CN214531895U - Underground multi-layer pipe gallery wall body sliding frame structure - Google Patents

Underground multi-layer pipe gallery wall body sliding frame structure Download PDF

Info

Publication number
CN214531895U
CN214531895U CN202120167798.4U CN202120167798U CN214531895U CN 214531895 U CN214531895 U CN 214531895U CN 202120167798 U CN202120167798 U CN 202120167798U CN 214531895 U CN214531895 U CN 214531895U
Authority
CN
China
Prior art keywords
pipe gallery
underground multi
gallery wall
main beam
hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120167798.4U
Other languages
Chinese (zh)
Inventor
吕国鹏
敖长江
刘斌
高树青
高保转
张乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Civil Engineering Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN202120167798.4U priority Critical patent/CN214531895U/en
Application granted granted Critical
Publication of CN214531895U publication Critical patent/CN214531895U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an underground multi-layer pipe gallery wall body sliding frame structure, the sliding frame structure comprises a portal frame structure, a hanging bracket structure, a walking system, a mould adjusting system, a counterweight structure and a template system, and the portal frame structure comprises a main beam, a secondary beam, a stand column and a transverse connection system; the hanger structure comprises a hanger, a guide wheel and a floor plate; the walking system comprises a bottom beam, wheels and a motor reducer; the mold adjusting system comprises a chain block and a rolling shaft; the top of the upright post is fixedly connected with the lower end face of the secondary beam, and the bottom of the upright post is fixedly connected with the bottom beam; the stand includes left stand and right stand, and left stand setting is in the one side that is close to girder left end portion, and right stand setting is in the position that is close to the girder mid point, is provided with the transverse connection system between left stand and the right stand. Adopt the balladeur train to drive the template walking to provide construction operation platform through suspending in midair the frame, replace the scaffold frame and set up, practice thrift construction cost, utilize the balladeur train to do outside construction gallows simultaneously, processing is simple, convenient operation.

