CN215630118U - Movable aluminum mould board piping lane pours shaping structure in succession - Google Patents

Movable aluminum mould board piping lane pours shaping structure in succession Download PDF

Info

Publication number
CN215630118U
CN215630118U CN202121463081.0U CN202121463081U CN215630118U CN 215630118 U CN215630118 U CN 215630118U CN 202121463081 U CN202121463081 U CN 202121463081U CN 215630118 U CN215630118 U CN 215630118U
Authority
CN
China
Prior art keywords
formwork
rod
vertical back
gallery
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121463081.0U
Other languages
Chinese (zh)
Inventor
观开剑
郭振翔
孙清臣
季永新
张延欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202121463081.0U priority Critical patent/CN215630118U/en
Application granted granted Critical
Publication of CN215630118U publication Critical patent/CN215630118U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本实用新型公开了一种可移动式铝模板管廊连续浇筑成型结构,包括管廊成型模板装置以及支撑在管廊成型模板装置上的模板内支撑架体,所述管廊成型模板装置包括对称设置的铝模板以及固定在铝模板外侧的一组横向背楞,在横向背楞上固定连接有一组竖向背楞,且两侧竖向背楞之间通过对拉螺栓固定连接,在每根竖向背楞的底部安装有行走轮,且竖向背楞通过钢丝绳与平移杆连接,在平移杆通过钢丝绳与卷扬机连接。本实用新型安拆及运输过程简单,只需要少量人工进行简单的构件松懈即可拆除模板,对构件进行紧固即可安装模板,模板是整体运输,依靠支架底部的行走轮及卷扬机进行整体移动即可。

Figure 202121463081

The utility model discloses a movable aluminum formwork tube gallery continuous casting and forming structure, which comprises a tube gallery forming formwork device and a formwork inner support frame body supported on the tube gallery forming formwork device. The pipe gallery forming formwork device comprises a symmetrical The set aluminum formwork and a set of horizontal back flutes fixed on the outside of the aluminum formwork are fixedly connected with a set of vertical back flutes, and the vertical back flutes on both sides are fixedly connected by pulling bolts. A walking wheel is installed on the bottom of the corrugation, and the vertical back corrugation is connected with the translation rod through a steel wire rope, and the translation rod is connected with the hoist through a steel wire rope. The utility model has simple installation, dismantling and transportation processes. The formwork can be dismantled by simply loosening the components by a small amount of labor, and the formwork can be installed by tightening the components. That's it.

