CN216787194U - Novel structure is administered to collecting space area shaft tower basis - Google Patents

Novel structure is administered to collecting space area shaft tower basis Download PDF

Info

Publication number
CN216787194U
CN216787194U CN202221242563.8U CN202221242563U CN216787194U CN 216787194 U CN216787194 U CN 216787194U CN 202221242563 U CN202221242563 U CN 202221242563U CN 216787194 U CN216787194 U CN 216787194U
Authority
CN
China
Prior art keywords
tower foundation
upper beam
tower
novel structure
underbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221242563.8U
Other languages
Chinese (zh)
Inventor
杨俊龙
薛康康
侯永刚
陈天新
范建冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Longxin Power Engineering Co ltd
Original Assignee
Zezhou Juxian Labor Dispatch Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zezhou Juxian Labor Dispatch Co ltd filed Critical Zezhou Juxian Labor Dispatch Co ltd
Priority to CN202221242563.8U priority Critical patent/CN216787194U/en
Application granted granted Critical
Publication of CN216787194U publication Critical patent/CN216787194U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a novel structure for managing a tower foundation in a goaf, belongs to the field of high-voltage transmission tower foundation engineering, and aims to reinforce and manage the tower foundation in a high-voltage transmission manner and prevent the safe and stable operation of an iron tower from being influenced by surface subsidence caused by artificial or natural disasters, wherein the adopted technical scheme is as follows: including upper beam, underbeam and base, the upper beam runs through former shaft tower basis and sets up, and the underbeam is the octagon, with upper beam fixed connection, and is provided with the pillar under upper beam and underbeam junction, pillar bottom fixed connection on the base, and the base is fixed in ground, and whole structure is three-layer down in the top. The utility model can not damage the original tower foundation during construction, can control the root opening of the tower foundation to keep stable, has stronger collapse resistance, and is convenient and safe to construct.