Description

Underground multi-layer pipe gallery wall body sliding frame structure
Technical Field
The utility model relates to a balladeur train construction field, especially underground multi-layer piping lane wall body balladeur train structure.
Background
The cast-in-place construction of the pipe gallery mostly adopts a construction method of full framing and wood formworks, and adopts a method of assembling, disassembling and transporting parts, so that the problems of low construction efficiency, large manual investment and the like exist.
For the construction of the outer wall of a multilayer pipe gallery, a scaffold needs to be erected along the whole length of a pipeline of the pipe gallery, and the input material and labor cost are high; and the scaffold is high in erection height, so that certain safety risk exists.
Wherein, pipe gallery integral casting platform truck, the construction technology that the platform truck adopted pipe gallery side wall, roof to pour simultaneously, through the ann of flexible realization template of hydraulic cylinder tear open, drive the cunning through the motor and move to next segment. The construction method has the following disadvantages: the side wall and the top plate are simultaneously poured, the construction period is long, and the concrete strength of the top plate needs to be waited for to increase to the design requirement; the template is a steel mould, a hydraulic system and a walking motor need to be combined, and the template is heavy in weight and high in cost; the outer wall formwork can not be provided for walking, and a scaffold needs to be erected on the outer wall.
The slip form system adopts the separate pouring of the side wall and the top plate of the pipe gallery, is a construction process for pouring the side wall, suspends the side form through the chain block, and is driven by the motor to travel to the next section. The construction method has the following defects: the template is an aluminum die and is suspended on the sliding frame through a chain block; and a scaffold is required to be erected on the outer wall.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an underground multi-layer piping lane wall body balladeur train structure will solve the scaffold and set up complicacy, the efficiency of construction is low, artifical the great, the safe risk is high, the material drops into big scheduling problem.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a sliding frame structure, which comprises a portal frame structure, a hanging frame structure, a walking system, a mould adjusting system, a counterweight structure and a template system, wherein the portal frame structure comprises a main beam, a secondary beam, a stand column and a transverse connecting system;
the hanger structure comprises a hanger, a guide wheel and a floor plate;
the walking system comprises a bottom beam, wheels and a motor reducer;
the mold adjusting system comprises a chain block and a rolling shaft;
the top of the upright post is fixedly connected with the lower end face of the secondary beam, and the bottom of the upright post is fixedly connected with the bottom beam; the upright columns comprise a left upright column and a right upright column, the left upright column is arranged on one side close to the left end part of the main beam, the right upright column is arranged at a position close to the middle point of the main beam, and a transverse connection system is arranged between the left upright column and the right upright column;
the hanging bracket is arranged on one side close to the right end part of the main beam, the top of the hanging bracket is fixedly connected with the main beam, the bottom of the hanging bracket is arranged on the ground, and one side of the hanging bracket is provided with a guide wheel;
the counterweight structure comprises a counterweight frame and a counterweight block, the counterweight frame comprises an inclined strut and a supporting plate, the lower part of the inclined strut is arranged on the bottom beam, the upper part of the inclined strut is arranged in the middle of the lower bottom surface of the supporting plate, and the counterweight block is arranged on the supporting plate.
Furthermore, the main beams are at least three and are arranged in parallel at intervals, and secondary beams are arranged between every two adjacent main beams.
Furthermore, the main beam adopts a No. 8 channel steel lattice structure, and the web members adopt angle steels with the model number of L50X 5; the secondary beam adopts an angle steel lattice structure with the model number of L50X 5; the upright post adopts a lattice structure with the model of a rectangular tube of 80X60X 5; the connection is made by assembling and welding L50X5 angle steel.
Further, the hanger is composed of a rectangular tube 50X50X4, and the guide wheel is a 3-inch wheel; the floor board is made of steel gangplank.
Furthermore, the bottom beam is composed of double 20b channel steel, and the wheels are 5-inch wheels.
Further, the chain block adopts a 5t chain block.
Further, the counterweight frame is composed of No. 8 channel steel.
Further, the top surface of the supporting plate is flush with the bottom surface of the transverse connecting system.
Further, the bottom beam is 235mm high.
Further, the mould adjusting system is arranged on the lower end face of the main beam between the right upright post and the hanging bracket.
Further, the stand is 5475mm high.
Further, the height of the main beam is equal to that of the secondary beam; the main beam is 510mm high.
Further, the length of girder is 6000mm at least.
Further, the distance between the left upright post and the right upright post is 2000 mm.
Further, the distance between the left upright post and the edge of the main beam is 600 mm.
Further, the distance between gallows and the right pillar is 2500 mm.
Further, the width of the hanger is 700 mm.
Further, the distance from the hanger to the right side edge of the main beam is 200 mm.
Further, at least two transverse connections are provided; the distance between the two attachment systems is less than 1/2 the height of the posts.
The beneficial effects of the utility model are embodied in:
1, the utility model provides an underground multi-layer piping lane wall body balladeur train structure adopts the balladeur train to drive the template walking to through hanging in midair and providing construction operation platform, replace the scaffold frame and set up, practice thrift construction cost, utilize the balladeur train to do outside construction gallows concurrently, processing is simple, convenient operation.
2, the utility model provides an underground multi-layer pipe gallery wall body balladeur train structure has fine popularization nature, and city underground pipe gallery is makeed, and the cast-in-place pipe gallery construction of multilayer has wide market.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by the practice of the invention. The primary objects and other advantages of the invention may be realized and attained by the structure particularly pointed out in the written description.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings.
FIG. 1 is an exterior wall slide design;
FIG. 2 is a left side view of the outer wall carriage;
FIG. 3 is a cross-sectional view of the hanger;
FIG. 4 is a concrete pouring state diagram of an outer wall;
FIG. 5 is a cross-sectional left side view of the carriage;