Figure 202121463081

Description

Movable aluminum mould board piping lane pours shaping structure in succession
Technical Field
The utility model relates to a movable type continuous pouring and forming structure for an aluminum formwork pipe gallery, and belongs to the technical field of building scaffolds.
Background
The pipe gallery is a modern and intensive urban infrastructure, and various urban pipelines are intensively arranged in the same space, so that unified planning, design, construction and management are facilitated. The section of pipe gallery mainly is the rectangle main, and standard section generally has the length more than several kilometers, and is very suitable for using the construction of aluminum mould board. The construction process of the existing aluminum formwork pipe gallery project is as follows: the workman carries out the template equipment according to template construction drawing, and after concrete placement accomplished, the workman demolishs the aluminium template, then the workman removes the transportation through tricycle or other moving means to the template, transports to next construction site and repeats the template ann and tear open again. The construction efficiency of such ann's dismantlement and transportation is low, needs a large amount of manual works to be under construction, has great potential safety hazard simultaneously in ann tears the handling in open, is unfavorable for safe civilized construction, and the workman has great potential safety hazard in ann tears the in-process in addition, is unfavorable for on-the-spot safe civilized management.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a movable continuous pouring molding structure of an aluminum template pipe gallery, which is convenient to install and disassemble, time-saving, labor-saving, safe and reliable, and overcomes the defects in the prior art.
In order to achieve the purpose, the utility model adopts the following technical scheme: the utility model provides a movable aluminium mould board pipe gallery pours shaping structure in succession, supports the support body in including pipe gallery shaping template device and the template of support on pipe gallery shaping template device, pipe gallery shaping template device is stupefied including the aluminium mould board that the symmetry set up and fix a set of horizontal back of the body in the aluminium mould board outside, and it is stupefied on the stupefied fixedly connected with a set of vertical back of the body of horizontal back of the body, and through to drawing bolt fixed connection between the stupefied vertical back of the body of both sides, installs the walking wheel in the stupefied bottom of every vertical back of the body, and vertical back of the body is stupefied to be connected with the translation pole through wire rope, passes through wire rope and hoist engine at the translation pole and is connected.
Furthermore, the support body includes the steel pipe frame that forms by the equipment of flexible pole setting and horizon bar in the template, and fixed mounting has two or more two-way adjustable level to the vaulting pole in the lower part of steel pipe frame, and fixed mounting has two-way adjustable diagonal braces symmetrically on the upper portion of steel pipe frame, two-way adjustable level to the both ends of vaulting pole with the tight top of the vertical back of the body of both sides stupefied, the both ends of two-way adjustable diagonal brace are tightly pushed up respectively on vertical back of the body stupefied and floor back of the body stupefied.
Furthermore, the bidirectional adjustable horizontal counter stay bar and the bidirectional adjustable diagonal stay bar have the same structure and respectively comprise a fixed sleeve and ejector rods in threaded connection with the two ends of the fixed sleeve, locking nuts are in threaded connection on the ejector rods, the outer ends of the ejector rods are fixedly connected with the vertical back ridges or the floor back ridges, and handles are fixedly connected to the fixed sleeve.
Due to the adoption of the technical scheme, the utility model has the following advantages:
the formwork can be dismantled only by simply loosening a small amount of manual work, the formwork can be installed by fastening the components, the formwork is transported integrally and moved integrally by the aid of the travelling wheels at the bottom of the support and the winch;
secondly, the construction efficiency is high, and the construction period is saved;
the safety coefficient is high, the workers are easy to install and dismantle, the high-altitude operation time is short, and the management of on-site safe and civilized construction is facilitated.
Drawings
FIG. 1 is a front view of a schematic of the structure of the present invention;
FIG. 2 is an enlarged view at A of FIG. 1;
FIG. 3 is a plan view of a schematic layout of the pipe gallery forming formwork arrangement and hoist;
FIG. 4 is a schematic view of the construction of the support frame within the formwork;
fig. 5 is a schematic structural diagram of a bidirectional adjustable horizontal pair brace rod or a bidirectional adjustable diagonal brace rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The embodiment of the utility model comprises the following steps: please refer to fig. 1-3, a movable aluminum mould board pipe gallery continuous casting forming structure, including pipe gallery shaping formwork device 1 and support body 2 in the template on pipe gallery shaping formwork device 1, pipe gallery shaping formwork device 1 includes the aluminum mould board 101 that the symmetry set up and fixes a set of horizontal back of the body stupefied 103 in the aluminum mould board 101 outside, fixedly connected with a set of vertical back of the body stupefied 104 on horizontal back of the body stupefied 103, and through tie bolt 102 fixed connection between the vertical back of the body stupefied 104 in both sides, install walking wheel 3 in the bottom of every vertical back of the body stupefied 104, and vertical back of the body stupefied 104 is connected with translation rod 5 through wire rope 4, is connected with hoist engine 6 through wire rope 4 at translation rod 5.
Referring to fig. 4, the formwork inner support body 2 includes a steel pipe frame assembled by telescopic vertical rods 201 and horizontal rods 204, two or more bidirectional adjustable horizontal counter-bracing rods 202 are fixedly installed at the lower part of the steel pipe frame, two bidirectional adjustable diagonal bracing rods 203 are symmetrically and fixedly installed at the upper part of the steel pipe frame, two ends of the bidirectional adjustable horizontal counter-bracing rods 202 are tightly propped against the vertical back ridges 104 at two sides, and two ends of the bidirectional adjustable diagonal bracing rods 203 are tightly propped against the vertical back ridges 104 and the floor back ridges 105 respectively.
Referring to fig. 5, the bidirectional adjustable horizontal counter stay 202 and the bidirectional adjustable diagonal stay 203 have the same structure, and both include a fixing sleeve 7 and a top rod 8 in threaded connection with both ends of the fixing sleeve 7, a locking nut 9 is in threaded connection with the top rod 8, the outer end of the top rod 8 is fixedly connected with the vertical back ridge 104 or the floor back ridge 105, and a handle 10 is fixedly connected with the fixing sleeve 7.
When adopting above-mentioned movable aluminum mould board piping lane to pour forming structure in succession and construct, at first divide two steps of construction with the piping lane, the piping lane bottom plate is pour to first adoption conventional method, treats that the piping lane bottom plate reaches design strength after, support body 2 pours piping lane wall body and roof in the second step adoption piping lane shaping template device 1 and the template.
When the pipe gallery wall body and the top plate are poured, firstly, a pipe gallery is divided into a plurality of sections, a pipe gallery forming template device 1 is erected at a first section of the pipe gallery and a formwork inner support frame body 2 supported on the pipe gallery forming template device 1 is poured, then, concrete of the first section of the pipe gallery is poured, after the concrete meets the formwork stripping requirements, the split bolts 102 on the pipe gallery forming template device 1 are disassembled, meanwhile, the bidirectional adjustable horizontal split supporting rods 202 and the bidirectional adjustable inclined supporting rods 203 on the formwork inner support frame body 2 are loosened, the length of the telescopic vertical rods 201 is shortened, the bottoms of the telescopic vertical rods 201 are separated from the bottom surface, the aluminum formwork 101 is separated from the formed first section of the pipe gallery, and the formwork inner support frame body 2 is suspended on the pipe gallery forming template device 1; at the moment, the weight of the pipe gallery forming formwork device 1 and the weight of the formwork inner support frame body 2 are all transferred to the travelling wheels 3 at the bottom of the vertical back ridge 104, and finally the hoisting machine 6 is used for pulling and translating the rod 5, and the translating rod 5 drives all the pipe gallery forming formwork devices 1 and the formwork inner support frame body 2 to move together to the next section of pipe gallery construction station for construction; and repeating the steps to continuously pour and form the whole pipe gallery.