Description

Novel structure is administered to collecting space area shaft tower basis
Technical Field
The utility model relates to the field of high-voltage transmission tower foundation engineering, in particular to a novel structure for managing a goaf tower foundation.
Background
The overhead tower is a main structure of a long-distance high-voltage power transmission mode in China, and the safety and reliability degree of the overhead tower is directly related to the safety operation of the whole power grid line. The overhead pole tower is mostly built in mountains and jungles, as the types of regions in natural environment are greatly different, such as common soft soil foundation, loess foundation and the like, the mechanical properties of different foundations are different, the influence degrees of the foundations are different due to natural disasters, accidents such as inclination and tower collapse of the transmission line pole tower are easily caused indirectly, in addition, in recent years, the urban construction speed is accelerated, the underground mining, the underground space development and other construction are frequent, the pole tower foundation is threatened more, and the proper pole tower foundation reinforcing mode is adopted, so that the overhead pole tower plays an important role in improving the operation level of a power grid and maintaining the safety and stability of the overhead pole tower.
Present reinforcement basis is mostly single-layer or bilayer structure, and generally directly sets up spud or pillar in upper beam below or former pole tower foundation below, and anti ability and stability of collapsing are relatively poor, and can cause destruction to former pole tower foundation when setting up the spud in former foundation below, and the security during the construction also can't guarantee completely.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects in the prior art, the utility model provides a novel structure for managing the tower foundation in the goaf, which can be used for reinforcement construction without damaging the original tower foundation and has higher stability.
The application provides a pair of collecting space area shaft tower basis administers novel structure adopts following technical scheme:
the utility model provides a novel structure is administered to collecting space area shaft tower basis, includes upper beam, underbeam and base, and the upper beam runs through former shaft tower basis setting, and the underbeam is the octagon, and upper beam and underbeam junction are provided with the pillar under, pillar bottom fixed connection on the base, and the base is fixed in ground, and whole structure is three-layer about in the top and middle.
Furthermore, the number of the upper beams is four, every two upper beams are vertically connected, and the joints are located on the original tower foundation.
Furthermore, the lower beam is integrally formed, and the joints of the upper beam and the lower beam are positioned at the corners of the lower beam structure.
Furthermore, a reinforcing column extending in the circumferential direction is arranged on the outer side of the original pole tower foundation.
Furthermore, the upper beam and the lower beam are connected and fixed by adopting foundation screws.
Compared with the prior art, the technical scheme of the utility model can not damage the original tower foundation when reinforcing and treating the goaf tower foundation; the upper beam is designed to cross the tower foundation, so that the root opening of the tower foundation can be controlled to be stable; the firmness of the upper beam during adjustment can be better improved by the extension design of the original foundation outer side reinforcing column; the lower beam is designed in an octagonal integrated manner, so that the structure is more stable, the space position between the upper beam and the lower beam is wide, and the adjustment is convenient; the whole structure forms a whole through the fixed connection between every two, so that the pole tower foundation cannot incline and slide when a certain part of geology collapses. The whole structure has higher stability, stronger collapse resistance, convenient construction and higher safety.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment of the present application;
FIG. 2 is a top view of an embodiment of the present application;
fig. 3 is a front view of an embodiment of the present application.
Description of reference numerals: 1-reinforcing column, 2-upper beam, 3-lower beam, 4-pillar, 5-base, 6-foundation screw and 7-original pole and tower foundation.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1-3, the utility model mainly comprises a reinforcing column 1, an upper beam 2, a lower beam 3, a pillar 4, a base 5 and anchor screws 6, and is used for reinforcing an original tower foundation 7. Wherein the reinforcing column 1 is formed by circumferentially extending and reinforcing 300mm on the periphery of the original pole tower foundation 7; the upper beams 2 are 4 in number, penetrate through the original tower foundation 7, are vertically connected in pairs, and are positioned at the original tower foundation 7; the lower beam 3 is an integrally formed octagonal foundation and is fixedly connected with the upper beam 2 through foundation screws 6, and the joints are positioned at the corners of the lower beam 3; the strut 4 is arranged right below the joint of the upper beam 2 and the lower beam 3 and penetrates through the upper beam 2 and the lower beam 3; the base 5 is fixedly connected to the position right below the support 4, and the lower surface thereof is connected to the ground.
The utility model is adopted to carry out reinforcement treatment on the tower foundation in the goaf, so that the original tower foundation can not be damaged; the upper beam is designed to cross the tower foundation, so that the root opening of the tower foundation can be controlled to be stable; the firmness of the upper beam during adjustment can be better improved by the extension design of the original foundation outer side reinforcing column; the lower beam is in octagonal integrated design, so that the structure is more stable, and the space position between the upper beam and the lower beam is wide, so that the adjustment is convenient; the whole structure forms a whole through the fixed connection between every two, so that the pole tower foundation cannot incline and slide when a certain part of geology collapses.
The above is a preferred embodiment of the present application, and the scope of protection of the present application is not limited by the above, so: all equivalent changes in the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (5)

1. The utility model provides a novel structure is administered to collecting space area shaft tower basis which characterized in that: including upper beam, underbeam and base, the upper beam runs through former shaft tower basis and sets up, and the underbeam is the octagon, with upper beam fixed connection, and is provided with the pillar under upper beam and underbeam junction, pillar bottom fixed connection on the base, and the base is fixed in ground, and whole structure is three-layer down in the top.
2. The novel structure of goaf tower foundation treatment of claim 1, characterized in that: the upper beams are four in number, every two of the upper beams are vertically connected, and the joints are located at the original tower foundation.
3. The novel structure of goaf tower foundation treatment of claim 1, characterized in that: the lower beam is integrally formed, and the joints of the upper beam and the lower beam are positioned at the corners of the lower beam structure.
4. The novel structure of goaf tower foundation treatment of claim 1, characterized in that: and a reinforcing column extending in the circumferential direction is arranged on the outer side of the original rod tower foundation.
5. The novel structure of goaf tower foundation treatment of claim 1, characterized in that: the upper beam and the lower beam are connected and fixed by adopting foundation screws.
CN202221242563.8U 2022-05-23 2022-05-23 Novel structure is administered to collecting space area shaft tower basis Active CN216787194U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221242563.8U CN216787194U (en) 2022-05-23 2022-05-23 Novel structure is administered to collecting space area shaft tower basis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221242563.8U CN216787194U (en) 2022-05-23 2022-05-23 Novel structure is administered to collecting space area shaft tower basis