FIG. 6 is a view showing a state of the carriage traveling on the outer wall;
fig. 7 is a carriage cross-sectional view;
FIG. 8 is a top view of a middle section;
fig. 9 is a cross-sectional view of the primary and secondary beams.
Reference numerals: 1-hanging bracket, 2-guide wheel, 3-paving plate, 4-bottom beam, 5-wheel, 6-motor reducer, 7-chain block, 8-rolling shaft, 9-main beam, 10-secondary beam, 11-left upright post, 12-right upright post, 13-transverse connecting system, 14-diagonal brace and 15-support plate.
Detailed Description
The technical solutions of the present invention are described in detail below by way of examples, which are only exemplary and can be used only for explaining and explaining the technical solutions of the present invention, but not for explaining the limitations of the technical solutions of the present invention.
Examples
As shown in fig. 1-3, the utility model adopts the multi-layer pipe gallery construction sliding frame to be used as an outer construction hanging frame instead of setting up a scaffold; the structure is as follows: the multi-layer pipe gallery outer wall sliding frame consists of a portal frame structure, a hanging frame structure, a walking system, a mold adjusting system, a counterweight structure and a template system; every 6m is a standard section.
The utility model provides a carriage structure, which comprises a portal structure, a hanger structure, a walking system, a mould adjusting system, a counterweight structure and a template system, wherein the portal structure comprises a main beam 9, a secondary beam 10, a stand column and a transverse connecting system 13;
the hanger structure comprises a hanger 1, a guide wheel 2 and a floor 3;
the walking system comprises a bottom beam 4, wheels 5 and a motor reducer 6;
the mould adjusting system comprises a chain block 7 and a rolling shaft 8;
as shown in fig. 9, there are at least three main beams 9 arranged in parallel at intervals, and a secondary beam 10 is arranged between adjacent main beams 9. The number of secondary beams 10 is flexibly arranged according to the stress situation. The top of the upright post is fixedly connected with the lower end face of the secondary beam 10, and the bottom of the upright post is fixedly connected with the bottom beam 4; the height of the upright post is 5475 mm. The upright columns comprise a left upright column 11 and a right upright column 12, the left upright column 11 is arranged on one side close to the left end part of the main beam 9, the right upright column 12 is arranged at a position close to the midpoint of the main beam 9, and a transverse connecting system 13 is arranged between the left upright column 11 and the right upright column 12;
referring to fig. 8, a hanger 1 is arranged at one side close to the right end of a main beam 9, the top of the hanger 1 is fixedly connected with the main beam 9, the bottom of the hanger 1 is arranged on the ground, and a guide wheel 2 is arranged at one side of the hanger 1; the hanging bracket 1 is paved with a floor 3 which is convenient for workers to walk.
The counterweight structure includes counterweight frame and balancing weight, and the counterweight frame includes bracing 14 and backup pad 15, and 14 lower parts of bracing set up on floorbar 4, and 14 upper portions of bracing set up bottom surface middle part under backup pad 15, and the balancing weight setting is in backup pad 15.
The main beam 9 adopts a No. 8 channel steel lattice structure, and the web members adopt angle steels with the model number of L50X 5; the secondary beam 10 adopts an angle steel lattice structure with the model number of L50X 5; the upright post adopts a lattice structure with the model of a rectangular tube of 80X60X 5; the connection is made by assembling and welding L50X5 angle steel. The hanger 1 adopts a rectangular tube 50X50X4 assembly welding, and the guide wheel 2 adopts a 3-inch wheel; the floor board 3 adopts a steel springboard.
The bottom beam 4 adopts double 20b channel steel assembly welding, and the height of the bottom beam 4 is 235 mm. The wheel 5 is a 5-inch wheel. The chain block 7 adopts a 5t chain block 7. The counterweight frame is assembled and welded by No. 8 channel steel. The top surface of the supporting plate 15 is flush with the bottom surface of the transverse connecting system 13.
The mould adjusting system is arranged on the lower end face of the main beam 9 between the right upright post 12 and the hanging bracket 1. The distance between the left upright 11 and the right upright 12 is 2000 mm. The distance between the left upright post 11 and the edge position of the main beam 9 is 600 mm. The distance between the hanger 1 and the right upright post 12 is 2500 mm. The width of the hanger 1 is 700 mm.
The height of the main beam 9 is equal to that of the secondary beam 10; the main beam 9 is 510mm high. The length of the main beam 9 is at least 6000 mm. The distance between the hanger 1 and the right side edge of the main beam 9 is 200 mm.
At least two transverse connecting systems 13 are arranged; the distance between the two attachment systems is less than 1/2 the height of the posts.
As shown in fig. 4-7, the construction method for performing outer wall concrete pouring by using the carriage structure comprises the following specific steps:
preparing materials according to a design drawing, and welding and assembling a sliding frame structure;
step two, after the binding of the reinforcing steel bars of the side wall of the pipe gallery is finished, the outer wall sliding frame structure is moved to the segment section by section according to the standard segment of 6m by a moving motor;
thirdly, the outer wall template is lowered and horizontally moved to an accurate position through a chain block 7 and a rolling shaft 8, and the mold is positioned and closed;
fourthly, mounting a pull rod and a transverse stay bar reinforcing template by utilizing the platform provided by the hanger 1;
pouring side wall concrete, and vibrating by a constructor standing on a construction platform;
step six, when the concrete meets the standard requirements, the transverse stay bar and the pull rod are dismantled;
seventhly, according to the standard section of 6m, the side mold is disassembled section by section and suspended through a chain block 7;
step eight, integrally moving the sliding frame structure and the template to the next stage according to 6m sections by a walking motor;
and step nine, repeating the steps and performing circular construction.
In the construction method, the sliding frame is also used as the outer construction hanging bracket 1 to replace the erected scaffold. The scaffold can completely replace a scaffold which is erected, labor and materials are saved, the advantages are obvious, and the scaffold is easy to accept by constructors. The sliding frame is used for balancing weight when running and is reliably anchored with the bottom plate of the pipe gallery when not running. Compared with a scheme of erecting a scaffold, the method saves 60.7 ten thousand yuan compared with the scheme of erecting the scaffold by calculating according to the length of the pipe gallery of 3km and 100 construction sections.
Figure DEST_PATH_IMAGE002
The above description is only for the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any changes or substitutions that can be considered by those skilled in the art within the technical scope of the present invention should be covered by the protection scope of the present invention.