Claims (3)

1.一种可移动式铝模板管廊连续浇筑成型结构,包括管廊成型模板装置(1)以及支撑在管廊成型模板装置(1)上的模板内支撑架体(2),其特征在于:所述管廊成型模板装置(1)包括对称设置的铝模板(101)以及固定在铝模板(101)外侧的一组横向背楞(103),在横向背楞(103)上固定连接有一组竖向背楞(104),且两侧竖向背楞(104)之间通过对拉螺栓(102)固定连接,在每根竖向背楞(104)的底部安装有行走轮(3),且竖向背楞(104)通过钢丝绳(4)与平移杆(5)连接,在平移杆(5)通过钢丝绳(4)与卷扬机(6)连接。1. A movable aluminum formwork tube gallery continuous casting and forming structure, comprising a tube gallery forming formwork device (1) and a formwork inner support frame body (2) supported on the tube gallery forming formwork device (1), it is characterized in that : The pipe gallery forming formwork device (1) comprises a symmetrically arranged aluminum formwork (101) and a set of transverse back corrugations (103) fixed on the outside of the aluminum formwork (101), and a transverse back corrugation (103) is fixedly connected with a A set of vertical back ridges (104), and the two sides of the vertical back ridges (104) are fixedly connected by a pair of tension bolts (102), and a traveling wheel (3) is installed at the bottom of each vertical back ridge (104), and the vertical The back ridge (104) is connected to the translation rod (5) through the wire rope (4), and the translation rod (5) is connected to the winch (6) through the wire rope (4). 2.根据权利要求1所述的可移动式铝模板管廊连续浇筑成型结构,其特征在于:所述模板内支撑架体(2)包括由伸缩立杆(201)和水平杆(204)组装而成的钢管架,在钢管架的下部固定安装有两根以上的双向可调水平对撑杆(202),在钢管架的上部对称地固定安装有两根双向可调斜撑杆(203),所述的双向可调水平对撑杆(202)的两端与两侧竖向背楞(104)顶紧,所述双向可调斜撑杆(203)的两端分别顶紧在竖向背楞(104)和楼板背楞(105)上。2. The movable aluminum formwork pipe gallery continuous casting and forming structure according to claim 1, characterized in that: the inner support frame body (2) of the formwork comprises a telescopic vertical rod (201) and a horizontal rod (204) assembled The steel pipe frame formed by the steel pipe frame is fixedly installed with two or more two-way adjustable horizontal support rods (202) at the lower part of the steel pipe frame, and two two-way adjustable diagonal support rods (203) are symmetrically fixed and installed at the upper part of the steel pipe frame. The two sides of the two-way adjustable horizontal support rod (202) are pressed against the vertical back ridges (104) on both sides, and the two ends of the two-way adjustable diagonal support rod (203) are pressed against the vertical back grooves respectively. (104) and the back of the floor slab (105). 3.根据权利要求2所述的可移动式铝模板管廊连续浇筑成型结构,其特征在于:所述双向可调水平对撑杆(202)和双向可调斜撑杆(203)的结构相同,均包括固定套筒(7)以及螺纹连接在固定套筒(7)两端的顶杆(8),在顶杆(8)上螺纹连接有锁紧螺母(9),所述顶杆(8)的外端与竖向背楞(104)或楼板背楞(105)固定连接,在固定套筒(7)上固定连接有把手(10)。3. The movable aluminum formwork tube gallery continuous casting and forming structure according to claim 2, characterized in that: the two-way adjustable horizontal pair struts (202) and the two-way adjustable diagonal struts (203) have the same structure , including a fixed sleeve (7) and a top rod (8) threadedly connected to both ends of the fixed sleeve (7), a locking nut (9) is threadedly connected to the top rod (8), and the top rod (8) The outer end of the ) is fixedly connected with the vertical back flute (104) or the floor back flute (105), and a handle (10) is fixedly connected on the fixing sleeve (7).
CN202121463081.0U 2021-06-29 2021-06-29 Movable aluminum mould board piping lane pours shaping structure in succession Expired - Fee Related CN215630118U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121463081.0U CN215630118U (en) 2021-06-29 2021-06-29 Movable aluminum mould board piping lane pours shaping structure in succession