Publications (1)

Publication Number Publication Date
CN216787194U true CN216787194U (en) 2022-06-21

Family

ID=82001978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221242563.8U Active CN216787194U (en) 2022-05-23 2022-05-23 Novel structure is administered to collecting space area shaft tower basis

Country Status (1)

Country Link
CN (1) CN216787194U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114991198A (en) * 2022-08-03 2022-09-02 山西龙炘电力工程有限公司 Goaf transmission tower foundation and foundation reinforcing and adjusting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114991198A (en) * 2022-08-03 2022-09-02 山西龙炘电力工程有限公司 Goaf transmission tower foundation and foundation reinforcing and adjusting method

Similar Documents

Publication Publication Date Title
CN205776249U (en) A kind of combined inner supporting structure
CN206768834U (en) A kind of deep basal pit combined support structure
CN216787194U (en) Novel structure is administered to collecting space area shaft tower basis
CN203729308U (en) Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall
CN205975658U (en) Steel platform tower crane foundation
CN103590408A (en) Novel double-row pile beam vertical anchor supporting system and construction method thereof
CN103103988A (en) Foundation ditch construction method of horizontal bracing structure of central island floor slaps
CN103485351A (en) Inclined pile vertical anchor rod supporting structure for foundation pit supporting and construction method thereof
CN103469803A (en) Pile beam vertical anchor support system used for supporting foundation pit and construction method of pile beam vertical anchor support system
CN108978677A (en) Deep pit digging combined support structure under complicated landform
CN111501771A (en) Application method of multi-elliptical-ring combined support in deep large-sludge foundation pit engineering
CN207525758U (en) A kind of reinforced Structure About Soldier Pile
CN203498841U (en) Inclined pile vertical anchor rod supporting structure used for foundation pit supporting
CN111962910B (en) Building underpinning foundation rotating displacement rectification method
CN108755702A (en) A kind of higher soft soil foundation foundation ditch strengthening processing method of level of ground water
CN107227741A (en) Basement supporting construction
CN203498842U (en) Pile beam vertical anchor supporting system used for foundation pit supporting
CN203583496U (en) Novel double-row-pile-beam vertical anchor supporting system
CN202830969U (en) Rectifying and reinforcing structure of cantilever retaining wall
CN212656252U (en) Novel transmission line tower foundation
CN209780906U (en) Tunnel hole-entering structure
CN209523202U (en) Foundation pit supporting anchor pulling structure
CN206625233U (en) The support-replacing system of the outer existing structures of foundation ditch in foundation pit construction
CN109706909A (en) The structures foundation reinforcing structure and its construction method worn under reply metro shield
CN216664144U (en) Downward-penetrating tunnel structure for preventing lateral deformation of overpass pile foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220726

Address after: 030006 room 718, Dasheng science and technology building, No. 303 Changzhi Road, Xiaodian District, Taiyuan City, Shanxi Province

Patentee after: Shanxi Longxin Power Engineering Co.,Ltd.

Address before: 048000 No. 19, Zhongzhuang street, Zhongzhuang village, Lichuan Town, Zezhou County, Jincheng City, Shanxi Province

Patentee before: Zezhou Juxian labor dispatch Co.,Ltd.

TR01 Transfer of patent right