CN216800281U - Spraying production line - Google Patents
Spraying production line Download PDFInfo
- Publication number
- CN216800281U CN216800281U CN202220111240.9U CN202220111240U CN216800281U CN 216800281 U CN216800281 U CN 216800281U CN 202220111240 U CN202220111240 U CN 202220111240U CN 216800281 U CN216800281 U CN 216800281U
- Authority
- CN
- China
- Prior art keywords
- spraying
- finish
- primer
- finish paint
- tool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Application Of Or Painting With Fluid Materials (AREA)
Abstract
The utility model relates to the technical field of spraying and discloses a spraying production line which comprises a rack, wherein a conveying tool disc is fixed on the surface of the rack, a shunting turnout is fixedly connected to the outer side of the conveying tool disc, and an upper workpiece position, a product caching tool, a product installation detection tool, a preheating box, a primer spraying robot, a primer spraying detection tool, a primer heating box, a finish spraying robot, a finish spraying detection tool, a finish heating box, a cooling box, a waiting position and a lower workpiece position are sequentially fixed on the surface of the conveying tool disc anticlockwise. This spraying production line, through adding the reposition of redundant personnel fork of establishing, after the finish paint spraying, if the material finish paint is unqualified under finish paint spraying detection frock, can carry out the after-spraying before returning to finish paint spraying robot by reposition of redundant personnel fork, need not staff's manual putting back and can return to last level, reduced staff's working strength, improved the degree of automation of production line, optimized the flexibility of staff's operation simultaneously.
Description
Technical Field
The utility model relates to the technical field of spraying, in particular to a spraying production line.
Background
Spraying means to cover the metal and non-metal surface with a protective layer or a decorative layer. With the development of industrial technology, spraying is developed from manual to industrial automation, and the degree of automation is higher and higher, so that the application of a spraying production line is wider and wider, and the spraying production line is deepened into multiple fields of national economy.
Traditional spraying production line needs the staff to manually put back unqualified product and mends again and spouts, and staff's working strength is great, and original production line is when operation such as last unloading and other stations simultaneously, though the beat nature is strong, but the degree of freedom is poor, and the continuity is poor, is difficult to satisfy user's user demand.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects in the prior art, the utility model provides a spraying production line to solve the problems in the background technology.
(II) technical scheme
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a spraying production line, includes the frame, the fixed surface of frame has the transport frock dish, the outside fixedly connected with reposition of redundant personnel fork of transport frock dish, the surface of carrying the frock dish anticlockwise is fixed with in proper order and goes up a position, product buffer memory frock, product installation detection frock, preheating cabinet, priming paint spraying robot, priming paint spraying detection frock, priming paint heating cabinet, finish paint spraying robot, finish paint spraying detection frock, finish paint heating cabinet, cooler bin, wait for position and lower position.
Preferably, the workpiece loading position, the product caching tool, the product installation detection tool, the preheating box, the primer spraying robot, the primer spraying detection tool, the primer heating box, the finish spraying robot, the finish spraying detection tool, the finish heating box, the cooling box, the waiting position and the workpiece unloading position are all provided with stoppers.
Preferably, a shunt branch is additionally arranged between the finish paint spraying detection tool and the finish paint heating box.
Preferably, the preheating time of the primer heating box to the primer is 2min, and the temperature is 60-80 ℃.
Preferably, the time for curing the finish paint by the finish paint heating box is 6min, and the temperature is 150 ℃.