Claims (10)

1. Underground multi-storey pipe gallery wall body balladeur train structure, its characterized in that: the sliding frame structure comprises a portal frame structure, a hanging bracket structure, a walking system, a mould adjusting system, a counterweight structure and a template system, wherein the portal frame structure comprises a main beam (9), a secondary beam (10), an upright post and a transverse connecting system (13);
the hanger structure comprises a hanger (1), a guide wheel (2) and a floor (3);
the walking system comprises a bottom beam (4), wheels (5) and a motor reducer (6);
the mould adjusting system comprises a chain block (7) and a rolling shaft (8);
the top of the upright post is fixedly connected with the lower end surface of the secondary beam (10), and the bottom of the upright post is fixedly connected with the bottom beam (4); the upright columns comprise a left upright column (11) and a right upright column (12), the left upright column (11) is arranged on one side close to the left end part of the main beam (9), the right upright column (12) is arranged at a position close to the middle point of the main beam (9), and a transverse connecting system (13) is arranged between the left upright column (11) and the right upright column (12);
the hanging bracket (1) is arranged on one side close to the right end part of the main beam (9), the top of the hanging bracket (1) is fixedly connected with the main beam (9), the bottom of the hanging bracket (1) is arranged on the ground, and one side of the hanging bracket (1) is provided with a guide wheel (2);
the counterweight structure comprises a counterweight frame and a counterweight block, the counterweight frame comprises an inclined strut (14) and a supporting plate (15), the lower part of the inclined strut (14) is arranged on the bottom beam (4), the upper part of the inclined strut (14) is arranged in the middle of the lower bottom surface of the supporting plate (15), and the counterweight block is arranged on the supporting plate (15).
2. The underground multi-story pipe gallery wall carriage configuration of claim 1, wherein there are at least three of said main beams (9).
3. The underground multi-story pipe gallery wall carriage structure of claim 1, wherein the hanger (1) is composed of a rectangular pipe 50X4, and the guide wheel (2) is a 3-inch wheel; the floor board (3) adopts a steel springboard.
4. The underground multi-story pipe gallery wall carriage structure of claim 1, wherein the bottom beams (4) are made of double 20b channel steel, and the wheels (5) are 5-inch wheels.
5. The underground multi-story pipe gallery wall carriage structure of claim 1, wherein the chain block (7) is a 5t chain block (7).
6. The underground multi-wall pipe gallery wall carriage configuration of claim 1, wherein the weight rack is comprised of channel steel No. 8.
7. The underground multi-story pipe gallery wall carriage configuration of claim 1, wherein the top surface of the support plate (15) is flush with the bottom surface of the transverse connection system (13).
8. The underground multi-storey pipe gallery wall carriage configuration of claim 1, wherein the bottom beams (4) are 235mm high.
9. The underground multi-story pipe gallery wall carriage structure of claim 1, wherein the formwork adjustment system is provided at a lower end face of the main beam (9) between the right upright (12) and the hanger (1).
10. The underground multi-storey pipe gallery wall carriage configuration of claim 1, wherein the length of the main beam (9) is at least 6000 mm.
CN202120167798.4U 2021-01-21 2021-01-21 Underground multi-layer pipe gallery wall body sliding frame structure Active CN214531895U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120167798.4U CN214531895U (en) 2021-01-21 2021-01-21 Underground multi-layer pipe gallery wall body sliding frame structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120167798.4U CN214531895U (en) 2021-01-21 2021-01-21 Underground multi-layer pipe gallery wall body sliding frame structure