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121463081.0U CN215630118U (en) 2021-06-29 2021-06-29 Movable aluminum mould board piping lane pours shaping structure in succession

Publications (1)

Publication Number Publication Date
CN215630118U true CN215630118U (en) 2022-01-25

Family

ID=79946622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121463081.0U Expired - Fee Related CN215630118U (en) 2021-06-29 2021-06-29 Movable aluminum mould board piping lane pours shaping structure in succession

Country Status (1)

Country Link
CN (1) CN215630118U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113338336A (en) * 2021-06-29 2021-09-03 中国建筑第四工程局有限公司 Movable aluminum formwork pipe gallery continuous pouring forming structure and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113338336A (en) * 2021-06-29 2021-09-03 中国建筑第四工程局有限公司 Movable aluminum formwork pipe gallery continuous pouring forming structure and construction method

Similar Documents

Publication Publication Date Title
CN103635643B (en) Construction Method of Reinforced Concrete Cylinder in High-rise Steel Structure Building
CN204151823U (en) Along building the one-sided cantilever hydraulic template trolley of side wall under covered back-digging structural slab
CN108360380B (en) A kind of bridge pier column construction work platform and construction method thereof
CN102661019A (en) Heat preservation and decoration integrated construction method for outer wall of building
CN115233960B (en) Integral construction platform structure and method for adding core tube wall in air
CN201962944U (en) Hydraulic climbing formwork for building construction
CN105862602B (en) The convertible template system and its construction method of hollow concrete leaning tower
CN107460889A (en) Integral mobile support formwork and its construction method in the construction of underground comprehensive pipe gallery
CN204804320U (en) Moving as a whole formula template is assembled in advance to building
CN100476146C (en) High altitude placing steel pole inner concrete operating platform frame
CN105019657A (en) Building construction system
CN204876578U (en) Building construction system
CN101457587B (en) Template mutually lifting climbing apparatus and method
CN211689948U (en) A suspension operation platform device for the construction of a cable-stayed bridge tower
CN108560904A (en) A kind of packaged type frame structure wall template system and wall construction method
CN204876577U (en) Building construction system
CN210025768U (en) A operation platform system for caisson template installation
CN113338336A (en) Movable aluminum formwork pipe gallery continuous pouring forming structure and construction method
CN110670873A (en) A kind of support system and construction method of steel formwork for ultra-high-section concrete column
CN108978711A (en) A kind of packaged type scaffold and the pipe gallery construction method using the scaffold
CN216515147U (en) Wet seam template device of integral type bridge
CN205934962U (en) A system of sliding for underground pipe gallery cast -in -situ construction
CN209907886U (en) An adjustable prefabricated stair construction platform
CN115045505A (en) Device for pouring concrete platform on steel structure frame and construction method
CN204876575U (en) Building construction system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220125