(III) advantageous effects
Compared with the prior art, the utility model provides a spraying production line, which has the following beneficial effects:
this spraying production line, through adding the reposition of redundant personnel fork of establishing, after the finish paint spraying, if the material finish paint is unqualified under finish paint spraying detection frock, can carry out the after-spraying before returning to finish paint spraying robot by reposition of redundant personnel fork, need not staff's manual putting back and can return to last level, reduced staff's working strength, improved the degree of automation of production line, optimized the flexibility of staff's operation simultaneously.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
In the figure: 1. a frame; 2. conveying a tooling plate; 3. shunting a branch; 4. a workpiece loading position; 5. product caching tooling; 6. installing a detection tool for a product; 7. a preheating box; 8. a primer spraying robot; 9. primer spraying detection tooling; 10. a primer heating box; 11. a finish paint spraying robot; 12. finish paint spraying detection tooling; 13. a finish paint heating box; 14. a cooling tank; 15. a wait bit; 16. and (5) a lower part position.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The utility model provides a technical scheme, a spraying production line comprises a rack 1, a conveying tool disc 2, a shunting turnout 3, an upper workpiece position 4, a product caching tool 5, a product installation detection tool 6, a preheating box 7, a primer spraying robot 8, a primer spraying detection tool 9, a primer heating box 10, a finish spraying robot 11, a finish spraying detection tool 12, a finish heating box 13, a cooling box 14, a waiting position 15 and a lower workpiece position 16, wherein as shown in figure 1, the conveying tool disc 2 is fixed on the surface of the rack 1, the shunting turnout 3 is fixedly connected to the outer side of the conveying tool disc 2, the upper workpiece position 4, the product caching tool 5, the product installation detection tool 6, the preheating box 7, the primer spraying robot 8, the primer spraying detection tool 9, the primer heating box 10 and the primer heating box 10 are sequentially fixed on the surface of the conveying tool disc 2 in an anticlockwise mode, the preheating time of the primer is 2min, the temperature is 60-80 ℃, the material primer is heated through the primer heating box 10, the curing of the primer can be accelerated, the primer is better attached to the outside of the material, a diversion turnout 3 is additionally arranged between the finish paint spraying robot 11, the finish paint spraying detection tool 12 and the finish paint heating box 13, after the finish paint is sprayed, if the material finish paint is unqualified under the finish paint spraying detection tool 12, the material finish paint can be returned to the finish paint spraying robot 11 through the diversion turnout 3 for additional spraying, the material finish paint can be returned to the upper level without manual replacement of workers, the working strength of the workers is reduced, the automation degree of the production line is improved, the flexibility of the workers is optimized, the curing time of the finish paint is 6min, the temperature is 150 ℃, the finish paint is cured through the finish paint heating box 13, the spraying quality of the production line is guaranteed, the attractiveness of materials is improved, the cooling box 14, the waiting position 15 and the lower position 16 are arranged, the upper position 4 is arranged, the product caching tool 5 is arranged, the product installation detection tool 6, the preheating box 7 is arranged, the primer spraying robot 8 is arranged, the primer spraying detection tool 9, the primer heating box 10 is arranged, the finish spraying robot 11 is arranged, the finish spraying detection tool 12 is arranged, the finish heating box 13, the cooling box 14 is arranged, the waiting position 15 and the lower position 16 are respectively provided with a stopper, the stoppers are additionally arranged on all the stations, the movement of the materials can be controlled by the stoppers, the ordered processing operation of all the stations on the materials is guaranteed, and the smooth operation of the production line is guaranteed.
The use method of the device comprises the following steps: firstly, a material to be painted is placed on a workpiece loading position 4 on a conveying tool tray 2, the conveying tool tray 2 is driven to operate by a customized transmission system, the material is moved to a product caching tool 5, the material is inspected by a product safety detection tool 6 and then enters a preheating box 7 for preliminary preheating, the preheating temperature is 80-100 ℃ and the preheating time is 2min, the preheating temperature reaches a primer spraying robot 8 after the preheating is completed, primer spraying is carried out on the surface of the material, the primer spraying detection tool 9 confirms that the primer spraying is complete and then enters a primer heating box 10 for preheating the primer, the preheating temperature is 60-80 ℃ and the preheating time is 2min, after the primer preheating is completed, the material reaches a finish spraying robot 11 for finish spraying, after the finish spraying is completed, the finish spraying is confirmed to be qualified by a finish spraying detection tool 12, the material enters a finish heating box 13 for curing the finish, the curing temperature of the finish paint is 150 ℃, the time duration is 6min, the materials which are detected to be unqualified are returned to the upper stage from the diversion fork 3 for re-spraying, the materials cured by the finish paint enter the cooling box 14 for cooling, the materials are cooled for 9min at normal temperature, then cooled for 9min by air conditioning wind, and finally the materials reach the waiting position 15 for waiting for blanking after the cooling is finished, and the workpieces are discharged from the workpiece discharging position 16.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a spraying production line, includes frame (1), its characterized in that: the fixed surface of frame (1) has transport frock dish (2), the outside fixedly connected with reposition of redundant personnel fork (3) of carrying frock dish (2), the surface of carrying frock dish (2) anticlockwise is fixed with in proper order and goes up a position (4), product buffer memory frock (5), product installation detection frock (6), preheating cabinet (7), priming paint spraying robot (8), priming paint spraying detection frock (9), priming paint heating cabinet (10), finish paint spraying robot (11), finish paint spraying detection frock (12), finish paint heating cabinet (13), cooler bin (14), wait for position (15) and lower position (16).