Publications (1)

Publication Number Publication Date
CN214531895U true CN214531895U (en) 2021-10-29

Family

ID=78346140

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120167798.4U Active CN214531895U (en) 2021-01-21 2021-01-21 Underground multi-layer pipe gallery wall body sliding frame structure

Country Status (1)

Country Link
CN (1) CN214531895U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960926A (en) * 2022-05-16 2022-08-30 中国化学工程第四建设有限公司 Chemical pipe gallery structure and pipeline replacement method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960926A (en) * 2022-05-16 2022-08-30 中国化学工程第四建设有限公司 Chemical pipe gallery structure and pipeline replacement method
CN114960926B (en) * 2022-05-16 2023-05-02 中国化学工程第四建设有限公司 Chemical pipe gallery structure and pipe replacement method

Similar Documents

Publication Publication Date Title
JP5047680B2 (en) Construction method of continuous viaduct
KR20140084107A (en) Self-Launching Movable Scaffolding System
CN110453613B (en) Full-section one-step suspension casting construction method for large-span beam bridge box girder
CN107419746A (en) A kind of mobile formwork system and its construction method
CN214531895U (en) Underground multi-layer pipe gallery wall body sliding frame structure
CN111364516A (en) Supporting and dismantling walking system for pipeline gallery wallboard running water construction and construction method thereof
CN109629439B (en) Construction method of single-tower cable-stayed bridge
CN110117933A (en) A kind of beam sections pier top cast-in-situ moving mold frame
CN203199913U (en) Assembling and disassembling type hoisting truss
CN207315404U (en) Municipal tunnel big cross section culvert and piping lane trolley
CN212026337U (en) Pipe gallery wallboard running construction supporting and dismantling walking system
CN112878667A (en) Sliding frame structure and construction method for outer wall concrete pouring by using same
CN112160247B (en) Construction method of asynchronous hydraulic creeping formwork for hollow high pier of limited space pier group
CN112726442A (en) Construction method of large-span thin-wall concrete sound barrier pouring trolley
CN210827111U (en) Environment-friendly down self-propelled steel trestle structure
CN116607426A (en) Arch bridge outsourcing concrete construction platform system and construction method
CN214996139U (en) Safe operation platform for overhead large-span steel reinforced concrete beam suspension formwork construction
CN115897399A (en) Construction method for inclined main tower of lute-shaped cable-stayed bridge
CN201943350U (en) Supporting steel frame for die holder of high-altitude large span overhanging structure
CN211420881U (en) Movable formwork for concrete construction of overhanging wing plate of steel-concrete composite beam
CN212316712U (en) Box culvert construction is with assembled platform truck
CN212612627U (en) Utility tunnel rectangle platform truck
CN211473320U (en) Tool type external hanging rack for corridor
CN109854277B (en) Construction method of large-span super-thick tunnel secondary lining structure
CN114108446A (en) High-speed railway stay cable bridge structure and construction method

Legal Events

Date Code Title Description
GR01 Patent grant