A template platform truck for ditch cable duct pouring construction
CN112921785A (en) Telescopic sliding formwork device for prefabricating steel-concrete composite beam
CN208831022U (en) A kind of open trench tunnel rectangular configuration lining template trolley for baffle system
CN112726442A (en) Construction method of large-span thin-wall concrete sound barrier pouring trolley
CN107815971A (en) High pier is from climbing liquid press to turn over molds system
CN116607426A (en) Arch bridge outsourcing concrete construction platform system and construction method
CN101457587B (en) Template mutually lifting climbing apparatus and method
CN115110765A (en) Construction method and device for shear wall at deformation joint
CN214531895U (en) Underground multi-layer pipe gallery wall body sliding frame structure
CN205934962U (en) A system of sliding for underground pipe gallery cast -in -situ construction
CN209227391U (en) Self-propelled bridge-collision-avoidance wall form trolley
CN112878667A (en) Sliding frame structure and construction method for outer wall concrete pouring by using same
CN208933913U (en) Whole revetment wall form mobile device
CN206128625U (en) Smooth empty reverse mould device
CN219219101U (en) Sectional early-dismantling formwork train
CN220415352U (en) Integral lifting die carrier for vertical shaft
CN215630118U (en) Movable aluminum mould board piping lane pours shaping structure in succession
CN112253184B (en) Rapid closing system for inverted arch lining of water delivery tunnel and construction method
CN213653212U (en) Self-propelled cast-in-place box girder integrated bridge construction machine
CN111271090B (en) Construction method for partition plate in urban underground comprehensive pipe gallery

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220624

CF01 Termination of patent right due to non-payment of annual fee