2. A painting line according to claim 1, characterised in that: the automatic workpiece loading device is characterized in that stoppers are arranged on the workpiece loading position (4), the product caching tool (5), the product installation detection tool (6), the preheating box (7), the primer spraying robot (8), the primer spraying detection tool (9), the primer heating box (10), the finish spraying robot (11), the finish spraying detection tool (12), the finish heating box (13), the cooling box (14), the waiting position (15) and the workpiece unloading position (16).
3. A painting line according to claim 1, characterised in that: a shunting branch (3) is additionally arranged between the finish paint spraying detection tool (12) and the finish paint heating box (13).
4. A painting line according to claim 1, characterised in that: the preheating time of the primer heating box (10) to the primer is 2min, and the temperature is 60-80 ℃.
5. A painting line according to claim 1, characterised in that: the time for curing the finish paint by the finish paint heating box (13) is 6min, and the temperature is 150 ℃.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220111240.9U CN216800281U (en) | 2022-01-17 | 2022-01-17 | Spraying production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220111240.9U CN216800281U (en) | 2022-01-17 | 2022-01-17 | Spraying production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216800281U true CN216800281U (en) | 2022-06-24 |
Family
ID=82063992
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220111240.9U Active CN216800281U (en) | 2022-01-17 | 2022-01-17 | Spraying production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216800281U (en) |
-
2022
- 2022-01-17 CN CN202220111240.9U patent/CN216800281U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102785042B (en) | Automatic welding system for truck frame | |
CN201930885U (en) | Production system for seamless connection of coating production line and coating piece cleaning production line | |
CN106269956B (en) | A kind of shaping process of light-alloy profile | |
CN107812649A (en) | A kind of full-automatic spraying production line and its operation method | |
CN106112561B (en) | A kind of transformer oil box assembly line and its production method | |
US20100266782A1 (en) | Method of powder coating-multiple layer powder applications of thermoset powder in a single booth for conductive and non-conductive substrates | |
CN105821363A (en) | Full-automatic hot galvanizing production line | |
CN216800281U (en) | Spraying production line | |
CN109624188B (en) | Intelligent production process of bumper assembly | |
CN115889059A (en) | Workpiece water-based paint coating production line and process | |
CN106031970A (en) | Manufacturing method of container | |
CN211587239U (en) | Full-automatic UV spraying production line | |
CN106179857B (en) | It is a kind of suitable for small batch, the automatic coating system and method for multi items components | |
CN210333132U (en) | SMC goods automatic spraying production line | |
CN108537310B (en) | Cast iron pipe production system and pipe number marking and tracking management method thereof | |
CN212051137U (en) | Continuous automatic negative pressure plate production line | |
CN209985624U (en) | Automatic surface paint spraying treatment device for hardware | |
CN209597566U (en) | A kind of aluminum component nylon coated machine | |
CN215784392U (en) | Production line for coating mold release agent | |
CN208714525U (en) | A kind of outer 3PE anticorrosion equipment of Himaya pipe | |
CN216025720U (en) | Multi-station upper and lower piece practical spraying equipment | |
CN212335332U (en) | Automatic storage electrophoresis coating production line for automobile parts | |
CN110815535A (en) | Wallboard production line | |
JPH09276988A (en) | Apparatus for automatically coating core for cast iron tube | |
CN214950486U (en) | Automatic blow-drying control device of electrolytic water burr spraying machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |